Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “charger”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

In-route inductive versus stationary conductive charging for shared automated electric vehicles: A university shuttle service

In-route inductive charging technology, as applied to automated electric vehicles, can help realize a fully automated system of both vehicles and chargers. This study presents a planning optimization analysis for fixed-route automated shuttles supported by in-route inductive charging technology. A techno-economic feasibility of inductive charging was assessed in comparison with stationary charging, including Level 2 AC chargers, and DC fast chargers (DCFCs). This analysis considered both present-day and future vehicle operations and overall system costs. A real project with two circulator Navya Arma shared automated electric vehicles (SAEVs) at the University of Michigan was investigated using real-world collected energy and travel data. The outcomes show that the proper design of quasi-dynamic inductive chargers at designated stops allows SAEVs to realize unlimited driving range and be cost-competitive to DCFC technology. Considering present-day costs and vehicles, low-speed SAEVs can realize charge-sustaining operation at a minimum cost either by implementing a 50-kW inductive charger at two stops with one segment per position and a 29-kWh onboard battery, or by installing a 100-kW inductive charger at one stop with one segment per position and a 28-kWh onboard battery. Overall, considering future costs and vehicles, either a 40-kW charger at one stop with a 29-kWh battery or a 50-kW charger at the north stop with a 14-kWh battery would enable charge-sustaining operation. In addition, quasi-dynamic inductive solution can reduce the onboard battery by about 15% while providing unlimited driving range, but stationary scenarios require about 112% additional battery capacity to support a 12-h driving range.

33 ADVANCED PROPULSION SYSTEMS↗

Operational optimization for multi-functional charging station with electric and hydrogen-powered vehicles

The rapid adoption of electric vehicles (EVs) and hydrogen fuel cell vehicles (HFCVs), combined with global efforts to reduce carbon emissions, has accelerated the development of EV charging and hydrogen refueling stations. In response to this demand, this paper introduces the concept of Multi-Functional Charging Station (MFCS) that integrates power generation, EV charging, battery swapping, and hydrogen refueling. A comprehensive operational model is developed for the MFCS that couples electricity and hydrogen conversion and storage technologies to enhance infrastructure utilization and improve overall system efficiency. The model also considers multiple revenue streams, including participation in energy and ancillary markets. To validate the effectiveness of the proposed model and evaluate its performance, a series of numerical experiments are conducted with different charger numbers, different electricity purchase limits, and different charger allocations. Numerical results demonstrate that shared charger configurations can lead to 8.11 % improvement in operational profit by improving resource utilization and reducing the number of depleted batteries at the end of operations compared to allocated charger setups. By varying the number of chargers, sensitivity analysis identifies diminishing marginal returns beyond about 45 chargers, suggesting it as an optimal sizing point under current settings. The integration of electricity and hydrogen conversion is also explored under scenarios with limited external electricity purchases. In conclusion, these findings indicate that optimizing charger allocation and energy management can significantly enhance station productivity and profitability, ultimately supporting the broader adoption of electrified and hydrogen-based transportation solutions.

Charging station↗

Equitable Urban Electric Vehicle Charging: Feasibility and Benefits of Streetlight Charging in Kansas City Right-of-Way

With an increasing global emphasis on sustainability, electric vehicles (EVs) play a crucial role in reducing urban pollution and carbon emissions. For EVs to be widely adopted, equitable and convenient access to charging infrastructure is essential. Equity in this paper refers to the proactive engagement with the community to ensure that the benefits of streetlight charging are distributed equitably across diverse neighborhoods in Kansas City, providing fair charging opportunities and resources to all community members. This research explores the potential of utilizing streetlights—ubiquitous elements of urban electrical infrastructure—as low-cost, equitable EV charging solutions. Compared with conventional chargers, streetlight charging offers several notable advantages, including proximity to roadways, potential boosts to the local economy, and easier usage due to city ownership. These chargers also leverage existing power setups to minimize costs and maximize efficiency by reutilizing existing structures. In this manuscript, we introduce a systematic framework to develop, analyze, and evaluate a scalable and cost-effective streetlight charging solution. Initially, we employ a two-tiered site selection framework that accounts for both charging demand and equity considerations to identify optimal locations for streetlight chargers. We then assess the feasibility of these chargers through observational data from 23 units installed in Kansas City, Missouri, comparing their performance with traditional chargers. Here, our evaluation extends to the environmental impact, comparing reduced gasoline consumption and greenhouse gas (GHG) emission reductions between streetlights and regular charging stations. Our findings reveal that streetlight charging stations offer faster charging speeds than conventional stations, validating their viability for EV charging. Additionally, the duration of stay at streetlight chargers tends to be shorter, likely due to parking constraints or associated costs. Furthermore, streetlight-powered chargers demonstrate considerable environmental advantages, achieving 11.94% greater avoided gasoline consumption and 11.24% higher GHG reductions compared with regular charging stations, highlighting their substantial environmental benefits.

42 ENGINEERING↗

Fleet Size Requirements for Each GSE Type at Each Airport

This dataset contains the required number of vehicles for each GSE type at each airport under six charging scenarios: (1) charging when the battery state of charge is insufficient for the next service using 40-kW chargers (S1); (2) charging when the battery state of charge is insufficient for the next service using 20-kW chargers (S2); (3) charging starts immediately after each GSE completes a service task using 40-kW chargers (S3); (4) charging starts immediately after each GSE completes a service task using 20-kW chargers (S4); (5) charging during off-peak hours using 40-kW chargers (S5); and (6) charging during off-peak hours using 20-kW chargers (S6). ![image](gse-vehicles-chargers.png) Number of GSE vehicles per GSE type and chargers required for different airport categories under charging scenario 1.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Solar Energy Extension Project

The town of Stratford plans to develop and own a 6 kilowatt (kW) solar array on the roof of a municipal-owned public pavilion on the town green. A SolarEdge level 2 EV charging station will be installed at the pavilion to be used by the public. The charging station will have one charging port. The town will install 3 air source heat pumps in the library located adjacent to the pavilion to reduce the use of propane to heat the library. The town will install 4 air source heat pumps in the Town Hall to reduce the use of #2 heating oil to heat the facility. The 6 kW solar array will provide electricity to the library to offset electricity usage, and when an EV plugs into the charging station the solar will provide electricity to the charging station. There is no ground disturbance or ground trenching associated with this project. The 6 kW solar array on the roof of the pavilion will include 20 (390) watt all black panels. A SolarEdge level 2 EV charger will be installed at the pavilion with the 240 V inverter. The solar array will provide electricity to the library and when a vehicle plugs into the EV charger the solar array will switch to power the charger. Any excess electricity that is generated by the array and not used by the library or the EV charger will be fed onto the grid and the town will receive a net metering credit applied towards future consumption. There is no ground disturbance associated with the EV charger or solar array, and the town will install signage to direct the public to the charger. The library will install 2 (18,000) BTU ductless air source heat pumps and 1 (24,000) BTU unit. This will significantly reduce the amount of propane required to heat the library. The Town Hall will install 2 (36,000) BTU ductless air source heat pumps and 2 (9,000) BTU units to reduce the amount of #2 heating oil required to heat the building.

14 SOLAR ENERGY↗

GSE Yearly Load Profiles for Each Airport Under Six Charging Scenarios

This dataset contains GSE yearly load profiles for each airport under six charging scenarios: (1) charging when the battery state of charge is insufficient for the next service using 40-kW chargers (S1); (2) charging when the battery state of charge is insufficient for the next service using 20-kW chargers (S2); (3) charging starts immediately after each GSE completes a service task using 40-kW chargers (S3); (4) charging starts immediately after each GSE completes a service task using 20-kW chargers (S4); (5) charging during off-peak hours using 40-kW chargers (S5); and (6) charging during off-peak hours using 20-kW chargers (S6). ![image](gse_load_profile_sample_day.png) GSE load profile of a sample day across different airport categories under charging scenario 1.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Use and Siting of Electric Vehicle Charging Stations in Juneau, Alaska

This report details a study of electric vehicle (EV) Level 2 charging stations in Juneau, Alaska. Utilization analyses of six public over five years and 250 residential chargers over two years are included, and a composite score is introduced to identify optimal locations for future charging stations that target residents of manufactured and multifamily housing (MMFH) in Juneau. We find that public charging station usage is very location-dependent, with three chargers in use more than 60% of days during the peak hour of the day (which ranges from 10 a.m. to 7 p.m.), including a charger near residential housing, illuminating potential needs for additional public chargers in those areas. Residential charging utilization typically occurs overnight - opposite to most public charging stations analyzed - and spikes after 10 p.m. This suggests that Alaska Electric Light & Power Company's time-of-use charging program, which lowers electricity rates at 10 p.m. to incentivize overnight charging, is very effective. Residential charging data also show that households tend to charge 15 hours per week, or 9% of the time, meaning that multiple households could likely share one charger if one were provided near MMFH locations. This is supported by residential charging session analysis, which shows that the median household has around two night charging sessions per week. The EV siting analysis identifies areas of high housing density, low access to public chargers, and unconstrained feeders. A cluster of MMFH parcels in Douglas demonstrated the highest composite scores considering all factors, being the only area to have a perfect score of 2.25.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Charging Hub Scenario Sheet Screenshot

The Excel-based CHECT tool estimates the LCOC ($/kWh) by charger type (Level 1, Level 2, and DC fast charging) for a given charging hub scenario. CHECT requires users to input certain charging hub scenario parameters, including the number of chargers, daily utilization, and charger replacement frequency by charger type. Additional inputs such as the charging schedule, local utility rates, capital/operational costs, and financial inputs can be customized by the user, or the tool can generate results using appropriate default values from literature for the charging hub scenario and service location(s). Using the above inputs, CHECT performs a robust techno-economic analysis to generate the LCOC by charger type, broken down by cost category (e.g., capital, operational, utility, taxes) for various combinations of charging hub types (multiunit dwelling or public) and ownership models (residential, utility, or private company). It also outputs the annual discounted cash flows and determines the most sensitive input variables. In addition, the tool allows users to easily compare the LCOC across various ownership models or across different states.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Soft costs and EVSE – Knowledge gaps as a barrier to successful projects

There has been a recent push to increase access to electric vehicle (EV) charging infrastructure. The National Electric Vehicle Infrastructure (NEVI) program, part of the Bipartisan Infrastructure Law (BIL) has made significant funding available for major charging infrastructure projects along state thruways, and many state and local incentives exist for EV owners to install chargers in their homes. However, deployment of these chargers has not kept up with demand, primarily due to issues in project planning, permitting processes, and unforeseen delays. This paper serves as a review of the current understanding of these and other non-hardware costs in EV charging infrastructure projects (collectively known as “soft costs”). We found that soft costs in EV charging infrastructure projects are not well understood. Specifically, there is little agreement on how soft costs should be categorized and tracked, and less agreement still on best practices for controlling these costs and lowering barriers to infrastructure deployment. A broader review of EV charging infrastructure cost analyses shows that these costs can have significant impacts on project outcomes. EV charging infrastructure projects may be able to examine the success of the solar industry in lowering soft costs, and a similar effort may lower project costs significantly. Further work on standardizing and collecting data on EV charging infrastructure costs is required to begin addressing and controlling these costs.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Electric vehicle supply equipment location and capacity allocation for fixed-route networks

Electric vehicle (EV) supply equipment location and allocation (EVSELCA) problems for freight vehicles are becoming more important because of the trending electrification shift. Some previous works address EV charger location and vehicle routing problems simultaneously by generating vehicle routes from scratch. Although such routes can be efficient, introducing new routes may violate practical constraints, such as drive schedules, and satisfying electrification requirements can require dramatically altering existing routes. To address the challenges in the prevailing adoption scheme, we approach the problem from a fixed -route perspective. We develop a mixed -integer linear program, a clustering approach, and a metaheuristic solution method using a genetic algorithm (GA) to solve the EVSELCA problem. The clustering approach simplifies the problem by grouping customers into clusters, while the GA generates solutions that are shown to be nearly optimal for small problem cases. A case study examines how charger costs, energy costs, the value of time (VOT), and battery capacity impact the cost of the EVSELCA. Charger equipment costs were found to be the most significant component in the objective function, leading to a substantial reduction in cost when decreased. VOT costs exhibited a significant decrease with rising energy costs. Further, an increase in VOT resulted in a notable rise in the number of fast chargers. Longer EV ranges decrease total costs up to a certain point, beyond which the decrease in total costs is negligible.

33 ADVANCED PROPULSION SYSTEMS↗

Public charging infrastructure for plug-in electric vehicles: What is it worth?

A lack of charging infrastructure is an important barrier to the growth of the plug-in electric vehicle (PEV) market. Public charging infrastructure has tangible and intangible value, such as reducing range anxiety or building confidence in the future of the PEV market. Quantifying the value of public charging infrastructure can inform analysis of investment decisions and can help predict the impact of charging infrastructure on future PEV sales. Estimates of willingness to pay (WTP) based on stated preference surveys are limited by consumers' lack of familiarity with PEVs. As an alternative, we focus on quantifying the tangible value of public PEV chargers in terms of their ability to displace gasoline use for PHEVs and to enable additional electric (e-) vehicle miles for BEVs, thereby mitigating the limitations of shorter range and longer recharging time. Simulation studies provide data that can be used to quantify e-miles enabled by public chargers and the value of additional e-miles can be inferred from econometric estimates of WTP for increased vehicle range. Functions are synthesized that estimate the WTP for public charging infrastructure by plug-in hybrid and battery electric vehicles, conditional on vehicle range, annual vehicle travel, pre-existing charging infrastructure, energy prices, vehicle efficiency, and household income. A case study based on California's public charging network in 2017 indicates that, to the purchaser of a new BEV with a 100-mile range and home recharging, existing public fast chargers are worth about $1500 for intraregional travel, and fast chargers along intercity routes are valued at over $6500.

33 ADVANCED PROPULSION SYSTEMS↗

Time Matters: A Survival Analysis of Public Electric Vehicle Charging Infrastructure Utilization

The rapid adoption of plug-in electric vehicles (PEVs) places significant demands on public charging infrastructure, making it critical to understand and optimize charger utilization. This study provides one of the most comprehensive analyses of charging behavior to date by applying a survival analysis to a dataset of nearly 16 million level 2 (L2) and direct current (DC) fast charger sessions across the United States from 2017 to 2022. Using Kaplan-Meier curves and log rank tests, our analysis reveals statistically significant and distinct duration patterns influenced by charger type, time of day, and day of the week. We find that L2 charging sessions exhibit high variability tied to venue type, whereas DC sessions are more uniform, typically lasting 30-45 min. This study introduces the operational efficiency score (OES), a metric for standardizing the performance evaluation of charging stations. Our findings offer actionable insights for optimizing charger deployment, developing dynamic pricing strategies to reduce vehicle dwell time, and improving load management for grid operators, ultimately enhancing the efficiency and availability of public charging infrastructure.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Planning Optimization for Inductively Charged On-demand Automated Electric Shuttles Project at Greenville, South Carolina

Wireless charging technology presents an ideal fit for autonomous electric vehicles for realizing a fully automated system (vehicle and charger). This paper presents a planning optimization analysis for a pilot project of in-route wireless charging infrastructure serving fixed-route on-demand shared automated electric shuttles (SAESs) at Greenville, South Carolina, USA. A single-objective non-linear mixed integer system planning optimization problem is formulated. A comprehensive cost model representing the overall inductively charged SAESs system is developed, considering road construction, power electronics and materials, traction battery, and installation costs. The optimization problem is solved to determine the best combination of the system key design parameters (number and allocations of wireless chargers, charging power level, track length and on-board battery capacity) that show the most cost-effective solution and allow the SAESs to achieve charge-sustaining operation. The planning platform incorporates representative simulated traffic data (driving speed and routes) for four SAESs in the Greenville using the Simulation of Urban Mobility tool. These data are fed to a vehicle powertrain model and a wireless charger power model to predict the battery power, energy and state-of-charge profiles, which are provided to the search algorithm to assess the design objectives under specific constraints. Finally, the results indicate that implementing high-power (100 kW) wireless charger at a few designated stops for fixed-route SAESs with the proper track length allows the vehicles to realize charge-sustaining operation, infinite range, and zero recharge downtime, with a significant reduction in the on-board battery (36%) and road coverage (69%), at minimum cost.

33 ADVANCED PROPULSION SYSTEMS↗

Macro Analysis to Estimate Electric Vehicles Fast-Charging Infrastructure Requirements in Small Urban Areas

Electric vehicles (EVs) are known to reduce emissions and fossil fuel dependency. However, the limited range, long charging time, and inadequate charging infrastructure have hampered the adoption of EVs. The current EV charging infrastructure planning studies and tools require detailed information, extensive resources, and skills that can be a significant barrier to urban areas for finding the required charging infrastructure to support a targeted EV market share. This study generates regression models to estimate the number of direct current fast charging stations and the chargers to support the EV charging demand for urban areas. These models provide macro-level estimates of the required infrastructure investment in urban areas, which can be easily implemented by policy-makers and city planners. This study incorporates data obtained from applying a disaggregate optimization-based charger placement model, developed recently by the same authors, for multiple case studies to generate the required data to calibrate the macro-level models, in the state of Michigan. This simulated data set includes the number of charging stations and chargers for each market share, technology advancement scenario, and the transportation network topology. The results show that the number of charging stations reduces with battery size and charging power and increases with EV market share and the road network lane length. The number of chargers reduces with charging power, whereas it increases with battery size, EV market share, and vehicle miles traveled in the system. The model developed here can be applied to any state having urban characteristics and weather conditions similar to Michigan.

Engineering↗

Multiplexing-Based Flyback Converter for Multi-Port USB Power Delivery with True Power-Sharing

Universal serial bus power delivery (USB-PD) chargers are more attractive to consumers with multiple output ports. Existing multiple port charger designs take multi-stage approach thus increase power loss and charger size. Also, ports are normally designed with different power capability thus the high-power port becomes under-used if the connected device is fully charged while the other lower power ports cannot take over the unused power. This is mainly limited by the power architecture design. This paper addresses this issue by presenting a multiplexing based multi-port quasi-resonant flyback converter. The design achieves true power-sharing with high efficiency, small size, and simple analog implementation. This paper discusses the operating principle and design considerations. A GaN-based 60 W dual port charger verifies the proposed scheme while achieving 76% size reduction and 1% efficiency improvement than state-of-the-art.

Xue, Lincoln↗

Time-Dependent Electric Bus and Charging Station Deployment Problem

Battery electric buses (BEBs) have gained popularity due to their emission-free and energy-efficient features. Many transit authorities worldwide have set goals to gradually replace their bus fleets with BEBs. Considering the potential decline in BEB battery and charger prices, this study proposes a time-dependent bus fleet transition model to determine the optimal bus fleet transition plan, which includes selecting the bus lines to be electrified, determining the timing and type of BEBs to be purchased, and deploying on-route fast chargers and depot chargers. The model is a bi-objective integer linear program that considers the trade-off between electrified transit mileages and bus electrification costs. A normalized normal constraint method is applied to solve the bi-objective optimization model. The effectiveness of the proposed model is tested using a real-world bus network. Additionally, sensitivity analyses are conducted to better understand the impact of different parameter values on the optimal solutions. Our proposed model can provide transit authorities with a powerful tool to make informed decisions about their BEB fleet replacement plans.

ADVANCED PROPULSION SYSTEMS↗

Extreme-scale EV charging infrastructure planning for last-mile delivery using high-performance parallel computing

Here, this paper addresses stochastic charger location and allocation problems under queue congestion for last-mile delivery using electric vehicles (EVs). The objective is to decide where to open charging stations and how many chargers of each type to install, subject to budgetary and waiting-time constraints. We formulate the problem as a mixed-integer non-linear program, where each station-charger pair is modeled as a multiserver queue with stochastic arrivals and service times to capture the notion of waiting in fleet operations. The model is extremely large, with billions of variables and constraints for a typical metropolitan area; even loading the model in solver memory is difficult, let alone solving it. To address this challenge, we develop a Lagrangian-based dual decomposition framework that decomposes the problem by station and leverages parallelization on high-performance computing systems, where the subproblems are solved by using a cutting plane method and their solutions are collected at the master level. We also develop a three-step rounding heuristic to transform the fractional subproblem solutions into feasible integral solutions. Computational experiments on data from the Chicago metropolitan area with hundreds of thousands of households and thousands of candidate stations show that our approach produces high-quality solutions in cases where existing exact methods cannot even load the model in memory. We also analyze various policy scenarios, demonstrating that combining existing depots with newly built stations under multiagency collaboration substantially reduces costs and congestion. These findings offer a scalable and efficient framework for developing sustainable large-scale EV charging networks.

Capacity allocation↗

Deployment priority of public charging speeds for increasing battery electric vehicle usability

To inform charger deployment decisions, this paper aims to understand the potential utilization and deployment priority for public charging infrastructure. A data-driven Cumulative Public Recharging (CPR) model is developed to explore the travel patterns by using 2017 National Household Travel Survey data. Given the daily trip sequence, trip distance, and dwell times, the study examines the daily expected driving range and BEV feasibility under different charging speeds, battery capacity, and charging behaviors. The results suggest that more advanced public chargers increase the daily expected driving range. Home charging is sufficient for most daily short-distance trips while public chargers are still needed for medium- and long-distance trips. Extreme fast charging (xFC) may not be necessary for people with home charging but could be more useful for people without home charging and for urgent charging. In conclusion, xFC becomes even less important to drivers with longer BEV ranges, a finding that contradicts conventional thinking.

33 ADVANCED PROPULSION SYSTEMS↗