Engineering PapersSearch

SEARCH · Engineering Papers

Results for “climbing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Onboard near-optimal climb-dash energy management

This paper studies optimal and near-optimal trajectories of high-performance aircraft in symmetric flight. Onboard, real-time, near-optimal guidance is considered for the climb-dash mission, using some of the boundary-layer structure and hierarchical ideas from singular perturbations. In the case of symmetric flight, this resembles neighborhood-optimal guidance using energy-to-go as the running variable. However, extension to three-dimensional flight is proposed, using families of nominal paths with heading-to-go as the additional running variable. Some computational results are presented for the symmetric case.

Weston, A.

Wind tunnel results of advanced high speed propellers in the takeoff, climb, and landing operating regimes

Low speed wind tunnel performance tests of two advanced propellers were completed. The 62.2 cm diameter adjustable pitch models were tested at Mach numbers typical of takeoff, initial climbout, and landing speeds in the 10 by 10 ft Supersonic Wind Tunnel. Both models had eight blades and a cruise design point operating condition of 0.80 Mach number, 10.668 km S.A. altitude, 243.8 m/s tip speed and a high power loading of 301 kW sq m. No adverse or unusual low speed operating conditions were found during the test with either the straight blade SR-2 or the 45 deg swept SR-3 propellers. The 45 deg swept propeller efficiency exceeded the straight blade efficiency by 4 to 5 percent. Typical net efficiencies of the straight and 45 deg swept propeller at a Mach 0.20 takeoff condition were 50.2 and 54.9 percent respectively. At a Mach 0.34 climb condition, the efficiencies were 53.7 and 59.1 percent. Reverse thrust data indicates that these propellers are capable of producing more reverse thrust at Mach 0.20 than a high bypass turbofan engine at Mach 0.20.

Stefko, G. L.

Wind-Tunnel Results of Advanced High-Speed Propellers at Takeoff, Climb, and Landing Mach Numbers

Low-speed wind-tunnel performance tests of two advanced propellers have been completed at the NASA Lewis Research Center as part of the NASA Advanced Turboprop Program. The 62.2 cm (24.5 in.) diameter adjustable-pitch models were tested at Mach numbers typical of takeoff, initial climbout, and landing speeds (i.e., from Mach 0.10 to 0.34) at zero angle of attack in the NASA Lewis 10 by 10 Foot Supersonic Wind Tunnel. Both models had eight blades and a cruise-design-point operating condition of Mach 0.80, and 10.668 km (35,000 ft) I.S.A. altitude, a 243.8 m/s (800 ft/sec) tip speed, and a high power loading of 301 kW/sq m (37.5 shp/sq ft). Each model had its own integrally designed area-ruled spinner, but used the same specially contoured nacelle. These features reduced blade-section Mach numbers and relieved blade-root choking at the cruise condition. No adverse or unusual low-speed operating conditions were found during the test with either the straight blade SR-2 or the 45 deg swept SR-3 propeller. Typical efficiencies of the straight and 45 deg swept propellers were 50.2 and 54.9 percent, respectively, at a takeoff condition of Mach 0.20 and 53.7 and 59.1 percent, respectively, at a climb condition of Mach 0.34.

Stefko, George L.

Nondimensional forms for singular perturbation analyses of aircraft energy climbs

This paper proposes a systematic approach for identifying the perturbation parameter in singular perturbation analysis of aircraft optimal guidance, and in particular considers a family of problems related to aircraft energy climbs. The approach, which is based on a nondimensionalization of the equations of motion, is used to evaluatae the appropriateness of forced singular perturbation formulations used in the past for transport and fighter aircraft, and to assess the applicability of energy state approximations and singular perturbation analysis for airbreathing transatmospheric vehicles with hypersonic cruise and orbital capabilities.

Calise, A. J.

Thrust and power required in climbing

The following article shows that the phenomena of climbing flight can be determined with sufficient accuracy and represented very clearly, for all flight positions, by means of the thrust diagrams. This method has often given good results.

Koenig, George

Multiple-Segment Climbing Robots

Multiple-segment climbing robots developed to perform such tasks as inspection, sandblasting, welding, and painting on towers and other structures. Look and move like caterpillars. Video camera mounted on one of segments rotated to desired viewing angle. Used in remote inspection of structure, to view motion of robot and/or provides video feedback for control of motion, and/or to guide operation of head mounted on foremost segment with motorized actuators.

Kerley, James

Acoustic Climb to Cruise Test

Flight test film footage of three different aircraft testing the acoustical noise levels during take-off, climb, maneuvers, and touch and go landings are described. These sound tests were conducted on two fighter aircraft and one cargo aircraft. Results from mobile test vehicle are shown.

Source record

Multi-sensor, high speed autonomous stair climbing

In this paper we present the design and implementation of a new set of estimation and control algorithms that increase the speed and effectiveness of stair climbing.

mobile robotics estimation control machine vision

Using the Climbing Drum Peel (CDP) Test to Obtain a G(sub IC) value for Core/Facesheet Bonds

A method of measuring the Mode I fracture toughness of core/facesheet bonds in sandwich Structures is desired, particularly with the widespread use of models that need this data as input. This study examined if a critical strain energy release rate, G(sub IC), can be obtained from the climbing drum peel (CDP) test. The CDP test is relatively simple to perform and does not rely on measuring small crack lengths such as required by the double cantilever beam (DCB) test. Simple energy methods were used to calculate G(sub IC) from CDP test data on composite facesheets bonded to a honeycomb core. Facesheet thicknesses from 2 to 5 plies were tested to examine the upper and lower bounds on facesheet thickness requirements. Results from the study suggest that the CDP test, with certain provisions, can be used to find the GIG value of a core/facesheet bond.

Nettles, A. T.

Robot Would Climb Steep Terrain

This brief describes the steep terrain access robot (STAR) -- a walking robot that has been proposed for exploring steep terrain on remote planets. The STAR would be able to climb up or down on slopes as steep as vertical, and even beyond vertical to overhangs. Its system of walking mechanisms and controls would be to react forces and maintain stability. To enable the STAR to anchor itself in the terrain on steep slopes to maintain stability and react forces, it would be necessary to equip the tips of the walking legs with new ultrasonic/ sonic drill corers (USDCs) and to develop sensors and control algorithms to enable robust utilization of the USDCs.

Kennedy, Brett

Modification of a Limbed Robot to Favor Climbing

The figure shows the LEMUR IIb, which is a modified version of the LEMUR II the second generation of the Limbed Excursion Mechanical Utility Robot (LEMUR). Except as described below, the LEMUR IIb hardware is mostly the same as that of the LEMUR II. The IIb and II versions differ in their kinematic configurations and characteristics associated with their kinematic configurations. The differences are such that relative to the LEMUR II, the LEMUR IIb is simpler and is better suited to climbing on inclined surfaces. The first-generation LEMUR, now denoted the LEMUR I, was described in Six-Legged Experimental Robot (NPO-20897), NASA Tech Briefs, Vol. 25, No. 12 (December 2001), page 58. The LEMUR II was described in Second-Generation Six-Limbed Experimental Robot (NPO-35140) NASA Tech Briefs, Vol. 28, No. 11 (November 2004), page 55. To recapitulate: the LEMUR I and LEMUR II were six-legged or sixlimbed robots for demonstrating robotic capabilities for assembly, maintenance, and inspection. They were designed to be capable of walking autonomously along a truss structure toward a mechanical assembly at a prescribed location. They were equipped with stereoscopic video cameras and image-data-processing circuitry for navigation and mechanical operations. They were also equipped with wireless modems, through which they could be commanded remotely. Upon arrival at a mechanical assembly, the LEMUR I would perform simple mechanical operations by use of one or both of its front legs (or in the case of the LEMUR II, any of its limbs could be used to perform mechanical operations). Either LEMUR could also transmit images to a host computer. The differences between the LEMUR IIb and the LEMUR II are the following: Whereas the LEMUR II had six limbs, the LEMUR IIb has four limbs. This change has reduced both the complexity and mass of the legs and of the overall robot. Whereas each limb of the LEMUR II had four degrees of freedom (DOFs), each limb of the LEMUR IIb has three DOFs. This change has also reduced both complexity and mass. Notwithstanding the decrease in the number of DOFs, the three remaining DOFs are configured to provide greater dexterity for motion along a surface. To extend reach, the limbs of the LEMUR IIb are 25 percent longer than those of the LEMUR II. Additional benefits stemming from the modifications are that the robot body supported by the limbs is now less massive and its center of gravity is now closer to the surface along which the robot is to move. These benefits have been obtained without sacrificing load-carrying capacity. Hence, overall, the LEMUR IIb is a more adept climber.

Okon, Avi

Trajectory Optimization Using Adjoint Method and Chebyshev Polynomial Approximation for Minimizing Fuel Consumption During Climb

This paper describes two methods of trajectory optimization to obtain an optimal trajectory of minimum-fuel- to-climb for an aircraft. The first method is based on the adjoint method, and the second method is based on a direct trajectory optimization method using a Chebyshev polynomial approximation and cubic spine approximation. The approximate optimal trajectory will be compared with the adjoint-based optimal trajectory which is considered as the true optimal solution of the trajectory optimization problem. The adjoint-based optimization problem leads to a singular optimal control solution which results in a bang-singular-bang optimal control.

Chebyshev Polynomial

Gripping Mechanisms for Microgravity and Extreme Terrain and Vertical Climbing Micro Ground Vehicle

Asteroids and comets may provide insight into the origins of our solar system and the precursors to life on our planet. Near Earth objects offer an accessible target of opportunity, but are small and lack the gravity necessary for conventional wheeled travel. Therefore, it is necessary to develop alternative methods for maneuvering in these environments. This project researched and developed a method for gripping rock surfaces. Work has been completed on the design and prototyping of several possible hooked gripping mechanisms. Future work includes quantitative testing, downselection to a final design, and attachment to the robotic platform, Lemur IIb. A second project focuses on the development of a 100g, crash-proof robot capable of climbing vertical surfaces using a novel silicone adhesive. Capable of carrying video/audio payloads the robot may serve as a surveillance tool for the Department of Defense or as a method of pre-flight spacecraft inspections. A specialized track was developed to provide the specific loading conditions necessary for proper engagement of the adhesive. Both of these projects rely heavily on the shape deposition manufacturing process, being researched at JPL, and 3D printing.

robotic locomotion

Scaling Climbing Collaborative Mobile Manipulators for Outfitting a Tall Lunar Tower and Truss Structures

In-space and planetary truss structures like the Tall Lunar Tower (TLT) can greatly benefit from truss climbing collaborative mobile manipulators (C2M2) for outfitting and other servicing tasks. Mobile robotic systems traversing truss structures will allow for improved access to the structure for placing equipment and routing cables after the structure has been assembled. The C2M2 is designed to provide access to the structure through collaborative mobile robotics. A series of gaits are developed allowing the robot to reach any point on the structure and validate the capabilities of the joint configuration. Scaling the system during the design phase is a necessary process given the wide range of trusses in development and payloads which are required for outfitting. The variable features of the system are the actuators and the length of the links connecting the two-degrees of freedom (DOF) modules. A scaling method was developed for determining the range of usable link lengths for a selected actuator in a design environment. The focus of the design is on a six-DOF robot arranged with two-DOF at each end and at the center. Two grippers are mounted at each end for grappling on the truss and holding cargo.

Collaborative Robotics

Scaling Climbing Collaborative Mobile Manipulators (C2M2) for Outfitting a Tall Lunar Tower (TLT) and Truss Structures

In-space and planetary truss structures like the Tall Lunar Tower (TLT) can greatly benefit from truss climbing collaborative mobile manipulators (C-CMMs) for outfitting and other servicing tasks. Mobile robotic systems traversing these structures will allow for improved access to the structure for placing equipment and routing cables after the structure has been assembled. The robotic system described in the proposed paper is designed to provide access to the structure through collaborative mobile robotics. The paper will provide a method to constrain the design of such a robot via the geometry of the truss structure and the controlling joint torques across various gaits. The focus of the design is on a six-degree of freedom (DOF) robot arranged with two-DOF at each end and at the center. The variable features of this system are the actuators and the length of the links connecting the two-DOF modules. The result of the analysis is a link sizing range which the robot can be designed within to ensure functionality on the truss structure. A C-CMM will be designed using the scaling utility and several constructed to demonstrate operating both independently and collaboratively.

in-space assembly

Climbing efficiency of aircraft

The object of this report was to indicate that we frequently only make use of 50 percent of the maximum brake horsepower of the engine in taking off the ground, that this loss is not inevitable, and that the effort to get engines of low weight per horsepower by boosting revolutions is of very little use to bombers and commercial airplanes.

AIRPLANES - PERFORMANCE