Design of a status monitor using cost- effectiveness analysis
Cost effectiveness analysis for design of satellite ground station status monitor
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Cost effectiveness analysis for design of satellite ground station status monitor
Electrolyzer capital costs strongly influence the total levelized cost of hydrogen production and have implications for hydrogen deployment. Current electrolyzer costs are high, and large cost reductions may be needed to achieve competitive hydrogen costs and targets. Understanding pathways for cost reduction via R&D and deployment is a critical research area for informed energy planning and enabling hydrogen use. This work presents bottom-up cost estimates of polymer electrolyte membrane (PEM) electrolyzer systems tied to design specifications and discusses perspectives for cost reduction opportunities based on ongoing research. We use a detailed manufacturing and process model for a 1 MW PEM electrolyzer stack and balance of plant (BOP) for rigorous cost estimation. This allows for robust estimates of component and manufacturing costs and examination of key cost contributors. Stack costs are dominated by material costs such as iridium and platinum catalysts, especially at high manufacturing rates; power electronics and hydrogen purification equipment are the largest contributors to BOP cost. At higher manufacturing rates, better equipment utilization could reduce stack costs significantly, and we estimate that experience and bulk purchasing will allow for cost reductions to some BOP components. Still, many well-established BOP technologies and stack material costs are less likely to see significant cost reductions at high manufacturing rates. As such, manufacturing scale is limited in how much it can reduce electrolyzer costs, and additional advances for cost reduction may be needed to achieve cost targets. It will likely take many combined strategies to achieve significant cost reductions for electrolyzers and enable low-cost hydrogen production. We can use our manufacturing cost model to quantify potential cost reductions from the considerations described above and demonstrate pathways to lower cost electrolyzers. This allows for better understanding of cost reduction strategies and enables more informed research, development, and deployment for electrolyzers.
This report describes an activity-based cost estimation method, proposed for the Space Exploration Initiative (SEI), as an alternative to NASA's traditional mass-based cost estimation method. A case study demonstrates how the activity-based cost estimation technique can be used to identify the operations that have a significant impact on costs over the life cycle of the SEI. The case study yielded an operations cost of $101 billion for the 20-year span of the lunar surface operations for the Option 5a program architecture. In addition, the results indicated that the support and training costs for the missions were the greatest contributors to the annual cost estimates. A cost-sensitivity analysis of the cultural and architectural drivers determined that the length of training and the amount of support associated with the ground support personnel for mission activities are the most significant cost contributors.
This paper describes the methods used by NASA for finding the 'best' design approach for meeting the objectives of space exploration. Models of the design process and the role that cost analysis plays in the process are described. The state-of-the-art of cost estimating is discussed, and a cost model designed for the exploration initiative is presented. The Space Exploration Initiative is discussed, and a cost estimate presented.
Prestressed concrete (PC) poles are becoming popular choices to support coastal power transmission systems. However, the existing literature does not offer a detailed analysis of the effectiveness of PC poles in terms of long-term vulnerabilities and the direct and indirect costs. This is due to (1) lack of fragility models for PC poles and (2) lack of probabilistic wind, storm surge, and wave models in coastal settings. In this study, we address these gaps through a series of Monte Carlo simulations to estimate fragility of PC poles as a function of age and hazard (wind, surges, and waves) intensity, and the development of a probabilistic hazard model based on 10,000 years of synthetic tropical cyclone data. The probabilistic hazard model is used in conjunction with high-resolution hydrodynamic models to generate realizations of coastal wind, storm surges, and waves for the Louisiana and Mississippi coasts. A comprehensive life cycle cost analysis for a service life of 70 years considering direct and indirect losses is conducted to compare the performance of a transmission line located in Pascagoula, Mississippi, when wood poles are replaced by PC poles. Results showed that aging has a minor effect on the reliability of PC poles, highlighting the advantages of replacing wood poles with PC poles, especially in coastal areas. In addition, PC poles are significantly more cost-effective compared with wood poles over their life cycle, leading to an estimated saving of $11.55 million (68.17% reduction). The results of this study provide key insight to inform decision-making processes to keep the coastal power grids resilient and cost-effective against future storm hazards.
Cost is one of the biggest obstacles to sending humans to Mars. However, spacecraft costs are typically not estimated until after the preliminary vehicle and mission concepts have been designed. By automating the cost estimation process, the effect of any change in vehicle or mission design on the mission cost can be determined more efficiently. This paper describes an extension to the tool SAPE (Systems Analysis for Planetary Entry, Descent, and Landing). This extension integrates the cost modeling software SEER-H (System Estimation and Evaluation of Resources-Hardware) with a number of systems analysis tools. This new method is used to analyze several trade spaces of a HIAD (Hypersonic Inflatable Aerodynamic Decelerator) entry vehicle for human Mars missions. Key findings include quantifying the impacts of ballistic coefficient, main engine specific impulse, and thrust-to-weight ratio on the overall cost of the vehicle, and how the payload per lander and number of landers affects the cost of a campaign to Mars.
The classical assumed-modes method is widely used in modeling the dynamics of flexible multibody systems. According to the method, the elastic deformation of each component in the system is expanded in a series of spatial and temporal functions known as modes and modal coordinates, respectively. This paper focuses on the selection of component modes used in the assumed-modes expansion. A two-stage component modal reduction method is proposed combining Component Mode Synthesis (CMS) with Component Cost Analysis (CCA). First, each component model is truncated such that the contribution of the high frequency subsystem to the static response is preserved. Second, a new CMS procedure is employed to assemble the system model and CCA is used to further truncate component modes in accordance with their contribution to a quadratic cost function of the system output. The proposed method is demonstrated with a simple example of a flexible two-body system.
It is noted that reduced models and reduced controllers for flexible space structures are obtained by retaining those modes which make the greatest contribution to quadratic control objectives. Attention is given to the relative importance of damping, frequency and mode shapes in the mode truncation decisions for the following control objectives: attitude control, vibration suppression and figure control. It is also shown that using Modal Cost Analysis (MCA) on the closed loop modes of the optimally controlled system allows the construction of reduced control policies which feedback only those closed loop coordinates which are most critical to the quadratic control performance criterion. In this manner, the modes which need to be controlled are deduced from truncations of the optimal controller.
The Space Superhighway is a concept for an in-space logistics network for payload delivery and propellant resupply within the Earth-Moon system. It is expected that in the next several years the number of spacecraft in cislunar space will increase significantly. Commercial launch service providers have significantly reduced the cost of access to space and reduced the barrier to entry for private companies to build and operate their own satellites. Many of these newer satellites are being designed to take advantage of future In-space Servicing, Assembly, and Manufacturing (ISAM) capabilities. In addition, the National Aeronautics and Space Administration (NASA) intends to develop and maintain a sustained human presence in cislunar space and on the surface of the Moon. The sustained lunar presence will then serve as a steppingstone for human missions to Mars. The combined demand for propellant resupply and payload delivery in cislunar space for NASA's Moon to Mars campaign in addition to commercial ventures will likely exceed 1,000 t in the upcoming decades. This work presents a concept for an in-space logistics network to fulfill that demand. The network consists of commercial launch vehicles, propellant tankers, orbital depots, and in-space electric propulsion tugs. This work specifically analyzes the cost of developing, producing, and operating such a network at varying levels of customer demand.
Reduced models and reduced controllers for systems governed by matrix-second-order differential equations are obtained by retaining those modes which make the largest contributions to quadratic control objectives. Such contributions, expressed in terms of modal data, used as mode truncation criteria, allow the statement of the specific control objectives to influence the early model reduction from very high order models which are available, for example, from finite element methods. The relative importance of damping, frequency, and eigenvector in the mode truncation decisions are made explicit for each of these control objectives: attitude control, vibration suppression and figure control. The paper also shows that using modal cost analysis (MCA) on the closed loop modes of the optimally controlled system allows the construction of reduced control policies which feedback only those closed loop modal coordinates which are most critical to the quadratic control performance criterion. In this way, the modes which should be controlled (and hence the modes which must be observable by choice of measurements), are deduced from truncations of the optimal controller.
The cost analyses of two leading atmospheric monitoring systems, namely the mass spectrometer and the gas chromatograph, are reported. A summary of the approach used in developing the cost estimating techinques is presented; included are the cost estimating techniques, the development of cost estimating relationships and the atmospheric monitoring system cost estimates.
New cost data are presented for the Hydrogen-Depolarized Carbon Dioxide Concentrator (HDC), based on modifying the concentrator to delete the quick disconnect valves and filters included in the system model defined in MDC-G4631. System description, cost data and a comparison between CO2 concentrator costs are presented.
This report documents the principal cost results (Task 3) derived from the Space Station Needs, Attributes, and Architectural Options study conducted for NASA by the McDonnell Douglas Astronautics Company. The determined costs were those of Architectural Options (Task 2) defined to satisfy Mission Requirements (Task 1) developed within the study. A major feature of this part of the study was the consideration of realistic NASA budget constraints on the recommended architecture. Thus, the space station funding requirements were adjusted by altering schedules until they were consistent with current NASA budget trends.
Methodology and cost estimating relationships, for flight-type and prototype CO2 concentrators, have been developed and presented. A validity check was made by comparing the molecular sieves system considered here and that developed for Skylab. The system evaluated here is twice the size of the Skylab system and is also more complex as it desorbs CO2 thermally and stores it in an accumulator. The cost estimates developed were found to be approximately 50 to 70% higher than the actual cost of the Skylab unit.
Cost estimates for experiments and subsystems flown in the Spacelab were established. Ten experiments were cost analyzed. Estimated cost varied from $650,000 for the hardware development of the SPE water electrolysis experiment to $78,500,000 for the development and operation of a representative life sciences laboratory program. The cost of subsystems for thermal, atmospheric and trace contaminants control of the Spacelab internal atmosphere was also estimated. Subsystem cost estimates were based on the utilization of existing components developed in previous space programs whenever necessary.
This report discusses the application and cost of two types of altimeter systems (spaceborne (satellite and shuttle) and airborne) to twelve user requirements. The overall design of the systems defined to meet these requirements is predicated on an unconstrained altimetry technology; that is, any level of altimeter or supporting equipment performance is possible.
The business management methods employed in the performance of the Apollo-Skylab Suit Program are studied. The data accumulated over the span of the contract as well as the methods used to accumulate the data are examined. Management methods associated with the monitoring and control of resources applied towards the performance of the contract are also studied and recommended upon. The primary objective is the compilation, analysis, and presentation of historical cost performance criteria. Cost data are depicted for all phases of the Apollo-Skylab program in common, meaningful terms, whereby the data may be applicable to future suit program planning efforts.
This study assesses the feasibility of solar installations at various sites in Winston-Salem, focusing on factors such as solar resource availability, electricity costs, and rooftop area for photovoltaic systems. The analysis begins by estimating daily energy requirements based on annual electricity use, followed by adjusting for seasonal and operational fluctuations. Using regional solar data from the National Solar Radiation Database (NSRDB), we calculate average peak sun hours to determine effective system sizing. A parametric approach using the System Advisor Model (SAM) refines this sizing process, incorporating a safety margin of 1.2 to address demand peaks. Each PV system is designed to fit available rooftop space, and a coverage threshold of 70% is identified as optimal for maximizing cost savings and sustainability. This threshold allows installations to meet substantial energy demands, supporting energy resilience and enhancing economic returns.