Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “corrective actions plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Postclosure Inspection and Monitoring Report for Surface Corrective Action Unit 417 at the Central Nevada Test Area, Nevada, Site

This report presents results of the biennial postclosure site inspection conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Central Nevada Test Area (CNTA), Nevada, Site (Figure 1) surface Corrective Action Unit (CAU) 417. The report has been prepared in accordance with the Post-Closure Monitoring Plan contained in the Closure Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada (NNSA/NV 2001), hereafter called the CAU 417 Closure Report. The site closure process was completed in 2001 in accordance with the amended Federal Facility Agreement and Consent Order (FFACO 1996, as amended) (FFACO) and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Responsibility for environmental site restoration was transferred from the DOE National Nuclear Security Administration Nevada Field Office to LM on October 1, 2006. This report summarizes investigation activities associated with CAU 417 that LM conducted from September 2018 through August 2020. A postclosure inspection was conducted in 2020 to document the physical condition of the CAU 417 soil covers, monuments, signs, fencing, and use-restricted areas.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Government review of the Mod-2 wind turbine (as-built)

The findings and recommendations of the Government committee formed to conduct an as-built review of the three Mod-2 wind turbine units at Goldendale, Washington are given. The purpose of the review was to identify any critical deficiencies in machine components that could result in failure, and to recommend any necessary corrective action before resuming safe machine operation. The review concluded that one of the deficiencies identified would preclude planned attended or unattended operation, provided that certain corrective actions were implemented.

Johnson, W. R.↗

Control of Technology Transfer at JPL

Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

Jet Propulsion Laboratory (JPL)↗

Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

Measures↗

Advanced Intelligent System Application to Load Forecasting and Control for Hybrid Electric Bus

The primary motivation for this research emanates from providing a decision support system to the electric bus operators in the municipal and urban localities which will guide the operators to maintain an optimal compromise among the noise level, pollution level, fuel usage etc. This study is backed up by our previous studies on study of battery characteristics, permanent magnet DC motor studies and electric traction motor size studies completed in the first year. The operator of the Hybrid Electric Car must determine optimal power management schedule to meet a given load demand for different weather and road conditions. The decision support system for the bus operator comprises three sub-tasks viz. forecast of the electrical load for the route to be traversed divided into specified time periods (few minutes); deriving an optimal 'plan' or 'preschedule' based on the load forecast for the entire time-horizon (i.e., for all time periods) ahead of time; and finally employing corrective control action to monitor and modify the optimal plan in real-time. A fully connected artificial neural network (ANN) model is developed for forecasting the kW requirement for hybrid electric bus based on inputs like climatic conditions, passenger load, road inclination, etc. The ANN model is trained using back-propagation algorithm employing improved optimization techniques like projected Lagrangian technique. The pre-scheduler is based on a Goal-Programming (GP) optimization model with noise, pollution and fuel usage as the three objectives. GP has the capability of analyzing the trade-off among the conflicting objectives and arriving at the optimal activity levels, e.g., throttle settings. The corrective control action or the third sub-task is formulated as an optimal control model with inputs from the real-time data base as well as the GP model to minimize the error (or deviation) from the optimal plan. These three activities linked with the ANN forecaster proving the output to the GP model which in turn produces the pre-schedule of the optimal control model. Some preliminary results based on a hypothetical test case will be presented for the load forecasting module. The computer codes for the three modules will be made available fe adoption by bus operating agencies. Sample results will be provided using these models. The software will be a useful tool for supporting the control systems for the Electric Bus project of NASA.

Momoh, James↗

Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2019

Desert Research Institute (DRI) conducted a field assessment of the potential for contaminated soil to be transported from the Smoky Site Contamination Area (CA) because of storm runoff. This activity supported U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM NV) efforts to establish post-closure monitoring plans for the Smoky Site Soils Corrective Action Unit (CAU) 550. The work was intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause the movement of contaminated soils, as well as determine the particle size fraction most closely associated with transported radionuclide-contaminated soils. These data will facilitate the design of the appropriate post-closure monitoring program. In 2011, DRI installed a meteorological monitoring station on the west side of the Smoky Site CA and a hydrologic (runoff) monitoring station within the CA, near the east side. The meteorological station collected air temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and soil water content data. The maximum, minimum, and average or total values (as appropriate) for each of these parameters were recorded for each 10-minute interval. The maximum, minimum, and average water depth in the flume installed at the hydrologic station were also recorded for each 10-minute interval. This report presents the data collected from these stations during fiscal year (FY) 2019. During the FY2019 reporting period, the warmest months were June, July, and August and the coldest were December and February. The highest monthly solar radiation (i.e., sunshine) values were recorded in June, July, and August, whereas December through February had the lowest solar radiation values. Monthly mean wind speeds were highest in the spring (April) and early summer (June). Winds were predominantly from the north, except in February, July, August, and September when winds were mostly from the west. The monthly average relative humidity ranged from 17 percent to approximately 60 percent. Humidity was lowest in the summer and highest in the winter. Monthly total precipitation ranged from 0.0 during August and September to 2.22 inches (in) (56.39 millimeters [mm]) in February. Total precipitation for FY2019 was 7.83 in (198.88 mm). During the reporting period, a single, nonzero, flow event was recorded at the flume. This occurred over two days between March 6 and 7, 2019, in response to 1.16 in (29.46 mm) of precipitation falling within 9.3 hours on March 6, 2019. This event produced a peak water depth of 0.39 in (0.99 centimeters [cm]) in the flume, and runoff was measured for approximately 23.5 hours. However, the maximum recorded flow depth was less than the limit for flow discharge and velocity that can be calculated for the six-inch (15 cm) throat of a Parshall flume. The runoff event produced insufficient flow velocities through the natural channel to cause local erosion and transport of bedload materials. No bedload samples were collected for radiological analysis. Observing meteorological and environmental conditions that lead to storm runoff will help identify the parameters and threshold conditions that should be incorporated into post-closure monitoring plans for this and similar Soils CAU sites. Routine monitoring of meteorological and hydrologic parameters at the Smoky Site CA has been discontinued at the request of EM NV, effective at the conclusion of FY2019. Environmental data acquisition was completed and the meteorological and runoff monitoring stations were removed from the Smoky Site on October 15, 2019.

54 ENVIRONMENTAL SCIENCES↗

Development of a Test-Bed for Testing and Refining EarthEn’s Supercritical CO 2 Based Energy Storage System

EarthEn’s energy storage concept leverages supercritical carbon dioxide (sCO 2 ) as a working fluid and relies on compact, high-performance components operating at elevated pressures and temperatures. To accelerate component development and reduce technical risk prior to larger-scale demonstrations, Oak Ridge National Laboratory (ORNL) developed a 100 kW-scale sCO 2 test-bed under a Cooperative Research and Development Agreement with EarthEn (CRADA NO. NFE-24-10050). The objective of the work was to design and construct a flexible experimental facility capable of reproducing key thermodynamic state points and heat-transfer conditions relevant to EarthEn’s thermal energy storage (TES) cycle, with particular emphasis on enabling development and evaluation of next-generation heat exchangers and TES concepts. The test-bed consists of a closed-loop sCO 2 circulation system housed within an open-topped enclosure. In its as-installed configuration, dense-phase sCO 2 is recirculated through a printed circuit recuperator, an electrically heated section, a throttling device used to simulate turbine expansion, and a water-cooled printed circuit heat exchanger that rejects heat to the building chilled-water system before returning to the pump. The pump is driven by a variable frequency drive, enabling controlled adjustment of flow and operating point. A comprehensive instrumentation suite was integrated to support both safe operation and high-quality data collection. Installed sensors include Coriolis flow meters for sCO 2 flow rate and density, resistance temperature detectors and thermocouples distributed throughout the loop (including the heated section and key heat exchanger ports), and pressure transducers for absolute and differential pressure measurements. The facility was designed to support high-pressure (19 MPa nominal) and high-temperature (575°C nominal) operation with credited overpressure protection provided by a rupture disk. Nominal operating conditions were selected to support 100 kW-class testing while maintaining flexibility for non-heated and heated shakedown, control development, and future integration of advanced TES test sections. In parallel with facility development, a system-level thermal-hydraulic model was created using Modelica-based tools to support component sizing, anticipate performance over targeted test conditions, and establish a framework for future model calibration against experimental data. At the conclusion of the project performance period, the facility was in final assembly, and the pressure boundary was nearly completed. However, several practical challenges associated with high-pressure/high-temperature systems and specialized component procurement impacted schedule and prevented initial pump-driven operation and full commissioning within the available resources. This report documents the as-built design, operating capabilities, and instrumentation, and it summarizes key lessons learned related to heater fabrication and testing, first-of-a-kind assembly factors, specialty flange supply constraints, and fill pump corrective actions. Finally, it outlines a phased plan for future commissioning and experimental campaigns, including control and instrumentation shakedown, heater characterization, model calibration, and testing at state points representative of EarthEn’s TES cycle.

25 ENERGY STORAGE↗

NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2019

Desert Research Institute (DRI) conducted a field assessment of the potential for radionuclide-contaminated soil to be transported from the Plutonium Valley Dispersion Sites Contamination Area (CA) because of both wind and storm water runoff. This activity supported U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM NV) efforts to establish post-closure monitoring plans for the Plutonium Valley Dispersion Sites Corrective Action Unit (CAU) 366. The DRI task was intended to identify the likely mechanism(s) of transport and determine the meteorological conditions that might cause the movement of radionuclide-contaminated soils. The emphasis of the work was on collecting sediment transported by channelized storm runoff and measuring airborne dust concentrations and associated wind conditions. These data will facilitate an appropriate post-closure monitoring program. In 2011, DRI installed meteorological monitoring stations north and south of the Plutonium Valley CA—known as Pu Valley North and Pu Valley South, respectively—as well as a fluvial sediment sampling station within the CA. Since installation, temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, volumetric soil moisture content, and airborne particulate concentrations have been collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters were recorded for each 10-minute interval. The sediment sampling station included an automatically activated sampling pump with collection bottles for suspended sediment, which was activated when sufficient flow was present in the channel, and passive traps for bedload material that was transported down the channel during runoff events. This report presents data collected from these stations during fiscal year (FY) 2019. During the FY2019 (October 1, 2018, through September 30, 2019) reporting period, the warmest month was July and the coldest month was February. Monthly total solar radiation was highest in June or July (depending on the station) and lowest in December. Monthly mean wind speeds were highest during February. At the Pu Valley North station, winds were commonly northerly, northwesterly, and southerly. At the Pu Valley South station, the wind direction was more variable and winds frequently came from most directions, excluding westerly and northwesterly winds. Winds above 15.0 miles per hour (mph) (24.1 kilometers per hour [km/hr]) were frequently southerly at both stations, and less-frequent strong winds were northerly (at the Pu Valley South station) or northwesterly (at the Pu Valley North station). Monthly average relative humidity ranged from 18 percent in August to 62 percent in January and February. Monthly total precipitation ranged from zero at both stations in September to 2.23 inches (in) (56.6 millimeters [mm]) during February at the Pu Valley South station and 2.09 in (53.1 mm) during March at the Pu Valley North station. From October 1, 2018, through September 30, 2019, the total precipitation was 8.23 in (209 mm) and 8.15 in (207 mm) at the Pu Valley South and Pu Valley North stations, respectively. The largest daily precipitation totals of 1.46 in (37.1 mm) and 1.14 in (29.0 mm) occurred at the Pu Valley South and Pu Valley North stations, respectively, on March 6, 2019. However, the ISCO autosampler was not activated during any storm event in FY2019 because the channel water depth measurements were insufficient for suspended sediment sample collection. Additionally, because no significant flow through the channel was indicated, no bedload samples were collected. Light breezes of 0.0 mph to 5.0 mph (0.0 km/hr to 8.0 km/hr) occurred most frequently (approximately 55 percent to 57 percent of the time). The frequency of occurrence diminished exponentially as the wind speed increased such that winds in excess of 25.0 mph (40.2 km/hr) occurred less than 0.01 percent of the time. Winds in excess of 15.0 mph (24.1 km/hr) were most commonly southerly, which is likely controlled by the topography of the valley because topographic highs define the east and west sides of the valley and converge toward the north.The concentrations of PM2.5 (particulate matter with an aerodynamic diameter ≤2.5 micrometers [μm]) and PM10 (particulate matter with an aerodynamic diameter ≤10 μm) in the air generally increase as wind speed increases. However, the particle profiler at the Pu Valley South station regularly malfunctioned, which resulted in poor data quality and a limited period of record within FY2019. Therefore, discussion of the annual dust observations is mostly limited to the Pu Valley North station. At the Pu Valley North station, significant increases in windblown dust concentrations were observed when wind speeds exceeded 15.0 mph (24.1 km/hr), especially during southerly winds. When all wind speeds were considered, high dust concentrations at the Pu Valley North station were frequently associated with northerly, northwesterly, or southerly winds. The majority of PM10 transport at the Pu Valley North station occurred when winds were blowing northerly and northwesterly because of the high frequency of winds up to 15.0 mph (24.1 km/hr). The ratio of PM10 to PM2.5 is a qualitative indicator of the proximity of dust sources to the observation point and the values of the PM10 to PM2.5 ratio tend to be higher nearer to the source. The PM10 to PM2.5 ratio increased from 1.2 to 2.8 with higher wind speeds at the Pu Valley North station. This increase suggests that some locally sourced PM10 was present in the air when local winds exceeded 15.0 mph (24.1 km/hr). Local dust suspension is interpreted during major dust events when peaks in the PM10 to PM2.5 ratio occur simultaneously with the maximum wind speed and the peak PM10 concentration. Analysis of the five major dust events in FY2019 revealed that northerly winds were dominant in three events and southerly winds were dominant in two events. Local suspension of dust within Plutonium Valley is suspected to have occurred during two of the five major events (April 9, 2019, and September 28 to 29, 2019), and a nonlocal source of dust is presumed for the three other major dust events (October 14, 2018; May 16, 2019; and September 2, 2019). The three suspected regional dust transport events exhibited winds that typically did not exceed the 15.0 mph (24.1 km/hr) wind speed threshold for local dust transport and featured PM10 to PM2.5 ratios that indicate large-scale regional dust transport. Similar event characteristics (e.g., wind speed and PM10 concentration) were observed at air monitoring stations approximately 70 mi (113 km) to the northwest within the Tonopah Test Range (TTR). Therefore, these three regional events may not reflect transport from the Plutonium Valley CA. Routine monitoring of meteorological and hydrologic parameters at Plutonium Valley has been discontinued at the request of EM NV, effective at the conclusion of FY2019. Environmental data acquisition has been completed, and both Pu Valley North and Pu Valley South meteorological stations within Plutonium Valley as well as the ISCO autosampler station within the CA were removed on October 14, 2019.

54 ENVIRONMENTAL SCIENCES↗

2023 Land Use Control Inspections Report

2023 Land Use Control (LUC) Inspections Report for John F. Kennedy Space Center (KSC), Florida. This letter report documents the quarterly LUC inspections the KSC Remediation Group conducts at Remediation Sites. No LUC findings occurred in 2023. A Corrective Action to address arsenic-impacted soil at the KSC Child Development Center was performed in July 2023. This letter report provides a summary and documents the field activities for that Corrective Action. Copies of the formal LUC Implementation Plans (LUCIPs) for 71 Remediation Sites at KSC are presented in this letter report. For the Remediation Sites that do not have formal LUCIPs, the report documents that informal LUCs that the Remediation Group has implemented at these sites.

Christopher Adkison↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project?s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Planning Package↗

Learning reliable manipulation strategies without initial physical models

A description is given of a robot, possessing limited sensory and effectory capabilities but no initial model of the effects of its actions on the world, that acquires such a model through exploration, practice, and observation. By acquiring an increasingly correct model of its actions, it generates increasingly successful plans to achieve its goals. In an apparently nondeterministic world, achieving reliability requires the identification of reliable actions and a preference for using such actions. Furthermore, by selecting its training actions carefully, the robot can significantly improve its learning rate.

Christiansen, Alan D.↗

TERRA Battery Thermal Control Anomaly - Simulation and Corrective Actions

The TERRA spacecraft was launched in December 1999 from Vandenberg Air Force Base, becoming the flagship of NASA's Earth Observing System program to gather data on how the planet's processes create climate. Originally planned as a 5 year mission, it still provides valuable science data after nearly 10 years on orbit. On October 13th, 2009 at 16:23z following a routine inclination maneuver, TERRA experienced a battery cell failure and a simultaneous failure of several battery heater control circuits used to maintain cell temperatures and gradients within the battery. With several cells nearing the minimum survival temperature, preventing the electrolyte from freezing was the first priority. After several reset attempts and power cycling of the control electronics failed to reestablish control authority on the primary side of the controller, it was switched to the redundant side, but anomalous performance again prevented full heater control of the battery cells. As the investigation into the cause of the anomaly and corrective action continued, a battery thermal model was developed to be used in determining the control ability remaining and to simulate and assess corrective actions. Although no thermal model or detailed reference data of the battery was available, sufficient information was found to allow a simplified model to be constructed, correlated against pre-anomaly telemetry, and used to simulate the thermal behavior at several points after the anomaly. It was then used to simulate subsequent corrective actions to assess their impact on cell temperatures. This paper describes the rapid development of this thermal model, including correlation to flight data before and after the anomaly., along with a comparative assessment of the analysis results used to interpret the telemetry to determine the extent of damage to the thermal control hardware, with near-term corrective actions and long-term operations plan to overcome the anomaly.

Grob, Eric W.↗

Employing Earned Value Management in Government Research and Design - Lessons Learned from the Trenches

To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.

Simon, Tom↗

On the uncertainty of estimating photovoltaic soiling using nearby soiling data

The accumulation of dust on the surface of photovoltaic modules can reduce their performance and affect the cost competitiveness of this technology. This phenomenon is known as soiling and can be mitigated through appropriate corrective and/or preventive actions. In order to maximize its effectiveness, it is important to plan the soiling mitigation strategy even before the PV system is operational. This is typically done through a nearest neighbor approach, by estimating soiling using data from the nearest operational photovoltaic system. This work focuses on understanding the uncertainty related to this practice. For this purpose, the semi-variance function is used to study the dissimilarity between the soiling losses of two locations in California depending on their distance. The results show that, when the soiling loss at a nearby system is used to estimate soiling of a site, the uncertainty can be approximated to increase linearly at a rate of 0.08-0.10%/km up to 60 or 80 km. After this distance, the use of a nearest neighbor approach is no longer justified, as it produces an uncertainty as big as the average soiling loss of the sites in the dataset used in this study. In some conditions, uncertainties > 0% are found also for sites located within 25 km, meaning that even close-by systems might soil differently.

14 SOLAR ENERGY↗

Integration of a computerized two-finger gripper for robot workstation safety

A microprocessor-based controller has been developed that continuously monitors and adjusts the gripping force applied by a special two-finger gripper. This computerized force sensing gripper system enables the endeffector gripping action to be independently detected and corrected. The gripping force applied to a manipulated object is real-time monitored for problem situations, situations which can occur during both planned and errant robot arm manipulation. When unspecified force conditions occur at the gripper, the gripping force controller initiates specific reactions to cause dynamic corrections to the continuously variable gripping action. The force controller for this intelligent gripper has been interfaced to the controller of an industrial robot. The gripper and robot controllers communicate to accomplish the successful completion of normal gripper operations as well as unexpected hazardous situations. An example of an unexpected gripping condition would be the sudden deformation of the object being manipulated by the robot. The capabilities of the interfaced gripper-robot system to apply workstation safety measures (e.g., stop the robot) when these unexpected gripping effects occur have been assessed.

Sneckenberger, John E.↗

Assessment of in-flight anomalies of long life outer plant mission

Thee unmanned planetary spacecraft to the outer planets have been controlled and operated successfully in space for an accumulated total of 66 years. The Voyager 1 and 2 spacecraft each have been in space for more than 26 years. The Galileo spacecraft was in space for 14 years, including eight years in orbit about Jupiter. During the flight operations for these missions, anomalies for the ground data system and the flight systems have been tracked using the anomaly reporting tool at the Jet Propulsion Laboratory. A total of 3300 incidents, surprises, and anomaly reports have been recorded in the database. This paper describes methods and results for classifying and identifying trends relative to ground system vs. flight system, software vs. hardware, and corrective actions. There are several lessons learned from these assessments that significantly benefit the design and planning for long life missions of the future. These include the necessity for having redundancy for successful operation of the spacecraft, awareness that anomaly reporting is dependent on mission activity not the age of the spacecraft, and the need for having a program to maintain and transfer operation knowledge and tools to replacement flight team members.

anomalies↗

Closure Report for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada National Security Site, Nevada with ROTC-1

CR loaded to this OSTI record. Just adding new file which includes CR plus new ROTC 1 and update the metadata to the following: This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 [as amended March 2010]). CAU 116 consists of the following two Corrective Action Sites (CASs), located in Area 25 of the Nevada National Security Site: (1) CAS 25-23-20, Nuclear Furnace Piping and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 consisted of Building 3210 and the attached concrete shield wall. CAS 25-23-20 consisted of the nuclear furnace piping and tanks. Closure activities began in January 2007 and were completed in August 2011. Activities were conducted according to Revision 1 of the Streamlined Approach for Environmental Restoration Plan for CAU 116 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2008). This CR provides documentation supporting the completed corrective actions and provides data confirming that closure objectives for CAU 116 were met. Site characterization data and process knowledge indicated that surface areas were radiologically contaminated above release limits and that regulated and/or hazardous wastes were present in the facility. The Record of Technical Change 1 updated the use restriction information.

54 ENVIRONMENTAL SCIENCES↗