Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Washington”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Mechanical suppression of invasive Northern Pike in Box Canyon Reservoir, Washington

Abstract Objective Northern Pike Esox lucius recently invaded Box Canyon Reservoir, Washington, expanding to over 10,000 individuals by 2011. To limit further impacts, a significant reduction in population abundance was required. Project objectives were to reduce relative abundance (catch per unit effort [CPUE]) to less than 1.7 Northern Pike/net (87% reduction) in the core area and to less than 0.5 Northern Pike/net in the northern reservoir section within 3 years and then maintain those abundance targets thereafter. Methods Using gill nets, we conducted intensive annual (2012–2018) suppression each spring, focusing on spawning aggregations in shallow (<2-m), flooded habitats. To evaluate CPUE, a standardized spring pike index netting (SPIN) survey was conducted annually in May and compared to suppression netting CPUE. Result In total, 17,464 Northern Pike were removed in 4868 net sets, with 92.9% captured in the first 3 years, limiting future recruitment. Mean SPIN CPUE in the core area declined from a presuppression (2011) high of 13.2 Northern Pike/net to less than 1.0 Northern Pike/net by 2014. Effort was reduced by up to 80% as the project transitioned from the initial suppression phase (2012–2014) to a control phase (2015–2018), which explored the minimum effort required to maintain abundance targets. A significant rebound in CPUE occurred from 2017 to 2018, indicating that over 267 net sets annually may be required for long-term control. Although the mean CPUE (±95% confidence interval) increased slightly in 2018 (0.6 ± 0.5 Northern Pike/net), the target abundance in the core area was achieved annually from 2013 to 2018. Changes in suppression CPUE reflected those observed in SPIN surveys, further validating the survey and corroborating abundance trends. Conclusion Results demonstrate that the suppression of Northern Pike in large, complex waters is feasible but requires a substantial long-term commitment. We expect the suppression of this invasive species to become standard practice outside of its native range. The methodology and equipment described here could be applied directly or modified by others to suppress Northern Pike.

Bean, Nicholas J.

Optimizing district energy systems under uncertainty: Insights from a case study from Washington D.C., USA

This study investigates solutions for delivering affordable heating and cooling to a brownfield site, focusing on a case study in Washington, DC. Moving towards more diverse and resilient energy systems, we identify the optimal portfolio for a district energy system with diverse energy sources to meet the area’s energy demands. Our methodological approach integrates two detailed models: one calculating building-level energy demand and the other optimizing district energy technology choices based on their demand profiles, accounting for uncertainties in energy prices, policies, and other parameters. The results provide an economic comparison of district and individual supply options at the building level, emphasizing the flexibility district systems can offer to the electricity sector. District energy systems demonstrate cost-stabilization benefits amidst volatile energy prices and external uncertainties. For heating, district systems yield significant cost savings compared to individual solutions, driven by fuel flexibility and the use of local renewable energy sources. For cooling, district systems also show advantages, though individual systems may remain more cost-effective for smaller buildings. Additionally, district systems exhibit considerable flexibility on the heating side, as evidenced by variations in electricity consumption. We recommend future research to explore the relationship between the economics of district energy systems, particularly at the building level, and their flexibility potential for the electricity sector across diverse geographic contexts to reduce overall grid costs and promote grid reliability. This includes areas with distinct zoning laws, municipal priorities, utility structures, and funding mechanisms, such as the United States, and regions like Europe with pronounced electricity price volatility.

24 POWER TRANSMISSION AND DISTRIBUTION

Closure to “Observation-Based Evaluation of Flood Estimation Techniques for a Small Snow-Dominated Basin in the Washington Cascade Mountains”

Here, this paper presents a closure to “Observation-Based Evaluation of Flood Estimation Techniques for a Small Snow-Dominated Basin in the Washington Cascade Mountains” by Hongxiang Yan, Zhuoran Duan, Mark S. Wigmosta, Ning Sun, Ethan D. Gutmann, Bert Kruyt, and Jeffrey R. Arnold. https://doi.org/10.1061/JHYEFF .HEENG-6147.

54 ENVIRONMENTAL SCIENCES

Quantifying the Variability of “Fixed-Width” Buffers on Harvested Lands in Western Oregon and Washington

In contemporary forest management, buffers of unharvested trees are left along streams to protect riparian and aquatic ecosystems. Buffer regulations often focus on specific minimum width requirements, which aid in straightforward regulation and application, but minimum widths also suggest buffered edges are uniform and contain little variability. Conceptual papers suggest that alternative buffer configurations may offer greater flexibility in landscape-level protection, increase forest complexity, and enhance aquatic and riparian biodiversity. However, before considering alternatives to fixed-width buffers, it is necessary to quantify the inherent variability in current buffer practices present on the landscape. In this study, we used aerial imagery to quantify variability of buffer widths in two hundred randomly selected recently harvested units on managed land in Oregon and Washington with both fish-bearing and non-fish-bearing sections of stream. Wider buffers on larger streams had a greater magnitude of variability, but when normalized by stream size, variation was greater in smaller streams, and overall, variation ranged from 25% to 50% of the mean width. Despite local variability, buffer widths rarely fell below 9.14 m (30 ft). The variation quantified here provides an initial measure of variability to inform future management, given emerging interest in variable retention buffers.

58 GEOSCIENCES

Five Years of Dissolved Oxygen, Temperature, Salinity, Depth, Weather Data from a Transitioning Wetland at Beaver Creek, Washington, USA

Groundwater dissolved oxygen (DO) variability in coastal system remains poorly understood despite its importance for biogeochemical cycling and ecosystem modeling. Here we investigate the temporal variability in groundwater DO and its hydro-climatic drivers across hourly to seasonal timescales in a transitioning wetland at Beaver Creek, Washington, USA. The site is transitioning from a freshwater forest to a brackish tidal wetland following removal of a barrier in 2014 that prevented tides from accessing the freshwater creek. By utilizing novel optical dissolved oxygen instrumentation (Opti O2, LLC) we obtained continuous, high-frequency (5-minute), in-situ measurements of DO from the flood-plain from June 26th, 2019 through September 30th, 2024. This 63 month dataset is comprised of groundwater dissolved oxygen, temperature, water level and salinity timeseries from the floodplain. This dataset also includes rainfall, air pressure, air temperature, and solar radiation data collected with a co-located Campbell ClimaVUE50 weather sensor. All data is contained within a single csv (2019-06-26 to 2024-09-30 Beaver Creek DO, saln, BGS, temp, weather.csv) that can easily be viewed either using software such as Excel or using any text editor.

54 ENVIRONMENTAL SCIENCES

Timeseries Photos of a Variably Inundated Stream: Umtanum Creek, Washington, United States

This dataset is associated with a broader study using game camera timeseries photos collected to evaluate stream variable inundation via changes in width (i.e. wet fraction). Four game cameras were deployed along Umtanum Creek (Washington, United States) to track changes in stream inundation over time. Drone imagery was collected at the same location on October 18, 2024 which was used to construct a digital elevation model (DEM) of the streambed topography. The associated paper and data can be found at https://doi.org/10.1016/j.envsoft.2025.106715 (Bao et al., 2025a)) and https://doi.org/10.15485/2589885 (Bao et al., 2025b), respectively. For details on how to navigate data packages generated by this project, see https://data.ess-dive.lbl.gov/portals/PNNLRiverCorridorSFA/About. In addition to this readme, this data package also includes a file-level metadata (FLMD) files that describes each file and a data dictionaries (DD) that describe all column/row headers and variable definitions. This dataset is comprised of (1) file-level metadata; (2) data dictionary; (3) readme; (4) field metadata; (5) field protocol; and (5) folders containing game camera photos. Game camera photos are organized into folders for each camera (CDL, CUL, CDR, CUR; see readme for information on camera naming) by the month photos were collected. All files are .csv, .jpg, or .pdf.

AI image segmentation

Energy Transitions Initiative Partnership Project: Bainbridge Island, Washington: Cohort 2 Technical Assistance: Improving Resilience

The City of Bainbridge Island (COBI) applied for and received technical assistance from the Energy Transitions Initiative Partnership Program (ETIPP) in part to achieve their goal of 100% renewable electricity generation by 2040, five years ahead of the Washington State goal. Their second goal of increasing energy resilience is discussed in this report. Pacific Northwest National Laboratory (PNNL) completed the technical analysis aspects of the project, supported by the community partner Spark Northwest and the program administrator, the National Renewable Energy Laboratory (NREL). PNNL worked with the Community Lead and stakeholders to ensure selection of hazards and energy infrastructure of highest priority and integration of existing expertise into the analysis. We have also worked to align analysis with current activities conducted by Puget Sound Energy (PSE), and other efforts within the Bainbridge Island community around resilience. This report, conducted under the ETIPP project in partnership with COBI, aims to build on this existing knowledge base with a specific energy focus, to identify hazards and threats to critical energy infrastructure, summarize the risk, and identify and analyze remaining resilience gaps.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Energy Transitions Initiative Partnership Project: Bainbridge Island, Washington - Cohort 2 Technical Assistance: Pathways to 100% Renewable Energy

The City of Bainbridge Island (COBI) applied for and received technical assistance from the Energy Transitions Initiative Partnership Program (ETIPP) in part to achieve their goal of 100% renewable electricity generation by 2040, five years ahead of the Washington State goal, and to increase its energy resilience in the face of natural disasters. To help address these goals, the City of Bainbridge Island (COBI) applied for and received technical assistance from the Energy Transitions Initiative Partnership Program (ETIPP) during 2022-2024. Supported by the U.S. Department of Energy, ETIPP provides technical assistance to remote coastal and island communities interested in approaches to renewable and resilient energy transitions. Pacific Northwest National Laboratory (PNNL) completed the technical analysis aspects of the project, supported by the community partner Spark Northwest and the program administrator, the National Renewable Energy Laboratory (NREL). This report begins by describing the approach to technical assistance in the ETIPP project, followed by the development of future scenarios for electric demand based on current use. Potential pathways to 100% renewable energy are identified and analyzed by technology contributions from solar energy, anaerobic biodigestion, distributed wind, and marine energy. The combinations of these technologies and contributions to meet demand are discussed, along with potential policies and programs for implementation of the most relevant technologies moving forward. The report concludes with recommendations for next steps for COBI to meet the goal of 100% renewable energy generation by 2040 on- and off-island, and key caveats to consider.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Results from an Aeromagnetic Survey to Detect Steel-Cased Wells at a Marcellus Shale Well Site in Washington County, Pennsylvania

Pennsylvania has a 150-year history of oil and gas production—the longest of any state—and this enduring activity has resulted in the drilling of more than 300,000 recorded wells. However, unknown wells likely exist because innumerable wells were drilled during Pennsylvania’s intense early oil and gas history when incomplete records were kept of well locations. There is concern that early wells are likely to be ineffectively sealed because there were no laws that required plugging when the wells were abandoned. Today, many undocumented and unplugged wells are thought to be in areas of emerging shale gas and shale oil development where open wellbores can provide a pathway for undesired upward migration of fluids and gas from hydraulically fractured reservoirs. Due to this concern, Pennsylvania regulators have asked operators to locate orphaned and abandoned wells within a 1,000-ft buffer of proposed new wells. The objective of this report is to demonstrate that high-resolution aeromagnetic surveys, historic air photos, and Light Detection and Ranging (LiDAR) imagery can be rapid and effective methods to reconnoiter large, forested areas of moderate terrain for the presence of abandoned wells. These well-finding methods were evaluated at a proposed Marcellus Shale gas drilling site in Washington County, Pennsylvania, where the methods collectively located 18 confirmed wells: 15 wells were identified from aeromagnetic surveys, two wells were identified from inspection of historical air photos, and one well was identified by evaluation of state-wide LiDAR imagery. Only six wells were previously known, and their locations, as recorded in Pennsylvania’s statewide oil and gas wells database (PA/IRIS/WIS), were often too inaccurate for the wells to be found in the dense underbrush. Twelve wells identified in this study were abandoned, unmarked, and undocumented. Aeromagnetic surveys locate wells by detecting the unique magnetic signature of vertical, steel well casing, which is depicted on magnetic maps as a “bull’s eye” type anomaly that is centered directly over the well. However, when wells were drilled and found to be sub-economic, their casing was sometimes pulled and salvaged for reuse. Such wellbores provide no magnetic response and go undetected if all casing was removed. Oftentimes attempts to retrieve well casing were not 100% successful. For example, historical records for one well in the study area indicate that the well was completed in 1902 as a dry hole and that, to the extent possible, the casing was pulled for reuse. However, a section of 10-in. diameter steel casing was not recovered and remains at an unknown depth in the wellbore. This well was easily detected by the aeromagnetic survey although only deep casing remained in the well. To mitigate for the likelihood that wellbores exist where most or all casing has been removed, this study augmented aeromagnetic data with historic air photos and digital terrain models generated from LiDAR datasets—both databases are publicly available at no cost for areas within Pennsylvania. These complementary methods located three wells where the aeromagnetic anomaly, although present, was subtle and overlooked. Together, these methods determined accurate locations for six known wells within the study area and located 12 previously unknown wells. Although it is not certain that these methods successfully located all wells in the study area, the application of these methods does represent a significant improvement over relying on existing databases for well locations. For the Appendix to the report, see: https://www.netl.doe.gov/energy-analysis/details?id=b46c417a-7c9e-4d25-b810-e6248b0217f4</p>

04 OIL SHALES AND TAR SANDS

EMP - Environmental Radiological Air Monitoring Plan: PNNL Operations in Washington

The Environmental Radiological Air Monitoring Plan (EMP) for Pacific Northwest National Laboratory (PNNL) describes systems/processes/practices related to radiological operations in Richland and Sequim, Washington, that are associated with environmental radiological air monitoring and surveillance activities. The activities described support the lab’s responsibility to maintain safe operations and minimize negative impacts to both onsite and offsite persons and environment. Dose assessments required by regulations and DOE Orders for the public and biota are described. PNNL conducts environmental air surveillance monitoring as part of the PNNL Site Radioactive Air Emissions License (RAEL)-005 for Richland Campus, issued in 2010 with its most recent renewal effective in January 2021. The radioactive air emissions license for the PNNL-Sequim campus (RAEL-014) was issued to the U.S. Department of Energy in 2012 with its most recent renewal effective in January 2023. The EMP is a compilation of the following four documents: - Environmental Radiological Air Monitoring Plan (this main document) (PNNL-20919) - Sampling and Analysis Plan (Attachment 1) (PNNL-20919-1) - Data Management Plan (Attachment 2) (PNNL-20919-2) - Dose Assessment Guidance (Attachment 3) (PNNL-20919-3).

40 CFR 61 Subpart H

Energy Technology Innovation Partnership Project Strategic Energy Plan for Washington County, Maine

This Strategic Energy Plan (SEP) for Washington County, Maine was developed through the U.S. Department of Energy's Energy Technology Innovation Partnership Project (ETIPP) to address local challenges related to electricity reliability, affordability, and safety. Grounded in a "relational infrastructure" approach, the plan recognizes that improved energy outcomes depend not only on physical grid investments but also on strengthened coordination and trust between utilities and communities. Using utility-provided reliability data, public datasets, and community input, the plan identifies key risks, including vegetation-related outages, high energy burden, and vulnerability among elderly and medically dependent populations. The SEP establishes three priority areas: hazard mitigation for energy infrastructure, outage safety and emergency readiness, and energy assistance and thermal safety. It outlines community-driven actions designed to complement utility-led system improvements, including targeted outreach, municipal coordination, and expanded access to energy programs. The plan also situates local conditions within broader state policy, market dynamics, and funding opportunities. Intended as a living document, this SEP provides a scalable framework for collaborative action to improve resilience, safety, and affordability in rural energy systems.

24 POWER TRANSMISSION AND DISTRIBUTION