Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WECC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Incorporating Demand Response into Western Interconnection Transmission Planning

This report documents the demand response (DR)-related analyses developed by LBNL and its collaborators for the Western Electricity Coordinating Council (WECC) transmission planning studies conducted within the 2011 and 2012 study cycles and includes four distinct study cases: the 10-Year Reference Case (termed the WECC 10-Year Common Case), the 10-Year State-Provincial Steering Committee (SPSC) High DSM/DG Case, the 20-Year WECC Reference Case, and the 20-Year SPSC High DSM/DG Case.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated Energy-Water Planning in the Western and Texas Interconnections

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, environmental impact, and reliability, the availability of water is an emerging issue. Toward this growing need, thermoelectric expansion should consider competing demands from other water use sectors balanced with fresh and non-traditional water supplies subject to climate variability. To address this need the Department of Energy's Office of Electricity Delivery and Energy Reliability supported an integrated planning project with funding through the American Reinvestment and Recovery Act (2009). Specifically, an integrated energy-water analysis was performed to support transmission system planners in the Western and Texas Interconnections to explore the potential implications of water availability and cost for long-term transmission planning. The project brought together electric transmission planners (e.g., Western Electricity Coordinating Council (WECC) and the Electric Reliability Council of Texas (ERCOT)) with western water planners (e.g., Western Governors' Association and the Western States Water Council). Efforts were organized into ten specific tasks: (1) project coordination and outreach; (2) thermoelectric water use; (3) non-thermoelectric water use; (4) water availability; (5) water cost; (6) environmental risk; (7) climate variability; (8) energy for water; (9) decision support system interface; and, (10) transmission planning support. Major accomplishments associated with this effort include: For the first time water availability was used to inform generation expansion planning by WECC and ERCOT. For the first time, projections of intensifying drought and its effect on reservoir levels, and thermal effluent discharge permitting were used to inform operational and expansion planning by ERCOT. Water withdrawal and consumption were characterized for each power plant in the WECC and ERCOT service areas/regions. Water use factors were also developed for a range of unit processes that allowed projection of future water demands related to electric generation expansion planning. Working with state water managers current and future water use (withdrawal and consumption) were projected throughout the Western United States at an 8-digit Hydraulic Unit Code (HUC-8) level (over 1200 watersheds). In a similar fashion water availability and cost were mapped across the Western United States. Considered were five different sources of water: unappropriated surface water, unappropriated groundwater, appropriated water, municipal wastewater and brackish groundwater. Water basins (at the HUC-8 level) were mapped across the Western United States with regard to their potential for conflicts between aquatic and riparian species and habitats listed under the Endangered Species Act and water availability for future energy development. Water planners were engaged through the Western States Water Council and thus reflects their membership of the 17 contiguous western states (i.e., Texas up through the Dakotas and West). Power plants at greatest risk to the impacts of drought were identified. The analysis considered the hazards of low flows, insufficient reservoir storage, and elevated water temperatures under intensifying drought conditions projected for the future. The electricity used to provide water-related services was mapped at a county level throughout the Western U.S. Considered was the electricity required for interbasin conveyance, agricultural pumping, drinking water and wastewater services. To communicate our results the project has produced 6 journal articles, 1 book chapter, 11 reports, and 47 presentations at related conferences.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deploying Intra-hour Uncertainty Analysis Tools to ABB’s GridView - CRADA 445

The quickly-changing generation resource mix in the US grid, with large additions of variable resources, retirements of traditional thermal generation, distributed generation and demand response, are creating new challenges on the traditional operation of both the generation and transmission systems. The ability to perform intra-hour high fidelity production cost modeling (PCM) is needed to allow grid operators and grid planners to integrate high penetration (more than 50%) of variable energy resources, and to make prompt well informed decisions in market operations and planning. In the last decade, PNNL has developed several stand-alone tools to enable grid operators and planners to understand the impact of high variable generation on their systems. These tools have been used is studies such as: (1) Evaluation the benefits of WECC balancing authorities coordination under high variable generation penetration , (2) Benefits of Energy Imbalance Market in the North West Power Pool and (3) Duke Energy and NV Energy solar integration studies. ABB’s GridView is a widely used commercial PCM tool. It is the tool used by WECC and their stakeholders to develop the WECC PCM planning model on bi-annual basis. This proposal is focused on the integrating of PNNL intra-hour uncertainty analysis tools to GridView.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of Climate Change Impacts on Renewable Energy Resources in Western North America

We examine a 25 km resolution climate model dataset to evaluate how regional climate change impacts solar and wind energy under a high-emission scenario. Our study considers the Western Electricity Coordinating Council (WECC) region, which covers the western United States and southwestern Canada, focusing specifically on locations with existing solar and wind infrastructure. First, we conduct a historical model comparison of solar and wind energy capacity factors to highlight model uncertainties across the study area. Using future climate projections, we then assess the seasonal patterns of solar and wind capacity factors for three timeframes: historical, mid-century, and end of century. Additionally, we estimate the frequency of solar and wind resource droughts during these periods for the entire WECC and its five operational subregions, finding that certain subregions are more susceptible to energy droughts due to limited renewable resources. Finally, we present day-ahead capacity factor forecasts to support energy storage planning and provide estimates of offshore wind energy capacity within the WECC. Our results indicate that offshore wind capacity factors are nearly twice as high as onshore values, with less seasonal variation, which suggests that offshore wind could offer a more consistent renewable energy supply in the future.

climate change↗

Effect of modeled time horizon on quantifying the need for long-duration storage

Long-Duration Energy Storage (LDES) has gained interest due to its key role in attaining a decarbonized, low-cost, and stable grid driven by variable renewable electricity (VRE). Currently, there is a wide range of LDES technologies being developed to provide electricity with 8+ hours of consecutive discharge. However, current capacity expansion models used in long-term planning processes rarely consider low cost LDES as a candidate technology. If they do, the storage balancing horizon (SBH) of the model usually only considers non-consecutive 1-day periods that do not capture the potential of LDES to shift energy across multiple days or even seasons. Addressing these limitations in existing models, this work explores the ways in which the optimal energy storage changes when increasing the number of consecutive days in the SBH and how these changes will impact planners who are determining the future roles of energy storage. Our analysis uses SWITCH, an open-source capacity expansion model with a high spatial resolution for the entire Western Electricity Coordinating Council (WECC) in a zero-carbon scenario in 2050. We find that the number of consecutive days in the SBH changes both the total selected power and energy capacity of LDES when storage energy and power capacity overnight costs are $\$$13 USD/kWh (or less) and $113 USD/kW, respectively. We also find that the amount of required energy in storage to drive a future VRE-driven WECC grid ranges from 2.5 TWh to 16.0 TWh depending on the length of the SBH. The optimal storage duration (energy to power ratio) we obtain ranges from 10 h to 620 h among all the scenarios. Furthermore, depending on the storage cost assumption, we observe different charge/discharge patterns when varying the length of the SBH. Given our results, we anticipate that as more LDES technologies become commercially available, it will be critical to increase the length of the SBH to fully capture the benefits of LDES assets in long-term planning processes of high VRE-driven grids.

42 ENGINEERING↗

Customized open source renewable energy models validated through PHIL lab experiments

Energy models for power systems require ongoing updates to reflect advancements in equipment technology and the increasing complexity of power electronic devices. This study utilizes a Power Hardware-in-the-Loop (PHIL) experimental setup to validate custom photovoltaic (PV) inverter models, aiming to enhance and expedite the development of advanced renewable energy models. The research compares the performance of a physical inverter with generic Renewable Energy Source (RES) models recommended by the Western Electricity Coordinating Council (WECC). As inverter-based renewable energy sources become more prevalent in modern electrical grids, it is crucial that dynamic models accurately represent their real-world behavior. Accurate models improve our understanding of these energy resources and their interactions with the grid. The proposed model enhancements are designed to better reflect real inverter performance, based on insights from PHIL experiments. These models are developed using the open source Modelica language and the OpenIPSL Modelica Library, allowing integration across various simulation tools without re-implementation. The paper concludes with a thorough assessment, comparing the enhanced models with PHIL experiments on a real PV inverter in a controlled laboratory setting. As a result, the study provides the enhanced WECC RES models and validation data as open source resources, facilitating further research and development.

Modelica↗

High-Fidelity Large-Signal Order Reduction Approach for Composite Load Model

With the increasing penetration of electronic loads and distributed energy resources, conventional load models cannot capture their dynamics. Therefore, a new comprehensive composite load model is developed by Western Electricity Coordinating Council (WECC). However, this model is a complex high-order non-linear system with multi-time-scale property, which poses challenges on power system studies with heavy computational burden. In order to reduce the model complexity, the authors firstly develop a large-signal order reduction (LSOR) method using singular perturbation theory. In this method, the fast dynamics are integrated into the slow ones to preserve transient characteristics of the former. Then, accuracy assessment conditions are proposed and embedded into the LSOR to improve and guarantee the accuracy of reduced-order model. Finally, the reduced-order WECC composite load model is derived by using the proposed algorithm. Overall, simulation results show that the reduced-order large-signal model significantly alleviates the computational burden while maintaining similar dynamic responses as the original composite load model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Regional inertia dynamics of U.S. interconnections: An event-based measurement approach

Power grid inertia plays a vital role in frequency stability following large disturbances, yet its distribution across the U.S. grid is highly uneven. While interconnection-wide inertia benchmarks are useful, they can mask regional variability driven by resource mix, network coupling, and geographic separation. This paper extends event-driven inertia estimation to the regional scale using field measurements from the Frequency Monitoring Network (FNET/GridEye). Starting from balancing authority and independent system operator footprints, candidate regions are refined using a composite coherency score that combines frequency-trajectory shape similarity, timing spread, and lead/lag behavior to ensure dynamic consistency. A filtered sliding difference method (FSDM) is then used to construct regional frequency trajectories, detect disturbance onset, and compute robust regional rate-of-change of frequency (RoCoF). Regional, local, and interconnection inertia are estimated by combining RoCoF with event power imbalance, and additional indicators (regional-to-system inertia ratio and inertial-support arrival time) quantify regional-to-interconnection coupling and relative regional contributions. The method is demonstrated on eleven regions across the Eastern Interconnection (EI) and the Western Electricity Coordinating Council (WECC), with the Electric Reliability Council of Texas (ERCOT) used for validation. In ERCOT, estimates compared against energy management system (EMS) values achieve a mean absolute percentage error of 17.94%. WECC exhibits consistently shorter inertial-support arrival times (0.15–0.3 s) than EI (0.7–1.1 s), highlighting contrasting coupling and disturbance-propagation behavior. Overall, the results reveal pronounced spatial heterogeneity in inertia and coupling, underscoring the value of regional monitoring for both operational decision-making and long-term system planning.

Disturbance events↗

Enhanced Frequency Support Scheme of Generic Inverter-Based Resource Models for Renewable-Dominated Power Grids

The frequency response of SG-dominated power grids is predictable ahead of an occurrence of a frequency event because the frequency response of SGs is consistent, and it can be inferred from the swing equation [1]. However, increasing the portion of IBRs in an SG-dominated power grid might make the characteristics of the conventional power grids no longer valid because this changing resource mix affects grid dynamics and controls [2]. Thus, maintaining these characteristics greatly benefits the control and operation of the power grids with high penetration of IBRs. To maintain these characteristics in IBR-dominated power grids, IBRs should have frequency response capability similar to that of an SG. The WECC modeling validation subcommittee has developed generic IBR models for large system planning [3]-[5]. These models can represent various vendors' dynamic behavior for WTG, PV, and ESS [5]. The current generic IBR models approved by WECC can provide frequency response only from droop control loops in REPC models [6], [7]. The contribution of the loops is proportional to the frequency deviation from the nominal frequency. Thus, it presents an insufficient contribution to arrest frequency variation compared to the frequency response of SGs because it allows a high ROCOF in the early stage of frequency events. This shortfall will become greater as the PL of IBRs increases in power grids. Controller enhancement for the generic IBR models is required to secure the frequency stability under high PL of IBRs as in the SG-dominated power grids. This paper proposes a control extension for the generic IBR models to enhance the frequency support capabilities and discusses the classification of frequency support for the different types of IBR considering their operating constraints. An inertial control scheme is implemented in the REPC and REEC models of the generic IBR models to achieve these objectives. The inertial control scheme includes the following stages: Control area data acquisition, inertia time constant estimation, IBR-related constraint check, IBR contribution determination, and inertial response provision. In the scheme, a REPC acquires control area data from a system operator and estimates a total inertia time constant for the control area the applicable IBR power plant belongs. Then, the estimated inertial time constant is transferred to each IBR controller—REEC—within the power plant. Each REEC checks the availability of applicable IBR for inertial response participation. If the IBR is available, the REEC amplifies the estimated inertial time constant to utilize it for inertial response provision. In this way, the proposed inertial response scheme extends the functionality of the generic IBR models to provide SG-like frequency response within their constraints. Various scenarios considering different IBR types, IBR penetration levels, and frequency control schemes were simulated and compared in an IEEE 39-bus system using PSCAD simulator to verify the effectiveness of the proposed scheme.

Kim, Jinho↗

EMT-TS Hybrid Simulation for Large Power Grids Considering IBR-Driven Dynamics

The escalating integration of inverter-based resources (IBRs) poses new challenges to power systems by introducing fast dynamics with higher frequencies, which may need to be simulated by an electromagnetic transient (EMT) program. As an alternative to conducting EMT simulations for the entire system, which is typically time consuming, hybrid simulation between EMT and phasor-domain transient stability (TS) can greatly reduce the computational burden while preserving the detailed fast dynamics in the EMT zone. This paper establishes an EMT-TS hybrid simulation platform using open-source tools, specifically ParaEMT, GridPACK, and HELICS, which are the EMT simulator, TS simulator, and interface framework, respectively. Case studies on the 240-bus Western Electricity Coordinating Council (WECC) system demonstrate that the developed ParaEMT-HELICS-GridPACK hybrid simulator can accurately capture both slow electromechanical and fast IBR-driven dynamics with a 2.4x speedup.

electromagnetic transient↗

Three-Stage Production Cost Modeling Approach for Evaluating the Benefits of Intra-Hour Scheduling Between Balancing Authorities

This paper introduces a production cost modeling approach for evaluating the benefits of intra-hour scheduling among Balancing Authorities (BAs). System operation is modeled in a three-stage sequential manner: day ahead (DA)-hour ahead (HA) real time (RT). In addition to contingency reserve, each BA will need to carry out 'up' and 'down' load following and regulation reserve capacity requirements in the DA and HA time frames. In the RT simulation, only contingency and regulation reserves are carried out as load following is deployed. To model current RT operation with hourly schedules, a new constraint was introduced to force each BA net exchange schedule deviation from HA schedules to be within North American Electric Reliability Corporation (NERC) area control error (ACE) limits. Case studies that investigate the benefits of moving from hourly exchange schedules between Western Electricity Coordinating Council (WECC) BAs into 10-minute exchange schedules under two different levels of wind and solar penetration (11% and 33%) are presented.

17 WIND ENERGY↗

Control and Coordination of Frequency Responsive Residential Water Heaters

Demand-side frequency control can complement traditional generator controls to maintain the stability of large electric systems in the face of rising uncertainty and variability associated with renewable energy resources. This paper presents a hierarchical frequency-based load control strategy that uses a supervisor to flexibly adjust control gains that a population of end-use loads respond to in a decentralized manner to help meet the NERC BAL-003-1 frequency response standard at both the area level and interconnection level. The load model is calibrated and used to model populations of frequency-responsive water heaters in a PowerWorld simulation of the U.S. Western Interconnection (WECC). The proposed design is implemented and demonstrated on physical water heaters in a laboratory setting. A significant fraction of the required frequency response in the WECC could be supplied by electric water heaters alone at penetration levels of less than 15%, while contributing to NERC requirements at the interconnection and area levels.

Williams, Tess L.↗

Assessing Gaussian Assumption of PMU Measurement Error Using Field Data

Gaussian PMU measurement noise has been assumed for many power system applications, such as state estimation, oscillatory modes monitoring, voltage stability analysis, to cite a few. This letter proposes a simple yet effective approach to validate this assumption by using the stability property of a probability distribution and the concept of redundant measurement. Extensive results using field PMU data from WECC system reveal that the Gaussian assumption is questionable.

Wang, Shaobu (ORCID:0000000236073573)↗

Mode Shape Estimation Algorithms Under Ambient Conditions: A Comparative Review

Abstract—This paper provides a comparative review of five existing ambient electromechanical mode shape estimation algorithms, i.e., the Transfer Function (TF), Spectral, Frequency Domain Decomposition (FDD), Channel Matching, and Subspace Methods. It is also shown that the TF Method is a general approach to estimating mode shape and that the Spectral, FDD, and Channel Matching Methods are actually special cases of it. Additionally, some of the variations of the Subspace Method are reviewed and the Numerical algorithm for Subspace State Space System IDentification (N4SID) is implemented. The five algorithms are then compared using data simulated from a 17-machine model of the Western Electricity Coordinating Council (WECC) under ambient conditions with both low and high damping, as well as during the case where ambient data is disrupted by an oscillatory ringdown. The performance of the algorithms is compared using the statistics from Monte Carlo Simulations and results from measured WECC data, and a discussion of the practical issues surrounding their implementation, including cases where power system probing is an option, is provided. The paper concludes with some recommendations as to the appropriate use of the various techniques. Index Terms—Electromechanical mode shape, small-signal stability, phasor measurement units (PMU), system identification, N4SID, subspace.

Dosiek, Luke↗

Uncertainty Quantification in Dynamic Simulations of Large-scale Power System Models using the High-Order Probabilistic Collocation Method on Sparse Grids

This paper proposes a probabilistic collocation method (PCM) to quantify the uncertainties with dynamic simulations in power systems. The appraoch was tested on a single-machine-infinite-bus system and the over 15,000 -bus Western Electricity Coordinating Council (WECC) system. Comparing to classic Monte-Carlo (MC) method, the proposed PCM applies the Smolyak algorithm to reduce the number of simulations that have to be performed. Therefore, the computational cost can be greatly reduced using PCM. The algorithm and procedures are described in the paper. Comparison was made with MC method on the single machine as well as the WECC system. The simulation results shows that using PCM only a small number of sparse grid points need to be sampled even when dealing with systems with a relatively large number of uncertain parameters. PCM is, therefore, computationally more efficient than MC method.

Uncertainty quantification, parameter estimation, ↗

Recovery Act: Strategies for Voltage Control and Transient Stability Assessment

As wind generation grows, its influence on power system performance will becoming increasingly noticeable. Wind generation differs from traditional forms of generation in numerous ways though, motivating the need to reconsider the usual approaches to power system assessment and performance enhancement. The project has investigated the impact of wind generation on transient stability and voltage control, identifying and addressing issues at three distinct levels of the power system: 1) at the device level, the physical characteristics of wind turbine generators (WTGs) are quite unlike those of synchronous machines, 2) at the wind-farm level, the provision of reactive support is achieved through coordination of numerous dissimilar devices, rather than straightforward generator control, and 3) from a systems perspective, the location of wind-farms on the sub-transmission network, coupled with the variability inherent in their power output, can cause complex voltage control issues. The project has sought to develop a thorough understanding of the dynamic behaviour of type-3 WTGs, and in particular the WECC generic model. The behaviour of such models is governed by interactions between the continuous dynamics of state variables and discrete events associated with limits. It was shown that these interactions can be quite complex, and may lead to switching deadlock that prevents continuation of the trajectory. Switching hysteresis was proposed for eliminating deadlock situations. Various type-3 WTG models include control blocks that duplicate integrators. It was shown that this leads to non-uniqueness in the conditions governing steady-state, and may result in pre- and post-disturbance equilibria not coinciding. It also gives rise to a zero eigenvalue in the linearized WTG model. In order to eliminate the anomalous behaviour revealed through this investigation, WECC has now released a new generic model for type-3 WTGs.

17 WIND ENERGY↗