Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “code compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Component Modeling Approach Software Tool

The Component Modeling Approach Software Tool (CMAST) establishes a set of performance libraries of approved components (frames, glass, and spacer) which can be accessed for configuring fenestration products for a project, and btaining a U-factor, Solar Heat Gain Coefficient (SHGC), and Visible Transmittance (VT) rating for those products, which can then be reflected in a CMA Label Certificate for code compliance. CMAST is web-based as well as client-based. The completed CMA program and software tool will be useful in several ways for a vast array of stakeholders in the industry: Generating performance ratings for bidding projects Ascertaining credible and accurate performance data Obtaining third party certification of overall product performance for code compliance

Source record↗

Energy Storage System Safety Documenting and Validating Compliance with Codes and Standards

Energy, environmental, and economic challenges are spurring more widespread consideration and use of energy storage systems (ESSs), which in turn are driving increased development of new ways to store energy electrochemically, mechanically, and thermally. These new methods necessitate an increased focus on ensuring that public health, safety, and welfare are not adversely affected—something that has been addressed for many years through codes, standards, and regulations (CSR5)1. CSRs provide requirements that establish a basis for determining if an ESS is safe, whether electrochemical, mechanical, or thermal and regardless of the range of ESS applications, energy capacities, physical sizes, location, or number installed at any given site. The key to achieving desired safety goals, as memorialized through CSRs, is through documenting and validating compliance with applicable CSRs. The process of documenting and validating compliance, which is a key component to the initial approval as well as continuing acceptance of an ESS installation, is generally called conformity assessment.

25 ENERGY STORAGE↗

Developing Performance Cost Index Targets for ASHRAE Standard 90.1 Appendix G – Performance Rating Method

Appendix G, the Performance Rating Method in ASHRAE Standard 90.1 has been updated to make two significant changes for the 2016 edition, to be published in October of 2016. First, it allows Appendix G to be used as a third path for compliance with the standard in addition to rating beyond code building performance. This prevents modelers from having to develop separate building models for code compliance and beyond code programs. Using this new version of Appendix G to show compliance with the 2016 edition of the standard, the proposed building design needs to have a performance cost index (PCI) less than targets shown in a new table based on building type and climate zone. The second change is that the baseline design is now fixed at a stable level of performance set approximately equal to the 2004 code. Rather than changing the stringency of the baseline with each subsequent edition of the standard, compliance with new editions will simply require a reduced PCI (a PCI of zero is a net-zero building). Using this approach, buildings of any era can be rated using the same method. The intent is that any building energy code or beyond code program can use this methodology and merely set the appropriate PCI target for their needs. This report discusses the process used to set performance criteria for compliance with ASHRAE Standard 90.1-2016 and suggests a method for demonstrating compliance with other codes and beyond code programs.

99 GENERAL AND MISCELLANEOUS↗

Developing Performance Cost Index Targets for ASHRAE Standard 90.1 Appendix G – Performance Rating Method - Rev.1

Appendix G, the Performance Rating Method in ASHRAE Standard 90.1 has been updated to make two significant changes for the 2016 edition, to be published in October of 2016. First, it allows Appendix G to be used as a third path for compliance with the standard in addition to rating beyond code building performance. This prevents modelers from having to develop separate building models for code compliance and beyond code programs. Using this new version of Appendix G to show compliance with the 2016 edition of the standard, the proposed building design needs to have a performance cost index (PCI) less than targets shown in a new table based on building type and climate zone. The second change is that the baseline design is now fixed at a stable level of performance set approximately equal to the 2004 code. Rather than changing the stringency of the baseline with each subsequent edition of the standard, compliance with new editions will simply require a reduced PCI (a PCI of zero is a net-zero building). Using this approach, buildings of any era can be rated using the same method. The intent is that any building energy code or beyond code program can use this methodology and merely set the appropriate PCI target for their needs. This report discusses the process used to set performance criteria for compliance with ASHRAE Standard 90.1-2016 and suggests a method for demonstrating compliance with other codes and beyond code programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

New Path for Building Compliance in ASHRAE Model Energy Efficiency Standard

This article describes a new path for performance based compliance with ASHRAE Standard 90.1. Using Appendix G, the Performance Rating Method, this path allows the same simulated baseline model to be used for both code compliance and beyond code programs. The baseline is fixed at approximately 90.1-2004 and independent of the designer's chosen design solutions to the greatest extent possible

Addendum BM↗

Renewable Energy Requirements for Future Building Codes: Options for Compliance

As the model energy codes are improved to reach efficiency levels 50 percent greater than current codes, use of on-site renewable energy generation is likely to become a code requirement. This requirement will be needed because traditional mechanisms for code improvement, including envelope, mechanical and lighting, have been pressed to the end of reasonable limits. Research has been conducted to determine the mechanism for implementing this requirement (Kaufman 2011). Kaufmann et al. determined that the most appropriate way to structure an on-site renewable requirement for commercial buildings is to define the requirement in terms of an installed power density per unit of roof area. This provides a mechanism that is suitable for the installation of photovoltaic (PV) systems on future buildings to offset electricity and reduce the total building energy load. Kaufmann et al. suggested that an appropriate maximum for the requirement in the commercial sector would be 4 W/ft 2 of roof area or 0.5 W/ft 2 of conditioned floor area. As with all code requirements, there must be an alternative compliance path for buildings that may not reasonably meet the renewables requirement. This might include conditions like shading (which makes rooftop PV arrays less effective), unusual architecture, undesirable roof pitch, unsuitable building orientation, or other issues. In the short term, alternative compliance paths including high performance mechanical equipment, dramatic envelope changes, or controls changes may be feasible. These options may be less expensive than many renewable systems, which will require careful balance of energy measures when setting the code requirement levels. As the stringency of the code continues to increase however, efficiency trade-offs will be maximized, requiring alternative compliance options to be focused solely on renewable electricity trade-offs or equivalent programs. One alternate compliance path includes purchase of Renewable Energy Credits (RECs). Each REC represents a specified amount of renewable electricity production and provides an offset of environmental externalities associated with non-renewable electricity production. The purpose of this paper is to explore the possible issues with RECs and comparable alternative compliance options. Existing codes have been examined to determine energy equivalence between the energy generation requirement and the RECs alternative over the life of the building. The price equivalence of the requirement and the alternative are determined to consider the economic drivers for a market decision. This research includes case studies that review how the few existing codes have incorporated RECs and some of the issues inherent with REC markets. Section 1 of the report reviews compliance options including RECs, green energy purchase programs, shared solar agreements and leases, and other options. Section 2 provides detailed case studies on codes that include RECs and community based alternative compliance methods. The methods the existing code requirements structure alternative compliance options like RECs are the focus of the case studies. Section 3 explores the possible structure of the renewable energy generation requirement in the context of energy and price equivalence. The price of RECs have shown high variation by market and over time which makes it critical to for code language to be updated frequently for a renewable energy generation requirement or the requirement will not remain price-equivalent over time. Section 4 of the report provides a maximum case estimate for impact to the PV market and the REC market based on the Kaufmann et al. proposed requirement levels. If all new buildings in the commercial sector complied with the requirement to install rooftop PV arrays, nearly 4,700 MW of solar would be installed in 2012, a major increase from EIA estimates of 640 MW of solar generation capacity installed in 2009. The residential sector could contribute roughly an additional 2,300 MW based on the same code requirement levels of 4 W/ft 2 of roof area. Section 5 of the report provides a basic framework for draft code language recommendations based on the analysis of the alternative compliance levels.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Pennsylvania and Delaware Energy Code Field Studies (Final Technical Report (FTR)

Led by Northeast Energy Efficiency Partnerships (NEEP) in partnership with Performance Systems Development (PSD), the project aimed to conduct energy code compliance field studies for single-family residential buildings in Pennsylvania and Delaware, as well as multifamily and commercial buildings in Pennsylvania. Using U.S. Department of Energy (DOE) approved methodologies, trained field teams conducted on-site observations and testing to document compliance with key energy efficiency measures, including building envelope insulation, air sealing, duct leakage, windows, and mechanical systems. Data from these studies would then be analyzed to identify construction trends and compliance gaps. The goals included published baseline data for each study, and a training roadmap tailored to each state’s needs. This roadmap would have guided outreach and training for builders, code officials, and other stakeholders on the specific code requirements that offered the greatest opportunity for improvement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Stable Whole Building Performance Method for Standard 90.1-Part II

In May of 2013 we introduced a new approach for compliance with Standard 90.1 that was under development based on the Performance Rating Method of Appendix G to Standard 90.11. Since then, the approach has been finalized through Addendum BM to Standard 90.1-2013 and will be published in the 2016 edition of the Standard. In the meantime, ASHRAE has published an advanced copy of Appendix G including Addendum BM and several other addenda so that software developers and energy program administrators can get a preview of what is coming in the 2016 edition of the Standard2. This article is an update on Addendum BM, summarizes changes made to the original concept as introduced in May of 2013, and provides an approach for developing performance targets for code compliance and beyond code programs.

Addendum BM↗

Sealed Crawl Spaces with Integrated Whole-House Ventilation in a Cold Climate

One method of code-compliance for crawlspaces is to seal and insulate the crawlspace, rather than venting to the outdoors. However, codes require mechanical ventilation; either via conditioned supply air from the HVAC system, or a continuous exhaust ventilation strategy. As the CARB's building partner, Ithaca Neighborhood Housing Services, intended to use the unvented crawlspace in a recent

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Sealed Crawl Spaces with Integrated Whole-House Ventilation in a Cold Climate

One method of code-compliance for crawlspaces is to seal and insulate the crawlspace, rather than venting to the outdoors. However, codes require mechanical ventilation; either via conditioned supply air from the HVAC system, or a continuous exhaust ventilation strategy. As the CARB's building partner, Ithaca Neighborhood Housing Services, intended to use the unvented crawlspace in a recent development, CARB was interested in investigating a hybrid ventilation method that includes the exhaust air from the crawlspace as a portion of an ASHRAE 62.2 compliant whole-house ventilation strategy. This hybrid ventilation method was evaluated through a series of long-term monitoring tests that observed temperature, humidity, and pressure conditions through the home and crawlspace.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building America Case Study: Sealed Crawl Spaces with Integrated Whole-House Ventilation in a Cold Climate, Ithaca, New York

"9One method of code-compliance for crawlspaces is to seal and insulate the crawlspace, rather than venting to the outdoors. However, codes require mechanical ventilation; either via conditioned supply air from the HVAC system, or a continuous exhaust ventilation strategy. As the CARB's building partner, Ithaca Neighborhood Housing Services, intended to use the unvented crawlspace in a recent development, CARB was interested in investigating a hybrid ventilation method that includes the exhaust air from the crawlspace as a portion of an ASHRAE 62.2 compliant whole-house ventilation strategy. This hybrid ventilation method was evaluated through a series of long-term monitoring tests that observed temperature, humidity, and pressure conditions through the home and crawlspace. Additionally, CARB worked with NREL to perform multi-point tracer gas testing on six separate ventilation strategies - varying portions of 62.2 required flow supplied by the crawlspace fan and an upstairs bathroom fan. The intent of the tracer gas testing was to identify effective Reciprocal Age of Air (RAoA), which is equivalent to the air change rate in well-mixed zones, for each strategy while characterizing localized infiltration rates in several areas of the home.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

90% Compliance Pilot Studies Final Report

In early 2010, the U.S. Department of Energy (DOE) announced an opportunity for states to participate in energy code compliance evaluation pilot studies. DOE worked with five Regional Energy Efficiency Organizations (REEOs, formerly referred to as Energy Efficiency Partnerships, or EEPs) to fund pilot studies covering nine states. This report details conclusions stated in individual state reports, as well as conclusions drawn by DOE based on their oversight of the pilot studies, and based on discussions held with the REEOs and representatives from the pilot study states and their contractors.

building codes↗

Maryland Residential Energy Code Field Study: Baseline Report

A research project in the state of Maryland investigated energy code-related aspects of residential single-family new construction. The study was initiated in January 2015 and continued through July 2015. During this period, research teams visited 207 homes during various stages of construction, resulting in a substantial data set based on observations made directly in the field. Analysis of the data has led to a better understanding of the energy features present in homes, and indicates over $1.5 million in potential savings to Maryland homeowners that could result from increased code compliance. Public and private entities within the state can use this information to justify and catalyze future investments in energy code training and related energy-efficiency programs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review (2023 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to AHJs at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2023, the National Renewable Energy Laboratory (NREL) had contacted over 1,700 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 793 AHJs had expressed interest in the platform as of the end of 2023. 161 AHJs had begun piloting the platform and 97 of these had publicly launched the platform by the end of 2023. In 2023, 668 installers submitted 18,906 permits through the SolarAPP+ platform, including 4,834 permits submitted as part of a solar plus storage program. SolarAPP+ permits accounted for around 43% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 14.5 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 7,200 hours of AHJ staff time in 2023. Finally, we estimate that SolarAPP+ eliminated over 150,000 business days in permitting-related delays in 2023.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY↗

EnergyPlus Analysis Capabilities for Use in California Building Energy Efficiency Standards Development and Compliance Calculations

California has been using DOE-2 as the main building energy analysis tool in the development of building energy efficiency standards (Title 24) and the code compliance calculations. However, DOE-2.1E is a mature program that is no longer supported by LBNL on contract to the USDOE, or by any other public or private entity. With no more significant updates in the modeling capabilities of DOE-2.1E during recent years, DOE-2.1E lacks the ability to model, with the necessary accuracy, a number of building technologies that have the potential to reduce significantly the energy consumption of buildings in California. DOE-2's legacy software code makes it difficult and time consuming to add new or enhance existing modeling features in DOE-2. Therefore the USDOE proposed to develop a new tool, EnergyPlus, which is intended to replace DOE-2 as the next generation building simulation tool. EnergyPlus inherited most of the useful features from DOE-2 and BLAST, and more significantly added new modeling capabilities far beyond DOE-2, BLAST, and other simulations tools currently available. With California's net zero energy goals for new residential buildings in 2020 and for new commercial buildings in 2030, California needs to evaluate and promote currently available best practice and emerging technologies to significantly reduce energy use of buildings for space cooling and heating, ventilating, refrigerating, lighting, and water heating. The California Energy Commission (CEC) needs to adopt a new building energy simulation program for developing and maintaining future versions of Title 24. Therefore, EnergyPlus became a good candidate to CEC for its use in developing and complying with future Title 24 upgrades. In 2004, the Pacific Gas and Electric Company contracted with ArchitecturalEnergy Corporation (AEC), Taylor Engineering, and GARD Analytics to evaluate EnergyPlus in its ability to model those energy efficiency measures specified in both the residential and nonresidential Alternative Calculation Method (ACM) of the Title-24 Standards. The AEC team identified gaps between EnergyPlus modeling capabilities and the requirements of Title 24 and ACMs. AEC's evaluation was based on the 2005 version of Title 24 and ACMs and the version 1.2.1 of EnergyPlus released on October 1, 2004. AEC's evaluation is useful for understanding the functionality and technical merits of EnergyPlus for implementing the performance-based compliance methods described in the ACMs. However, it did not study the performance of EnergyPlus in actually making building energy simulations for both the standard and proposed building designs, as is required for any software program to be certified by the CEC for use in doing Title-24 compliance calculations. In 2005, CEC funded LBNL to evaluate the use of EnergyPlus for compliance calculations by comparing the ACM accuracy test runs between DOE-2.1E and EnergyPlus. LBNL team identified key technical issues that must be addressed before EnergyPlus can be considered by the CEC for use in developing future Nonresidential Title-24 Standards or as an ACM tool. With Title 24 being updated to the 2008 version (which adds new requirements to the standards and ACMs), and EnergyPlus having been through several update cycles from version 1.2.1 to 2.1, it becomes crucial to review and update the previously identified gaps of EnergyPlus for use in Title 24, and more importantly to close the gaps which would help pave the way for EnergyPlus to be adopted as a Title 24 compliance ACM. With this as the key driving force, CEC funded LBNL in 2008 through this PIER (Public Interest Energy Research) project with the overall technical goal to expand development of EnergyPlus to provide for its use in Title-24 standard compliance and by CEC staff.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗