Development of Next-Generation Vertical GaN Devices for High-Power-Density Electric Drivetrain.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Wear related failures of spherical roller bearings in the main bearing position of three-point mount wind turbines have been higher than expected and can contribute to higher than anticipated operation-and-maintenance costs. In this paper, the operational conditions of such a main bearing, including measured axial displacement and velocity subject to the estimated axial loads are described for an instrumented, commercial wind turbine. The field measurements suggest a maximum axial speed between the bearing rings that is less than 2 millimeters per second. It is estimated that the axial speed between the ring and rollers is approximately 25% of this value. When compared to a speed of rolling from approximately 200-352 millimeters per second, the measured axial sliding is therefore significantly less than 1% of the speed of rolling. Previous numerical studies of lubricant film formation in rolling contacts have shown that the effect of axial sliding starts to be noticeable only when this ratio exceeds 10%; therefore, the axial velocity represents only a small disturbance to the nominal pure rolling case, and the influence on oil film building can be neglected. A simple analytic model of the main bearing motion was also developed and demonstrated similar displacement and velocity characteristics.
Abstract not provided.
The following submission includes processed laboratory data from NREL's Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC), in the form of MATLAB workspaces. This dataset was created using NREL's Large Amplitude Motion Platform (LAMP) and collected between August and September 2023. Included with this submission is a test log of all the processed data "HERO WEC LAMP test run log.xlsx" so that the user can easily find the data of interest. Additionally, more detailed descriptions of the type of data and how it was processed, or calculated, can be found in the document titled "Lamp Data Description.docx". The MATLAB workspaces can be visualized using the file "LAMP_Data_Viewer_Ver2.m/mlx". The user simply needs to upload the workspace of interest and run the file "LAMP_Data_Viewer_Ver2.m/mlx". Both the .m and .mlx file format has been provided depending on the user's preference. The MATLAB workspaces have been separated into zip files corresponding to either Drivetrain, Hydraulic, or Electric configuration runs representing the respective test cases that were run. The drivetrain runs were used to characterize the drivetrain only (no pump or generator). The Hydraulic runs represent the configuration when the seawater pump is installed, and the Electric runs represents the configuration when the generator is installed. The following sub-categories of data are included for each type: - DW - Deep water sine wave profile (not run in drivetrain configuration) - Heave - Heave only sine wave profile - Heave_NoRO (hydraulic configuration only) - Heave_ACC (hydraulic configuration only) - IR - Surge and heave irregular wave profile (not run in drivetrain configuration) - RW - Heave only profile created from real world encoder data (not run in drivetrain configuration) For those interested in the raw, unprocessed, data the authors have created a separate submission, linked below. This submission includes the raw TDMS files and associated files necessary to translate the data into either python or MATLAB formats. This data set has been developed by the National Renewable Energy Laboratory, operated by Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.
This submission contains the original, unprocessed data from the 2023 Large Amplitude Motion Platform (LAMP) testing of NREL's Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC). This data serves as a companion to MHKDR #520. Data was collected using NREL's Modular Ocean Data AcQuisition (MODAQ) system in TDMS format. Specifications of TDMS files can be found on the NI website. The TDMS files have been separated into zip files corresponding to either Drivetrain, Hydraulic, or Electric configuration runs representing the respective test cases that were run. The drivetrain runs were used to characterize the drivetrain only (no pump or generator). The Hydraulic runs represent the configuration when the seawater pump is installed, and the Electric runs represents the configuration when the generator is installed. The following sub-categories of data are included for each type: - DW - Deep water (monochromatic sine wave) profile (not run in drivetrain configuration) - Heave - Heave only (monochromatic sine wave) profile - Heave_NoRO (hydraulic configuration only) - Heave_ACC (hydraulic configuration only) - IR - Surge and heave irregular wave profile (not run in drivetrain configuration) - RW - Heave only profile created from real world encoder data (not run in drivetrain configuration) Reference documents: - "HERO WEC Lamp Test Run Log.xlsx": contains specifications for each test run - "Lamp Data Description.docx": provides detailed information about data types and processing methods For those interested in the processed data the authors have created a separate submission, MHKDR #520, linked below. This data set has been developed by the National Renewable Energy Laboratory, operated by Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.
An axial load management system for a turbomachine including a rotating drivetrain, a thrust bearing assembly, a sensor, and a valve supply line. The rotating drivetrain includes a compressor section and an expander section fluidly coupled together by a closed flowpath. The thrust bearing assembly includes a thrust runner, a thrust bearing housing, and a gas thrust bearing extending between the thrust runner and the thrust bearing housing. Further, the gas thrust bearing supports the rotating drivetrain. The sensor is attached to at least one of the thrust bearing housing or the gas thrust bearing. The valve supply line is fluidly coupled to the closed flowpath. A valve positioned within the valve supply line selectively allows a working fluid to flow between the closed flowpath and a thrust chamber defined by a rotating surface and a fixed surface to modify an axial load on the rotating drivetrain.
The integration of the inverter-based renewable energy resources is increasing and replacing conventional synchronous generators in the evolving bulk power system (BPS), impacting the system inertia along the way. Also, the limited over-current capability of power electronic converters continues to deteriorate the grid strength of the evolving power systems. Type-5 wind turbines have the potential to mitigate these problems because this configuration interfaces with the grid through a synchronous generator; hence, its operation and consequent grid impacts might mimic the conventional synchronous generator. The drivetrain of this type of turbines, however, is different from the more common Type-3 and Type-4 turbines. A hydraulic torque converter and gearbox with torque limiting feature are integral parts of a Type-5 wind turbine drivetrain, to isolate the wind speed variations at the wind turbine rotor from the grid connected generator side. This supports the synchronous operation of the generator. However, high fidelity models of Type-5 wind turbine drivetrain including these core components are not openly and widely available for grid integration and transient stability studies. Moreover, Type-5 turbines are not commonly deployed and hence its power generation and frequency stability characteristics are not widely publicized. This hinders appropriate assessment of Type-5 wind power plant's contribution to bulk grid resilience. This work provides transient stability assessment of a standalone Type-5 wind turbine. Normal operation and grid transient studies are performed to see the step load change and wind speed disturbance impacts on the Type-5 drivetrain and generation dispatch. Preliminary results show that Type-5 wind turbines can support load changes of between 0.6 p.u to 1.15 p.u. Beyond this point, the synchronization of the generator starts to deviate from its set point.
A simple co-design example in a reduced parameter space is presented for an oscillating flap device. Initially, the WEC geometry and mass properties are considered along with drivetrain gear ratio, inertia, motor constant and stiffness under both PI and optimal control. This parameter space is reduced to those to which performance is most sensitive for a fixed geometry. The gear ratio, drivetrain stiffness, and flap mass are found to be the most impactful design criteria as they can create orders of magnitude variations in power performance. The performance of the optimized system is compared with several sub-optimal variants in terms of electrical and mechanical power capture, transmission coefficients, and transducer power gain. Notably, though substantial power capture improvements are demonstrated when an optimal controller is employed, this power capture remains sensitive to appropriate selections of drivetrain and flap design parameters, implying that control co-design procedures remain necessary for high-performing WECs. Furthermore, a number of practical caveats and extensions to the presented co-design methodology are suggested, including the characterization of system static friction, especially in the presence of high gear ratios.
Electrification of drivetrain systems is now seen as a major opportunity by the transportation industry across the globe to reduce the greenhouse gas emissions and revolutionize the travel patterns of millions of people. The cumulative number of plug-in hybrid and battery electric vehicles (EVs) sold in the United States has now surpassed 2 million in 2021, according to the International Energy Agency. The introduction of EVs in different classes of passenger vehicles and the continued drop in prices spurred by government incentives have attracted the attention of consumers despite certain barriers, such as higher initial cost and range anxiety. In the United States, the EV market share is now growing at an exponential pace, with the domestic automakers allocating a lion's share of new and future car sales to EVs. Additionally, different market studies project decreasing cost and rising sales of medium- and heavy-duty electric trucks. Although electrification initiatives are strongly pursued in the on-road passenger vehicle market, off-highway sectors, such as construction, mining, and agriculture, are also gradually implementing electric drivetrain technologies in their machineries. As EVs grow in popularity on a global scale, innovative drivetrain technologies must meet the increasing energy demand by significantly increasing system efficiency.
NREL is the only organization in the US that is accredited to conduct tests of wind turbine systems and components in accordance with International Electrotechnical Commission (IEC) test standards. The National Wind Technology Center houses the only full-scale wind turbine blade drivetrain test facilities in the US. To maintain these facilities, accreditation, and the acceptance of the wind industry, NREL must strive continuously to maintain and improve staff capabilities, procedures, facility and equipment. In addition, as wind turbines continue to increase in size, NREL must improve its capability to test the larger components associated with these new turbines. NREL is currently investigating methods to increase blade and drivetrain testing capabilities. Mitsubishi Power Systems (MPS) must also strive to meet the demands of the evolving wind energy industry by developing, proving and manufacturing new, cost-effective blades for its turbines. Mitsubishi has established a joint venture with TPI composites of Rhode Island for manufacturing blades to be installed on US wind turbines. There is an obvious advantage to test these prototype blades in a US facility. The NREL blade test facility is uniquely capable of fulfilling this need. In addition, NREL can provide other testing support to MPS through the use of its dynamometer facility for drivetrain testing and through the use of NREL’s field-testing capabilities for testing wind turbine systems. This CRADA provides the opportunity for both organizations to achieve critical goals in development of wind energy in the US. MPS obtains verification of its wind turbine components and system. NREL obtains improved test capabilities.
Heat engines employing fluid bearing assemblies hermetically sealed with a closed flowpath for a working fluid are generally disclosed. For example, the heat engine includes a rotating drivetrain and a fluid bearing assembly. The rotating drivetrain includes a compressor section, an expander section, and a heat exchanger. The compressor section and expander section together define at least in part a closed flowpath for the flow of a working fluid. The heat exchanger is thermally coupled to the closed flowpath for adding heat to the working fluid. The fluid bearing assembly is configured to utilize the working fluid to support the rotating drivetrain. Further, the fluid bearing assembly is hermetically sealed with the closed flowpath.
Hydrokinetic turbines (HKTs) hold great promise as a renewable energy source, but high maintenance costs and limited energy output hinder their widespread adoption. The lack of comprehensive research on HKT drivetrain designs creates a knowledge gap in enhancing generation efficiency and cost reduction. A model of the HKT system with a focus on electric drivetrains and power converters is required to address this knowledge gap. This paper first introduces a MATLAB-averaged model integrating electrical-mechanical-thermal domains and aging behaviors within multi-time frames. Then a PLECS model, which incorporates maximum power point tracking and dq reference framed control for AC-DC-AC power converters, is enriched by a dynamic thermal model to predict fast transients accurately. These models optimize the design at the component level, resulting in improved integrated system performance. Furthermore, the validation of the models is carried out through hardware experiments for the averaged model and hardware-in-the-loop testing for the dynamic model.
Increased wind turbine size raises unknowns related to structural flexibility. Moreover, moving to deeper waters, component reliability becomes more critical. This work investigates main bearing response dependence on drivetrain flexibility and wake impingement in a two-turbine wind farm. A 15-MW floating direct-drive turbine is considered. Large eddy simulations (LES) are employed to model neutral, stable and unstable atmospheric conditions at below-rated mean wind speed, while the engineering codes OpenFAST and FAST.Farm simulate turbine and wake behavior. Results indicate significant sensitivities in fatigue estimates to lateral distance between the upstream and downstream turbine. The trends are most substantial in stable conditions, where the waked downwind main bearing sees twice the fatigue damage estimates of the upstream turbine for one position and 50% for another. Main bearing fatigue sensitivity to drivetrain flexibility is minor, while properly including generator rotor inertia loads is important for the axial forces of the locating (axially fixed) bearing, especially in stable conditions.
Electrifying cars, buses, and trucks is an attractive means of reducing energy use and emissions because it involves more efficient drivetrain components and minimal restructuring of the transportation network. Transit buses, driving fixed routes, help minimize driver range anxiety by properly sizing energy storage systems. A major challenge to fully electrifying transit buses is providing the amount of energy they consume in a day of driving. To enable a full day of operation without charging, batteries need to be large, which could be expensive and heavy. This work utilizes real-world transit bus data used in a battery-electric drivetrain model to co-optimize charger locations, charger power levels, and vehicle battery sizes.
State fleets represent an enticing opportunity to explore the near-term feasibility of fleet electrification. In many instances, state fleet operations encompass a wide geographic area with fleet locations for many vehicles. Serving these wide areas will require a significant amount of energy and, in the case of electric vehicles (EVs), a significant level of charging power. The peak demand as a result of this charging demand is of interest for fleets, with impacts on both utility bills and installation costs ranking among some of the greatest concerns. The combination of a wide operational area and multiple fleet locations positions state fleets as ideal candidates to understand the impacts of vehicle charging on fleet operations. As the availability of electric drivetrains expands beyond light-duty sedans, fleets need to understand when it will be appropriate operationally and financially to start adding electric drivetrains to their fleets. Throughout this process, it will also be important to understand the charging implications of fleet electrification and the resulting impacts to facility electrical systems. To better understand these considerations, NREL contracted Sawatch Labs to analyze the role that increasing state fleet electrification may have on the charging demand at fleet parking facilities.
University fleets represent an enticing opportunity to explore the near-term feasibility of achieving net-zero-carbon emissions in transportation. In many instances, universities operate much like a small, self-contained ecosystem with all the same transportation needs as a larger municipality, but with a smaller geographic footprint. Their fleets often include a wide variety of vehicle types serving the campus, including low-speed vehicles (e.g., golf carts), light-duty sedans, SUVs, and pickups, as well as medium-duty trucks and delivery vehicles. The mix of vehicle and operational needs combined with broader activities related to net-zero campuses makes universities and colleges unique microcosms to determine the feasibility of and path to achieving net-zero fleets. As the availability of electric drivetrains expands beyond light-duty sedans, fleets need to understand when it will be operationally and financially appropriate to start adding electric drivetrains to their fleets. To better understand these opportunities, NREL contracted Sawatch Labs to analyze the role electric vehicles (EVs) can have in helping universities meet net-zero emissions and fleet sustainability goals they have instituted.
Wind turbine major systems (blades, pitch, main bearing, gearbox, and generator) are integrated into a composite system. Specifications for these systems and components are developed to achieve symmetry of operation, avoiding negative interaction. For instance, the main bearing, gearbox, and generator (drivetrain) components are interdependent, functioning in unison for efficient energy production. Hence, wind resource and grid interactions affecting the drivetrain impact the performance and reliability of the turbine generator. This paper discusses generator reliability covering the technology evolution over the last 20 years. EPRI's Wind Network for Enhanced Reliability (WinNER) web-based tool and Shermco Industries databases are presented, and conclusions are drawn regarding failures specific to generator design, manufacturing, and operating conditions. Additionally, this paper compares the life expectancy of stator-fed configurations and doubly fed generator systems.
As the U.S clean energy transition hinges on the growth of offshore wind, this is expected to be a major driver for innovations in manufacturing, material and design advancements to enable robust and cost-competitive wind turbines. The race to build larger and taller turbines rated 10 megawatts (MW) and beyond, has intensified pressure on OEMs in terms of logistics of handling and transporting large wind components, securing critical raw material as well as scaling up necessary domestic production infrastructure to meet the demand. There is increased interest in building lightweight, more efficient, and high-power dense drivetrains that will ease the burden on installation, minimize the raw material demand, increasing domestic sourceability. Despite good efficiency and reliability, existing drivetrain technologies such as direct-drive permanent magnet generators are heavy (> 300 tons), expensive, and often rely on large quantities of rare-earth permanent magnets (PMs), steel and copper.