Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “corrective actions plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Source record↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Schumann, Deborah C.↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Christopher Lewis Sadler↗

A procedure concept for local reflex control of grasping

An architecture is proposed for the control of robotic devices, and in particular of anthropomorphic hands, characterized by a hierarchical structure in which every level of the architecture contains data and control function with varying degree of abstraction. Bottom levels of the hierarchy interface directly with sensors and actuators, and process raw data and motor commands. Higher levels perform more symbolic types of tasks, such as application of boolean rules and general planning operations. Layers implementation has to be consistent with the type of operation and its requirements for real time control. It is proposed to implement the rule level with a Boolean Artificial Neural Network characterized by a response time sufficient for producing reflex corrective action at the actuator level.

Fiorini, Paolo↗

KSC Headquarters Building Area SWMU 104 Soil Interim Measure Report for LOC 2D and LOC 2E Kennedy Space Center, Florida

This Interim Measure (IM) Report for Location of Concern (LOC) 2D and LOC 2E summarizes the activities associated with implementation of an IM to address soil and concrete contamination at the Kennedy Space Center (KSC) Headquarters Building Area (KHQA) located at KSC, Florida. KHQA has been designated Solid Waste Management Unit (SWMU) 104 under KSC’s Resource Conservation and Recovery Act Corrective Action Program. The IM consisted of excavating/removing residual polychlorinated biphenyl (PCB) contamination in soil and concrete from two separate areas, LOC 2D and LOC 2E, which were associated with electrical transformer locations. IM activities were conducted in accordance with the Interim Measure Work Plan (IMWP), Revision 1, for KHQA dated June 2018, which was approved by the Florida Department of Environmental Protection in a correspondence letter dated April 2016 and the United States Environmental Protection Agency in a correspondence letter dated August 2018. The objective of the IM was to remove all remaining contaminated media with total PCB concentrations greater than the State of Florida Residential Soil Cleanup Target Level (RSCTL) (0.5 milligrams per kilogram [mg/kg]). This cleanup goal meets unrestrictive re-use conditions in Florida, and is below federal regulations for PCB Bulk Remediation Waste Cleanup of 1 mg/kg for high occupancy, unrestricted use areas, as outlined in 40 Code of Federal Regulations (CFR) 761.61(a). The timeline of the IM was coordinated with demolition of the former KSC Headquarters Building (demolished in 2021) in order to safely remove contaminated media after electrical equipment was de-energized and removed from the site. Excavation activities were conducted between January 10, 2022, and February 8, 2022, and included two waste streams for off-site disposal: (1) PCB-remediation waste greater than or equal to 50 mg/kg, and (2) PCB-remediation waste less than 50 mg/kg. A total of approximately 347 cubic yards (478 tons) of PCB-contaminated soil and concrete was initially removed from the LOC 2D and LOC 2E areas, as defined in the IMWP. An additional 4.35 tons of soil and concrete were removed based on verification sampling, which was conducted until the cleanup goal was achieved. The total area of excavation from both LOC 2D and LOC 2E was approximately 5,186 square feet (0.12 acres), and excavation depths ranged from 0.5 to 4.0 feet below land surface Excavated soils and concrete were stockpiled based on waste stream and subsequently transported and disposed of at Waste Connections of Osceola County, LLC – JED Landfill in St. Cloud, Florida (PCBs less than 50 mg/kg) or the Chemical Waste Management Landfill in Emelle, Alabama (PCBs greater than or equal to 50 mg/kg). Following excavation, clean backfill was brought to the site and provided to the Demolition Contractor to complete backfill and grading in conjunction with their final site restoration activities from building demolition. Post-IM groundwater sampling was conducted in May 2022 at three monitoring wells installed in April 2022 to confirm that PCBs did not leach into groundwater. These wells were installed where the highest PCB concentrations were detected at LOC 2D, LOC 2E, and from the Building Perimeter IM (previously completed in 2020). All PCB results in groundwater were non-detect. Volatile organic compounds were also analyzed based on potential past use of solvents in transformers with PCB-dielectric fluids and the potential release of dielectric fluids containing volatile organic compounds, and all results were non-detect. Based on completion of a successful IM at LOC 2D and LOC 2E, as well as previous remedial actions that have addressed other contamination at KHQA (SWMU 104), No Further Action without controls will be recommended for SWMU 104. NASA will submit separate Site Rehabilitation Completion Order request documentation for SWMU 104 to support an NFA without controls recommendation.

PCB↗

Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

IMWP↗

Autonomous organization of grasping tasks

This paper describes an architecture for the control of robotic devices, and in particular of anthropomorphic hands, characterized by a hierarchical structure in which every level of the architecture contains data and control function with varying degree of abstraction. Bottom levels of the hierarchy interface directly with sensors and actuators, and process raw data and motor commands. Higher levels perform more symbolic types of tasks, such as application of Boolean rules and general planning operations. The implementation of the layer has to be consistent with the type of operation and its requirements for real time control. One implementation of the rule level, with a Boolean artificial neural network which would have a response time sufficient for producing reflex corrective action at the actuator level is presented.

Fiorini, Paolo↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide EVM guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts, and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical, cost and schedule problems as well as the intended course and success of corrective actions.

Christopher Lewis Sadler↗

Path planning and execution monitoring for a planetary rover

A path planner and an execution monitoring planner that will enable the rover to navigate to its various destinations safely and correctly while detecting and avoiding hazards are described. An overview of the complete architecture is given. Implementation and testbeds are described. The robot can detect unforseen obstacles and take appropriate action. This includes having the rover back away from the hazard and mark the area as untraversable in the in the rover's internal map. The experiments have consisted of paths roughly 20 m in length. The architecture works with a large variety of rover configurations with different kinematic constraints.

Gat, Erann↗

Converter Compressor Building, SWMU 089 Monitoring Well 21 Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) Contract 80KSC019D0011/80KSC019F0070, for the implementation of a bioremediation Interim Measure (IM) at the Converter Compressor Building (CCB) site located at Kennedy Space Center (KSC), Florida. The location of CCB within KSC is shown on Figure A-1. CCB has been designated as Solid Waste Management Unit (SWMU) 089 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. The overall Corrective Action Objective (CAO) for CCB is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), and vinyl chloride (VC) to less than State of Florida Groundwater Cleanup Target Levels (GCTLs). The objective for the IM associated with this IM is to reduce groundwater concentrations for the contaminants of concern (COCs) to less than their Natural Default Attenuation Concentrations (NADCs) within the Monitoring Well 21 Area (herein referred to as MW21 Area) via bioremediation injections to support transition to long term monitoring (LTM). This IWP describes the activities that will be performed for the treatment of the MW21 Area. The Revision 1 CCB MW21 Area Interim Measure Work Plan (IMWP; NASA, 2024), which was approved by the Florida Department of Environmental Protection (FDEP) on December 26, 2024, was used as the design basis for this IWP.

Mark Jonnet↗

Promoting Lifelong Ocean Education-2 Years Later: Charting Progress and Adjusting Course

Session participants will identify how their regional or national efforts contribute to the overall progress on the education recommendations in the USCOP and the work that remains. They will examine progress, identify shortcomings, and suggest course corrections in current and planned efforts. This session will build upon VADM Lautenbacher's keynote presentation on ocean education. Examples, such as ocean literacy efforts at regional and national levels, will be highlighted to stimulate discussion on progress, challenges, and solutions. Working in small groups, participants will consider actions that they, their organizations, or NMEA might take to further the ocean and aquatic education agenda.

Meeson, Blanche↗

Agent-Based Simulations for Project Management

Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

White, J. Chris↗

Former Central Heat Plant, SWMU 045 Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) presents detailed design elements for the air sparging (AS) Interim Measure (IM) design provided in the IM Work Plan (IMWP) within the High Concentration Plume (HCP) at the Former Central Heat Plan (CHP) located at Kennedy Space Center (KSC), Florida. The IMWP presented an approach to implement an AS IM to reduce chlorinated volatile organic compound concentrations to concentrations that facilitate a transition to long-term monitoring. CHP has been designated Solid Waste Management Unit 045 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

Christopher J Pike↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

Automated Diagnosis Of Conditions In A Plant-Growth Chamber

Biomass Production Chamber Operations Assistant software and hardware constitute expert system that diagnoses mechanical failures in controlled-environment hydroponic plant-growth chamber and recommends corrective actions to be taken by technicians. Subjects of continuing research directed toward development of highly automated closed life-support systems aboard spacecraft to process animal (including human) and plant wastes into food and oxygen. Uses Microsoft Windows interface to give technicians intuitive, efficient access to critical data. In diagnostic mode, system prompts technician for information. When expert system has enough information, it generates recovery plan.

Clinger, Barry R.↗

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗