Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Unit commitment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Practical Implementation of GPU-based Computing at the Grid Edge for Resilience Scenarios

This paper presents a practical implementation of GPU-accelerated computing at the grid edge to enhance power system resilience through next-generation smart meters. Advanced Metering Infrastructure (AMI) systems rely predominantly on centralized processing architectures, which limit real-time response capabilities during grid disturbances. This work proposes the integration of GPU-enabled computational platforms directly within smart meter to enable local execution support for power system analytics, fault detection algorithms, and optimization routines. The proposed framework uses the Julia programming language to leverage highperformance parallel computing capabilities while maintaining code portability and development efficiency. We use two experimental scenarios to benchmark the computational feasibility of this approach: sparse linear system solutions representative of power flow analyses, and multi-stage production cost simulations incorporating unit commitment and economic dispatch operations. Results demonstrate that computationally intensive power system algorithms, such as those supporting resilience scenario calculations, can be effectively executed at the distribution edge using commercially available embedded GPU hardware. Keywords—GPU acceleration, edge computing, smart meters, grid resilience, AMI, resilience.

De Souza, Reubun [School of Electrical Engineering

Analysis of Proposed 2007-2008 Revisions to the Lightning Launch Commit Criteria for United States Space Launches

Ascending space vehicles are vulnerable to both natural and triggered lightning. Launches under the jurisdiction of the United States are generally subject to a set of rules called the Lightning Launch Commit Criteria (LLCC) (Krider etal., 1999; Krider etal., 2006). The LLCC protect both the vehicle and the public by assuring that the launch does not take place in conditions posing a significant risk of a lightning strike to the ascending vehicle. Such a strike could destroy the vehicle and its payload, thus causing failure of the mission while releasing both toxic materials and debris. To assure safety, the LLCC are conservative and sometimes they may seriously limit the ability of the launch operator to fly as scheduled even when conditions are benign. In order to safely reduce the number of launch scrubs and delays attributable to the LLCC, the Airborne Field Mill (ABFM II) program was undertaken in 2000 - 2001. The effort was directed to collecting detailed high-quality data on the electrical, microphysical, radar and meteorological properties of thunderstorm-associated clouds. Details may be found in Dye et al., 2007. The expectation was that this additional knowledge would provide a better physical basis for the LLCC and allow them to be revised to be less restrictive while remaining at least as safe. That expectation was fulfilled, leading to significant revisions to the LLCC in 2003 and 2005. The 2005 revisions included the application of a new radar-derived quantity called the Volume Averaged Height Integrated Radar Reflectivity (VAHIRR) in the rules governing flight through anvil clouds. VAHIRR is the product of the volume averaged radar reflectivity times the radardetermined cloud thickness. The reflectivity average extends horizontally 5 km west, east, south and north of a point along the flight track and vertically from the 0 C isotherm to the top of the radar cloud. This region is defined as the "Specified Volume". See Dye et al., 2006 and Merceret et al., 2006 for a more thorough description of VAHIRR. The units are dBZ km (not dBZ per kilometer) and the threshold is 10 dBZ km. It is safe to fly through an anvil cloud for which VAHIRR is below this threshold everywhere along the flight track as long as (1) the entire cloud within 5 nmi. (9.26 km) of the flight track is colder than 0 C, (2) the points at which VAHIRR must be evaluated are at least 20 km from any active convective cores and recent lightning, and (3) the radar return is not being attenuated within the Specified Volume around those points.

Dye, James E.

Analysis of Proposed 2007-2008 Revisions to the Lightning Launch Commit Criteria for United States Space Launches

Ascending space vehicles are vulnerable to both natural and triggered lightning. Launches under the jurisdiction of the United States are generally subject to a set of rules called the Lightning Launch Commit Criteria (LLCC). The LLCC protect both the vehicle and the public by assuring that the launch does not take place in conditions posing a significant risk of a lightning strike to the ascending vehicle. Such a strike could destroy the vehicle and its payload, thus causing failure of the mission while releasing both toxic materials and debris. To assure safety, the LLCC are conservative and sometimes they may seriously limit the ability of the launch operator to fly as scheduled even when conditions are benign. In order to safely reduce the number of launch scrubs and delays attributable to the LLCC, the Airborne Field Mill (ABFM) program was undertaken in 2000 - 2001. The effort was directed to collecting detailed high-quality data on the electrical, microphysical, radar and meteorological properties of thunderstorm-associated clouds. The expectation was that this additional knowledge would provide a better physical basis for the LLCC and allow them to be revised to be both safer and less restrictive. That expectation was fulfilled, leading to significant revisions to the LLCC in 2003 and 2005. The 2005 revisions included the application of a new radar-derived quantity called the Volume Averaged Height Integrated Radar Reflectivity (VAHIRR) in the rules governing flight through anvil clouds. Analysis of the ABFM data has continued, and two additional revisions to the LLCC were proposed in late 2006 for adoption in 2007 or 2008. One proposal was to apply the VAHIRR concept to debris clouds, and the other was to reduce the "stand-off distances" in the rules for anvil and/or debris clouds. The stand-off distance is the clearance (out side of the cloud) required between the flight path of the vehicle and the edge of a cloud that it is not permissible to fly through. This paper will discuss these proposed changes in the LLCC and the scientific rationale for adopting or rejecting them based on ABFM data.

Dye, J. E.

Commercial development of space - A national commitment

The United States is currently in a unique position. It has all the assets required to lead the world in commercial space development. It has the transportation: the Shuttle and a family of expendable launch vehicles. Space Station Freedom is forthcoming. It has the extrepreneurial spirit, coupled with a strong university system and lending institutions with financial capacity necessary for entrepreneurial activities. But, there are a number of actions that the government should take to improve the climate and prospects for greater commercial development of space. This paper outlines some of the steps that NASA is taking to incentivize the private sector to apply its resources and talents to commercial space endeavors.

Rose, James T.

Multi-parametric analysis for mixed integer linear programming: An application to transmission upgrade and congestion management

Upgrading the capacity of existing transmission lines is essential for meeting the growing energy demands, facilitating the integration of renewable energy, and ensuring the security of the transmission system. This study focuses on the selection of lines whose capacities and by how much should be expanded from the perspective of the Independent System Operators (ISOs) to minimize the total system cost. We employ advanced multi-parametric programming and an enhanced branch-and-bound algorithm to address complex mixed-integer linear programming (MILP) problems, considering multi-period time constraints and physical limitations of generators and transmission lines. To characterize the various decisions in transmission expansion, we model the increased capacity of existing lines as parameters within a specified range. This study first relaxes the binary variables to continuous variables and applies the Lagrange method and Karush-Kuhn-Tucker (KKT) conditions to obtain optimal solutions and identify critical regions associated with active and inactive constraints. Moreover, we extend the traditional branch-and-bound (B&B) method by determining the problem’s upper and lower bounds at each node of the B&B decision tree, helping to manage computational challenges in large-scale MILP problems. Here, we compare the difference between the upper and lower bounds to obtain an approximate optimal solution within the decision-makers’ tolerable error range. In addition, the first derivative of the objective function on the parameters of each line is used to inform the selection of lines for easing congestion and maximizing social welfare. Finally, the capacity upgrades are selected by weighing the reductions in system costs against the expense of upgrading line capacities. The findings are supported by numerical simulations and provide transmission-line planners with decision-making guidance.

24 POWER TRANSMISSION AND DISTRIBUTION

GRACE Final Technical Report

The GRACE project (Grid that is Risk-Aware for Clean Electricity) was a five-year research initiative funded by the U.S. Department of Energy's Advanced Research Projects Agency- Energy (ARPA-E) under the PERFORM program. Led by Duke University's Nicholas School of the Environment, with contributions from The Ohio State University, North Carolina State University, Dartmouth College, and Pacific Northwest National Laboratory, the project addressed a fundamental challenge in grid management: conventional software plans for a single most-likely outcome and relies on reserves as a buffer, leaving utilities poorly equipped for the growing variability introduced by renewable energy. GRACE demonstrated a better approach: explicitly representing thousands of plausible future scenarios and choosing operating schedules that perform well across all of them.

14 SOLAR ENERGY

ARPA-E Grid Optimization (GO) Competition Challenge 1

The ARPA-E Grid Optimization (GO) Competition Challenge 1, from 2018 to 2019, focused on the basic Security Constrained AC Optimal Power Flow problem (SCOPF) for a single time period. The Challenge utilized sets of unique datasets generated by the ARPA-E GRID DATA program. Each dataset consisted of a collection of power system network models of different sizes with associated operating scenarios (snapshots in time defining instantaneous power demand, renewable generation, generator and line availability, etc.). The datasets were of two types: Real-Time, which included starting-point information, and Online, which did not. Week-Ahead data is also provided for some cases but was not used in the Competition. Although most datasets were synthetic and generated by GRIDDATA, a few came from industry and were only used in the Final Event. All synthetic Input Data and Team Results for the GO Competition Challenge 1 for the Sandbox, Trial Events 1 to 3, and the Final Event along with problem, format, scoring and rules descriptions are available here. Data for industry scenarios will not be made public. Challenge 1, a minimization problem, required two computational steps. Solver 1 or Code 1 solved the base SCOPF problem under a strict wall clock time limit, as would be the case in industry, and reported the base case operating point as output, which was used to compute the Objective Function value that was used as the scenario score. The feasibility of the solution was provided by the Solver 2 or Code 2, which solves the power flow problem for all contingencies based on the results from Solver 1. This is not normally done in industry, so the time limits were relaxed. In fact, there were no time limits for Trial Event 1. This proved to be a mistake, with some codes running for more than 90 hours, and a time limit of 2 seconds per contingency was imposed for all other events. Entrants were free to use their own Solver 2 or use an open-source version provided by the Competition. Containers, such as Docker, were considered to improve the portability of codes, but none that could reliably support a multi-node parallel computing environment, e.g., MPI, could be found. For more information on the competition and challenge see the "GO Competition Challenge 1 Information" and "GO Competition Challenge 1 Additional Information" resources below.

ACOPF

Greenhouse Gas Life Cycle Emissions Assessment Model (GLEAM) Model Documentation

The Greenhouse gas Life cycle Emissions Assessment Model (GLEAM) estimates life cycle greenhouse gas emissions from future scenarios of electricity generation considering a wide range of generation technologies. Building on the National Laboratory of the Rockies longstanding effort to quantify life cycle emissions by electricity generation technology under the LCA Harmonization Project, GLEAM streamlines the process of estimating cumulative greenhouse gas emissions on a life cycle basis. Given a set of inputs regarding annual installed and decommissioned generation capacity, as well as generation, GLEAM estimates the carbon dioxide equivalent emissions by year. The model also offers optional modules to decompose carbon dioxide equivalent emissions into constituent greenhouse gases (e.g., carbon dioxide, methane, and nitrous oxide) as well as estimate hydrogen leakage from relevant technologies. The results from GLEAM can be used to inform future electricity planning scenarios as well as investment or regulatory decisions.

24 POWER TRANSMISSION AND DISTRIBUTION

Overview of the Environmental Control and Life Support System (ECLSS) Testing At MSFC

Previously, almost all water used by the crew during space flight has been transported from earth or generated in-flight as a by-product of fuel cells. Additionally, this water has been stored and used for relatively short periods. To achieve the United States' commitment to a permanent manned presence in space, more innovative techniques are demanded. Over 20,000 pounds of water and large quantities of air would have to be transported to the International Space Station (ISS) every 90 days with a corresponding amount of waste returned to earth, for an 8-person crew. This approach results in prohibitive logistics costs, and necessitates near complete recovery and recycling of water. The potential hazards associated with long-term reuse of reclaimed water and revitalized air resulted in the recognition that additional characterization of closed-loop systems and products is essential. Integrated physical/chemical systems have been designed, assembled, and operated to provide air and potable water meeting ISS quality specifications. The purpose of the Environmental Control and Life Support System (ECLSS) test program at NASA's Marshall Space Flight Center is to conduct research related to the performance of the ISS and its Environmental Control components. The ECLSS Test Program encompasses the Water Recovery Test (WRT), the Integrated Air Revitalization Test (IART), and Life Testing, which permits ECLSS design evaluation. These subsystems revitalize air and reclaim waste waters representative of those to be generated on-orbit. This paper provides an overview of MSFC's 1997 ECLSS testing. Specific tests include: the Stage 10 Water Recovery Test; the Contaminant Injection Test; the Performance Enhancement Test and Life Testing of the Four Bed Molecular Sieve; the Oxygen Generator Assembly Life Test; and the ISS Water Distribution Biofilm Life Test.

Traweek, Mary S.

The International Space Station: Operations and Assembly - Learning From Experiences - Past, Present, and Future

As the Space Shuttle continues flight, construction and assembly of the International Space Station (ISS) carries on as the United States and our International Partners resume the building, and continue to carry on the daily operations, of this impressive and historical Earth-orbiting research facility. In his January 14, 2004, speech announcing a new vision for America s space program, President Bush ratified the United States commitment to completing construction of the ISS by 2010. Since the launch and joining of the first two elements in 1998, the ISS and the partnership have experienced and overcome many challenges to assembly and operations, along with accomplishing many impressive achievements and historical firsts. These experiences and achievements over time have shaped our strategy, planning, and expectations. The continual operation and assembly of ISS leads to new knowledge about the design, development and operation of systems and hardware that will be utilized in the development of new deep-space vehicles needed to fulfill the Vision for Exploration and to generate the data and information that will enable our programs to return to the Moon and continue on to Mars. This paper will provide an overview of the complexity of the ISS Program, including a historical review of the major assembly events and operational milestones of the program, along with the upcoming assembly plans and scheduled missions of the space shuttle flights and ISS Assembly sequence.

Fuller, Sean

The International Space Station: A Pathway to the Future

Nearly six years after the launch of the first International Space Station element, and four years after its initial occupation, the United States and our 16 international partners have made great strides in operating this impressive Earth orbiting research facility. This past year we have done so in the face of the adversity of operating without the benefit of the Space Shuttle. In his January 14, 2004, speech announcing a new vision for America's space program, President Bush affirmed the United States' commitment to completing construction of the International Space Station by 2010. The President also stated that we would focus our future research aboard the Station on the longterm effects of space travel on human biology. This research will help enable human crews to venture through the vast voids of space for months at a time. In addition, ISS affords a unique opportunity to serve as an engineering test bed for hardware and operations critical to the exploration tasks. NASA looks forward to working with our partners on International Space Station research that will help open up new pathways for future exploration and discovery beyond low Earth orbit. This paper provides an overview of the International Space Station Program focusing on a review of the events of the past year, as well as plans for next year and the future.

Kitmacher, Gary H.

The International Space Station: Stepping-stone to Exploration

As the Space Shuttle returns to flight this year, major reconfiguration and assembly of the International Space Station continues as the United States and our 5 International Partners resume building and carry on operating this impressive Earth-orbiting research facility. In his January 14,2004, speech announcing a new vision for America's space program, President Bush ratified the United States commitment to completing construction of the ISS by 2010. The current ongoing research aboard the Station on the long-term effects of space travel on human physiology will greatly benefit human crews to venture through the vast voids of space for months at a time. The continual operation of ISS leads to new knowledge about the design, development and operation of system and hardware that will be utilized in the development of new deep-space vehicles needed to fulfill the Vision for Exploration. This paper will provide an overview of the ISS Program, including a review of the events of the past year, as well as plans for next year and the future.

Gerstenmaier, William H.

International Collaboration in Lunar Exploration

The U.S. Vision for Space Exploration commits the United States to return astronauts to the moon by 2020 using the Ares I Crew Launch Vehicle and Ares V Cargo Launch Vehicle. Like the Apollo program of the 1960s and 1970s, this effort will require preliminary reconnaissance in the form of robotic landers and probes. Unlike Apollo, some of the data NASA will rely upon to select landing sites and conduct science will be based on international missions as well, including SMART-1, SELENE, and Lunar Reconnaissance Orbiter (LRO). Opportunities for international cooperation on the moon also lie in developing lunar exploration technologies. The European Space Agency's SMART-1 orbiter (Figure 1) is making the first comprehensive inventory of key chemical elements in the lunar surface. It is also investigating the impact theory of the moon's formation.'

Morris, K. Bruce

The International Space Station: Stepping-stone to Exploration

As the Space Shuttle returns to flight this year, major reconfiguration and assembly of the International Space Station continues as the United States and our 5 International Partners resume building and carry on operating this impressive Earth-orbiting research facility. In his January 14, 2004, speech announcing a new vision for America's space program, President Bush ratified the United States' commitment to completing construction of the ISS by 2010. The current ongoing research aboard the Station on the long-term effects of space travel on human physiology will greatly benefit human crews to venture through the vast voids of space for months at a time. The continual operation of ISS leads to new knowledge about the design, development and operation of system and hardware that will be utilized in the development of new deep-space vehicles needed to fulfill the Vision for Exploration. This paper will provide an overview of the ISS Program, including a review of the events of the past year, as well as plans for next year and the future.

Gerstenmaier, William H.

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Advancing International Integration and Strengthening Responsible Peaceful Uses of Nuclear Applications Through Specialized Curriculums

Nuclear technology has been pivotal in addressing some of the most pressing global challenges, ranging from energy production to combatting infectious diseases to agricultural security. Oak Ridge National Laboratory (ORNL), as a leader in nuclear research and development including in the field of radioisotopes, is well situated to share lessons learned and enhance global collaboration from years of discoveries in the field. Accordingly, the U.S. Department of Energy’s National Nuclear Security Administration (NNSA) sponsors specialized educational programs at ORNL, with support from the IAEA, focused on advancing peaceful nuclear applications and associated industries while upholding strong nuclear safety, security, and safeguards standards. The Joint U.S./IAEA International School on Peaceful Uses of Nuclear Applications, launched in 2024, is a cornerstone of this collaboration. The school provides an opportunity for early-career professionals from around the globe to gain practical knowledge and skills in utilizing nuclear technologies for peaceful purposes. This initiative demonstrates the United States’ commitment to its obligations under the Treaty on the Non-Proliferation of Nuclear Weapons (NPT), specifically Article IV, which calls on nuclear-weapon states to facilitate access to the peaceful uses of nuclear energy while guarding against the proliferation of nuclear weapons. In this paper, we explore the curriculum, objectives, and global impact of the program. Participants of the ICARST-2025 conference are invited to learn more about this program, contribute to its development, and explore opportunities for collaboration. This school exemplifies how strategic partnerships, and educational initiatives can drive the peaceful and beneficial use of nuclear technology worldwide

Raffo Caiado, Ana [ORNL] (ORCID:0009000239304805)

National Zero-Emission Freight Corridor Strategy

The United States has committed to decarbonizing freight transportation by advancing the deployment of commercial zero-emission medium- and heavy-duty vehicles (ZEMHDVs) and infrastructure. It is pursuing this goal by leveraging historic federal and private investments, policies, and partnerships. Through the U.S. National Blueprint for Transportation Decarbonization1 and the Global Memorandum of Understanding for Zero-Emission Medium- and Heavy-Duty Vehicles,2 the United States has committed to identifying viable pathways and implementation actions that promote at least 30% ZE-MHDV sales by 2030, with a goal of 100% by 2040. These actions, along with the investments laid out in the Bipartisan Infrastructure Law and Inflation Reduction Act, put the nation on a path to advancing transportation and infrastructure solutions that are better for freight movement, our communities, the environment, and the economy. Providing ubiquitous and convenient access to electric vehicle (EV) charging and hydrogen refueling along our nation’s freight corridors, and at truck depots within freight hubs, is key to successfully deploying ZE-MHDVs. Consistent with its charge in the Bipartisan Infrastructure Law, 3 the Joint Office of Energy and Transportation (Joint Office), in collaboration with the U.S. Department of Energy (DOE), Department of Transportation, and the Environmental Protection Agency, has developed the National Zero-Emission Freight Corridor Strategy (Strategy). The Strategy guides infrastructure deployment to meet growing market demands; catalyze public and private investment; and support utility and regulatory planning and action at local, state, and regional levels.

33 ADVANCED PROPULSION SYSTEMS

Getting brighter: Impacts of improved day-ahead solar forecasts in high-solar, high-storage electricity systems

This paper analyzes the impacts of improved day-ahead solar forecasts on costs and dispatch in the solar-rich Southeast U.S. It uses an optimized high-solar, high-storage resource portfolio in which solar generation capacity accounts for 45 % of total installed capacity (34 %–36 % of generation) and energy storage capacity (43 GW) is equivalent to 33 % of peak demand. In a base scenario, improved day-ahead solar forecasts reduce production costs by $\$87$ million per year ($\$0.13$ per MWh load, $2023$$). This level of savings is within the range or lower than earlier studies of solar forecast improvements at lower levels of solar generation (<25 % of total generation). In this study, solar expansion was accompanied by two important sources of flexibility for managing solar forecast error: energy storage and day-ahead solar curtailment. Furthermore, the analysis finds that regional coordination complements day-ahead solar forecast improvements while natural gas commitment flexibility is a substitute for forecast improvements, as the improved solar forecast leads to sub-optimal commitment of thermal units. Day-ahead solar forecast improvements reduce reserves required to manage forecast error by 30 %. Fewer reserves to manage large, infrequent solar forecast errors could be an important benefit of improved solar forecasts.

14 SOLAR ENERGY