Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “control room design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Control Room of the Future Testbed Workshop – After-Action Report

The U.S. Department of Energy’s Office of Electricity is supporting a one-year, multi-laboratory effort to define the needs and requirements for a Control Room of the Future testbed, or CROFT. The effort responds to increasing grid complexity driven by large new loads, dynamic generation resources, and the growing adoption of advanced technologies and tools, including artificial intelligence (AI) and machine learning (ML). To support safe, secure, and effective grid modernization, CROFT will focus on how emerging technologies and tools can be rigorously evaluated in realistic operational settings, with attention to human-machine interaction, cognitive load, and workforce readiness. The project team includes Argonne National Laboratory, Idaho National Laboratory, National Laboratory of the Rockies, and Pacific Northwest National Laboratory. As part of the scoping effort, the team conducted two industry-focused workshops: one at DTECH on February 5, 2026, informed by prior industry interviews, and a second on May 4, 2026, adjacent to IEEE T&D. These engagements brought together utilities, vendors, consultants, national laboratories, academia, and government stakeholders to identify and prioritize use cases, barriers, validation needs, data-sharing constraints, and near- and longer-term requirements. This feedback will directly inform CROFT’s architecture and research focus areas, ensuring the testbed is grounded in real-world operational needs and designed to evaluate emerging technologies and tools in realistic control-room environments.

artificial intelligence↗

Applied Virtual Reality in Reusable Launch Vehicle Design, Operations Development, and Training

Application of Virtual Reality (VR) technology offers much promise to enhance and accelerate the development of Reusable Launch Vehicle (RLV) infrastructure and operations while simultaneously reducing developmental and operational costs. One of the primary cost areas in the RLV concept that is receiving special attention is maintenance and refurbishment operations. To produce and operate a cost effective RLV, turnaround cost must be minimized. Designing for maintainability is a necessary requirement in developing RLVs. VR can provide cost effective methods to design and evaluate components and systems for maintenance and refurbishment operations. The National Aeronautics and Space Administration (NASA)/Marshall Space Flight Center (MSFC) is beginning to utilize VR for design, operations development, and design analysis for RLVs. A VR applications program has been under development at NASA/MSFC since 1989. The objectives of the MSFC VR Applications Program are to develop, assess, validate, and utilize VR in hardware development, operations development and support, mission operations training and science training. The NASA/MSFC VR capability has also been utilized in several applications. These include: 1) the assessment of the design of the late Space Station Freedom Payload Control Area (PCA), the control room from which onboard payload operations are managed; 2) a viewing analysis of the Tethered Satellite System's (TSS) "end-of-reel" tether marking options; 3) development of a virtual mockup of the International Space Welding Experiment for science viewing analyses from the Shuttle Remote Manipulator System elbow camera and as a trainer for ground controllers; and 4) teleoperations using VR. This presentation will give a general overview of the MSFC VR Applications Program and describe the use of VR in design analyses, operations development, and training for RLVs.

Hale, Joseph P.↗

Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation and Lessons Learned

In May 2016, the U.S. Nuclear Regulatory Commission (NRC) staff provided a digital instrumentation and control (I&C) regulatory infrastructure integrated action plan to the NRC for approval. One of the objectives of that plan was to establish a clear regulatory structure with reduced regulatory uncertainty to enable the expanded safe use of digital I&C in commercial nuclear reactors while continuing to ensure safety and security. To achieve this end, the NRC, with collaboration from industry, developed a streamlined License Amendment Request Alternate Review (AR) process for safety-related (SR) digital I&C upgrades. In spite of this effort, the industry has remained reluctant to perform such I&C upgrades because of perceived regulatory and financial risks associated with being the first or an early adopter of the AR process for SR I&C upgrades. The U.S. Department of Energy Light Water Reactor Sustainability Program at the Idaho National Laboratory performed Initial Scoping Phase research to help break this impasse by supporting a SR I&C Pilot Upgrade, working with MPR Associates, ScottMadden Inc., and Exelon Generation. Exelon’s Limerick Generating Station (LGS) was selected as the target for this research. This paper summarizes the Initial Scoping Phase engineering and operations, licensing, and project management activities necessary to bound the scope, schedule, and estimated cost of the project sufficiently to enable utility management authorization of Conceptual Design Phase activities. These efforts and associated products are intended to provide a template to support larger industry efforts to perform similar upgrades as a foundation stone for a digital transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership. As a result of the combined effort of Exelon Generation and research participants, Conceptual Design Phase activities for the subject upgrade at LGS were approved by Exelon. Further, the U.S. Department of Energy also awarded a $50 million cost share award to Exelon in order to pave the way for SR I&C modernization and associated control room upgrades across the U.S. nuclear fleet. Additional research reports are planned for the Conceptual Design Phase, Detailed Design Phase, and the Implementation Phase of the LGS project to document the process followed and promulgate lessons learned to industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Virtual reality as a human factors design analysis tool: Macro-ergonomic application validation and assessment of the Space Station Freedom payload control area

A virtual reality (VR) Applications Program has been under development at MSFC since 1989. Its objectives are to develop, assess, validate, and utilize VR in hardware development, operations development and support, missions operations training, and science training. A variety of activities are under way within many of these areas. One ongoing macro-ergonomic application of VR relates to the design of the Space Station Freedom Payload Control Area (PCA), the control room from which onboard payload operations are managed. Several preliminary conceptual PCA layouts have been developed and modeled in VR. Various managers and potential end users have virtually 'entered' these rooms and provided valuable feedback. Before VR can be used with confidence in a particular application, it must be validated, or calibrated, for that class of applications. Two associated validation studies for macro-ergonomic applications are under way to help characterize possible distortions of filtering of relevant perceptions in a virtual world. In both studies, existing control rooms and their 'virtual counterparts will be empirically compared using distance and heading estimations to objects and subjective assessments. Approaches and findings of the PCA activities and details of the studies are presented.

Hale, Joseph P.↗

Need for research and training reactors for advanced reactor designs

Full text of publication follows. Research and training reactors have served a valuable role in helping train workforce for currently operating fleet of light water reactors. These research and training reactors have been used in reactor laboratory classes to familiarize the students with such vital concepts as approach to criticality, reactor period, neutron moderation, reactivity, flux distribution and leakage, etc. As the industry moves toward advanced non-light-water reactor designs, it is critical that research and training reactors be developed and deployed at university campuses to help train the new generation of nuclear and non-nuclear engineers who are likely to design, build, and operate these advanced reactors. Among the designs currently being pursued for nuclear power generation include molten salt, sodium cooled, and gas cooled designs, with options for various fuel forms. Thus, industry and DOE in collaboration with academic institutions should devise plans on how to familiarize the next generation of nuclear workforce with hands-on experience necessary for such designs. These research and training reactors will play a vital role in familiarizing the future workforce with hands-on experience with concepts associated with fast spectrum reactors, gas cooled reactors, and other features not associated with light water reactors. In addition to classical nuclear engineering concepts, these advanced research and training reactors can also be used for hands-on training as well as for research on features being considered in the design of GEN-IV reactors: cyber security for digital control room operations, hybrid energy system, hydrogen generation, district heating, autonomous control... (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

3D Modeling of Safety-Related Upgrade Pilot Project

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper will present the development of the HFE 3D modeling execution of the Main Control Room safety upgrades. New equipment and modifications are planned for upgrading the new safety systems. 3D modeling allows for visualization of the new equipment and modifications to be shared with engineering and design teams for evaluation and review. Anthropometric considerations such as sight lines and functional reach can be evaluated directly using the 3D model. This effort has helped to provide visualizations for additional review with operations personnel and project stakeholders.

3D Modeling↗

Sensor Impact Evaluation at Different Sensor Locations in a Multi-zone Office Building

FY 2022 Q1 deliverables include the development of an emulator that can evaluate the sensor impacts at different sensor locations (i.e., thermostat locations) in a multizone office building. This report presents the detailed procedure of developing the emulator and using the emulator for preliminary sensor impact analysis. In designing new multizone buildings or retrofitting existing buildings, the room thermostat locations or subzoning design has been often determined by best practices without considering the effects of this design in terms of energy or thermal comfort. In subzoning design, the total number of thermostats is usually smaller than the total number of rooms. As a result, one thermostat in one room often controls the indoor temperature of several other adjacent rooms. For example, five zones might share one thermostat located in one of the zones. Because the demands for thermal load in different zones could be different for the multizone buildings, this subzoning design can compromise control performance and waste building energy consumption. Furthermore, for multizone buildings, subzoning could introduce thermal discomfort for zones. This issue has not be thoroughly investigated in simulation/field studies, and the US Department of Energy’s Oak Ridge National Laboratory explored the impacts of subzoning design through modeling and experimental study.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Impact of Wall Control Performance on Connected Lighting Systems

Wall controls form the only touchpoint for individual room users and that room’s lighting control system. As such, these interfaces strongly influence user understanding and utilization of the system, as well as overall acceptance. The Next Generation Lighting Systems (NGLS) program began an evaluation of the wall controls in 14 connected lighting systems installed in various rooms of the NGLS Living Lab at Parsons School of Design in New York City. These systems demonstrate the wide range of approaches to wall control setup and functionality taken by manufacturers. Characterizing the 14 controls across six attributes, only four, or 29%, were identical. Requirements for wall control design were not specified explicitly by NGLS. Rather, wall controls were required to provide system performance according to three criteria: vacancy control (manual on/auto off) of two zones; manual continuous dimming of the same two zones; and an AV presentation mode in one of the two zones. This report examines the classification of entries, the assessment method used to evaluate the systems from installation through day-to-day use, and the system performance observed to date for each.

42 ENGINEERING↗

A Tale of Two Simulators—A Comparative Human-in-the-Loop Nuclear Power Plant Operations Study on Thermal Power Dispatch for Hydrogen Production

A study was designed for a reconfigurable, full-scale, full-scope nuclear power plant control room simulator to compare two different thermal power dispatch systems, on separate simulator platforms, demonstrating a TPD concept of operation. A TPD system can provide a desirable alternative revenue source for utilities but requires addressing new and unique operational issues. The selection of representative scenarios and the scenario-based experimental design are presented as key elements to capture evidence for validating the developed TPD concept of operations overcome these operational issues.

Ulrich, Thomas A.↗

The Aircraft Simulation Role in Improving Flight Safety Through Control Room Training

NASA Dryden Flight Research Center uses its six-degrees-of-freedom (6-DOF) fixed-base simulations for mission control room training to improve flight safety and operations. This concept is applied to numerous flight projects such as the F-18 High Alpha Research Vehicle (HARV), the F-15 Intelligent Flight Control System (IFCS), the X-38 Actuator Control Test (XACT), and X-43A (Hyper-X). The Dryden 6-DOF simulations are typically used through various stages of a project, from design to ground tests. The roles of these simulations have expanded to support control room training, reinforcing flight safety by building control room staff proficiency. Real-time telemetry, radar, and video data are generated from flight vehicle simulation models. These data are used to drive the control room displays. Nominal static values are used to complete information where appropriate. Audio communication is also an integral part of training sessions. This simulation capability is used to train control room personnel and flight crew for nominal missions and emergency situations. Such training sessions are also opportunities to refine flight cards and control room display pages, exercise emergency procedures, and practice control room setup for the day of flight. This paper describes this technology as it is used in the X-43A and F-15 IFCS and XACT projects.

Shy, Karla S.↗

Packaging Technology for SiC High Temperature Circuits Operable up to 500 Degrees Centigrade

New high temperature low power 8-pin packages have been fabricated using commercial fabrication service. These packages are made of aluminum nitride and 96 percent alumina with Au metallization. The new design of these packages provides the chips inside with EM shielding. Wirebond geometry control has been achieved for precise mechanical tests. Au wirebond samples with 45 degree heel-angle have been tested using wireloop test module. The geometry control improves the consistency of measurement of the wireloop breaking point.Also reported on is a parametric study of the thermomechanical reliability of a Au thick-film based SiC die-attach assembly using nonlinear finite element analysis (FEA) was conducted to optimize the die-attach thermo-mechanical performance for operation at temperatures from room temperature to 500 degrees Centigrade. This parametric study centered on material selection, structure design and process control.

Chen, Lian-Yu↗

The development of a Space Shuttle General Purpose Work Station (GPWS)

The GPWS being developed for the Life Sciences Laboratory to be flown on the fourth Spacelab mission in late 1985 is characterized, and results from Phase I and Phase II tests are reported. The GPWS is designed to provide biological protection for both experiment and operator, a clean-room environment, control of liquids at zero gravity, protection against Spacelab-cabin contamination by chemical vapors, and work space with lights and other accommodations for one or two users in the zero-gravity neutral-body position. The flight hardware subsystems are examined and illustrated; the approach taken to evaluate human factors, performance, contaminant control, and user accommodation is explained; the design-verification unit for ground testing is described; and the improvements introduced in constructing the flight version are indicated.

Wagner, P. A.↗

Actuator Exerts Tensile Or Compressive Axial Load

Compact, manually operated mechanical actuator applies controlled, limited tensile or compressive axial force. Designed to apply loads to bearings during wear tests in clean room. Intended to replace hydraulic actuator. Actuator rests on stand and imparts axial force to part attached to clevis inside or below stand. Technician turns control screw at one end of lever. Depending on direction of rotation of control screw, its end of lever driven downward (for compression) or upward (for tension). Lever pivots about clevis pin at end opposite of control screw; motion drives downward or upward link attached via shearpin at middle of lever. Link drives coupling and, through it, clevis attached to part loaded.

Nozzi, John↗

A study of elevated temperature testing techniques for the fatigue behavior of PMCS: Application to T650-35/AMB21

An experimental study was conducted to investigate the mechanical behavior of a T650-35/AMB21 eight-harness satin weave polymer composite system. Emphasis was placed on the development and refinement of techniques used in elevated temperature uniaxial PMC testing. Issues such as specimen design, gripping, strain measurement, and temperature control and measurement were addressed. Quasi-static tensile and fatigue properties (R(sub sigma) = 0.1) were examined at room and elevated temperatures. Stiffness degradation and strain accumulation during fatigue cycling were recorded to monitor damage progression and provide insight for future analytical modeling efforts. Accomplishments included an untabbed dog-bone specimen design which consistently failed in the gage section, accurate temperature control and assessment, and continuous in-situ strain measurement capability during fatigue loading at elevated temperatures. Finally, strain accumulation and stiffness degradation during fatigue cycling appeared to be good indicators of damage progression.

Gyekenyesi, Andrew L.↗

Human Factors Considerations for Automating Microreactors

The U.S. Nuclear Regulatory Commission (NRC) has interacted with vendors pursuing the commercialization of microreactors ( <10 MW th ). It is envisioned that microreactors could be assembled and fueled in a factory and shipped to a site. Many of the sites are expected to be remote locations requiring off-grid power or in some cases military bases. However, before this new class of nuclear reactor can be fully developed and implemented by designers, an effort must be made to explore the technical issues and provide reasonable assurance to the public regarding health and safety impacts centered on various technical issues. Prior works have examined many of these issues. One issue not yet fully explored is the possible change in role of the operations and support personnel. Due to the passive safety features of microreactors and their low level of nuclear material, the microreactor facilities may automate more functions and rely on inherent safety features more than its predecessor nuclear power plants. In some instances, human operators may not be located onsite and may instead be operating or monitoring the facility from a remote location. Some designs also call for operators to supervise and control multiple microreactors from the control room. This report explores the issues around reduced staffing of microreactors, highlights the historical safety functions associated with human operators, assesses current licensing requirements for appropriateness to varying levels of personnel support, and describes a recommended regulatory approach for reviewing the impact of reduced staff to the operation of microreactors. The report evaluates these issues through an extensive literature survey and Subject Matter Expert interviews. The literature covers research topics related to Human Factors Engineering as well as regulatory guidance given by the Nuclear Regulatory Commission.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Real-time simulator for helicopter rotor wind-tunnel operations

This paper describes the elements and operation of a simulator that is being used to train operators of the Rotor Test Apparatus (RTA) in the large-scale 40- by 80-Foot Wind Tunnel at Ames Research Center. The simulator, named TUTOR (for Tunnel Utilization Trainer with Operating Rotor) duplicates the controls of the rotor and its dynamic behavior, as well as the wind-tunnel controls. The simulation software uses a preexisting blade-element model of a four-bladed rotor with flapping and lead-lag degrees of freedom. Equations were developed for all hardware and controls of the RTA and of the wind tunnel that are normally required to perform a wind-tunnel test of a helicopter rotor. The simulator hardware consists of consoles designed to have the same appearance and functions as those in the control room of the 40- by 80-Foot Wind Tunnel, allowing input from three operators who normally establish the required operating conditions during a test run. Normal operating procedures can be practiced, as well as simulated emergencies such as rotor power failure.

Talbot, P. D.↗

Master Console, SMC

The Master Console oversees the function of Computer Systems in Firing room 1 (FR1). Master Console Operators, MCOs' for short, are our customer. I was integrated into the System Monitoring and Control (SMC) software team that is under the guidance of David Slaiman, who is the product group lead. I have been brought up to speed with System Monitoring and Control. The initial time spent reading SMC software design description and understanding how it works. The current Firing Room 1 Console Display is a floor layout giving the MCO two essential pieces of information which are Health and Status. When an issue arises, the MCO has to look on the display to find which console is affected and then the MCO must use the Reference designator from the display to manually search for the Portal Workstation (PWS) installed in the console using the hardware map; which is a long process to lookup a PWS if an issue is present. My project is to make the FR1 Console Display easier for the MCO's to pinpoint PWS's without having to lookup additional resources in the process. My project also includes updating Firing Room 1 Console Display to include the F1R Non-Redundant Set. The display does not have good use of space and functionality. PWS numbers were not present in the previous design and are the critical component in efficient understanding and administration of the consoles. Part of the process includes getting feedback from the customer, instead of just emailing them with a question, we made a proposal with changes so they could respond and give us their input; which proved to be an effective method for engaging them. In order to do this I had to use the Display Editor (DE) tool developed by NASA, Paint.Net and Visio. The process I have been using has been Visio to alter the floor layout of Firing Room and take advantage of the white areas, and then I take the altered floor plan into Paint.Net. Once in Paint.Net I put the new floor plan as a background to the standard console display. Paint.Net also serves as a tool to create the new service state bars for the new background; finally I used the DE to assemble everything and setup the right CUI's for each PWS.

MCO↗