DOE OSTI2012
American Recovery and Reinvestment Act (ARRA) funding was provided to supplement the environmental management program at several DOE sites, including the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Demolition of the ETTP K-33 Building, the largest building to be demolished to date in Oak Ridge, was awarded to LSRS in FY-2010 under the ARRA program. The K-33 building was an 82 foot tall 2-story structure covering approximately 32 acres. Once this massive building was brought down to the ground, the debris was segregated and consolidated into piles of concrete rubble and steel across the remaining pad. The process of demolishing the building, tracking across concrete debris with heavy equipment, and stockpiling the concrete rubble caused it to become pulverized. During and after storm events, hexavalent chromium leached from the residual cement present in the large quantities of concrete. Storm water control measures were present to preclude migration of contaminants off-site, but these control measures were not designed to control hexavalent chromium dissolved in storm water from reaching nearby receiving water. The following was implemented to mitigate hexavalent chromium in storm water: - Steel wool was distributed around K-33 site catch basins and in water pools as an initial step in addressing hexavalent chromium. - Since the piles of concrete were too massive and unsafe to tarp, they were placed into windrows in an effort to reduce total surface area. - A Hach colorimetric field meter was acquired by the K-33 project to provide realtime results of hexavalent chromium in site surface water. - Three hexavalent chromium treatment systems were installed at three separate catch basins that receive integrated storm water flow from the K-33 site. Sodium bisulfite is being used as a reducing agent for the immobilization of hexavalent chromium while also assisting in lowering pH. Concentrations initially were 310 - 474 ppb of hexavalent chromium in surface water at the out-falls that discharge to nearby receiving water. After implementation of the actions described above, concentrations of hexavalent chromium have been effectively reduced to less than 25 ppb at the out-falls. The LSRS team completed demolition of K-33 five months ahead of schedule, and debris removal was completed three months ahead of schedule. A total of 164,000 tons of steel and concrete from the building demolition, accounting for 13,000 shipments, were disposed to the EMWMF. Because of the high toxicity of hexavalent chromium at low concentrations, hexavalent chromium had to be controlled at ppb levels. Hexavalent chromium contaminant concentrations were successfully reduced by over 90% in surface water discharged from the K-33 demolition site into nearby receiving water. Initial efforts of wind-rowing debris piles and obtaining real-time hexavalent chromium measurements to focus initiatives coupled with placement of steel wool in pools or catch basins had some effectiveness. More significant reductions were obtained as the debris piles were removed/disposed in EMWMF, and treatment of surface water with sodium bisulfite in integrated manholes occurred. (authors)
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗