Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Transformer Efficiency Assessment - Okinawa, Japan

The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of “key” transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturer’s factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCB’s actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Fuel Cycle Economic Tools, Algorithms, and Methodologies

The Advanced Fuel Cycle Initiative (AFCI) Systems Analysis supports engineering economic analyses and trade-studies, and requires a requisite reference cost basis to support adequate analysis rigor. In this regard, the AFCI program has created a reference set of economic documentation. The documentation consists of the “Advanced Fuel Cycle (AFC) Cost Basis” report (Shropshire, et al. 2007), “AFCI Economic Analysis” report, and the “AFCI Economic Tools, Algorithms, and Methodologies Report.” Together, these documents provide the reference cost basis, cost modeling basis, and methodologies needed to support AFCI economic analysis. The application of the reference cost data in the cost and econometric systems analysis models will be supported by this report. These methodologies include: the energy/environment/economic evaluation of nuclear technology penetration in the energy market—domestic and internationally—and impacts on AFCI facility deployment, uranium resource modeling to inform the front-end fuel cycle costs, facility first-of-a-kind to nth-of-a-kind learning with application to deployment of AFCI facilities, cost tradeoffs to meet nuclear non-proliferation requirements, and international nuclear facility supply/demand analysis. The economic analysis will be performed using two cost models. VISION.ECON will be used to evaluate and compare costs under dynamic conditions, consistent with the cases and analysis performed by the AFCI Systems Analysis team. Generation IV Excel Calculations of Nuclear Systems (G4-ECONS) will provide static (snapshot-in-time) cost analysis and will provide a check on the dynamic results. In future analysis, additional AFCI measures may be developed to show the value of AFCI in closing the fuel cycle. Comparisons can show AFCI in terms of reduced global proliferation (e.g., reduction in enrichment), greater sustainability through preservation of a natural resource (e.g., reduction in uranium ore depletion), value from weaning the U.S. from energy imports (e.g., measures of energy self-sufficiency), and minimization of future high level waste (HLW) repositories world-wide.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A cost and community perspective on the barriers to microbiome data reuse

Microbiome research is becoming a mature field with a wealth of data amassed from diverse ecosystems, yet the ability to fully leverage multi-omics data for reuse remains challenging. To provide a view into researchers’ behavior and attitudes towards data reuse, we surveyed over 700 microbiome researchers to evaluate data sharing and reuse challenges. We found that many researchers are impeded by difficulties with metadata records, challenges with processing and bioinformatics, and problems with data repository submissions. We also explored the cost constraints of data reuse at each step of the data reuse process to better understand “pain points” and to provide a more quantitative perspective from sixteen active researchers. The bioinformatics and data processing step was estimated to be the most time consuming, which aligns with some of the most frequently reported challenges from the community survey. From these two approaches, we present evidence-based recommendations for how to address data sharing and reuse challenges with concrete actions for future work.

59 BASIC BIOLOGICAL SCIENCES↗

Estimated capital costs of fish exclusion technologies for hydropower facilities

Hydropower is a reliable source of renewable energy, and its future expansion is likely to be in the form of either smaller new stream development (NSD) projects or powering existing non-powered dams. Thresholds for entrainment risk to fish and the requirements for fish exclusion at hydropower facilities often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders, but little quantitative information is present within the literature regarding the specific costs of fish exclusion measures. Cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening were identified using keyword searches of an existing environmental mitigation cost data set and manual extraction from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 p.m.&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens and represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with NSD projects. Results indicate highly variable costs are associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1–2 in.). These data provide an initial baseline for estimating exclusion costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects.

13 HYDRO ENERGY↗

Can developing countries leapfrog the centralized electrification paradigm?

Due to the rapidly decreasing costs of small renewable electricity generation 'systems, centralized power systems are no longer a necessary condition of universal access to modern energy services. Developing countries, where centralized electricity infrastructures are less developed, may be able to adopt these new technologies more quickly. We first review the costs of grid extension and distributed solar home systems (SHSs) as reported by a number of different studies. We then present a general analytic framework for analyzing the choice between extending the grid and implementing distributed solar home systems. Drawing upon reported grid expansion cost data for three specific regions, we demonstrate this framework by determining the electricity consumption levels at which the costs of provision through centralized and decentralized approaches are equivalent in these regions. We then calculate SHS capital costs that are necessary for these technologies provide each of five tiers of energy access, as defined by the United Nations Sustainable Energy for All initiative. Our results suggest that solar home systems can play an important role in achieving universal access to basic energy services. The extent of this role depends on three primary factors: SHS costs, grid expansion costs, and centralized generation costs. Given current technology costs, centralized systems will still be required to enable higher levels of consumption; however, cost reduction trends have the potential to disrupt this paradigm. By looking ahead rather than replicating older infrastructure styles, developing countries can leapfrog to a more distributed electricity service model. (C) 2016 International Energy Initiative. Published by Elsevier Inc. All rights reserved.

distributed electrification↗

DEVELOPMENT AND APPLICATION OF RISK ANALYSIS TOOLKIT FOR PLANT RESOURCE OPTIMIZATION

This paper presents the development of methods and tools that are being designed to optimize plant operations (e.g., maintenance/replacement schedules and optimal maintenance postures for plant components) in a manner that is more cost effective than current approaches and makes better use of available component health and cost data. These methods include both data- and model-based optimization methods. Model-based optimization methods directly include reliability and cost models to determine an optimal plant operational strategy. We consider gradient-based and evolutionary (based on genetic algorithms) optimization methods. The second class of methods target more specific use cases (e.g., project schedule optimization) and are not based on reliability models directly, but they require specific component reliability and cost data. This class of methods is based on variants of the knapsack problem with an aim to determine an optimal project schedule that maximizes the overall NPV. This paper also presents multi-objective methods designed to identify an optimal maintenance posture based on a Pareto frontier analysis. Rather than dictating the “right” tradeoff (i.e., identify the absolute best posture), we show how it is possible to perform a trade space exploration approach (i.e., identify value and costs of several postures and let the analysis account for desired value and cost metrics). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space. For all these methods we present detailed applicative examples that show their validity from a decision-making perspective.

97 - MATHEMATICS AND COMPUTING↗

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

Installations of solar photovoltaic (PV) systems have been growing at a rapid pace in recent years. In 2008, 5,948 MW of PV was installed globally, up from 2,826 MW in 2007, and was dominated by grid-connected applications. The United States was the world's third largest PV market in terms of annual capacity additions in 2008, behind Spain and Germany; 335 MW of PV was added in the U.S. in 2008, 293 MW of which came in the form of grid-connected installations. Despite the significant year-on-year growth, however, the share of global and U.S. electricity supply met with PV remains small, and annual PV additions are currently modest in the context of the overall electric system. The market for PV in the U.S. is driven by national, state, and local government incentives, including up-front cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and Federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy, and by the positive attributes of PV - modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the location of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. To address this need, Lawrence Berkeley National Laboratory initiated a report series focused on describing trends in the installed cost of grid-connected PV systems in the U.S. The present report, the second in the series, describes installed cost trends from 1998 through 2008. The analysis is based on project-level cost data from more than 52,000 residential and non-residential PV systems in the U.S., all of which are installed at end-use customer facilities (herein referred to as 'customer-sited' systems). The combined capacity of systems in the data sample totals 566 MW, equal to 71% of all grid-connected PV capacity installed in the U.S. through 2008, representing the most comprehensive source of installed PV cost data for the U.S.9 The report also briefly compares recent PV installed costs in the U.S. to those in Germany and Japan. Finally, it should be noted that the analysis presented here focuses on descriptive trends in the underlying data, and is primarily summarized in tabular and graphical form; later analysis may explore some of these trends with more-sophisticated statistical techniques. The report begins with a summary of the data collection methodology and resultant dataset (Section 2). The primary findings of the analysis are presented in Section 3, which describes trends in installed costs prior to receipt of any financial incentives: over time and by system size, component, state, customer segment (residential vs. commercial vs. public-sector vs. non-profit), application (new construction vs. retrofit), and technology type (building-integrated vs. rack-mounted, crystalline silicon vs. thin-film, and tracking vs. rack-mounted). Section 4 presents additional findings related to trends in PV incentive levels over time and among states (focusing specifically on state and utility incentive programs as well as state and Federal tax credits), and trends in the net installed cost paid by system owners after receipt of such incentives. Brief conclusions are offered in the final section.

14 SOLAR ENERGY↗

Tracking the Sun IV: An Historical Summary of the Installed Cost of Photovoltaics in the United States from 1998 to 2010

The present report describes installed cost trends for grid-connected PV projects installed from 1998 through 2010 (with some limited and preliminary results presented for projects installed in the first six months of 2011). The analysis is based on project-level cost data from approximately 116,500 residential, non-residential, and utility-sector PV systems in the United States. The inclusion of utility-sector PV is a new element in this year’s report. The combined capacity of all systems in the data sample totals 1,685 MW, equal to 79% of all grid-connected PV capacity installed in the United States through 2010 and representing one of the most comprehensive sources of installed PV cost data for the U.S. Based on this dataset, the report describes historical installed cost trends over time, and by location, market segment, technology type, and component. The report also briefly compares recent PV installed costs in the United States to those in Germany and Japan, and describes trends in customer incentives for PV installations and net installed costs after receipt of such incentives. The analysis presented here focuses on descriptive trends in the underlying data, serving primarily to summarize the data in tabular and graphical form.

14 SOLAR ENERGY↗

On-the-fly machine-learning for high-throughput experiments: search for rare-earth-free permanent magnets

Advanced materials characterization techniques with ever-growing data acquisition speed and storage capabilities represent a challenge in modern materials science, and new procedures to quickly assess and analyze the data are needed. Machine learning approaches are effective in reducing the complexity of data and rapidly homing in on the underlying trend in multi-dimensional data. Here, we show that by employing an algorithm called the mean shift theory to a large amount of diffraction data in high-throughput experimentation, one can streamline the process of delineating the structural evolution across compositional variations mapped on combinatorial libraries with minimal computational cost. Data collected at a synchrotron beamline are analyzed on the fly, and by integrating experimental data with the inorganic crystal structure database (ICSD), we can substantially enhance the accuracy in classifying the structural phases across ternary phase spaces. We have used this approach to identify a novel magnetic phase with enhanced magnetic anisotropy which is a candidate for rare-earth free permanent magnet.

Kusne, AG↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Small Hydro Reference Model Project (Final Project Report)

Small hydropower has long been developed in the United States, but still thousands of small hydro sites remain untapped. Most of them are technically and environmentally feasible but may not be cost-effective to develop at the current level of technology and carbon and fuel markets. This report aims to identify the cost drivers for small hydro generation through cost analyses, and to improve understanding of the pathways for cost reduction and the strategies for accelerating small hydro development in the United States. Reference to the empirical cost equations in literature, an initial capital cost (ICC) equation for nonpowered dam (NPD) and conduit projects has been preliminarily developed using limited project cost data collected from the Federal Energy Regulatory Commission (FERC) e-library and directly from industrial contacts. The regression analysis shows a correlation between the project ICC and plant capacity and head. The electro-mechanical equipment costs for Francis, axial flow, Kaplan, and propeller turbines are derived from the historical budget prices of a small hydro turbine manufacturer. These cost curves show the turbine-generator cost is also associated with the plant capacity and net head. In addition, the initial cost breakdowns are analyzed based on project cost data from literature and industry. It was found that the turbine-generator and the powerhouse are often the major cost components for low-head projects, whereas water conveyance is likely to be the key cost driver for high-head projects. The ICC variations for different site features, such as new greenfield sites vs. non-powered dams, are also discussed.

Zhang, Qin Fen (Katherine)↗

Decommissioning costs - some international perspectives and initiatives. Presentation for Panel discussion. Session No. 024: 'Getting a Handle on Decommissioning Costs - a Global Perspective'

Financing for decommissioning: Are the cost estimates valid? Are the financing arrangements suitable? Are the fund management systems appropriate? Cost estimates are estimated, analysed and updated on a regular basis, but cost comparisons are not straight-forward. There is an incomplete understanding of variability between estimates. Multiple internal and external factors impact estimates: Institutional, legal and policy, purpose, Strategies and plans, overall context, Facility characteristics and history Contingencies and risk, Limited actual cost data. The financing arrangements: there exists a range of systems in place for the implementation of Funding Policy and Strategy, but there are Considerable variations in: Calculating funding requirements, contributions/provisions, Allocating risks and requirements for securities Managing funds and accounting, adjusting the system, Managing disbursements, Reporting and supervision. All cost estimates for future decommissioning activities include considerable uncertainties. These uncertainties will gradually diminish with growing experience from current and planned projects. Different costing methods have different data requirements. Their reliability depends on the extent to which various data are available and applicable to the specific case being considered. Independent of the assessment method, some uncertainty is inevitable in all estimates of future costs. Analysis of the costing method may be useful in order to locate the key uncertainties in each specific estimate. NEA's Decommissioning Cost Estimation Group (DCEG) was Created in 2008 to foster the exchange of information and experience. It Aims to enhance the credibility, reliability, and auditability of the cost estimation process. It Helps define international good practices in decommissioning cost estimation. However, some major challenges remain. Weaknesses in: Understanding relations between estimates and actual costs, Lack of relevant cost data, sharing data. How might be addressed: Improved sharing of cost data, Systematic analyses of estimates and actual costs, Developing benchmarking approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Fuel Cycle Cost Basis Report: Module D1-1: Uranium-based Ceramic LWR Fuel Fabrication (Rev.2)

Cost module on LWR fuel fabrication to accompany the Advanced Fuel Cycle Cost Basis Report. In this update, we are adding detailed life cycle cost data and a calculated, levelized fabrication cost derived from a non-proprietary bottom-up estimate prepared in 1978 by Oak Ridge National Laboratory (ORNL) (Judkins and Olsen 1978a). In 2018, the 1978 ORNL estimate was escalated by SA&I authors to 2017 USD using factors that represent inflation, escalation above inflation typical of nuclear projects, and the effects of more stringent safety and environmental regulations. In this FY-21 document, the $/kgU results in 2017 USD from the unpublished 2018 interim study (Williams and Ganda 2018) can be escalated to 2020 USD using a factor of 1.052. The literature-based unit cost (or price) data from previous (2004–2017) AFC-CBRs are escalated to 2020 USD using factors from Chapter 8 of the main FY-21 AFC-CBR document. This data, in addition to the results of the updated bottom-up estimate, are used to define the “what-it-takes” (WIT) range for the unit fabrication costs for conventional ceramic UOX light-water reactor (LWR) fuel. This FY-23 document also includes calculated unit costs for accident-tolerant LWR fuels (ATFs) of three different types. Some of these fuels constitute a ceramic pelletized form with fuel meat uranium compounds other than UO2 (a.k.a.,. UOX), thus the change in the title of this module in which the word “UO2” is changed to “Uranium-based Ceramic.”

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Optics Enabled Networks and Architectures for Data Center Cost and Power Efficiency

Bandwidth demand for datacenter networks continues as performance increases and is further fueled by the exploding demand for AI and new HPC workloads. Managing power and costs will require a range of solutions including new networking and workload specialized architectures, composable systems and optical circuit switching. In this study we focus primarily on two topics, examining the benefits of flatter networks (enabled mainly by means of co-packaged-optics-enabled switches) and the utilization improvement potential for composable (disaggregated) systems, while discussing specialized hardware and networks, and optical circuit switching more briefly.

99 GENERAL AND MISCELLANEOUS↗

EverGREEN 2045: An Energy Mix to Decarbonize Washington State

Washington State’s future resource mix is likely to be comprised of intermittent renewables and carbon-free generation including hydropower by 2045. Generation will likely be comprised of wind, solar photovoltaic (PV), batteries, pumped storage hydropower (PSH), existing nuclear power plants, and potentially enhanced geothermal systems and advanced nuclear reactor technologies. To assess the cost and stability of the future resource mix, we partner with X-energy (advanced reactor design) and AltaRock Energy (enhanced geothermal system) for proprietary cost data. After estimating the costs of these two new technologies, we design plausible future resource mix scenarios to meet Washington State’s Clean Energy Transformation Act which transitions the state to carbon-free generation by 2045. We assess the cost and stability of the future resource mix with power system analysis tools, finding revenues are sufficient to cover variable operating and maintenance costs for most technologies providing power in 2030 and 2045, but capacity payments or power purchase agreements will likely be necessary for flexible resources, including enhanced geothermal systems and advanced nuclear reactors, to participate in the future resource mix.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessing 21st century contaminants of concern using integrative passive sampling devices to obtain more meaningful and cost-effective data on impacts from stormwater runoff

In many cases stormwater compliance monitoring is labor intensive, expensive, and largely unsuccessful in providing the data needed to support stormwater management goals. In addition, data from manual grab sampling and automated composite sampling are rarely collected in a manner that provides the information required to identify sources of contamination, evaluate the effectiveness of Best Management Practices, or inform effective decision making. Furthermore, monitoring is often driven by the need to meet low concentration benchmarks for metals and other constituents that do not take into account loading into the receiving waters, resulting in arbitrary monitoring requirements (monthly or seasonally) that are not tied to the driving forces within the watershed such as hydrology (flow regime), weather (storm events and antecedent dry periods), and upland land use and cover (Rosen and Johnston 2015, US Navy 2016).

stormwater, passive samplers, trace metals↗