Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “corrective action management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM activities completed in November 2021 along with an October 2021 direct push technology (DPT) investigation to confirm plume stability for the Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. HBF has been designated as Solid Waste Management Unit 007 under the KSC Resource Conservation and Recovery Act Corrective Action Program.

Jennifer Buel↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Former Central Heat Plant SWMU 045 Year 2 Air Sparge System Performance Monitoring Report

This Air Sparge (AS) Performance Monitoring (PM) Report (PMR) presents Year 2 operation, maintenance, and monitoring (OM&M) activities, PM results, and monitoring well installations supporting the AS Interim Measure (IM) at the Former Central Heat Plant (CHP) at Kennedy Space Center (KSC), Florida. CHP has been designated Solid Waste Management Unit 045 under the KSC Resource Conservation and Recovery Act Corrective Action Program. An AS IM was installed at CHP between 2019 and 2021, which included the installation of an AS system to treat a chlorinated solvent groundwater plume. Contaminants of concern (COCs) identified at CHP for the AS IM include tetrachloroethene (PCE), trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), and vinyl chloride (VC). The completed AS system includes a network of 267 AS wells, which treat approximately 1.3 acres of contaminated groundwater. “Hot” compressor technology is used to treat the source zone, while a “cold” compressor is used to treat two hot spot (HS) areas (HS1 and HS2) and the high concentration plume (HCP). The AS system began operation in June-July 2021 and this document includes Year 2 of operation. The overall runtimes for the AS system for the Year 2 reporting period (October 2022 to September 2023) were approximately 69 percent for the cold trailer and 71 percent for the hot trailer. Air samples and vapor screening results collected during the reporting period showed concentrations less than applicable human health and air emissions permit criteria. Groundwater performance monitoring results show that AS treatment continues to be effective in reducing COC concentrations at CHP. At the shallow interval, COC concentrations were all non-detect, less than, or met their respective State of Florida Groundwater Cleanup Target Levels (GCTLs) at the end of Year 2 in September 2023. In the deep interval, 10 of the 15 PM wells detected COCs greater than their respective GCTLs, with two of these wells also exceeding the Natural Attenuation Default Concentration for VC. Based on Year 2 OM&M and PM results, continued operation of the AS system is required to meet the IM objective. It is therefore recommended to continue with AS IM operations at CHP with the following plan for Year 3.

Kevin Alex Murphy↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Area South of K7-516, SWMU 100 Performance Monitoring Report Kennedy Space Center, Florida

This Performance Monitoring Report (PMR) presents operations, maintenance, and monitoring information and performance monitoring results for the air sparging (AS) groundwater Interim Measure at the Area South of K7-516 (516S) located at Kennedy Space Center (KSC), Florida. AS expansion activities are also included in this PMR. The 516S site has been designated Solid Waste Management Unit 100 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from January 1, 2023, through December 31, 2023.

Mark J. Jonnet↗

Turbulence flight director analysis and preliminary simulation

A control column and trottle flight director display system is synthesized for use during flight through severe turbulence. The column system is designed to minimize airspeed excursions without overdriving attitude. The throttle system is designed to augment the airspeed regulation and provide an indication of the trim thrust required for any desired flight path angle. Together they form an energy management system to provide harmonious display indications of current aircraft motions and required corrective action, minimize gust upset tendencies, minimize unsafe aircraft excursions, and maintain satisfactory ride qualities. A preliminary fixed-base piloted simulation verified the analysis and provided a shakedown for a more sophisticated moving-base simulation to be accomplished next. This preliminary simulation utilized a flight scenario concept combining piloting tasks, random turbulence, and discrete gusts to create a high but realistic pilot workload conducive to pilot error and potential upset. The turbulence director (energy management) system significantly reduced pilot workload and minimized unsafe aircraft excursions.

Johnson, D. E.↗

Nuclear Safety [Vol. 33, No. 4, October-December 1992]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 499 Technical Note: Nuclear Regulatory Commission’s Examination Question Bank System, C. L Jensen and N. L. Skinner; 506 Report on the Specialists’ Meeting on Passive and Active Safety Features of Liquid-Metal Fast Breeder Reactors Organized by the International Atomic Energy Agency at Oarai Engineering Centre of Power Reactor and Nuclear Development Corporation, Japan, November 5-7,1991, S. R. Paranjpe; ACCIDENT ANALYSIS: 514 A Review of Hydrogen Production During Melt/Water Interaction in LWRs, D. F. Fletcher, B. D. Turland, and S. P. A. Lawrence; 535 A Review of the U 3 0 8 -Al Reaction as a Potential Heat Source in Research and Test Reactor Accidents, J. L. Snelgrove; CONTROL AND INSTRUMENTATION: 543 Multilevel Interfaces for Power Plant Control Rooms II: A Preliminary Design Space, K. J. Vicente; DESIGN FEATURES: 549 Twenty-Second DOE/NRC Nuclear Air Cleaning and Treatment Conference, R. R. Bellamy, D. W. Moeller, and M. W. First; 562 Book Review: Safety Assessment of Unit 5 (WWER-440/W-213) of the Greifswald Nuclear Power Station, M. H. Fontana; WASTE AND SPENT FUEL MANAGEMENT: 576 Activities Related to Waste and Spent Fuel Management, M. D. Muhlheim and E. G. Silver; OPERATING EXPERIENCES: 586 Analysis of Corrective Actions Applied to Nuclear Power Plant Operations, A. E. Cross; 593 Reactor Shutdown Experience, Compiled by J. W. Cletcher; 596 Operating U.S. Power Reactors, Compiled by M. D. Muhlheim and E. G. Silver; 609 Non-Commercial Power Operating Experience; 614 World Nuclear Performance, Compiled by M. D. Muhlheim; RECENT DEVELOPMENTS: 623 General Administrative Activities, Compiled by M. D. Muhlheim and E. G. Silver; 635 Reports, Standards, and Safety Guides, D. S. Queener; 639 Proposed Rule Changes as of June 30, 1992; ANNOUNCEMENTS: 513 Fourth International Conference on Nuclear Fuel Reprocessing and Waste Management RECOD '94; 585 International Topical Meeting on Advanced Reactors Safety; 622 International Workshop on Implementation of ALARA at Nuclear Power Plants; 648 Short Course on Nuclear Criticality Safety; 648 8th Topical Meeting on Problems in Reactor Physics MEPhi-VOLGA-93; 643 The Authors; 646 Reviewers of Nuclear Safety, Vol. 33

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

KSC Headquarters Building Area SWMU 104 Soil Interim Measure Report for LOC 2D and LOC 2E Kennedy Space Center, Florida

This Interim Measure (IM) Report for Location of Concern (LOC) 2D and LOC 2E summarizes the activities associated with implementation of an IM to address soil and concrete contamination at the Kennedy Space Center (KSC) Headquarters Building Area (KHQA) located at KSC, Florida. KHQA has been designated Solid Waste Management Unit (SWMU) 104 under KSC’s Resource Conservation and Recovery Act Corrective Action Program. The IM consisted of excavating/removing residual polychlorinated biphenyl (PCB) contamination in soil and concrete from two separate areas, LOC 2D and LOC 2E, which were associated with electrical transformer locations. IM activities were conducted in accordance with the Interim Measure Work Plan (IMWP), Revision 1, for KHQA dated June 2018, which was approved by the Florida Department of Environmental Protection in a correspondence letter dated April 2016 and the United States Environmental Protection Agency in a correspondence letter dated August 2018. The objective of the IM was to remove all remaining contaminated media with total PCB concentrations greater than the State of Florida Residential Soil Cleanup Target Level (RSCTL) (0.5 milligrams per kilogram [mg/kg]). This cleanup goal meets unrestrictive re-use conditions in Florida, and is below federal regulations for PCB Bulk Remediation Waste Cleanup of 1 mg/kg for high occupancy, unrestricted use areas, as outlined in 40 Code of Federal Regulations (CFR) 761.61(a). The timeline of the IM was coordinated with demolition of the former KSC Headquarters Building (demolished in 2021) in order to safely remove contaminated media after electrical equipment was de-energized and removed from the site. Excavation activities were conducted between January 10, 2022, and February 8, 2022, and included two waste streams for off-site disposal: (1) PCB-remediation waste greater than or equal to 50 mg/kg, and (2) PCB-remediation waste less than 50 mg/kg. A total of approximately 347 cubic yards (478 tons) of PCB-contaminated soil and concrete was initially removed from the LOC 2D and LOC 2E areas, as defined in the IMWP. An additional 4.35 tons of soil and concrete were removed based on verification sampling, which was conducted until the cleanup goal was achieved. The total area of excavation from both LOC 2D and LOC 2E was approximately 5,186 square feet (0.12 acres), and excavation depths ranged from 0.5 to 4.0 feet below land surface Excavated soils and concrete were stockpiled based on waste stream and subsequently transported and disposed of at Waste Connections of Osceola County, LLC – JED Landfill in St. Cloud, Florida (PCBs less than 50 mg/kg) or the Chemical Waste Management Landfill in Emelle, Alabama (PCBs greater than or equal to 50 mg/kg). Following excavation, clean backfill was brought to the site and provided to the Demolition Contractor to complete backfill and grading in conjunction with their final site restoration activities from building demolition. Post-IM groundwater sampling was conducted in May 2022 at three monitoring wells installed in April 2022 to confirm that PCBs did not leach into groundwater. These wells were installed where the highest PCB concentrations were detected at LOC 2D, LOC 2E, and from the Building Perimeter IM (previously completed in 2020). All PCB results in groundwater were non-detect. Volatile organic compounds were also analyzed based on potential past use of solvents in transformers with PCB-dielectric fluids and the potential release of dielectric fluids containing volatile organic compounds, and all results were non-detect. Based on completion of a successful IM at LOC 2D and LOC 2E, as well as previous remedial actions that have addressed other contamination at KHQA (SWMU 104), No Further Action without controls will be recommended for SWMU 104. NASA will submit separate Site Rehabilitation Completion Order request documentation for SWMU 104 to support an NFA without controls recommendation.

PCB↗

Robonaut 2 and Watson: Cognitive Dexterity for Future Exploration

Future exploration missions will dictate a level of autonomy never before experienced in human spaceflight. Mission plans involving the uncrewed phases of complex human spacecraft in deep space will require a coordinated autonomous capability to be able to maintain the spacecraft when ground control is not available. One promising direction involves embedding intelligence into the system design both through the employment of state-of-the-art system engineering principles as well as through the creation of a cognitive network between a smart spacecraft or habitat and embodiments of cognitive agents. The work described here details efforts to integrate IBM's Watson and other cognitive computing services into NASA Johnson Space Center (JSC)'s Robonaut 2 (R2) anthropomorphic robot. This paper also discusses future directions this work will take. A cognitive spacecraft management system that is able to seamlessly collect data from subsystems, determine corrective actions, and provide commands to enable those actions is the end goal. These commands could be to embedded spacecraft systems or to a set of robotic assets that are tied into the cognitive system. An exciting collaboration with Woodside provides a promising Earth-bound testing analog, as controlling and maintaining not normally manned off-shore platforms have similar constraints to the space missions described.

Badger, Julia M.↗

Components Cleaning Facility, SWMU 30 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report (IGWMR) presents the findings of IGWM completed in June and December 2019 at the eastern portion of the Components Cleaning Facility (CCF East) site located at Kennedy Space Center (KSC), Florida. The site has been designated Solid Waste Management Unit (SWMU) 030 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

Patrice L Lehocky↗

Hypergol Maintenance Facility North SWMU 090 Year 2 Air Sparge System Performance Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Performance Monitoring Report (PMR) presents Year 2 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. HMFN has been designated Solid Waste Management Unit (SWMU) 090 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from August 2021 to August 2022.

Christopher Hook↗

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM activities completed in November 2022, and March through May 2023 including results from existing and newly installed groundwater monitoring wells and direct push technology (DPT) groundwater sampling in the Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. HBF has been designated as Solid Waste Management Unit (SWMU) 007 under the KSC Resource Conservation and Recovery Act Corrective Action Program.

Jennifer Buel↗

Hypergol Maintenance Facility North, SWMU 090, Year 3 Air Sparge System Performance Monitoring Report, Kennedy Space Center, Florida

This Performance Monitoring Report (PMR) presents Year 3 Air Sparge (AS) System operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. HMFN has been designated Solid Waste Management Unit (SWMU) 090 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from September 2022 to August 2023. The HMFN AS IM was implemented in 2019-2020 to treat a chlorinated solvent groundwater plume that resulted from historical operations supporting the National Aeronautics and Space Administration (NASA) Space Program. The system includes 213 AS wells, with screen depths ranging from 25 feet to 45 feet below land surface (bls) and treats approximately 1.62 acres of contaminated groundwater. The objective of the AS IM is to actively reduce groundwater concentrations exceeding Florida Department of Environmental Protection Natural Attenuation Default Concentrations (NADCs) (identified as the High Concentration Plume [HCP]) to levels that facilitate transition into a Long-Term Monitoring program. The AS IM targets all of the HCP, except for a source zone area within the HCP where trichloroethene (TCE) concentrations exceed 11,000 micrograms per liter (μg/L) at depths greater than 45 feet bls. This is because site lithology was found to not be conducive to the AS treatment technology at these deeper depths. NASA will re-visit plans for potentially utilizing another remedial technology for residual deeper contamination following completion of the AS IM. OM&M activities and results from Year 3 indicate that the AS system at HMFN is operating as designed and is meeting performance criteria. Groundwater performance monitoring results indicate that following the third year of AS system operation, TCE concentrations in wells across all treated depth intervals have been reduced by an average of more than 99 percent. Overall, the areal extent of the plume showed a reduction following Year 3 of AS operations; however, continued operation of the AS system is required to meet the IM objective.

VOCs↗

Addendum 2 to the Closure Report for CAU 577 Area 5 Chromium Containing Waste Disposal Cells, NNSS, Nevada

Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” includes five low-level waste cells at the Nevada National Security Site Area 5 Radioactive Waste Management Site where buried waste received from Nuclear Fuel Services, Inc., was subsequently determined to contain chromium that exceeded the toxicity characteristic leaching procedure regulatory limit, which would require the waste to carry hazardous waste code D007. CAU 577 was created to satisfy the requirements of the Settlement Agreement (SA) executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) on April 25, 2019 (NDEP 2019). The SA required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO). The FFACO process ensures proper closure of the chromium-containing waste and documentation of that closure through FFACO-type documents. The following three Corrective Action Sites (CASs) were closed, and their closure was documented in the Closure Report for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada, DOE/EMNV--0030, dated September 2021 (U.S. Department of Energy [DOE] Environmental Management [EM] Nevada Program 2021a): • CAS 05-21-02, Waste Disposal Cell 12 • CAS 05-21-03, Waste Disposal Cell 15 • CAS 05-21-04, Waste Disposal Cell 17 Closure of the following CAS was previously documented in the Addendum to the Closure Report for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada, DOE/EMNV--0030-ADD, dated September 2022 (DOE EM Nevada Program 2022): • CAS 05-21-05, Waste Disposal Cell 20 This second addendum to the Closure Report documents the closure activities that have occurred for CAS 05-21-06, Waste Disposal Cell 21. This is the last CAS in CAU 577. The final waste shipment was placed in the waste disposal cell on November 21, 2022. Following this, closure activities began on November 28, 2022, and were conducted according to the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for CAU 577 (DOE EM Nevada Program 2021b). The following closure activities were performed: • Constructing an engineered evapotranspiration cover • Installing two subsidence monuments and vadose zone monitoring equipment • Seeding the cover with a mixture of native plant species • Installing four concrete monuments on the corners of the cover and placing two use restriction (UR) warning signs on each monument These activities fulfill applicable federal and state regulations for closure of CAS 05-21-06 and minimize potential future exposure pathways to buried waste. Completed closure activities are also consistent with closure of the nine historical Resource Conservation and Recovery Act (RCRA) units included in Section 10.2.2 of the RCRA Permit that governs hazardous waste management activities at the Nevada National Security Site (Permit NEV HW0101) (NDEP 2023). UR documentation for this CAS is included in Appendix B of this report. The post-closure plan is presented in detail in the CADD/CAP for CAU 577 (DOE EM Nevada Program 2021b), and the requirements are summarized in Section 5.2 of this document. In accordance with paragraph 5D of the SA, a request to incorporate the requirements for post-closure monitoring of CAU 577 was included with the permit application for RCRA Permit NEV HW0101 that was submitted in January 2022 (NNSA/NFO 2022). The request included the post-closure requirements for the three CASs that had been closed at the time of submittal of the application as well as requirements that would be implemented upon future approval of closure of the remaining two CASs. All CAU 577 post-closure monitoring requirements have been captured in the April 4, 2023, Revision 7 of the RCRA Permit (NDEP 2023). As the RCRA Permit NEV HW0101 has been revised since the submittal of the original CAU 577 Closure Report (DOE EM Nevada Program 2021a) and Addendum 1 (DOE EM Nevada Program 2022), the post-closure requirements in this Addendum 2 report do not align with the previous documents. Specific changes resulting from the issuance of Revision 7 of the RCRA Permit are discussed in Section 5.2 of this report. The requirements in this report are consistent with the current permit (NDEP 2023) and supersede all requirements listed in the CAU 577 Closure Report and Addendum 1. All CAU 577 post-closure requirements should be conducted in accordance with the version of the RCRA Permit that is current at the time of the activities being performed. The DOE EM Nevada Program is requesting a Notice of Completion from NDEP for closure of CAU 577. Although CAU 577 is not a legacy site, the FFACO process is being followed to ensure proper closure of the chromium-containing waste. Therefore, transfer of CAU 577 from Appendix III of the FFACO to Appendix IV, Closed Corrective Action Units, is requested, as all closure activities have been completed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples will be collected at locations SW0001, SW0002, and SW0003 during both the March and September 2017 events. Team consensus was also reached at the October 2017 KSCRT meeting to continue with operation and maintenance (O&M) of the AS system at SW3.

REPORT↗

C-5 Electrical Substation (SWMU 066) Performance Monitoring Report

The C-5 Electrical Substation (C5ES) is a National Aeronautics and Space Administration (NASA) operated electrical power substation located at the John F. Kennedy Space Center (KSC), Florida. This facility has been designated Solid Waste Management Unit (SWMU) 066 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. This Performance Monitoring Report (PMR) presents the Interim Measure (IM) activities, including baseline sampling, air sparge system construction and operation, and performance monitoring, that were completed to remediate chlorinated volatile organic compounds (CVOC) in groundwater exceeding the Florida Department of Environmental Protection (FDEP) natural attenuation default concentrations (NADC).

Andrew Scott Starr↗