Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Black-box optimization of a closed-circuit reverse osmosis system for desalination through extremum seeking control

We study the minimization of the cost function of a closed-circuit desalination reverse osmosis (CCRO) system, which is used for producing drinking water. The cost function is a trade-off between the specific energy consumption and the specific brine management cost. The extremum-seeking controller (ESC) manipulates the critical electric conductivity of the brine to minimize the cost function. Experiments were designed in which the composition of the feed salinity is increased to test the controller’s ability to converge to a new optimum. The ESC was able to shift the critical conductivity to a new optimum, which resulted in a 9% improvement in the cost function.

Chowdhury, Dhruba↗

Issues in NASA program and project management

This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Issues in NASA program and project management

This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Conceptual Cost Estimating

Kennedy Space Center data aid in efficient construction-cost managment. Report discusses development and use of NASA TR-1508, Kennedy Space Center Aerospace Construction price book for preparing conceptual budget, funding cost estimating, and preliminary cost engineering reports. Report based on actual bid prices and Government estimates.

Brown, J. A.↗

A universal co-solvent dilution strategy enables facile and cost-effective fabrication of perovskite photovoltaics

Cost management and toxic waste generation are two key issues that must be addressed before the commercialization of perovskite optoelectronic devices. We report a groundbreaking strategy for eco-friendly and cost-effective fabrication of highly efficient perovskite solar cells. This strategy involves the usage of a high volatility co-solvent, which dilutes perovskite precursors to a lower concentration (<0.5 M) while retaining similar film quality and device performance as a high concentration (>1.4 M) solution. More than 70% of toxic waste and material cost can be reduced. Mechanistic insights reveal ultra-rapid evaporation of the co-solvent together with beneficial alteration of the precursor colloidal chemistry upon dilution with co-solvent, which in-situ studies and theoretical simulations confirm. The co-solvent tuned precursor colloidal properties also contribute to the enhancement of the stability of precursor solution, which extends its processing window thus minimizing the waste. This strategy is universally successful across different perovskite compositions, and scales from small devices to large-scale modules using industrial spin-coating, potentially easing the lab-to-fab translation of perovskite technologies.

36 MATERIALS SCIENCE↗

Performance measurement: A tool for program control

Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.

Abell, Nancy↗

Studying Wind Loading on CSP Collectors to Improve Performance and Reliability

Electricity generation through Concentrating Solar-thermal Power (CSP) adds the advantage of thermal energy storage and heat production. CSP collector costs constitute nearly one-third of total plant costs. Managing wind loading, especially dynamic wind loading caused by the turbulent wind flow, is a significant design challenge. Traditional collector designs rely on wind tunnel experiments and numerical simulations, which do not fully capture dynamic effects. Here, we provide an overview of NREL's activities on wind loading on CSP collectors, aiming to improve their reliability and cost-efficiency. We present insights from field measurements at operational parabolic trough and power-tower CSP plants. Over two years, we measured turbulent wind fields and resulting structural loads in a parabolic trough plant, revealing wind, turbulence, and collector field interactions. Similar measurements are ongoing at the Crescent Dunes heliostat field. These campaigns show how atmospheric turbulence, wind direction, and collector orientation affect dynamic wind loading. Upwind collector structures can generate turbulent structures, causing fluctuating loads at downstream collectors, impacting fatigue lifetime and optical efficiency. Preliminary results indicate that interior collectors experience higher turning moments than those at the edges, suggesting higher drive wear. At Crescent Dunes, we use instrumented heliostats at the field's edge and interior to study the translation of turbulent wind to dynamic structural loads. The campaign is still ongoing, and we will present first findings. Another focus of our work is tying the experimental wind loading findings to optical performance of the collectors, using simulation tools. For example, we derive torsional errors of the parabolic troughs - the angular offset from the sun position along a collector row. This error is impacted by wind-induced mirror deformations. Future work will focus on continuing the measurement efforts and combining them with computational fluid dynamic simulations. By providing detailed field measurements and validated models, our efforts aim to enhance understanding of wind loading on CSP collectors, improving their structural integrity and optical performance.

CSP↗

Considerations in developing geographic informations systems based on low-cost digital image processing

The potential of digital image processing systems costing $20,000 or less for geographic information systems is assessed with the emphasis on the volume of data to be handled, the commercial hardware systems available, and the basic software for: (1) data entry, conversion and digitization; (2) georeferencing and geometric correction; (3) data structuring; (4) editing and updating; (5) analysis and retrieval; (6) output drivers; and (7) data management. Costs must also be considered as tangible and intangible factors.

Henderson, F. M.↗

Functionalized Mesoporous Carbon Materials for Effective Recovery of Rare Earth Elements from NdFeB Magnet Scrap

The increasing demand and high dependence on international supplies of rare earth elements (REEs) have prompted the US to explore alternative resources and sustainable technologies for domestic REE production. One potential resource is the secondary electronic and industrial wastes at DoD complexes and across the US. These hazardous wastes require high costs for the maintenance and remediation, but their high-REE contents offer unique opportunities for REE recovery. Current hydrometallurgical technologies for REE extraction are energy intensive and costly, with low REE recovery efficiency and the generation of hazardous secondary wastes. Thus, it is crucial to develop high efficiency and environmental-friendly technologies for REE extraction and recovery from the secondary wastes. This project aims to develop novel functionalized mesoporous carbon materials for effective recovery of REEs from NdFeB magnet scrap. The proposed novel functionalized materials will be applied in a solid-liquid separation platform that can effectively extract, recover and separate REEs from NdFeB magnet scrap (the current focus), but also from other secondary electronic/industrial wastes in the future, minimize the generation of secondary hazardous wastes, and offset the management costs for existing waste streams.

36 MATERIALS SCIENCE↗

Contact Graph Routing

Contact Graph Routing (CGR) is a dynamic routing system that computes routes through a time-varying topology of scheduled communication contacts in a network based on the DTN (Delay-Tolerant Networking) architecture. It is designed to enable dynamic selection of data transmission routes in a space network based on DTN. This dynamic responsiveness in route computation should be significantly more effective and less expensive than static routing, increasing total data return while at the same time reducing mission operations cost and risk. The basic strategy of CGR is to take advantage of the fact that, since flight mission communication operations are planned in detail, the communication routes between any pair of bundle agents in a population of nodes that have all been informed of one another's plans can be inferred from those plans rather than discovered via dialogue (which is impractical over long one-way-light-time space links). Messages that convey this planning information are used to construct contact graphs (time-varying models of network connectivity) from which CGR automatically computes efficient routes for bundles. Automatic route selection increases the flexibility and resilience of the space network, simplifying cross-support and reducing mission management costs. Note that there are no routing tables in Contact Graph Routing. The best route for a bundle destined for a given node may routinely be different from the best route for a different bundle destined for the same node, depending on bundle priority, bundle expiration time, and changes in the current lengths of transmission queues for neighboring nodes; routes must be computed individually for each bundle, from the Bundle Protocol agent's current network connectivity model for the bundle s destination node (the contact graph). Clearly this places a premium on optimizing the implementation of the route computation algorithm. The scalability of CGR to very large networks remains a research topic. The information carried by CGR contact plan messages is useful not only for dynamic route computation, but also for the implementation of rate control, congestion forecasting, transmission episode initiation and termination, timeout interval computation, and retransmission timer suspension and resumption.

Burleigh, Scott C.↗

Final Report on Aerosol Pretreatment Technology Performance and Benchmarking

Solvent-based post-combustion CO 2 capture (PCC) technology remains one of the leading methods to combat global CO 2 emissions produced from large-scale coal-fired power production. Advanced solventbased PCC technology has made significant improvements in design and performance that reduce capital and operating costs to enable its commercial use. Key to low cost, manageable logistics, and environmentally safe operation of solvent-based PCC technology are minimal solvent losses from the process through the treated gas stream exiting PCC plant absorbers. High flue gas aerosol particle concentrations (>10 5 particles/cm 3 ) for particles in the range of 70-200 nm have been shown to cause significant amine solvent losses for solvent-based PCC processes through several mechanisms including absorption of solvent and water into growing aerosol particles. Flue gas aerosol pretreatment technology is the only realistic and economically attractive method to reduce very high aerosol particle concentrations (>10 7 particles/cm 3 ) to enable solvent-based PCC for existing power plants lacking sufficient particle removal systems, such as baghouses. The overall goal of this project was to design, construct, independently test, and evaluate three flue gas aerosol pretreatment technologies identified to significantly reduce high aerosol particle concentrations (>10 7 particles/cm 3 ) in the 70-200 nm particle size range: (1) a novel, high-velocity water injection spray concept developed by RWE and tested by Linde, (2) an innovative electrostatic precipitator (ESP) device with optimized operating conditions developed by Washington University in St. Louis (WUSTL), and (3) a non-regenerative sorbent-based filter technology developed by InnoSepra for SO x and NO x removal from coal-fired power plant flue gas. Each technology has been validated with tests on 500-1000 scfm of actual coal-fired flue gas and evaluated in terms of particle removal efficiency (%), cost competitiveness, and environmental impact. Aerosol measurements were performed upstream and downstream of each aerosol reduction unit during independent testing of each technology using advanced instrumentation and analytical methods provided by WUSTL. To perform aerosol measurements, isokinetic probes were inserted into flanged pipes attached to the flue gas piping, and a small suction pump was used to sample gas containing aerosol particles. Aerosol particle number concentrations (# particles/cm 3 ) and size distributions were then measured using a scanning mobility particle sizer (SMPS, TSI Inc.) for very fine particles (<1,000 nm) and a particle counter manufactured by GRIMM for particles larger than 1,000 nm. This report summarizes the aerosol removal performance results from pilot scale testing of each technology. Performance results have been benchmarked against pre-defined targets and other flue gas aerosol pretreatment technologies with documented performance. Linde Gas North America LLC has been the prime contractor to DOE responsible for overall project management and provided the design for the high-velocity water spray-based aerosol removal technology based on a design concept developed by the German utility company RWE.

20 FOSSIL-FUELED POWER PLANTS↗

Design of the ECCE detector for the Electron Ion Collider

The EIC Comprehensive Chromodynamics Experiment (ECCE) detector has been designed to address the full scope of the proposed Electron Ion Collider (EIC) physics program as presented by the National Academy of Science and provide a deeper understanding of the quark-gluon structure of matter. To accomplish this, the ECCE detector offers nearly acceptance and energy coverage along with excellent tracking and particle identification. The ECCE detector was designed to be built within the budget envelope set out by the EIC project while simultaneously managing cost and schedule risks. Finally, this detector concept has been selected to be the basis for the EIC project detector.

47 OTHER INSTRUMENTATION↗

Energy-Efficient Microbial Electrochemical Lignin and Alkaline Hydroxide Recovery from DMR Black Liquor

Black liquor is a complex waste stream generated from the fast-expanding biorefinery industry, and the high management cost has been known as a major development barrier. In this work, we demonstrated a rationally designed 4-chamber microbial electrolysis process that was capable of recovering the value-added lignin, NaOH, and H2 products while removing waste organics from the Deacetylation and Mechanical Refining (DMR) black liquor, which could potentially reduce the disposal cost by up to 40%. The lab-scale MEC achieved 52% organic removal from a highly concentrated feedstock (28,960 ± 212 mg/L COD) and recovered 83.2 mM NaOH under a small voltage application (1.2 V). Lignin recovery was observed to be as high as 13.98 +/- 0.28 g/L, and 0.35 L/L/day H2 was produced with a faradaic efficiency of 93.5%. This work provided a good example on how complex liquid waste stream can be valorized via multi-functional microbial electrochemical technology, and how the traditionally unfavored pH gradient in an electrochemical reactor can be manipulated for lignin precipitation and alkaline recovery at the same time. The versatility and good performance in concurrent contaminants removal, lignin precipitation, H2 production and NaOH recovery demonstrate a good potential for microbial electrolysis in black liquor treatment.

BIOMASS FUELS,INORGANIC, ORGANIC, PHYSICAL, AND AN↗

Identification and Testing of Electric Vehicle Fast Charger Cybersecurity Mitigations

Fast-charging infrastructure for electric vehicles (EVs) is needed to enable and achieve the national goals of transitioning the vehicle fleet toward more electrification. Idaho National Laboratory, Oak Ridge National Laboratory, and the National Renewable Energy Laboratory (NREL) have jointly worked to identify, evaluate, and mitigate potential cyber-related consequences associated with fast charger systems. NREL contributed by considering cyberattack scenarios and consequences associated with integrating distributed energy resources (DERs) at fast-charging stations. The dynamic nature of fast-charger load profiles would encourage site operators to incorporate solar for energy cost reduction and energy storage for peak demand cost management at future charging facilities with multiple fast chargers at a site. These energy resources would be monitored and coordinated via a site energy management controller with data exchange between devices and local power metering infrastructure; thus, networking between devices and the design of the system becomes important in the overall cybersecurity posture. In addition, component vendors and system operators might have remote interfaces to any of these systems. It is therefore important to understand the breadth of the cyberattack surface and potential strategies to mitigate impacts. This project has focused on components and protocols expected to be found within a local charging site that includes multiple chargers and DER resources. Our methods and results are summarized in this final report.

42 ENGINEERING↗

Knowledge-Based Hazardous Waste Determinations for Solar Photovoltaic (PV) Modules: A Foundational Study

This report explores using "generator knowledge" to determine whether a solar photovoltaic (PV) module must be managed as hazardous waste prior to recycling or landfilling. Generator knowledge is a legal term and existing regulatory pathway for making a hazardous waste determination that has been used by other industries but is a relatively unknown option to the PV industry. In the United States, a hazardous waste determination often acts as a pre-requisite to recycle or landfill a PV module. The results of the hazardous waste determination dictate whether the PV module must be managed as hazardous waste or nonhazardous solid waste. Managing a PV module as hazardous waste requires compliance with stringent U.S. federal and state hazardous waste law. In addition to increased management costs, which can be ten times higher, legal liability for PV modules regulated as hazardous waste is also heightened with both civil and criminal penalties for noncompliance which includes making an inaccurate or faulty hazardous waste determination. The most common reason a PV module would be regulated as hazardous is if it contains a regulated metal in an amount that equals or exceeds the toxicity characteristic limits. To determine whether a PV module exhibits a hazardous characteristic, the regulated person/entity must "apply knowledge...in light of the materials and processes used." In the absence of adequate knowledge to determine whether the PV module is hazardous, it must be tested using Test Method 1311 Toxicity Characteristic Leaching Procedure (TCLP) or an equivalent EPA-approved method. Although TCLP is the predominant method used to today to make a hazardous waste determination for PV modules, evidence from this study concludes it is not practical to TCLP test every PV module even in a single utility-scale installation, and a scalable solution is needed. This study finds that knowledge-based hazardous waste determinations may allow a regulated person/entity to make a hazardous waste determination for more than one PV module at one time - making this regulatory pathway a potential scalable solution. Through legal analysis and interviews with 44 experts, the authors explore what it means to make an accurate knowledge-based hazardous determination for PV modules considering sources and forms of information as well as potential limitations. The work aims to provide a foundation for building consensus on whether knowledge-based hazardous determinations are a viable, scalable industry approach for solar.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Design Status and Experimental Strategy for Initial Molten Salt Irradiation Experiments in HFIR

The development and deployment of molten salt reactor (MSR) technologies require experimental capabilities that can evaluate molten fuel salt behavior and structural material performance under representative irradiation conditions. Although modeling and separate effects testing provide important insight, there remains a critical lack of in-pile data that capture the coupled effects of neutron irradiation, temperature, salt chemistry, and time. Informed by lessons learned from historical MSR programs and recent international irradiation efforts, this report presents a structured approach to addressing existing gaps in molten salt irradiation testing using the High Flux Isotope Reactor (HFIR). A phased irradiation strategy is presented that incrementally increases experimental complexity while managing cost, risk, and facility constraints. The framework progresses from passive, nonfueled static capsule experiments to fueled, instrumented, and ultimately circulating molten salt systems, providing a pathway for materials screening, mechanistic understanding, and qualification-relevant testing. The report defines a near-term Phase 1 passive capsule concept, associated irradiation conditions, and a conceptual post-irradiation examination strategy. Ongoing modeling, out-of-pile testing, and safety analysis activities are described to support continued capability maturation and to enable future phases of molten salt irradiation testing in support of MSR technology deployment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Earth Observatory Satellite system definition study. Report 7: EOS system definition report

The Earth Observatory Satellite (EOS) study is summarized to show the modular design of a general purpose spacecraft, a mission peculiar segment which performs the EOS-A mission, an Operations Control Center, a Data Processing Facility, and a design for Low Cost Readout Stations. The study verified the practicality and feasibility of the modularized spacecraft with the capability of supporting many missions in the Earth Observation spectrum. The various subjects considered in the summary are: (1) orbit/launch vehicle tradeoff studies and recommendations, (2) instrument constraints and interfaces, (3) design/cost tradeoff and recommendations, (4) low cost management approach and recommendations, (5) baseline system description and specifications, and (6) space shuttle utilization and interfaces.

Source record↗