Engineering PapersSearch

SEARCH · Engineering Papers

Results for “asteroid navigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

The Hayabusa Spacecraft Sample Return Mission

The Hayabusa (originally known as MUSES-C) engineering spacecraft was launched by the 5th Mu V launch vehicle on May 9, 2003 by the Japan Aerospace Exploration Agency (JAXA). It was designed to acquire samples from the surface of near-Earth asteroid 25143 Itokawa (1998 SF36) and return them to Earth. The main objectives of the mission were to demonstrate the performance of various technologies such as ion engine performance, autonomous navigation and control, asteroid surface sampling, and recovery of the return capsule after high speed re-entry. Hayabusa successfully returned a small capsule to Earth in June 2010 with a parachute assisted landing in Woomera, Australia. Details of the Hayabusa mission and the recovery operation will be presented for discussion.

Abell, Paul A.

Autonomous GN and C for Spacecraft Exploration of Comets and Asteroids

A spacecraft guidance, navigation, and control (GN&C) system is needed to enable a spacecraft to descend to a surface, take a sample using a touch-and-go (TAG) sampling approach, and then safely ascend. At the time of this reporting, a flyable GN&C system that can accomplish these goals is beyond state of the art. This article describes AutoGNC, which is a GN&C system capable of addressing these goals, which has recently been developed and demonstrated to a maturity TRL-5-plus. The AutoGNC solution matures and integrates two previously existing JPL capabilities into a single unified GN&C system. The two capabilities are AutoNAV and GREX. AutoNAV is JPL s current flight navigation system, and is fairly mature with respect to flybys and rendezvous with small bodies, but is lacking capability for close surface proximity operations, sampling, and contact. G-REX is a suite of low-TRL algorithms and capabilities that enables spacecraft operations in close surface proximity and for performing sampling/contact. The development and integration of AutoNAV and G-REX components into AutoGNC provides a single, unified GN&C capability for addressing the autonomy, close-proximity, and sampling/contact aspects of small-body sample return missions. AutoGNC is an integrated capability comprising elements that were developed separately. The main algorithms and component capabilities that have been matured and integrated are autonomy for near-surface operations, terrain-relative navigation (TRN), real-time image-based feedback guidance and control, and six degrees of freedom (6DOF) control of the TAG sampling event. Autonomy is achieved based on an AutoGNC Executive written in Virtual Machine Language (VML) incorporating high-level control, data management, and fault protection. In descending to the surface, the AutoGNC system uses camera images to determine its position and velocity relative to the terrain. This capability for TRN leverages native capabilities of the original AutoNAV system, but required advancements that integrate the separate capabilities for shape modeling, state estimation, image rendering, defining a database of onboard maps, and performing real-time landmark recognition against the stored maps. The ability to use images to guide the spacecraft requires the capability for image-based feedback control. In Auto- GNC, navigation estimates are fed into an onboard guidance and control system that keeps the spacecraft guided along a desired path, as it descends towards its targeted landing or sampling site. Once near the site, AutoGNC achieves a prescribed guidance condition for TAG sampling (position/orientation, velocity), and a prescribed force profile on the sampling end-effector. A dedicated 6DOF TAG control then implements the ascent burn while recovering from sampling disturbances and induced attitude rates. The control also minimizes structural interactions with flexible solar panels and disallows any part of the spacecraft from making contact with the ground (other than the intended end-effector).

Carson, John M.

Independent Optical Navigation Processing for the Osiris-Rex Mission Using the Goddard Image Analysis and Navigation Tool

The OSIRIS-REx mission to the asteroid(101955) Bennu heavily relies on optical navigation to provide relative state information between the asteroid and the spacecraft. These measurements enable determination of the spacecraft's orbit to the tight requirements needed to meet the science goals of the mission. In this document we describe the algorithms and techniques used by the Goddard independent verification and validation navigation effort to extract these measurements from the images taken by the spacecraft during the mission.We also demonstrate the capabilities of the techniques by showing the high accuracy of the results when used in an orbit determination solution.

Liounis, Andrew

Deep Space Relay Terminals for Mars Superior Conjunction

The Sun periodically blocks direct communication between the Earth and Mars, creating a need for a relay when missions have a critical need for communication during these times. We examined several approaches based on optical or radio-frequency relays placed in deep space between the Earth and Mars, exploring multiple possible placements of relays, including periodic orbits in the Sun-Earth and Sun-Mars rotating frames, and eccentric, sun-centered orbits. L4 and L5 long-period orbits in the sun-Mars system provide suitable communications geometry continuously for very long durations. In such an orbit, a deep space relay terminal with two 50 cm optical telescopes and two 75 cm Ka-band dish antennas, along with associated receivers and transmitters, would be capable of supporting Mars superior conjunctions with an optical data rate of 28 to 44 Mbps for return links, and 30-36 Mbps in the forward direction. The relay should use efficient, low-noise optical detectors, such as appropriately cooled Avalanche Photo Diode or Superconducting Nanowire Single Photon Detectors, to achieve these data rates. The single relay discussed in this study might have additional value beyond communications, providing a synergistic platform for solar observation, solar wind observation, gravitational studies, the search for near-earth asteroids, or a navigational beacon.

Lau, Chi-Wung

Double Asteroid Redirection Test (DART) Mission

NASA’s Double Asteroid Redirection Test (DART) mission was humanity’s first attempt to move a celestial body, demonstrating the capability to perform a kinetic impact on a planetary defense–relevant sized asteroid. DART was part of the international collaboration known as the Asteroid Impact & Deflection Assessment (AIDA), involving NASA, the European Space Agency (ESA), the Agenzia Spaziale Italiana (ASI), and scientists around the world. DART was a key step to demonstrating preparedness to respond to planetary defense scenarios, and it provides a crucial data point for likely outcomes. Near-Earth objects (NEOs) greater than 140 m in size are of particular interest to planetary defense because they have the potential to cause significant damage if they were to impact Earth, and also because they are difficult to detect, with less than 50% of the predicted population discovered as of 2022 (National Academies Press, 2022). With an appropriately sized spacecraft and enough warning (typically many years to decades), a kinetic impact can slightly alter the orbit of an asteroid in a way that, over time, prevents the asteroid from colliding with Earth in the future. DART’s target was Dimorphos, the smaller (~150-m-diameter) member of the binary asteroid system (65803) Didymos, which is a near-Earth, potentially hazardous, and well-characterized asteroid system. By simply observing changes to the system after impact and comparing them with a pre-impact reference, it was possible to use ground-based telescopes to observe the deflection in the orbit of Dimorphos after impact. Developed and operated by the Johns Hopkins University Applied Physics Laboratory (APL), the mission entered formulation in 2015 after multiple years of concept development. The project was administered according to NPR 7120.5, with technical oversight and funding through the Planetary Missions Program Office (PMPO) at Marshall Space Flight Center (MSFC) and overall support as a directed mission from NASA’s Planetary Defense Coordination Office (PDCO). The DART spacecraft hosted a singular payload, the Didymos Reconnaissance and Asteroid Camera for Optical navigation (DRACO), and a deployable CubeSat contributed by ASI named the Light Italian CubeSat for Imaging of Asteroids (LICIACube). On 11 September 2022, DART deployed LICIACube, which subsequently followed the DART spacecraft at a safe distance and observed the immediate aftermath of the DART impact. DART was designed to autonomously detect, navigate to, and impact Dimorphos. This autonomous design was chosen to maximize the probability of impact, since commanding from the ground could result in course corrections arriving too late. On the day of impact, 26 September 2022, the spacecraft’s autonomous systems successfully detected and locked on to Dimorphos, impacting its surface within 2 m of the center of the illuminated figure (Jensenius et al., 2023). No human intervention was required for a successful impact, demonstrating that humanity possesses the technology to perform a kinetic impact. Within 2 weeks of impact, it was clear that the orbit of Dimorphos had been significantly altered. On 11 October 2022, NASA Administrator Bill Nelson announced that the new orbital period of Dimorphos was shortened by approximately 32 ± 2 min, from 11 h and 55 min before impact to 11 h and 23 min after impact. With additional observations over the following months, the accuracy of this measurement improved to a –33.24 min ± 1.4 s orbital period change (Naidu et al., 2023; Scheirich et al., 2023), and Beta (β), the momentum transfer enhancement parameter, was reported to be 3.6 (Cheng et al., 2023). Subsequent studies examined the details of DART’s impact site, modeled the impact event, investigated the ejecta produced, and analyzed the dynamics of the Didymos system. These combined results clearly demonstrate that the project met all Level 1 mission requirements.

asteroid

Small Body Landing Accuracy Using In-Situ Navigation

Spacecraft landings on small bodies (asteroids and comets) can require target accuracies too stringent to be met using ground-based navigation alone, especially if specific landing site requirements must be met for safety or to meet science goals. In-situ optical observations coupled with onboard navigation processing can meet the tighter accuracy requirements to enable such missions. Recent developments in deep space navigation capability include a self-contained autonomous navigation system (used in flight on three missions) and a landmark tracking system (used experimentally on the Japanese Hayabusa mission). The merging of these two technologies forms a methodology to perform autonomous onboard navigation around small bodies. This paper presents an overview of these systems, as well as the results from Monte Carlo studies to quantify the achievable landing accuracies by using these methods. Sensitivity of the results to variations in spacecraft maneuver execution error, attitude control accuracy and unmodeled forces are examined. Cases for two bodies, a small asteroid and on a mid-size comet, are presented.

in-situ navigation

Estimating the Mass of Asteroid 433 Eros During the Near Spacecraft Flyby

The terminal navigation of the Near-Earth Asteroid Rendezvous (NEAR) spacecraft during its flyby of asteroid 433 Eros on December 23, 1998 involved coordinated efforts to determine the heliocentric orbits of the spacecraft and Eros and then to determine the relative trajectory of the spacecraft with respect ot Eros.

Asteroid Near-Earth Asteroid Rendezbous (NEAR) mas

OSIRIS-REx Orbit Determination Covariance Studies at Bennu

The Origins Spectral Interpretation Resource Identification Security Regolith Explorer (OSIRIS-REx) mission is a NASA New Frontiers mission launching in 2016 to rendezvous with the small, Earth-crossing asteroid (101955) Bennu in late 2018, ultimately returning a sample of regolith to Earth. Approximately three months before the encounter with Bennu, the asteroid becomes detectable in the narrow field PolyCam imager. The spacecraft's rendezvous with Bennu begins with a series of four Asteroid Approach Maneuvers, slowing the spacecraft's speed relative to Bennu beginning two and a half months prior to closest approach, ultimately delivering the spacecraft to a point 18 km from Bennu in Nov, 2018. An extensive campaign of proximity operations activities to characterize the properties of Bennu and select a suitable sample site will follow. This paper will discuss the challenges of navigating near a small 500-m diameter asteroid. The navigation at close proximity is dependent on the accurate mathematical model or digital terrain map of the asteroid's shape. Predictions of the spacecraft state are very sensitive to spacecraft small forces, solar radiation pressure, and mis-modeling of Bennu's gravity field. Uncertainties in the physical parameters of the central body Bennu create additional challenges. The navigation errors are discussed and their impact on science planning will be presented.

COVARIANCE

OSIRIS-REx Orbit Determination Covariance Studies at Bennu

The Origins Spectral Interpretation Resource Identification Security Regolith Explorer (OSIRIS-REx) mission is a NASA New Frontiers mission launching in 2016 to rendezvous with the small, Earth-crossing asteroid (101955) Bennu in late 2018, and ultimately return a sample of regolith to Earth. Approximately 3 months before the encounter with Bennu, the asteroid finally becomes detectable in the narrow field PolyCam imager. The spacecraft's rendezvous with Bennu begins with a series of four Asteroid Approach Maneuvers, which slow the spacecraft's speed relative to Bennu beginning two and a half months prior to closest approach, ultimately delivering the spacecraft to a point 18 km from Bennu on Nov 18, 2018. An extensive campaign of proximity operations activities to characterize the properties of Bennu and select a suitable sample site will follow. This paper will discuss the challenges of navigating near a small 500-m diameter asteroid. The navigation at close proximity is dependent on the accurate mathematical model or digital terrain map of the asteroids shape. Predictions of the spacecraft state are very sensitive to spacecraft small forces, solar radiation pressure, and mis-modeling of Bennu's gravity field. Uncertainties in the physical parameters of the central body Bennu create additional challenges. The navigation errors are discussed and their impact on science planning will be presented.

Covariance

Satellite Dynamics about Asteroids

Current space goals for NASA include planned and proposed missions to asteroids. These missions generally call for a period of orbital operations in close proximity to the asteroid, in some cases coming within 2 radii of the asteroid. A challenge for the navigators of these missions is to predict the orbital environment about the asteroid and to derive pre-mission plans for the control of these orbits. This paper investigates the major perturbations asteroid orbiters will encounter over a range of relevant asteroid sizes.

asteroid

Landmark navigation and target characterization in a simulated Itokawa encounter

A simulated asteroid Itokawa was constructed from Ostro's latest radar model adding craters, rocks and fractal surfacing. Images were constructed from this model with known spacecraft positions and orientations, and asteroid pole and shape as 'ground truth', using available values for the Hayabusa camera parameters, and following the proposed encounter scenario.

stereophotoclinometry

Precomputing Process Noise Covariance for Onboard Sequential Filters

Process noise is often used in estimation filters to account for unmodeled and mismodeled accelerations in the dynamics. The process noise covariance acts to inflate the state covariance over propagation intervals, increasing the uncertainty in the state. In scenarios where the acceleration errors change significantly over time, the standard process noise covariance approach can fail to provide effective representation of the state and its uncertainty. Consider covariance analysis techniques provide a method to precompute a process noise covariance profile along a reference trajectory using known model parameter uncertainties. The process noise covariance profile allows significantly improved state estimation and uncertainty representation over the traditional formulation. As a result, estimation performance on par with the consider filter is achieved for trajectories near the reference trajectory without the additional computational cost of the consider filter. The new formulation also has the potential to significantly reduce the trial-and-error tuning currently required of navigation analysts. A linear estimation problem as described in several previous consider covariance analysis studies is used to demonstrate the effectiveness of the precomputed process noise covariance, as well as a nonlinear descent scenario at the asteroid Bennu with optical navigation.

onboard

Asteroid approach covariance analysis for the Clementine mission

The Clementine mission is designed to test Strategic Defense Initiative Organization (SDIO) technology, the Brilliant Pebbles and Brilliant Eyes sensors, by mapping the moon surface and flying by the asteroid Geographos. The capability of two of the instruments available on board the spacecraft, the lidar (laser radar) and the UV/Visible camera is used in the covariance analysis to obtain the spacecraft delivery uncertainties at the asteroid. These uncertainties are due primarily to asteroid ephemeris uncertainties. On board optical navigation reduces the uncertainty in the knowledge of the spacecraft position in the direction perpendicular to the incoming asymptote to a one-sigma value of under 1 km, at the closest approach distance of 100 km. The uncertainty in the knowledge of the encounter time is about 0.1 seconds for a flyby velocity of 10.85 km/s. The magnitude of these uncertainties is due largely to Center Finding Errors (CFE). These systematic errors represent the accuracy expected in locating the center of the asteroid in the optical navigation images, in the absence of a topographic model for the asteroid. The direction of the incoming asymptote cannot be estimated accurately until minutes before the asteroid flyby, and correcting for it would require autonomous navigation. Orbit determination errors dominate over maneuver execution errors, and the final delivery accuracy attained is basically the orbit determination uncertainty before the final maneuver.

Ionasescu, Rodica

Navigation Strategies for Primitive Solar System Body Rendezvous and Proximity Operations

A wealth of scientific knowledge regarding the composition and evolution of the solar system can be gained through reconnaissance missions to primitive solar system bodies. This paper presents analysis of a baseline navigation strategy designed to address the unique challenges of primitive body navigation. Linear covariance and Monte Carlo error analysis was performed on a baseline navigation strategy using simulated data from a· design reference mission (DRM). The objective of the DRM is to approach, rendezvous, and maintain a stable orbit about the near-Earth asteroid 4660 Nereus. The outlined navigation strategy and resulting analyses, however, are not necessarily limited to this specific target asteroid as they may he applicable to a diverse range of mission scenarios. The baseline navigation strategy included simulated data from Deep Space Network (DSN) radiometric tracking and optical image processing (OpNav). Results from the linear covariance and Monte Carlo analyses suggest the DRM navigation strategy is sufficient to approach and perform proximity operations in the vicinity of the target asteroid with meter-level accuracy.

Getzandanner, Kenneth M.

Orbit Operations at 433 Eros: Navigation for the NEAR Shoemaker Mission

NASA's Near Earth Asteroid Rendezvous Mission began its record-setting exploration of the asteroid 433 Eros by inserting the spacecraft into orbit about Eros on February 14, 2000. This is the first spacecraft from any country to orbit an asteroid. The mission has overcome a failed insertion burn attempt on December 20, 1998, an event that would have ended most planetary missions, to return to the same target and successfully begin its science mapping a little more than a year later. Shortly after the successful insertion into orbit, the mission was renamed NEAR Shoemaker (NEAR) in memory of the late astronomer and geologist Eugene Shoemaker. NEAR will gather science data at Eros until February 14, 2001, which is the nominal end of mission. The NEAR mission is managed by the Johns Hopkins University, Applied Physics Laboratory in Laurel, Maryland. Since the initial mission concept in 1992, the design and implementation of the NEAR navigation system have been the responsibility of the Jet Propulsion Laboratory, California Institute of Technology. This presentation will show some of the unique features of navigation and mission design related to orbiting an asteroid and to designing a robust navigation system for the NEAR spacecraft. The problem of navigating a spacecraft about an asteroid is made difficult by the relative uncertainty in the asteroid physical properties which perturb the orbit: i.e., the mass, gravity field, and spin state. To help solve this problem, the navigation system for NEAR uses traditional DSN radio metric Doppler and range tracking, along with new technologies of optical landmark tracking and laser ranging to the asteroid surface. The experiences to date for each of these data types in the navigation solutions will be presented. Plans for the remainder of the NEAR mission will be presented, which include low orbits (down to 35 km radius circular orbits), and close flybys that may pass within 1 km of the surface. In addition, at the end of mission, NASA has approved a controlled descent and hovering phase that will culminate with the spacecraft impacting the surface. The maneuver planning for this final phase will also be presented.

Williams, B. G.

Testing and Development of NEA Scout Solar Sail Deployer Mechanism

The Near Earth Asteroid (NEA) Scout is a deep space CubeSat designed to use an 86 square meter solar sail to navigate to a near earth asteroid called VG 1991. The solar sail deployment mechanism aboard NEA Scout has gone through numerous design cycles and ground tests since its conception in 2014. An engineering development unit (EDU) was constructed in the spring of 2016 and since then, the NEA Scout team has completed numerous ground deployments aiming to mature the deployment system and the ground test methods used to validate that system. Testing a large, non-rigid gossamer system in 1G environments has presented its difficulties to numerous solar sailing programs before, but NEA Scout’s size, sail configuration, and budget has led the team to develop new deployment techniques and uncover new practices while improving their test methods. NEA Scout’s spooled sail and boom design differs from any solar sail design to date: a single square sail membrane spooled upon a non-circular mandrel and the booms are spooled on two separate coils. This configuration was necessitated by the 6U footprint and is not common among other solar sailing missions. The program has planned and completed 3 separate full scale sail deployments to date, with a flight sail deployment test scheduled for FY18. The sail deployment tests have helped mature flight operations plans and developed preliminary off-nominal deployment mitigation strategies. The paper entitled “Design and Development of NEA Scout Solar Sail Deployer Mechanism” was presented at the 43rd Aerospace Mechanisms Symposium. Since then, the system has matured and completed ascent vent, random vibration, boom deployment and sail deployment tests. This paper will discuss the lessons learned and advancements made while working on solar sail testing and redesign cycles.

Few, Alex

Testing and Development of NEA Scout Solar Sail Deployer Mechanism

The Near Earth Asteroid (NEA) [1] Scout is a deep space CubeSat designed to use an 86 m2 solar sail to navigate to a near earth asteroid called VG 1991. The solar sail deployment mechanism aboard NEA Scout has gone through numerous design cycles and ground tests since its conception in 2014. An engineering development unit (EDU) was constructed in the spring of 2016 and since then, the NEA Scout team has completed numerous ground deployments aiming to mature the deployment system and the ground test methods used to validate that system. Testing a large, non-rigid gossamer system in 1G environments has presented its difficulties to numerous solar sailing programs before, but NEA Scout's size, sail configuration, and budget has led the team to develop new deployment techniques and uncover new practices while improving their test methods. The program has planned and completed 5 separate full scale sail deployments to date, with a flight sail deployment test scheduled for FY18. The paper entitled "Design and Development of NEA Scout Solar Sail Deployer Mechanism" [2] was presented at the 43rd Aerospace Mechanisms Symposia. Since then, the system has matured and completed ascent vent, random vibration, boom deployment and sail deployment tests. This paper will discuss the lessons learned and advancements made while working on solar sail deployment testing and mechanical redesign cycles.

Few, Alex