Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost data analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

JPL multipolarization workstation - Hardware, software and examples of data analysis

A low-cost stand-alone interactive image processing workstation has been developed for operations on multipolarization JPL aircraft SAR data, as well as data from future spaceborne imaging radars. A recently developed data compression technique is used to reduce the data volume to 10 Mbytes, for a typical data set, so that interactive analysis may be accomplished in a timely and efficient manner on a supermicrocomputer. In addition to presenting a hardware description of the work station, attention is given to the software that has been developed. Three illustrative examples of data analysis are presented.

Burnette, Fred↗

Feasibility of Economic Analysis of Radiation Therapy Oncology Group (RTOG) 91-11 Using Medicare Data

Purpose: The specific aim of this analysis was to evaluate the feasibility of performing a cost-effectiveness analysis using Medicare data from patients treated on a randomized Phase III clinical trial. Methods and Materials: Cost data included Medicare Part A and Part B costs from all providers-inpatient, outpatient, skilled nursing facility, home health, hospice, and physicians-and were obtained from the Centers for Medicare and Medicaid Services for patients eligible for Medicare, treated on Radiation Therapy Oncology Group (RTOG) 9111 between 1992 and 1996. The 47-month expected discounted (annual discount rate of 3%) cost for each arm of the trial was calculated in 1996 dollars, with Kaplan-Meier sampling average estimates of survival probabilities for each month and mean monthly costs. Overall and disease-free survival was also discounted 3%/year. The analysis was performed from a payer's perspective. Incremental cost-effectiveness ratios were calculated comparing the chemotherapy arms to the radiation alone arm. Results: Of the 547 patients entered, Medicare cost data and clinical outcomes were available for 66 patients. Reasons for exclusion included no RTOG follow-up, Medicare HMO enrollment, no Medicare claims since trial entry, and trial entry after 1996. Differences existed between groups in tumor characteristics, toxicity, and survival, all which could affect resource utilization. Conclusions: Although we were able to test the methodology of economic analysis alongside a clinical trial using Medicare data, the results may be difficult to translate to the entire trial population because of non-random missing data. Methods to improve Medicare data capture and matching to clinical trial samples are required.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Tracking the Sun III; The Installed Cost of Photovoltaics in the United States from 1998-2009

Installations of solar photovoltaic (PV) systems have been growing at a rapid pace in recent years. In 2009, approximately 7,500 megawatts (MW) of PV were installed globally, up from approximately 6,000 MW in 2008, consisting primarily of grid-connected applications. With 335 MW of grid-connected PV capacity added in 2009, the United States was the world's fourth largest PV market in 2009, behind Germany, Italy, and Japan. The market for PV in the United States is driven by national, state, and local government incentives, including up-front cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy, and by the positive attributes of PV - modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the possible deployment of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. Despite the significant year-on-year growth, however, the share of global and U.S. electricity supply met with PV remains small, and annual PV additions are currently modest in the context of the overall electric system. To address this need, Lawrence Berkeley National Laboratory initiated a report series focused on describing trends in the installed cost of grid-connected PV systems in the United States. The present report, the third in the series, describes installed cost trends from 1998 through 2009, and provides preliminary cost data for systems installed in 2010. The analysis is based on project-level cost data from approximately 78,000 residential and non-residential PV systems in the U.S., all of which are installed at end-use customer facilities (herein referred to as 'customer-sited' systems). The combined capacity of systems in the data sample totals 874 MW, equal to 70% of all grid-connected PV capacity installed in the United States through 2009 and representing one of the most comprehensive sources of installed PV cost data for the U.S. The report also briefly compares recent PV installed costs in the United States to those in Germany and Japan. Finally, it should be noted that the analysis presented here focuses on descriptive trends in the underlying data, serving primarily to summarize the data in tabular and graphical form; later analysis may explore some of these trends with more-sophisticated statistical techniques. The report begins with a summary of the data collection methodology and resultant dataset (Section 2). The primary findings of the analysis are presented in Section 3, which describes trends in installed costs prior to receipt of any financial incentives: over time and by system size, component, state, system ownership type (customer-owned vs. third party-owned), host customer segment (residential vs. commercial vs. public-sector vs. non-profit), application (new construction vs. retrofit), and technology type (building-integrated vs. rack-mounted, crystalline silicon vs. thin-film, and tracking vs. fixed-axis). Section 4 presents additional findings related to trends in PV incentive levels over time and among states (focusing specifically on state and utility incentive programs as well as state and federal tax credits), and trends in the net installed cost paid by system owners after receipt of such incentives. Brief conclusions are offered in the final section, and several appendices provide additional details on the analysis methodology and additional tabular summaries of the data.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Q1 2023 U.S. Solar Photovoltaic System and Energy Storage Cost Benchmarks With Minimum Sustainable Price Analysis Data File

The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office (SETO) aims to accelerate the advancement and deployment of solar technology in support of an equitable transition to a decarbonized economy no later than 2050, starting with a decarbonized power sector by 2035. Its approach to achieving this goal includes driving innovations in technology, hardware, and soft cost reductions to make solar affordable and accessible for all. As part of this effort, SETO must track solar cost trends so it can focus its research and development (R&D) on the highest-impact activities. The benchmarks in this report are bottom-up cost estimates of all major inputs to PV and energy storage system installations. Bottom-up costs are based on national averages and do not necessarily represent typical costs in all local markets. Like last year's report, this year's report includes two distinct sets of benchmarks: minimum sustainable price (MSP) benchmarks and modeled market price (MMP) benchmarks. MSP benchmarks can be interpreted as the minimum price a company needs to charge to remain financially solvent in the long term based on the minimum sustainable prices of all inputs including minimum sustainable profit margins. MMP benchmarks can be interpreted as the actual cash sales price a company charges in the given benchmark period. These simplified estimates are useful for tracking technological progress, but they do not reflect all experiences. In fact, no individual estimate under any approach can reflect the diversity of the PV and storage manufacturing and installation industries.

14 SOLAR ENERGY↗

Final Technical Report: Amicus O&M Cooperative

Despite the maturation of the broader solar PV industry, the operations and maintenance (O&M) market segment is still relatively under developed. The lack of industry coherence jeopardizes the long-term performance of multiple gigawatts of installed capacity, and thus, the legitimacy of solar PV as a dependable source of electricity generation in the U.S. To address these challenges, the project team formed a new company, the Amicus Operations and Maintenance (O&M) Cooperative, whose mission is to ensure that solar PV fulfills its promise as a responsible and reliable energy source, for generations to come. Amicus O&M Cooperative created solutions to the market gaps by establishing a consistent level of O&M service offerings; standardizing scopes of work and legal agreements; training and certifying technicians; minimizing transaction costs for asset owners; and mitigating risk by creating redundancy in the companies who are able to perform work to these standards. We attracted double the number of member-companies originally forecast (goal: 10, actual: 20), broadening the reach of the service area, minimizing travel costs, and reducing response times for O&M services. We built a professional website and a software platform for managing work orders. Lastly, we have established multiple channels for communication among members, including monthly calls for sales topics and for technical/operational topics, an intranet for announcements/ questions/articles, and regular in-person meetings in association with the meetings of our sister cooperative, Amicus Solar. Throughout the project, participants sought feedback, input, and insights from stakeholders in the O&M market segment, including current and potential member-companies and potential clients. The problem statement above was confirmed many times over, with additional insight on the need for more workforce development, driving efficiency and lowering cost through better data analysis and remote diagnostics, and finding ways to reduce the cost of secondary and ancillary services as well (including items such as vegetation management and module cleaning). For solar to maintain its status as a reliable energy source – and for it to continue attracting investment – it must perform to expectation. This is where solar PV O&M technicians come into play. The cooperative helps them perform their work more cost effectively by streamlining “soft costs” including legal costs and work management, as well as reducing travel time and expenses. The new cooperative has demonstrated significant price reductions for O&M services relative to reported industry averages, which benefits clients directly and the public indirectly through cleaner air, economic development, and job growth.

14 SOLAR ENERGY↗

The vehicle design evaluation program - A computer-aided design procedure for transport aircraft

The vehicle design evaluation program is described. This program is a computer-aided design procedure that provides a vehicle synthesis capability for vehicle sizing, external load analysis, structural analysis, and cost evaluation. The vehicle sizing subprogram provides geometry, weight, and balance data for aircraft using JP, hydrogen, or methane fuels. The structural synthesis subprogram uses a multistation analysis for aerodynamic surfaces and fuselages to develop theoretical weights and geometric dimensions. The parts definition subprogram uses the geometric data from the structural analysis and develops the predicted fabrication dimensions, parts material raw stock buy requirements, and predicted actual weights. The cost analysis subprogram uses detail part data in conjunction with standard hours, realization factors, labor rates, and material data to develop the manufacturing costs. The program is used to evaluate overall design effects on subsonic commercial type aircraft due to parameter variations.

Oman, B. H.↗

Development and implementation of a low cost micro computer system for LANDSAT analysis and geographic data base applications

Since the implementation of the GRID and IMGRID computer programs for multivariate spatial analysis in the early 1970's, geographic data analysis subsequently moved from large computers to minicomputers and now to microcomputers with radical reduction in the costs associated with planning analyses. Programs designed to process LANDSAT data to be used as one element in a geographic data base were used once NIMGRID (new IMGRID), a raster oriented geographic information system, was implemented on the microcomputer. Programs for training field selection, supervised and unsupervised classification, and image enhancement were added. Enhancements to the color graphics capabilities of the microsystem allow display of three channels of LANDSAT data in color infrared format. The basic microcomputer hardware needed to perform NIMGRID and most LANDSAT analyses is listed as well as the software available for LANDSAT processing.

Faust, N.↗

An efficient Bayesian data-worth analysis using a multilevel Monte Carlo method

Improving the understanding of subsurface systems and thus reducing prediction uncertainty requires collection of data. As the collection of subsurface data is costly, it is important that the data collection scheme is cost-effective. Design of a cost-effective data collection scheme, i.e., data-worth analysis, requires quantifying model parameter, prediction, and both current and potential data uncertainties. Assessment of these uncertainties in large-scale stochastic subsurface hydrological model simulations using standard Monte Carlo (MC) sampling or surrogate modeling is extremely computationally intensive, sometimes even infeasible. In this paper, we propose an efficient Bayesian data-worth analysis using a multilevel Monte Carlo (MLMC) method. Compared to the standard MC that requires a significantly large number of high-fidelity model executions to achieve a prescribed accuracy in estimating expectations, the MLMC can substantially reduce computational costs using multifidelity approximations. Since the Bayesian data-worth analysis involves a great deal of expectation estimation, the cost saving of the MLMC in the assessment can be outstanding. While the proposed MLMC-based data-worth analysis is broadly applicable, we use it for a highly heterogeneous two-phase subsurface flow simulation to select an optimal candidate data set that gives the largest uncertainty reduction in predicting mass flow rates at four production wells. Finally, the choices made by the MLMC estimation are validated by the actual measurements of the potential data, and consistent with the standard MC estimation. But compared to the standard MC, the MLMC greatly reduces the computational costs.

97 MATHEMATICS AND COMPUTING↗

Low-Cost, User-Friendly, Rapid Analysis of Dynamic Data System Established

An issue of primary importance to the development of new jet and certain other airbreathing combined-cycle powered aircraft is the advancement of airframe-integrated propulsion technologies. Namely, engine inlets and their systems and subsystems are required to capture, convert, and deliver the atmospheric airflow demanded by such engines across their operating envelope in a form that can be used to provide efficient, stable thrust. This must be done while also minimizing aircraft drag and weight. Revolutionary inlet designs aided by new technologies are needed to enable new missions. An unwanted byproduct of pursuing these inlet technologies is increased time-variant airflow distortion. Such distortions reduce propulsion system stability, performance, operability, and life. To countermand these limitations and fully evaluate the resulting configurations, best practices dictate that this distortion be experimentally measured at large scale and analyzed. The required measurements consist of those made by an array of high-response pressure transducers located in the flow field at the aerodynamic interface plane (AIP) between the inlet and engine. Although the acquisition of the necessary pitot-pressure time histories is relatively straight-forward, until recent years, the analysis has proved to be very time-consuming, tedious, and expensive. To transform the analysis of these data into a tractable and timely proposition, researchers at the NASA Glenn Research Center created and established the Rapid Analysis of Dynamic Data (RADD) system. The system provides complete, near real-time analysis of time-varying inlet airflow distortion datasets with report quality output. This fully digital approach employs Institute of Electrical and Electronics Engineers (IEEE) binary data file format standardization to establish data-acquisition-system-independent processing on low cost personal computers. Features include invalid instrumentation code-out, logging, and multiple replacement schemes as needed for each channel of instrumentation. The AIP pressure distribution can be interpolated to simulate measurements by alternate AIP probe arrays, if desired. In addition, the RADD system provides for the application of filters that can be used to focus the analysis on the frequency range of interest.

Arend, David J.↗

Parallel In Situ Coupling of a Simulation with a Fully Featured Visualization System

There is a widening gap between compute performance and the ability to store computation results. Complex scientific codes are the most affected since they must save massive files containing meshes and fields for offline analysis. Time and storage costs instead dictate that data analysis and visualization be combined with the simulations themselves, being done in situ so data are transformed to a manageable size before they are stored. Earlier approaches to in situ processing involved combining specific visualization algorithms into the simulation code, limiting flexibility. We introduce a new library which instead allows a fully-featured visualization tool, VisIt, to request data as needed from the simulation and apply visualization algorithms in situ with minimal modification to the application code.

99 GENERAL AND MISCELLANEOUS↗

Production-quality Tools for Adaptive Mesh RefinementVisualization

Adaptive Mesh Refinement (AMR) is a highly effectivesimulation method for spanning a large range of spatiotemporal scales,such as astrophysical simulations that must accommodate ranges frominterstellar to sub-planetary. Most mainstream visualization tools stilllack support for AMR as a first class data type and AMR code teams usecustom built applications for AMR visualization. The Department ofEnergy's (DOE's) Science Discovery through Advanced Computing (SciDAC)Visualization and Analytics Center for Enabling Technologies (VACET) isextending and deploying VisIt, an open source visualization tool thataccommodates AMR as a first-class data type, for use asproduction-quality, parallel-capable AMR visual data analysisinfrastructure. This effort will help science teams that use AMR-basedsimulations and who develop their own AMR visual data analysis softwareto realize cost and labor savings.

99 GENERAL AND MISCELLANEOUS↗

STOCHASTIC OPTIMIZATION FOR LONG TERM CAPITAL STRUCTURES, SYSTEMS, AND COMPONENTS REFURBISHMENT AND REPLACEMENT

As commercial nuclear power plants (NPPs) pursue extended plant operations in the form of Second License Renewals (SLRs), opportunities exist for these plants to provide capital investments to ensure long-term, safe, and economic performance. Several utilities have already announced their intention to pursue extended operations for one or more of their NPPs via SLR2. The goal of this research is to develop a riskinformed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions in NPP operations. In order to prioritize project selection via a riskinformed approach we developed a single decision-making tool that integrates safety/reliability, cost, and stochastic optimization models to provide users with data analysis capabilities to more cost effectively manage plant assets. Both stochastic analysis methods—such as Monte Carlo-based sampling strategies—and multi-stage stochastic optimization strategies are employed to provide priority lists to decisionmakers in support of risk-informed decisions. We applied the proposed method to a trial application of projected replacement/refurbishment expenditures for plant capital assets (i.e., Structures, Systems, and Components [SSCs]). The objective is to optimize the SSC replacement/refurbishment schedule in terms of economic constraints, data uncertainties, and SSC reliability data, as well to generate a priority list for maximizing returns on investment.

42 ENGINEERING↗

Evaluation of the Super ESPC Program: Level 2 -- Recalculated Cost Savings

This report presents the results of Level 2 of a three-tiered evaluation of the U.S. Department of Energy Federal Energy Management Program's Super Energy Savings Performance Contract (Super ESPC) Program. Level 1 of the analysis studied all of the Super ESPC projects for which at least one Annual Measurement & Verification (M&V) Report had been produced by April 2006. For those 102 projects in aggregate, we found that the value of cost savings reported by the energy service company (ESCO) in the Annual M&V Reports was 108% of the cost savings guaranteed in the contracts. We also compared estimated energy savings (which are not guaranteed, but are the basis for the guaranteed cost savings) to the energy savings reported by the ESCO in the Annual M&V Report. In aggregate, reported energy savings were 99.8% of estimated energy savings on the basis of site energy, or 102% of estimated energy savings based on source energy. Level 2 focused on a random sample of 27 projects taken from the 102 Super ESPC projects studied in Level 1. The objectives were, for each project in the sample, to: repeat the calculations of the annual energy and cost savings in the most recent Annual M&V Report to validate the ESCO's results or correct any errors, and recalculate the value of the reported energy, water, and operations and maintenance (O&M) savings using actual utility prices paid at the project site instead of the 'contract' energy prices - the prices that are established in the project contract as those to be used by the ESCO to calculate the annual cost savings, which determine whether the guarantee has been met. Level 3 analysis will be conducted on three to five projects from the Level 2 sample that meet validity criteria for whole-building or whole-facility data analysis. This effort will verify energy and cost savings using statistical analysis of actual utility use, cost, and weather data. This approach, which can only be used for projects meeting particular validity criteria, is described in Shonder and Florita (2003) and Shonder and Hughes (2005). To address the first objective of the Level 2 analysis, we first assembled all the necessary information, and then repeated the ESCOs' calculations of reported annual cost savings. Only minor errors were encountered, the most common being the use of incorrect escalation rates to calculate utility prices or O&M savings. Altogether, our corrected calculations of the ESCO's reported cost savings were within 0.6% of the ESCOs' reported cost savings, and errors found were as likely to favor the government as they were the ESCO. To address the second objective, we gathered data on utility use and cost from central databases maintained by the Department of Defense and the General Services Administration, and directly from some of the sites, to determine the prices of natural gas and electricity actually paid at the sites during the periods addressed by the annual reports. We used these data to compare the actual utility costs at the sites to the contract utility prices. For natural gas, as expected, we found that prices had risen much faster than had been anticipated in the contracts. In 17 of the 18 projects for which the comparison was possible, contract gas prices were found to be lower than the average actual prices being paid. We conclude that overall in the program, the estimates of gas prices and gas price escalation rates used in the Super ESPC projects have been conservative. For electricity, it was possible to compare contract prices with the actual (estimated) marginal prices of electricity in 20 projects. In 14 of these projects, the overall contract electricity price was found to be lower than the marginal price of electricity paid to the serving utility. Thus it appears that conservative estimates of electricity prices and escalation rates have been used in the program as well. Finally we calculated the value of the reported energy savings using the prices of utilities actually paid by the sites instead of the contract prices. In 16 of the 22 projects (where this calculation was possible), the recalculated annual cost savings were greater than the annual cost savings reported by the ESCO. In the aggregate for the 22 projects analyzed, the annual cost savings calculated using actual energy prices were found to be 111% of the ESCO-reported savings. Using statistical methods to expand this estimate to the entire 102-project population of Super ESPC projects, we estimate that the total annual cost savings calculated using actual energy prices instead of contract energy prices are about 110% of the reported annual cost savings. We can combine the results of the Level 1 and Level 2 studies to estimate overall cost savings realized by the government for the entire 102-project population of Super ESPC projects examined in Level 1.

03 NATURAL GAS↗

Lessons Learned--MO&DA at JPL

The basic questions addressed in this paper are how to avoid future surprise growth in Mission Operations and Data Analysis (MO&DA) costs, and how to minimize total MO&DA costs for planetary missions. The context of this paper and its conclusions is in the arena of JPL mission operations support. The fundamental conclusion is that there is no simple, single solution: the entire Project life-cycle must be addressed.

MO&DA↗

Research study on stabilization and control. Modern sampled-data control theory: Stability analysis of the low cost large space telescope system

The pointing stability of the low-cost large space telescope (LST) system was investigated. The low-cost LST is characterized by the use of reaction wheels for the generation of control torques. Because of the critical requirement on the pointing accuracy of the LST, the nonlinear frictional characteristics of the bearings of the reaction wheels were studied which can cause limit cycles in a closed-loop system. Another possible source of pointing error in the LST is due to the effect of quantization and sensor noise. Since the LST is a digital system, digital to analog and analog to digital converters and sensors for positional and rate feedbacks were used. Sensor noise and amplitude quantization causes pointing error in the LST and, in addition, quantization is a nonlinear phenomenon which can cause self-sustained oscillations in the closed-loop system. The dynamic modeling of the single-axis LST is described, and several methods of evaluating the attitude error of the digital LST due to quantization and noise inputs are given.

Kuo, B. C.↗

Advanced Fuel Cycle Cost Basis

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗