Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Industry survey of space system cost benefits from New Ways Of Doing Business

The cost of designing, building and operating space system hardware has always been expensive. Small quantities of specialty parts escalate engineering design, production and operations cost. Funding cutbacks and shrinking revenues dictate aggressive cost saving programs. NASA's highest priority is providing economical transportation to and from space. Over the past three decades NASA has seen technological advances that provide grater efficiencies in designing, building, and operating of space system hardware. As future programs such as NLS, LUTE and SEI begin, these greater efficiencies and cost savings should be reflected in the cost models. There are several New Ways Of Doing Business (NWODB) which, when fully implemented will reduce space system costs. These philosophies and/or culture changes are integrated in five areas: (1) More Extensive Pre-Phase C/D & E, (2) Multi Year Funding Stability, (3) Improved Quality, Management and Procurement Processes, (4) Advanced Design Methods, and (5) Advanced Production Methods. Following is an overview of NWODB and the Cost Quantification Analysis results using an industry survey, one of the four quantification techniques used in the study. The NWODB Cost Quantification Analysis is a study performed at Marshall Space Flight Center by the Engineering Cost Group, Applied Research Incorporated and Pittsburg State University. This study took place over a period of four months in mid 1992. The purpose of the study was to identify potential NWODB which could lead to improved cost effectiveness within NASA and to quantify potential cost benefits that might accrue if these NWODB were implemented.

Rosmait, Russell L.↗

Collaborating with Autonomous Agents

With the anticipated increase of small unmanned aircraft systems (sUAS) entering into the National Airspace System, it is highly likely that vehicle operators will be teaming with fleets of small autonomous vehicles. The small vehicles may consist of sUAS, which are 55 pounds or less that typically will y at altitudes 400 feet and below, and small ground vehicles typically operating in buildings or defined small campuses. Typically, the vehicle operators are not concerned with manual control of the vehicle; instead they are concerned with the overall mission. In order for this vision of high-level mission operators working with fleets of vehicles to come to fruition, many human factors related challenges must be investigated and solved. First, the interface between the human operator and the autonomous agent must be at a level that the operator needs and the agents can understand. This paper details the natural language human factors e orts that NASA Langley's Autonomy Incubator is focusing on. In particular these e orts focus on allowing the operator to interact with the system using speech and gestures rather than a mouse and keyboard. With this ability of the system to understand both speech and gestures, operators not familiar with the vehicle dynamics will be able to easily plan, initiate, and change missions using a language familiar to them rather than having to learn and converse in the vehicle's language. This will foster better teaming between the operator and the autonomous agent which will help lower workload, increase situation awareness, and improve performance of the system as a whole.

Trujillo, Anna C.↗

Modeling and Simulation of the ARES UPPER STAGE Transportation, Lifting, Stacking and Mating Operations Within the Vehicle Assembly Building at KSC

This viewgraph presentation describes the modeling and simulation of the Ares Upper Stage Transportation, lifting, stacking, and mating operations within the Vehicle Assembly Building (VAB) at Kennedy Space Center (KSC). An aerial view of KSC Launch Shuttle Complex, two views of the Delmia process control layout, and an upper stage move subroutine and breakdown are shown. An overhead image of the VAB and the turning basin along with the Pegasus barge at the turning basin are also shown. This viewgraph presentation also shows the actual design and the removal of the mid-section spring tensioners, the removal of the AFT rear and forward tensioners tie downs, and removing the AFT hold down post and mount. US leaving the Pegasus Barge, the upper stage arriving at transfer aisle, upper stage receiving/inspection in transfer aisle, and an overhead view of upper stage receiving/inspection in transfer aisle are depicted. Five views of the actual connection of the cabling to the upper stage aft lifting hardware are shown. The upper stage transporter forward connector, two views of the rotation horizontal to vertical, the disconnection of the rear bolt ring cabling, the lowering of the upper stage to the inspection stand, disconnection of the rear bolt ring from the upper stage, the lifting of the upper stage and inspection of AFT fange, and the transfer of upper stage in an integrated stack are shown. Six views of the mating of the upper stage to the first stage are depicted. The preparation, inspection, and removal of the forward dome are shown. The upper stage mated on the integrated stack and crawler is also shown. This presentation concludes with A Rapid Upper Limb Assessment (RULA) utilizing male and female models for assessing risk factors to the upper extremities of human beings in an actual physical environment.

Kromis, Phillip A.↗

Software packager user's guide

Software integration is a growing area of concern for many programmers and software managers because the need to build new programs quickly from existing components is greater than ever. This includes building versions of software products for multiple hardware platforms and operating systems, building programs from components written in different languages, and building systems from components that must execute on different machines in a distributed network. The goal of software integration is to make building new programs from existing components more seamless -- programmers should pay minimal attention to the underlying configuration issues involved. Libraries of reusable components and classes are important tools but only partial solutions to software development problems. Even though software components may have compatible interfaces, there may be other reasons, such as differences between execution environments, why they cannot be integrated. Often, components must be adapted or reimplemented to fit into another application because of implementation differences -- they are implemented in different programming languages, dependent on different operating system resources, or must execute on different physical machines. The software packager is a tool that allows programmers to deal with interfaces between software components and ignore complex integration details. The packager takes modular descriptions of the structure of a software system written in the package specification language and produces an integration program in the form of a makefile. If complex integration tools are needed to integrate a set of components, such as remote procedure call stubs, their use is implied by the packager automatically and stub generation tools are invoked in the corresponding makefile. The programmer deals only with the components themselves and not the details of how to build the system on any given platform.

Callahan, John R.↗

Simplified Vehicle Control Concept for a Lift Plus Cruise eVTOL Vehicle

Electric Vertical Takeoff and Landing (eVTOL) vehicles have the potential to enable cost effective Urban Air Mobility (UAM) applications. These concepts may also pose several challenging handling and control problems, which must be addressed prior to safe and efficient urban operations. This paper investigates a simplified vehicle control concept that is designed to address some of these challenges for a conceptual Lift Plus Cruise vehicle. This concept also includes several variations of a transition-to-hover function, designed to assist pilots in capturing and maintaining a stabilized hover prior to landing. The different simplified control architectures for this concept are presented along with preliminary findings. Preliminary results show that the simplified control concept can be effective in assisting pilots to achieve safe and reliable hover landings, and that transition-to-hover functions have the potential of reducing workload while increasing accuracy. A follow on evaluation will be performed in the Vertical Motion Simulator (VMS) at NASA Ames Research Center. The planned tests will focus on more operationally representative scenarios, while building upon these operations with additional test cases exploring variations in glidepath angles and wind conditions.

simplified vehicle control↗

Terrestrial Proving Ground Capabilities Needed for Lunar In Situ Resource Utilization (ISRU) & Construction Concepts of Operation

Incorporating any new technology or system into a human exploration mission or architecture requires development well in advance of the mission to eliminate technology, cost, and schedule risk concerns. It is often stated that technologies need to be at a Technology Readiness Level (TRL) of 6, i.e. ‘system/subsystem model or prototype demonstration in a relevant environment (ground or space)’, by Authority To Proceed (ATP) or by the Preliminary Design Review (PDR) for the mission at the latest. There are two game changing capabilities for sustained human exploration of space that can have a significant effect on the overall exploration architecture and the technologies and systems included in the architecture. The first game changing capability, known as In Situ Resource Utilization (ISRU), involves the search for, acquisition, and processing of resources on the Moon and Mars into mission consumables and usable products, and the second is the ability to utilize space resources in the construction of roads, structures, and surface infrastructure. ISRU and surface construction capabilities have the potential to greatly reduce the cost and risk of human exploration while enabling sustained lunar surface and commercial operations. However, ISRU and surface construction systems are complex and must operate in extremely harsh environments, with abrasive regolith and pervasive dust, for long-periods of time, with potentially limited opportunities for maintenance and repair by humans. The complexity of these capabilities and operations also means that there are a limited number of companies that can design, build, and operate end-to-end systems on their own. The majority of the technologies being developed for these systems are by small companies and at the component or subsystem level. With the overarching strategy of the United States National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) to enable industry to implement ISRU and surface infrastructure for Artemis and space commercialization, it is therefore important to establish processes and capabilities to promote and foster collaborations among large and small companies involved in ISRU and surface infrastructure development. For ISRU and infrastructure systems and capabilities to be used in Artemis missions and future commercial lunar surface operations, a coordinated framework with virtual/physical integration and testing locations, or ‘Proving Grounds’, needs to be established and operated on a regular basis and open to all. This paper will discuss the ISRU and surface construction near and long-term concepts of operations, and review operations and lessons-learned from the previous ISRU analog field tests. From this information, requirements and capabilities will be proposed to support and enable the integration and testing of ISRU and construction systems with industry, academia, and international agencies, as well as what facilities and organizations could help establish these Proving Grounds.

ISRU↗

The expanded role of computers in Space Station Freedom real-time operations

The challenges that NASA and its international partners face in their real-time operation of the Space Station Freedom necessitate an increased role on the part of computers. In building the operational concepts concerning the role of the computer, the Space Station program is using lessons learned experience from past programs, knowledge of the needs of future space programs, and technical advances in the computer industry. The computer is expected to contribute most significantly in real-time operations by forming a versatile operating architecture, a responsive operations tool set, and an environment that promotes effective and efficient utilization of Space Station Freedom resources.

Crawford, R. Paul↗

STS-114: Discovery Shuttle Processing Overview Briefing

This video of a briefing to representatives from the national media took the form of a slide show presentation by Jon Cowart, Manager of the Resident Office at Johnson Space Center. The presentation was an overview of ground maintainance facilities and procedures at Kennedy Space Center used to support Space Shuttle operations. The photographs in the slide show: Shuttle ground transport, maintenance, computers, and payloads, the Vehicle Assembly Building, ground operations, launch operations, crew boarding, liftoff, Pad A and Pad B, Solid Rocket Motor retrieval, crew procedures on-orbit, and landing. After the presentation is a brief question and answer session, in which reporters ask Cowart about Shuttle readiness, changes in Shuttle operations made for the Return to Flight, and how weather affects Shuttle operations.

Source record↗

Hardware Autonomy for Space Infrastructure

NASA prioritizes autonomous systems development with the expectation that it will continue to drive significant improvements in human and science exploration capability. Crew operations benefit from a spectrum of machine assistance to complete replacement of dangerous or highly repetitive tasks. Many science operations have a teleoperation component, and similarly benefit from a range of autonomy implementations that make long distance applications feasible. As we consider longer duration deep space missions, we also consider higher levels of autonomy in order meet emergent safety, maintenance, and logistics needs. One of the challenges within this scope is installation and maintenance of infrastructure, such as large scale instrumentation and communications equipment, crew habitats, and operational facilities. We describe how a programmable meta-material architecture may shift the paradigm of how we design, build, and operate future space infrastructure and assets. A primary objective of this strategy is to free the design space from launch vehicle constraints and fundamentally shift how a mission is designed and conducted. This integrates advances in materials (mechanical meta-materials), manufacturing (cooperative mobile robotics), and autonomy (multi-agent planning algorithms). Engineering systems that utilize a modular and reconfiguration building block approach, such as digital communication and computation systems, currently lead in terms of size and complexity scalability. NASA is extending the benefits and flexibility of digital systems to hardware systems, to optimize materials life-cycle management and expand our space exploration mission capabilities to meet long duration and deep space infrastructure needs, in accordance with long term NASA goals of "in-space reliance" and "mass-less exploration."

In space assembly↗

In-Flight Thermal Performance of the Lidar In-Space Technology Experiment

The Lidar In-Space Technology Experiment (LITE) was developed at NASA s Langley Research Center to explore the applications of lidar operated from an orbital platform. As a technology demonstration experiment, LITE was developed to gain experience designing and building future operational orbiting lidar systems. Since LITE was the first lidar system to be flown in space, an important objective was to validate instrument design principles in such areas as thermal control, laser performance, instrument alignment and control, and autonomous operations. Thermal and structural analysis models of the instrument were developed during the design process to predict the behavior of the instrument during its mission. In order to validate those mathematical models, extensive engineering data was recorded during all phases of LITE's mission. This inflight engineering data was compared with preflight predictions and, when required, adjustments to the thermal and structural models were made to more accurately match the instrument s actual behavior. The results of this process for the thermal analysis and design of LITE are presented in this paper.

Roettker, William↗

Simulating Operations at a Spaceport

SPACESIM is a computer program for detailed simulation of operations at a spaceport. SPACESIM is being developed to greatly improve existing spaceports and to aid in designing, building, and operating future spaceports, given that there is a worldwide trend in spaceport operations from very expensive, research- oriented launches to more frequent commercial launches. From an operational perspective, future spaceports are expected to resemble current airports and seaports, for which it is necessary to resolve issues of safety, security, efficient movement of machinery and people, cost effectiveness, timeliness, and maximizing effectiveness in utilization of resources. Simulations can be performed, for example, to (1) simultaneously analyze launches of reusable and expendable rockets and identify bottlenecks arising from competition for limited resources or (2) perform what-if scenario analyses to identify optimal scenarios prior to making large capital investments. SPACESIM includes an object-oriented discrete-event-simulation engine. (Discrete- event simulation has been used to assess processes at modern seaports.) The simulation engine is built upon the Java programming language for maximum portability. Extensible Markup Language (XML) is used for storage of data to enable industry-standard interchange of data with other software. A graphical user interface facilitates creation of scenarios and analysis of data.

Nevins, Michael R.↗

Operations automation

This is truly the era of 'faster-better-cheaper' at the National Aeronautics and Space Administration/Jet Propulsion Laboratory (NASA/JPL). To continue JPL's primary mission of building and operating interplanetary spacecraft, all possible avenues are being explored in the search for better value for each dollar spent. A significant cost factor in any mission is the amount of manpower required to receive, decode, decommutate, and distribute spacecraft engineering and experiment data. The replacement of the many mission-unique data systems with the single Advanced Multimission Operations System (AMMOS) has already allowed for some manpower reduction. Now, we find that further economies are made possible by drastically reducing the number of human interventions required to perform the setup, data saving, station handover, processed data loading, and tear down activities that are associated with each spacecraft tracking pass. We have recently adapted three public domain tools to the AMMOS system which allow common elements to be scheduled and initialized without the normal human intervention. This is accomplished with a stored weekly event schedule. The manual entries and specialized scripts which had to be provided just prior to and during a pass are now triggered by the schedule to perform the functions unique to the upcoming pass. This combination of public domain software and the AMMOS system has been run in parallel with the flight operation in an online testing phase for six months. With this methodology, a savings of 11 man-years per year is projected with no increase in data loss or project risk. There are even greater savings to be gained as we learn other uses for this configuration.

Boreham, Charles Thomas↗

Embracing Innovation in Aviation While Respecting Its Safety Tradition

Need for change is real, current systems are not sustainable. Sense of urgency is due to emerging markets and diversity of operations. Build-a-little-test-a-little and deploy. Research issues remain - however goal should be "cross the finish line" to improve operations. Research is means to an end and not an end in itself. Goal is highly scaled operations that are affordable and safe.

Innovation↗

Interferometric tracking system for the tracking and data relay satellite

This report documents construction and testing of the Interferometric Tracking System project developed under the NASA SBIR contract NAS5-30313. Manuals describing the software and hardware, respectively entitled: 'Field Station Guide to Operations' and 'Field Station Hardware Manual' are included as part of this final report. The objective of this contract was to design, build, and operate a system of three ground stations using Very Long Baseline Interferometry techniques to measure the TDRS orbit. The ground stations receive signals from normal satellite traffic, store these signals in co-located computers, and transmit the information via phone lines to a central processing site which correlates the signals to determine relative time delays. Measurements from another satellite besides TDRS are used to determine clock offsets. A series of such measurements will ultimately be employed to derive the orbital parameters, yielding positions accurate to within 50 meters or possibly better.

Effland, John E.↗

ATD-2 Digital Services / DIP

The path to NAS-wide implementation for ATD-2 multi-airport IADS is as a digital service for flight operators that builds on and supplements FAA TBO investments. This session will focus on a suite of Machine Learning (ML) services the ATD-2 team developed to model airport surface operations. The approach used to leverage SWIM data sets will be described and a preliminary analysis of ML model accuracy will be presented. NASA’s plans to build on this work under the ATM-X Digital Information Platform (DIP) sub-project will be discussed.

ATD TIM, ATD-2 Digital Services, DIP↗

Assessment of Some IASMS-relevant Data Sources for Aviation Safety

An In-time Aviation Safety Management System (IASMS) [1,2] is a set of services, functions, and capabilities (SFCs) necessary for monitoring known hazards and emergent risks, assessing safety data for anomalies, precursors, and trends, mitigating hazards that reach safety thresholds, and assuring efficacy of controls in mitigating hazards. An IASMS will continually monitor the NAS to collect data on the status of aircraft, air traffic management systems, weather, and airports. Within the NASA Aeronautics Research Mission Directorate (ARMD) System-Wide Safety (SWS) project’s technical challenge called In-time Aviation Safety Management Systems (IASMS) for Commercial Aviation Operations, which we often refer to as Technical Challenge 6 (TC-6), we have performed an assessment of several aviation data sources we have found that are relevant to assessing the safety of the National Airspace System (NAS) in the context of an IASMS. This assessment includes understanding the nature of the data themselves and using some data analytics tools on these data to show how they can be used to identify potential safety issues. We also describe how the data and analytics are part of a system that can allow for other data and analytics to be performed and for the results to be visualized for use by appropriate operators to identify potential safety issues and develop mitigations. This report is a step toward the ultimate goal of TC-6, which is to develop a prototype IASMS system that demonstrates the potential of an IASMS and inspire operators to build analogous systems to make the best possible use of the significant investments that they make in collecting, storing, and managingdata related to their operations.

aviation safety↗

The Status of NASA SCaN's Efforts to Integrate Commercial Satellite Communication Service Providers Into the Near Space Network

The National Aeronautics and Space Administration’s (NASA) Space Communication and Navigation (SCaN) program intends to deliver operationally ready commercial space-based communications relay services to missions by 2031. The high-throughput, demand-responsive networks that commercial providers are building and operating will remove long-standing network constraints, enhancing mission capability and data-return.

Near Space Network↗

Making Human Spaceflight Practical and Affordable: Spacecraft Designs and their Degree of Operability

As we push toward new and diverse space transportation capabilities, reduction in operations cost becomes increasingly important. Achieving affordable and safe human spaceflight capabilities will be the mark of success for new programs and new providers. The ability to perceive the operational implications of design decisions is crucial in developing safe yet cost competitive space transportation systems. Any human spaceflight program - government or commercial - must make countless decisions either to implement spacecraft system capabilities or adopt operational constraints or workarounds to account for the lack of such spacecraft capabilities. These decisions can benefit from the collective experience that NASA has accumulated in building and operating crewed spacecraft over the last five decades. This paper reviews NASA s history in developing and operating human rated spacecraft, reviewing the key aspects of spacecraft design and their resultant impacts on operations phase complexity and cost. Specific examples from current and past programs - including the Space Shuttle and International Space Station - are provided to illustrate design traits that either increase or increase cost and complexity associated with spacecraft operations. These examples address factors such as overall design performance margins, levels of redundancy, degree of automated failure response, type and quantity of command and telemetry interfaces, and the definition of reference scenarios for analysis and test. Each example - from early program requirements, design implementation and resulting real-time operations experience - to tell the end-to-end "story" Based on these experiences, specific techniques are recommended to enable earlier and more effective assessment of operations concerns during the design process. A formal method for the assessment of spacecraft operability is defined and results of such operability assessments for recent spacecraft designs are provided. Recent experience in applying these techniques to Orion spacecraft development is reviewed to highlight the direct benefits of early operational assessment and collaborative development efforts.

Crocker, Alan R.↗