Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “backfilling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

M3SF-24LL010302052-Comprehensive Analysis of Radionuclide Interaction with Hydrothermally Altered Repository Materials

This progress report (Level 3 Milestone Number M3SF-24LL010302052) summarizes research conducted at Lawrence Livermore National Laboratory (LLNL) within the Crystalline Work Package Number SF-24LL01030205. The research is focused on actinide and radionuclide sequestration in hydrothermally altered repository materials. In FY24, we completed a rigorous analysis of Se sorption to iron oxide phases using our L-SCIE sorption database. This effort explicitly accounts for surface titration behavior of oxide surfaces that was the subject of a recently published manuscript (Han et al., 2023). With this in mind, our Se sorption analysis now yields a more robust workflow for developing self-consistent surface complexation modeling approaches that can be adapted to specific SCM conceptual and numerical approaches (i.e. non-electrostatic, diffuse layer, triple layer models). In late FY24, we plan to publish the results of our comprehensive surface complexation modeling of Se(IV) and Se(VI) sorption to iron oxide mineral phases and provide a path forward to developing robust radionuclide sorption models for use in performance assessment. In FY24, we also submitted a manuscript summarizing our approach to integrating radionuclide sorption and coprecipitation phenomena and evaluation of radionuclide partitioning values across a range of radionuclides relevant to performance assessment. We demonstrated our approach in detail using Se sorption and coprecipitation with iron oxide minerals as a test case. This manuscript was recently accepted for publication in Applied Geochemistry (Balboni et al., Accepted). We also continued experiments to identify radionuclide interaction with hydrothermally altered crystalline repository and backfill materials. Recent research performed at Los Alamos National Laboratory (LANL) and Sandia National Laboratory (SNL) has provided key insights regarding the hydrothermal alteration behavior of bentonite backfill in the presence of repository materials (steel, concrete, etc.). We are now examining how mineral alteration affects retardation behavior of a suite of radionuclides of interest to repository performance assessment. These experiments also allow us to test the predictive ability of our component additivity approach to surface complexation and ion exchange. Our guiding hypothesis is that a robust surface complexation/ion exchange model and associated database, developed using our L-SCIE approach, can effectively predict changes in radionuclide sorption behavior resulting from the hydrothermal alteration of mineralogy in a repository near field. A short update of results to date is presented below.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

RANGERS: Modeling Report on Integrity and Performance Assessment of Engineered Barrier Systems in a Salt Repository for HLW/SNF

The Engineered Barrier System (EBS) plays an important role in ensuring the long-term safety and containment of high-level waste (HLW) and spent nuclear fuel (SNF) in deep geological repositories in salt formation. As part of a multi-barrier system, the EBS works alongside the natural barrier, which is the salt formation itself and the technical barrier comprising the disposal casks. The primary function of the EBS is to maintain containment during a defined period until the backfill used in the repository made of crushed salt, develops its sealing capacity through compaction. Over the time, the backfill eventually compacts to a state of low porosity and permeability, acting as a long-term seal. However, until this process is complete, the EBS must retain its structural and functional integrity. Regulatory guidelines in Germany currently require the EBS to remain effective for up to next ice age, that is expected in 50,000 years. The significant hydro-geological and topographic changes expected during an ice age could make it impossible to accurately predict the hydro-chemical conditions within the repository system at that time. In response to these challenges, BGE TECHNOLOGY GmbH (BGE TEC) and Sandia National Laboratories (SNL) have jointly developed a comprehensive methodology for the design and safety assessment of engineered barrier systems within the scope of the RANGERS project. This methodology is tailored for repositories in salt formations. The developed methodology provides a structured approach for designing and assessing the performance of the EBS in salt-based repositories. It begins with defining a sealing concept based on the geological characteristics of the selected site and the overall repository design. The entire repository system, comprising the geological site, repository infrastructure, and EBS, is then subjected to a Features, Events, and Processes (FEP) analysis, focusing solely on those FEPs that affect the EBS. The derived FEPs help identify the loads and stresses acting on the EBS, which serve as the foundation for conducting an integrity assessment. This analysis helps predict the EBS’s evolution and performance over the regulatory time frame, feeding into integrated performance assessment simulations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DECOVALEX-2023: Task C Final Report

The Full-scale Emplacement (FE) heater experiment at the Mont Terri Underground Rock Laboratory (URL) was designed and conducted by Nagra to replicate an emplacement tunnel of Nagra’s reference repository design at 1:1 scale. Alongside testing the technical feasibility of constructing disposal tunnels, emplacing waste containers in the tunnels and then backfilling them, the main goals of the FE experiment are (1) to obtain a better understanding of the coupled effects of induced thermo-hydro-mechanical (THM) processes that may occur and (2) to validate existing coupled THM models (Müller et al., 2017). A key aspect of ensuring safety for repositories located in low-permeability rock involves minimizing any damage to the rock itself, thereby preserving its integrity and promoting a stable environment Amongst a number of processes that could damage the rock is the increase in pore pressure due to thermal loading caused by heat emitted from the waste. To reduce the potential damage of the rock, it is important to analyse the evolution of heat over time due to the heat load of the containers and assess possible consequences by coupled THM models. The aim of Task C of DECOVALEX-2023 was to build 3D numerical models of the FE experiment, focussing in particular on the heating induced pore pressure change in the Opalinus Clay. Data from a large number of sensors were available from the FE experiment for model comparison. These sensors measured temperature and relative humidity in the bentonite around the heaters, and temperature, pressure and displacement/strain in the surrounding Opalinus clay. Data were available from the start of excavation (April 2012) up to August 2020 for most sensors (more than 5 years from the start of heating in December 2014). To fulfil the overall aim of the task, the work was broken down into a number of steps, starting with simpler models to build confidence in each team’s approach and then moving to more complex models that better represent the FE experiment. Step 0 consisted of 2D benchmark models, gradually increasing the number of processes that are represented from thermal (T) only models in Step 0a, to coupled thermal hydraulic (TH) models in Step 0b with a representation of changing porosity, to coupled thermo-hydro-mechanical (THM) models in Step 0c, where porosity changes are calculated by the mechanical model. A detailed specification of processes, parameters, initial and boundary conditions was provided for this step, with the ambition that all teams would work towards close agreement in their model results, thus building confidence in the model implementations. vi It was not straightforward to achieve agreement between the teams, so additional steps (Step 0b2, 0b3, 0c2, 0c3) were added along with derivation of some analytical solutions against which the models could be compared. The reasons for the differences between teams were investigated and found to be caused primarily by different conceptual model assumptions (including temperature dependence of the thermal expansion of water), different model formulations (including porosity evolution) and differences in modelled domain sizes, boundary conditions and grid discretisation. This demonstrates that comparisons between multiple modelling teams and/or comparison with analytical results and experimental data are highly beneficial in providing an indication of uncertainty in model predictions. At the conclusion of Step 0, almost all teams had achieved a close agreement in model results and those that had not achieved an agreement knew the reason for this. Step 1 moved from 2D models to 3D models of the FE experiment without adding technical features like shotcrete or EDZ, and only considering the heating phase. Initially the 3D model was tightly specified to continue to build confidence in the model implementations (Step 1a). The results of Step 1a were compared to the data from the FE-experiment without the teams seeing the data. The teams were then provided with a sub-set of the data from the FE-experiment and invited to consider how best to use the large dataset for model comparison (Step 1b). Teams were then asked to use the data provided to calibrate their models, only changing material property values rather than adding features or processes to their models (Step 1c). In Step 1, teams were asked to only model the heating phase of the experiment, so pressure in the Opalinus Clay was reported as change in pressure since the initial conditions were specified rather than modelled. The change from 2D to 3D models was accompanied by an increase in the dispersion of results between the teams. Some of this was resolved during the task, but some remained and is potentially due to model discretisation. Calibration of parameters was useful in improving the fit of the models to the data but the remaining differences indicated that the models were missing features or processes. In Step 2, the teams were asked to update their models with additional features and processes as well as calibrating parameters to try and improve the fit of the models to the data. Teams were encouraged to represent ventilation of the open FE tunnel prior to backfilling with heaters and bentonite and in Step 2, the absolute pressure in the Opalinus Clay was compared between the teams. Teams took different approaches, but there was consideration of adding shotcrete and an EDZ into the model, representing stress change during excavation and different approaches to modelling ventilation of the FE tunnel. Overall, the documented results showed a very good agreement for temperature. The results for porewater pressure evolution showed a significant improvement for most teams compared to Step 1c with a good agreement to the measurements for several teams whereas some teams overpredicted the pressure increase and others overpredicted the drainage effect especially for the sensors close to the heater. Step 3 was an opportunity for teams to use the models developed in Step 1 and Step 2 to make predictions about the temperature and pressure changes that will be expected at the FE experiment over the next few years in light of the planned changes in thermal output of the heaters.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of the Three Mile Island, Unit 2, Accident Corium and Severely Damaged Fuel Debris

The Three Mile Island, Unit Two (TMI-2) pressurized water reactor core melted down in 1979 due to an untimely combination of maintenance problems that led to a loss of feedwater, followed by a series of operational misunderstandings and errors. The melted core recovery process required development of a wide array of tools. After approximately three years of water management and other cleanup actions, the first views of the core revealed a much higher degree of damage than previously expected. Approximately 62 metric tons of the core had melted, leaving only 42 of the 177 fuel assemblies standing with a majority of rods intact. The core to be recovered was composed of loose debris and a solidified mass of formerly molten fuel. Robotic tools that had been designed for the task were of limited effectiveness due to the range of material types and phases. Over a period of several years, the central melt was broken up, primarily by use of a core-boring drill originally designed to acquire samples through the depth of the debris field. The broken pieces were loaded into specially designed debris canisters by use of long-handled pick-and-place tools and suctioned into baffled knockout canisters using an airlift vacuum system. A remotely operable underwater plasma arc torch was developed for removal of the lower core support structure to be able to retrieve the fuel pieces and secondary melt that had accumulated on the bottom reactor vessel head. Canister design played a central role in defining the initial retrieval process and later affected transportation, interim wet and its current interim dry storage. Due to concerns about the potential for radiolysis of residual water in the debris and other canister material, the canisters were fitted with hydrogen recombiner catalyst units to prevent a buildup of flammable gas and potential pressurization. To confirm the effectiveness of the recombiners during shipping, eight dewatered canisters were kept sealed for up to 205 days with periodic sampling of the headspace gas. The highest hydrogen value (9 vol%) was observed in a canister held for 147 days while the longest stored canister resulted in a 5% hydrogen concentration. The oxygen concentration never exceeded 0.5 %, and the primary backfill was >80% argon, meaning there was no flammability risk. Radiolytic hydrogen was also observed in wet pool storage, where the vented canisters discharged a portion of the water backfill as a result of gas production. The 344 canisters (268 fuel debris, 62 filter, and 12 knockout type) were dewatered, loaded in groups of seven into a double barrier shipping cask, and transported to the U.S. Department of Energy site in Idaho for 10 years of pool storage.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RectifHydPlus: Forty Year Hydropower Generation Reanalysis for Conterminous United States, Version 1.1.

This dataset contains monthly hydropower net-generation totals for 590 plants (each >10 MW) across the conterminous United States (CONUS) from 1980 to 2019. RectifHydPlus v1.1 includes one harmonized table of historical monthly generation—backfilled with observed monthly values where available—and two companion tables: (i) an estimates-only version with no backfill and (ii) a hydrological-control version that removes the effects of capacity and operational change. Each table comprises 23,600 records (590 plants × 40 years). The dataset was developed to address temporal gaps and inconsistencies in publicly available hydropower generation data as available through EIA-923 survey reports. Each record includes a quality label denoting the underlying proxy—from best (direct reservoir releases) to weakest (pattern copied from similar years). By combining the agency-reported survey records with observed and simulated hydrologic releases, RectifHydPlus offers complete, quality-labeled monthly estimates suitable for trend analysis and generation of hydropower generation inputs for energy-water modeling.

Turner, Sean [Oak Ridge National Laboratory (ORNL)↗

Additively manufactured structure with reinforced access opening

A method and system of additively-manufacturing a structure having a reinforced access opening includes printing, via an additive printing device having at least one printer head, a portion of the structure adjacent to a support surface. The portion of the structure is printed of a cementitious material, and the printed portion of the structure defines an access opening for the structure. Moreover, the method includes providing a void of the cementitious material at a top boundary of the access opening, placing one or more reinforcement members in the void such that the one or more reinforcement members extend across the void, and continuing to print the printed portion of the structure around the void to build up the structure. Thus, the method also includes backfilling the void with a backfill material to incorporate the one or more reinforcement members within the void into the printed portion of the structure.

Li, Xiaopeng↗

Predicting Saturated Hydraulic Conductivity over Time for Degrading Saltstone Vault Concrete - 20376

At the Savannah River Site (SRS), low-level liquid tank waste is mixed with cementitious materials to produce a solid, monolithic waste form referred to as saltstone. The liquid saltstone mixture is pumped into massive concrete structures referred to as saltstone disposal units (SDUs) for curing and long-term storage. SDUs are vaults made of high performance concrete forming a barrier between saltstone and the surrounding environment. Predicting the long-term performance of SDU vault concrete, as well as the saltstone material itself, is critical to understanding the potential releases of radionuclides to the surrounding environment as described in the Saltstone Disposal Facility (SDF) performance assessment (PA). The hydraulic conductivity profile for SDU vault concrete was conservatively assumed to degrade linearly from the initial saturated hydraulic conductivity of the intact concrete over a long period of time. The initial hydraulic properties of saturated SDU vault concrete have been measured, and the final hydraulic properties of degraded vault concrete are assumed to be the same as the porous backfill material that will surround the vault after closure. The assumed final condition of the vault concrete is also conservative in that it provides a greater estimate of water penetration through the vault than would generally be expected. Therefore, insights that provide more realistic but conservative estimates as to how degradation processes may change the hydraulic properties of the SDU vault concrete, the time dependent relationship of the vault concrete hydraulic properties to degradation (and thus time), and the final hydraulic properties of the vault concrete provides useful additions to the SDF PA. This paper focuses on the assumption that the saltstone vault concrete saturated hydraulic conductivity would decrease linearly as a function of degradation time; this assumption resulted from a worst-case, weighted (by relative layer thickness), arithmetic average of intact and backfill material hydraulic conductivities representing flow parallel to a layered system. This research indicates that the effective saturated hydraulic conductivity of the degraded SDU vault concrete should be based on the relative thickness-weighted geometric mean of the intact and degraded layers hydraulic conductivities. This alternative, which is supported extensively in the relevant literature and evaluated in this paper, leads to a more realistic and defensible estimate of the effective saturated hydraulic conductivity in degraded vault concrete while remaining conservative. The impact of using the more realistic estimate of the effective saturated hydraulic conductivity for the degraded concrete decreases the effective saturated hydraulic conductivity by up to several orders of magnitude for early times (i.e., when the SDU vault concrete is assumed degraded via sulfate attack and carbonation). This revised estimate of the effective saturated hydraulic conductivity has been implemented in the recently revised SDF PA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Robust Reference Electrode in Aggressive Chemical and Radiation Environments in the Hanford Waste Tanks

The Hanford site stores more than 200 million liters of radioactive and chemically hazardous wastes from the production of weapons materials. The wastes are stored in 177 underground carbon-steel storage tanks, separated between 149 single shell tanks (SSTs) and 28 double shell tanks (DSTs). The DSTs provide critical retrieval and interim storage before the waste is vitrified in the Waste Treatment and Isolation Plant (WTP). The tanks will need to remain in-service far beyond the initial 40-year design life, and effective corrosion control practices must remain in force to extend the tanks’ lifespans. This effort includes direct measurements of corrosion rate (e.g., ultrasonic measurements and corrosion coupons) and electrochemical processes (e.g., linear polarization measurements and open circuit potential measurements). The Hanford site began monitoring the corrosion potential in select DSTs in 2008. Of the 45 reference electrodes that have been installed, 29 have failed and 6 others provided unreliable results. DOE-EM is supporting a 3-year program to develop a chemical and radiation resistant reference electrode for application in the Hanford tanks. The first year of the program focused on understanding the failure mechanism for the reference electrodes and identification of candidate construction materials that would mitigate degradation of the electrodes in the waste environment. During the second year of the program, the objectives were to: 1) test candidate materials under simulated waste conditions, 2) design components that will extend the service life of the electrode, 3) fabricate materials for prototype reference electrodes, and 4) assemble prototype reference electrodes for accelerated testing. The reference electrode is constructed of four principal parts: 1) junction, 2) casing, 3) inner chamber backfill materials, and 4) the sensing wire. Principally, improvements of the junction, casing, and inner chamber backfill materials are being pursued. The junction material at the interface between the waste and the inner chamber of the reference electrode was identified as a critical component in the failure of the reference electrodes. Nine candidate replacement junction materials were tested under simulated waste conditions to evaluate permeation rate. These materials included a variety of polymeric and ceramic materials, some of which were 3-D printed. Thus far, porous polyvinylidene fluoride materials have performed satisfactorily and are being considered for prototype development. The commercial electrode casing materials in general have performed well. Additionally, 3-D printing of chemically and mechanically stable materials is being investigated as a means for further improvement in fabrication consistency. SRNL has also investigated altering the reference electrode design to extend the service life. The new design of the interior of the reference electrode casing creates a longer, more tortuous path between the junction material and the electrode sensing wire. A finite element model was used to optimize the design without adversely impacting the circuit resistance of the electrode during the measurements, thus preserving the measurement accuracy while enhancing the service life. The inner chamber back fill materials are also critical to the performance of the reference electrode. Materials that are resistant to intruding tank waste and provide a conductive path to the sensing wire were investigated. Gel and powder materials that are interspersed with a conductive chloride bearing material were tested for their influence on diffusion and electrode resistance. All the investigated materials and components will be assembled, with collaboration from commercial vendors, to fabricate the initial prototypes. Accelerated testing of the prototypes will be initiated in Year 2 of the program and will be completed in Year 3. A recommendation on the materials of construction and the design of the new robust reference electrode will be presented to the Hanford tank farm facility.

Sykes, Kiana [Savannah River National Laboratory (↗

DRAS: Deep Reinforcement Learning for Cluster Scheduling in High Performance Computing

Cluster schedulers are crucial in high-performance computing (HPC). They determine when and which user jobs should be allocated to available system resources. Existing cluster scheduling heuristics are developed by human experts based on their experience with specific HPC systems and workloads. However, the increasing complexity of computing systems and the highly dynamic nature of application workloads have placed tremendous burden on manually designed and tuned scheduling heuristics. More aggressive optimization and automation are needed for cluster scheduling in HPC. In this work, we present an automated HPC scheduling agent named DRAS (Deep Reinforcement Agent for Scheduling) by leveraging deep reinforcement learning. DRAS is built on a hierarchical neural network incorporating special HPC scheduling features such as resource reservation and backfilling. An efficient training strategy is presented to enable DRAS to rapidly learn the target environment. Once being provided a specific scheduling objective given by the system manager, DRAS automatically learns to improve its policy through interaction with the scheduling environment and dynamically adjusts its policy as workload changes. We implement DRAS into a HPC scheduling platform called CQGym. CQGym provides a common platform allowing users to flexibly evaluate DRAS and other scheduling methods such as heuristic and optimization methods. Furthermore, the experiments using CQGym with different production workloads demonstrate that DRAS outperforms the existing heuristic and optimization approaches by up to 50%.

97 MATHEMATICS AND COMPUTING↗

Potential Advantages to Employing an Onsite Laboratory at FUSRAP Sites Contaminated with Radionuclides and Metals - 20353

Various factors that support an evaluation of the relative costs, advantages and disadvantages of utilizing an onsite laboratory or an offsite laboratory for remediation of Formerly Utilized Sites Remedial Action Program (FUSRAP) sites contaminated with radionuclides and metals are presented. In terms of how much more quickly an onsite laboratory provides results versus an offsite laboratory, the results of this study provide tools for calculating the amount of cost savings per day for excavation of contaminated soils for various scenarios including: - State, municipal or local property remediation where the remediation schedule becomes time-critical due to the extra cost and inconvenience to the town or municipality caused by the need for increased security and safety personnel, possible road closures and detours, and the inconvenience to the public due to modified or decreased services of State or municipal facilities; - Residential property where the remediation schedule becomes time-critical due to the inconvenience to the homeowner as well as the importance of maintaining good community relations; - Commercial property where the remediation schedule becomes time-critical due to the hardship and potential loss of revenue endured by the property owner; - Open area where treatment of excavation water is required, and - Open area where treatment of excavation water is not required. For every scenario, the number of matrices, radionuclide and metal contaminants of concern and the project duration are important factors. The costs for the onsite laboratory included the capital costs associated with setting up the lab such as trailer(s) or building(s), power and water hookup, analytical testing equipment, balances, computers, desks and bookcases; support equipment such as hot plates, filtration assemblies, safety equipment, ovens, etc.; and supplies such as glassware, pipettes, filters, etc. and ongoing costs such as labor, chemicals and reagents, standards, cost of the laboratory obtaining certification and maintenance. Offsite laboratory sample testing costs are generally very competitive and typically substantially lower than onsite laboratory costs if only the sample testing costs are considered. The great disadvantage of using an offsite laboratory is that they often cannot guarantee rapid turnaround times for results which creates project delays associated with the remediation process including delays determining the completeness of the characterization and remediation processes, delays in backfilling a property and additional costs for treating wastewater (excavation water, stormwater or both). These costs will vary greatly depending upon the area of the country in which the project is located due to the wide range of labor costs for the onsite laboratory and field workers, as well as the contaminants of interest, matrices and most importantly the size of the impacted area and the number of properties located in that area. This paper provides guidelines for calculating the cost savings that may be realized if an onsite laboratory can generate results more quickly than an offsite laboratory by estimating the costs associated with the remediation process for the various scenarios noted above such as work crew labor costs, excavator and dump truck equipment rentals, wastewater treatment costs (if applicable) and the additional costs incurred by homeowners, commercial property owners and towns/municipalities that are reimbursed by the potentially responsible parties. Key assumptions involve the typical quickest turnaround time provided by the onsite and offsite laboratories. Costs for the operation of a wastewater treatment system and the remediation of a site area or property were provided by personnel who have been involved in the operation of a large FUSRAP site in New Jersey for many years. This study provides valuable information for determining the most cost-effective approach for analysis of project samples and therefore may be used on upcoming FUSRAP projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Priority-BF: A Task Manager for Priority-Based Scheduling

The increasing demand for computational resources, particularly in High-Performance Computing environments, necessitates to rethink how we handle job scheduling strategies. This work addresses the challenge of managing concurrent jobs with differing priorities on overloaded parallel systems, where strict QoS constraints are often difficult for users to define. Our solution relies on a qualitative description of priorities and pulls from two key approaches: the Easy-BF algorithm and the Conservative Backfilling algorithms. This solution improves the response time for high-priority jobs by 50% without affecting the overall system utilization. We show its applicability in several critical scenarios such as High-Performance Computing (HPC) resource management and in-situ computing.

Gainaru, Ana [ORNL]↗

Stability of plutonium oxide nanoparticles in the presence of montmorillonite and implications for colloid facilitated transport

The physical and chemical stability of PuO 2 nanoparticles (intrinsic colloids) in groundwater will control their transport and may affect the performance of high-level radioactive waste repositories. In this study, we examined the chemical stability of two types of PuO 2 nanoparticles at both 25 and 80 °C. The “alkaline” PuO 2 nanoparticles were prepared by neutralizing an acidic Pu(IV) solution with dilute NaOH to pH ~9.5. The “acidic” PuO 2 nanoparticles were precipitated from 0.1 M nitric acid by heating a Pu(IV) solution at 60–80 °C for 30 min. The chemical stability of these PuO 2 nanoparticles was tested in the presence of montmorillonite, a common mineral in the environment and potentially relevant backfill material in some nuclear waste repository designs. The “alkaline” PuO 2 nanoparticles were found to be unstable over a timescale of months at both 25 and 80 °C, with elevated temperature enhancing their dissolution rates and sorption to montmorillonite. PuO 2 nanoparticle dissolution rates decreased with increasing Pu concentration, consistent with solution saturation. The “acidic” PuO 2 nanoparticles appeared to remain stable for much longer than the “alkaline” PuO2 nanoparticles. The “alkaline” PuO 2 nanoparticle dissolution rate constants were as high as 10 -11.9±0.4 mol m -2 s -1 and 10 -11.2±0.2 mol m -2 s -1 at 25 and 80 °C, respectively, while the “acidic” PuO 2 nanoparticle dissolution rate at 80 °C was 10 -13.5 mol m -2 s -1 . Based on transmission electron microscopy, the “alkaline” and “acidic” PuO 2 nanoparticles were of similar size (2.5–4.5 and 2–3 nm nanoparticles, respectively). However, the “acidic” PuO 2 nanoparticles formed more ordered nanoparticle aggregates. Our results suggest that the specific conditions experienced during PuO 2 nanoparticle formation could significantly affect the stability of PuO 2 in the presence of competing sorption processes and, in turn, the relative importance of intrinsic versus pseudocolloid transport in the environment.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Numerical study of the chemo-mechanical behavior of FEBEX bentonite in nuclear waste disposal based on the Barcelona expansive model

Experimental studies show that compacted bentonite used as a backfill material for nuclear waste repository experiences strong coupling between chemical and mechanical processes. Here, we use a dual-structure expansive soil model, referred to as the Barcelona Expansive Model (BExM), to predict the behavior of bentonite buffer in subsurface emplacement tunnels for high-level radioactive waste. After emplacement, the bentonite is subjected to complex and coupled Thermal-Hydraulic-Mechanical-Chemical (THMC) processes. The BExM constitutive model is implemented in a multi-phase reactive transport and geomechanics simulator, TOUGHREACT-FLAC3D, and the model is verified with one benchmark test on FEBEX bentonite. We utilize a one-way Chemo-Mechanical (C-M) coupling approach, in which chemical changes affect the mechanical behavior of bentonite through the BExM linked with the evolution of mass fraction of smectite, exchangeable cation concentration, and ionic strength via osmotic suction. The parameters of the new coupled model for FEBEX bentonite are calibrated against a series of laboratory experiments with various salinity solutions. Finally, coupled THMC modeling is conducted for a generic argillite repository with bentonite buffer under high temperature, focusing on the long-term chemical change and its effect on the mechanical process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An international study on THM modelling of the full-scale heater experiment at Mont Terri laboratory

We present results from an international model comparison study of the Full-Scale Emplacement (FE) experiment in Opalinus Clay at the Mont Terri Laboratory, Switzerland. Based on a provided parameter set the teams decided which parameters they adopted for their models, whether they considered the excavation and the ventilation phase in addition to the heating phase and if they included technical features like the shotcrete or the EDZ. The teams were able to reproduce the measured parameters temperature, relative humidity and pore pressure. The modelled results for temperature agree very closely between the teams especially in the sensors in Opalinus Clay. All teams were able to reproduce the redistribution of water in the bentonite backfill due to heating. The evolution of the relative humidity showed similar trends with differences in the intensity of the dry out effect. To model the pore pressure evolution is more complex because it comprises the full interaction of the coupled THM processes. The spread between the pore pressure modelled by the teams was larger, with some teams overestimating the pressure increase due to heating and some teams overestimating the extent of drainage. The agreement of modelled results with measurements improves with larger distance to the heater. We conclude that the EDZ and the shotcrete potentially influence the behaviour of the rock causing higher differences closer to the heater. Further research is needed to better implement those influences into the models. Based on the calibrated models, the future evolution of temperature, relative humidity and pore pressure was predicted over the next 10 years following a change of the heat power applied in 2023 and 2024. Again, the predicted temperatures agree very closely between the teams. Most teams do not expect an increase in relative humidity during the next 10 years after the initial dry-out.

58 GEOSCIENCES↗

Impact of corrosion layer composition and thermal pretreatment on the radiolytic generation of molecular hydrogen from aluminum alloys

To fully evaluate the feasibility of extending the dry storage of aluminum-clad spent nuclear fuel (ASNF) in helium-backfilled cannisters, the amount of radiation-induced molecular hydrogen (H 2 ) generated and the impact of absorbed radiation dose on the ASNF corrosion layer composition must be accurately assessed. Here, in this study, we report a slowing in the rate of radiolytic H 2 generation for pre-corroded AA1100 and AA6061 aluminum alloy coupons irradiated to up to 53 MGy of absorbed cobalt-60 gamma dose. By exploring a variety of thermal pretreatment conditions for AA6061 coupons, we find that the “steady-state” yield of H 2 depends more on the aluminum alloy used than on the treatments applied prior to dry storage. Scanning electron microscopy and positron annihilation lifetime spectroscopy techniques also provided evidence for gamma radiation-induced defects in the corrosion layers of the investigated aluminum alloy coupons for high absorbed doses (~50 MGy), the consequences of which on cladding integrity and H 2 generation should be explored in future works.

38 - RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCL↗

Removal of deuterium retained in boron powder by oxygen or high-temperature bakeout

Fuel retention in dust accumulated in fusion devices is a potential operational hazard. Boronization is one of the leading wall-conditioning candidates for future fusion devices. Fuel retention characteristics of boron dust must be studied to accurately understand the potential hazards of boron dust in fusion devices. We evaluated the retention of deuterium (D) in commercially available boron powder as a proxy for tritium retention in boron dust. Diffuse reflectance infrared Fourier transform spectroscopy revealed that boron powder between 300 and 500 K exposed to neutral hydrogen (H 2 ) gas retains H via B-H bonding. We utilized D 2 exposures of 17,400 L on the boron powder, which led to retention on the order of 0.5 g D per 100 kg B or 1.2 g D per m 2 B, as estimated from temperature programmed desorption measurements. We evaluated how powder bakeouts under ultra-high vacuum (UHV), or in an oxygen (O 2 ) or H 2 gas backfilled environment can remove the retained fuel. Bakeouts below 523 K under UHV exhibited poor D removal, promoting recapture of D 2 present as background gas in the chamber. Higher temperature bakeouts led to the removal of over 80% of the retained D within 3 days (623 K) or 1 h (723 K). Bakeouts at 423 K under an O 2 gas environment removed ∼150% more retained D from the boron powder, when compared to bakeouts conducted under UHV. These results suggest that efficient fuel removal from boron dust can be achieved by high-temperature bakeout (>623 K) or by bakeouts at lower temperature (423 K) under an O 2 environment.

Bakeout↗

Sensitivity study of coupled chemical-CFD simulations for analyzing aluminum-clad spent nuclear fuel storage in sealed canisters

We report the United States Department of Energy (DOE) manages over 50 Metric Tons Heavy Metal (MTHM) of aluminum-clad spent nuclear fuel. One main source for DOE’s Aluminum-clad spent nuclear fuel (ASNF) inventory is the advanced test reactor (ATR) at the INL site, which makes this fuel of particular interest for storage scenarios. Road-ready and final disposition packaging configurations for the ATR fuel dictates storage within helium-backfilled, sealed DOE standard canisters. The conditions within these sealed canisters for extended (greater than50 year dry) storage is of interest. To further this goal, a three-dimensional (3D) multi-physics computational fluid dynamics (CFD) model is developed of the sealed DOE standard canisters. This 3D CFD model is one-way coupled with bulk gas radiolysis reactions considering sealed canisters with inert gas and possible trace amounts of air and water vapor. This study looks at the evolution of the thermal history of the canisters over a 50 year time period with a coupling to the chemical reactions occurring from radiolytic breakdown of residual water. A sensitivity study is then carried out over the parameters of the model including the fuel decay heat, residual water content, sealed pressure, canister external temperature, and canister emissivity. In pure helium, hydrogen generation rates are low, under 10 ppm, but hydrogen generation rates are affected greatly by the presence of even 1% residual air, increasing by 50-plus-fold, and nitric acid generation with residual air also occurs ranging from 500 to 4000 ppm after 50 years. The fuel decay heat and the residual water content show the most importance in the generation of hydrogen gas in pure air, and for nitric acid with a residual air condition. External temperature, canister emissivity and sealed pressure all show minor sensitivity effects to the generation of potentially harmful species.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tailoring On-Surface Molecular Reactions and Assembly through Hydrogen-Modified Synthesis: From Triarylamine Monomer to 2D Covalent Organic Framework

Relative to conventional wet-chemical synthesis techniques, on-surface synthesis of organic networks in ultrahigh vacuum has few control parameters. The molecular deposition rate and substrate temperature are typically the only synthesis variables to be adjusted dynamically. Here we demonstrate that reducing conditions in the vacuum environment can be created and controlled without dedicated sources-relying only on backfilled hydrogen gas and ion gauge filaments-and can dramatically influence the Ullmann-like on-surface reaction used for synthesizing two-dimensional covalent organic frameworks (2D COFs). Using tribromo dimethylmethylene-bridged triphenylamine ((Br 3 )DTPA) as monomer precursors, we find that atomic hydrogen (H*) blocks aryl-aryl bond formation to such an extent that we suspect this reaction may be a factor in limiting the ultimate size of 2D COFs created through on-surface synthesis. Conversely, we show that control of the relative monomer and hydrogen fluxes can be used to produce large self-assembled islands of monomers, dimers, or macrocycle hexamers, which are of interest in their own right. On-surface synthesis of oligomers, from a single precursor, circumvents potential challenges with their protracted wet-chemical synthesis and with multiple deposition sources. Using scanning tunneling microscopy and spectroscopy (STM/STS), we show that changes in the electronic states through this oligomer sequence provide an insightful view of the 2D COF (synthesized in the absence of atomic hydrogen) as the end point in an evolution of electronic structures from the monomer.

36 MATERIALS SCIENCE↗