Findings on subtask 3.3 – applicability of automated brine chemistry determinations for treatment and recovery processes through facility automation/modularization: engineering design study
Under the Energy & Environmental Research Center’s (EERC’s) ~$\$$22 million Phase II Brine Extraction and Storage Test (BEST) Program, a multimillion-dollar brine treatment technology test bed facility was established in western North Dakota to provide a platform for evaluating developing technologies and approaches for brine treatment and volume reduction. The initial facility, and associated research effort, was funded by the U.S. Department of Energy (DOE), with in-kind contributions provided by several industry participants and the state of North Dakota. Since its opening, the Brine Technology Test Facility (BTTF) has supported performance evaluations of desalination technologies capable of treating high-salinity produced water (PW) and enabled data collection for multiple approaches of PW management and critical material recovery. As part of the decommissioning process for the original project, facility ownership and liability were transferred to Select Water, which is providing the EERC with a continuing site access option for state or federal research and/or commercial technology development. This report documents the findings from a design study conducted by the EERC and the engineering firm that was originally contracted to design and construct the facility (Advanced Engineering and Environmental Services, LLC [AE2S]) that evaluated the current status of BTTF and its systems and developed a retrofit design to increase the facility’s capabilities through automation and modularization of its PW treatment infrastructure. The proposed retrofit will provide DOE and industry with an expanded range of conditioned PW that can be produced at the facility for evaluating fit-for-purpose water treatment technologies, online instrumentation for brine chemistry determination, and systems that recover critical materials like lithium and magnesium. The current facility consists of an 9600-square-foot facility that includes a 40-foot by 65-foot Class 1, Division 2-rated demonstration area and associated control rooms and lab-ready space capable of sourcing oil and gas PW and wastewater from industrial sources or tailoring brine compositions up to 300,000 mg/L total dissolved solids (TDS) and supplying them at rates up to 25 gpm for extended-duration technology demonstrations. The colocation of the facility with Select Water’s water management facilities allows for access and unloading of more than 10,000 bbl/day of trucked water delivered to site and associated access to on-site Class I and Class II brine disposal wells and nearby hazardous waste landfills operated and/or contracted by Select Water to dispose of concentrate and/or effluents associated with the testing.