Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Uncertainty management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

APIS: Honeybee Foraging Task Assignment for Use in Uncertain and Unreliable Environments

Multiagent Cyber-Physical-Human (CPH) systems in realistic environments operate under uncertain conditions. Communication among agents, aimed at reducing the uncertainty, is itself subject to uncertainty. We propose to manage uncertainties in autonomous, long-duration operations of multiagent systems via a modified Honeybee Foraging (HBF) behavioral scheme. The resulting system, Autonomous Persistent Intelligent Swarm (APIS),incorporates two new behaviors to ameliorate informational uncertainty. When “scouting”, agents are tasked based on informational quality and reliability rather than solely on priorities. When “dancing”, agents are tasked to rendezvous with other dancing agents to exchange information at close range, where successful communication is guaranteed. When coupled with uncertainty-aware modeling across agents, these behaviors improve situational awareness and resilience of the system, enabling it to function under more uncertain conditions arising during long-duration missions.

Autonomous systems↗

DOE site remedial management optimization utilizing on the cloud computing systems - 15676

Environmental cleanups at complex sites necessarily address many competing demands and answer questions such as: 'What is the best way and in a sustainable manner to minimize risk to human health and the environment during active restoration efforts and/or long term legacy management, while incorporating parameter uncertainty, management considerations, and stakeholder concerns into the process?' Physics Based Management Optimization (PBMO{sup TM}) provides a means to answer such questions. 'Physics Based' indicates incorporation of numerically computed groundwater flow and transport processes into the analysis. This enables optimal remedy design based on comprehensive mass removal/destruction metrics and optimal monitoring strategies. 'Management Optimization' indicates the ability to incorporate objective functions (e.g., management constraints, sustainability considerations) into the evaluation. PBMO{sup TM} components have been successfully implemented for optimal plume delineation (points of compliance) and monitoring, for optimal system design and to optimize existing active treatment systems in the US at multiple DOE, DOD and industrial sites since the mid 1990's. PBMO{sup TM} has been recently extended and implemented on multi-core, multi-CPU grid computing systems including computational clusters, local area networks and the Cloud. This extension allows for increased flexibility and adaptation of computational resources which can now support optimal remedy design and long term management strategies for complex soil and groundwater sites. In the PBMO{sup TM} -Grid case study, we evaluate flow and transport for a typical optimization search for a realistic project against sequential optimization. PBMO{sup TM}-Grid reduces the CPU time required to solve the optimization problem by more than a factor of 14 X compared to sequential optimization. PBMO{sup TM}-Grid can be deployed for deterministic or stochastic optimization and formally computes design risk and predicted degree of remedial action success. The numerical models used can consist of a single 'mega' model (aka a monolith), or a mixture of models and other calculations or expert systems. PBMO{sup T}M-Grid integrates the computational models in a seamless manner, and models run on the Cloud can be implemented in Windows or Linux platforms. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Statistical Uncertainty of Inhalation Dose Coefficients in Consequence Management: Propagated Dose Uncertainty in ICRP 66 Human Respiratory Tract Model

Reference inhalation dose models rely on deterministic biokinetics and reference computational phantoms, limiting their applicability to the variability present in population-specific exposures encountered in emergency response scenarios. Here, this study introduces REDCAL, a Python-based computational framework developed to propagate uncertainty in inhalation dose coefficients using the International Commission on Radiological Protection (ICRP) Publication 66 Human Respiratory Tract Model. REDCAL integrates ICRP deposition and clearance models, systemic biokinetics, and governing physics principles, and leverages Sandia National Laboratories’ Dakota toolkit for uncertainty quantification via Latin Hypercube Sampling. REDCAL was validated against DCAL, with biokinetic retention results differing by less than 1% and effective dose coefficients by less than 2% across all tested radionuclides. Stochastic sampling introduced variability in dose coefficients, with geometric standard deviations (GSD) in committed effective dose coefficients (CEDC) ranging from 1.0 to 1.5, based on lognormal distribution fits. Analysis demonstrated that variations in the activity median aerodynamic diameter (AMAD) notably influenced the computed CEDC values. Smaller particles (<1 µm) increased doses by 20–30% due to deeper lung deposition and prolonged retention for alpha emitting radionuclides, such as 241 Am and 239 Pu. Radionuclides with fast clearance, such as 133 I, demonstrated a dose reduction exceeding 50%, as AMAD increased beyond 5 µm due to upper airway deposition and rapid mucociliary clearance. The greatest GSD among the radionuclides reported in this study was for 241 Am. In most cases, the largest GSDs in the CEDC were associated with larger particle sizes, an expected outcome, as ICRP Publication 66 defines GSD in particle size as a function of AMAD, resulting in an extended tail of the lognormal distribution. The findings support improved inhalation dose assessments and enhance consequence management strategies for the U.S. Federal Radiological Monitoring and Assessment Center by quantifying uncertainty in dose coefficients and strengthening decision-making for emergency response scenarios.

Biokinetic Modeling↗

Confidence in Numerical Simulations

This PowerPoint presentation offers a high-level discussion of uncertainty, confidence and credibility in scientific Modeling and Simulation (M&S). It begins by briefly evoking M&S trends in computational physics and engineering. The first thrust of the discussion is to emphasize that the role of M&S in decision-making is either to support reasoning by similarity or to “forecast,” that is, make predictions about the future or extrapolate to settings or environments that cannot be tested experimentally. The second thrust is to explain that M&S-aided decision-making is an exercise in uncertainty management. The three broad classes of uncertainty in computational physics and engineering are variability and randomness, numerical uncertainty and model-form uncertainty. The last part of the discussion addresses how scientists “think.” This thought process parallels the scientific method where by a hypothesis is formulated, often accompanied by simplifying assumptions, then, physical experiments and numerical simulations are performed to confirm or reject the hypothesis. “Confidence” derives, not just from the levels of training and experience of analysts, but also from the rigor with which these assessments are performed, documented and peer-reviewed.

97 MATHEMATICS AND COMPUTING↗

Errors and Uncertainties in Dose Reconstruction for Radiation Effects Research

Dose reconstruction for studies of the health effects of ionizing radiation have been carried out for many decades. Major studies have included Japanese bomb survivors, atomic veterans, downwinders of the Nevada Test Site and Hanford, underground uranium miners, and populations of nuclear workers. For such studies to be credible, significant effort must be put into applying the best science to reconstructing unbiased absorbed doses to tissues and organs as a function of time. In many cases, more and more sophisticated dose reconstruction methods have been developed as studies progressed. For the example of the Japanese bomb survivors, the dose surrogate “distance from the hypocenter” was replaced by slant range, and then by TD65 doses, DS86 doses, and more recently DS02 doses. Over the years, it has become increasingly clear that an equal level of effort must be expended on the quantitative assessment of uncertainty in such doses, and to reducing and managing uncertainty. In this context, this paper reviews difficulties in terminology, explores the nature of Berkson and classical uncertainties in dose reconstruction through examples, and proposes a path forward for Joint Coordinating Committee for Radiation Effects Research (JCCRER) Project 2.4 that requires a reasonably small level of effort for DOSES-2008.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Exploration of Uncertainty in Glacier Modelling

There are procedures and methods for verification of coding algebra and for validations of models and calculations that are in use in the aerospace computational fluid dynamics (CFD) community. These methods would be efficacious if used by the glacier dynamics modelling community. This paper is a presentation of some of those methods, and how they might be applied to uncertainty management supporting code verification and model validation for glacier dynamics. The similarities and differences between their use in CFD analysis and the proposed application of these methods to glacier modelling are discussed. After establishing sources of uncertainty and methods for code verification, the paper looks at a representative sampling of verification and validation efforts that are underway in the glacier modelling community, and establishes a context for these within overall solution quality assessment. Finally, an information architecture and interactive interface is introduced and advocated. This Integrated Cryospheric Exploration (ICE) Environment is proposed for exploring and managing sources of uncertainty in glacier modelling codes and methods, and for supporting scientific numerical exploration and verification. The details and functionality of this Environment are described based on modifications of a system already developed for CFD modelling and analysis.

Thompson, David E.↗

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TPSAS-NF1676L-12725-DND

Uncertainty analysis and robust design - increase confidence and consistency in aerospace vehicle safety predictions by developing improved methods for quantifying and managing uncertainty. Quantifying: uncertainty modeling (model uncertainty based on experimental data, simulations and/or expert opinion) and uncertainty propagation (given uncertainty models of a system’s inputs, how to propagate them through system models, to efficiently evaluate the corresponding system’s outputs?). Managing: robust design (generate designs that robustly accommodate uncertainty) and uncertainty decomposition (identify uncertainties that contribute the most to performance degradation and determine the parameters that should (not) be modeled as uncertain).

Sean P Kenny↗

Multiple Damage Progression Paths in Model-Based Prognostics

Model-based prognostics approaches employ domain knowledge about a system, its components, and how they fail through the use of physics-based models. Component wear is driven by several different degradation phenomena, each resulting in their own damage progression path, overlapping to contribute to the overall degradation of the component. We develop a model-based prognostics methodology using particle filters, in which the problem of characterizing multiple damage progression paths is cast as a joint state-parameter estimation problem. The estimate is represented as a probability distribution, allowing the prediction of end of life and remaining useful life within a probabilistic framework that supports uncertainty management. We also develop a novel variance control mechanism that maintains an uncertainty bound around the hidden parameters to limit the amount of estimation uncertainty and, consequently, reduce prediction uncertainty. We construct a detailed physics-based model of a centrifugal pump, to which we apply our model-based prognostics algorithms. We illustrate the operation of the prognostic solution with a number of simulation-based experiments and demonstrate the performance of the chosen approach when multiple damage mechanisms are active

Daigle, Matthew↗

PyTUQ: Python Toolkit for Uncertainty Quantification

SAND2025-03661O PyTUQ is a user-friendly software toolkit designed to help researchers and professionals understand and manage uncertainty in several scientific fields. By providing tools for analyzing how uncertainties affect outcomes, PyTUQ can be applied in areas such as energy production, and biology. Its unique approach allows users to make more informed decisions by assessing risks and improving predictions. Whether you're studying combustion processes or exploring complex biological systems, PyTUQ empowers you to gain deeper insights and enhance the reliability of your results. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

SciDAC↗

Nuclear data uncertainty quantification for the nuclide inventory of a Calvert Cliffs spent fuel sample

The impact of nuclear data cross section uncertainties and covariance matrices on the nuclide vector of spent nuclear fuel was investigated; This exercise was carried out for the Calvert Cliffs fuel assembly D047 benchmark available in the SFCOMPO database. Sample P irradiated in rod MKP109 for 4 cycles up to a burnup of approximately 44 GWd/MTU was selected for the analysis. Nuclear data uncertainties were taken from the most recent libraries released by evaluation projects JEFF, ENDF/B and JENDL, and were propagated using the SANDY code via a stochastic sampling approach. This paper provides a quantification of the uncertainty on the concentration of several actinides and fission products relevant for spent fuel management. Uncertainties generally below 5 % were predicted for the concentrations of most of the uranium, neptunium and plutonium isotopes relevant for SNF applications. Curium isotopes carry larger uncertainties that might exceed 10 %. The contribution of cross section uncertainties on the concentrations of fission products was found to be marginal with the exception of a few nuclides. These results can be significantly affected by the lack of evaluated covariance matrices for the capture cross section of several fission products. Burnup tracers such as {sup 148}Nd and {sup 137}Cs have negligible uncertainties because of the power normalisation imposed in every stochastic calculation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Distributed Prognostics and Health Management with a Wireless Network Architecture

A heterogeneous set of system components monitored by a varied suite of sensors and a particle-filtering (PF) framework, with the power and the flexibility to adapt to the different diagnostic and prognostic needs, has been developed. Both the diagnostic and prognostic tasks are formulated as a particle-filtering problem in order to explicitly represent and manage uncertainties in state estimation and remaining life estimation. Current state-of-the-art prognostic health management (PHM) systems are mostly centralized in nature, where all the processing is reliant on a single processor. This can lead to a loss in functionality in case of a crash of the central processor or monitor. Furthermore, with increases in the volume of sensor data as well as the complexity of algorithms, traditional centralized systems become for a number of reasons somewhat ungainly for successful deployment, and efficient distributed architectures can be more beneficial. The distributed health management architecture is comprised of a network of smart sensor devices. These devices monitor the health of various subsystems or modules. They perform diagnostics operations and trigger prognostics operations based on user-defined thresholds and rules. The sensor devices, called computing elements (CEs), consist of a sensor, or set of sensors, and a communication device (i.e., a wireless transceiver beside an embedded processing element). The CE runs in either a diagnostic or prognostic operating mode. The diagnostic mode is the default mode where a CE monitors a given subsystem or component through a low-weight diagnostic algorithm. If a CE detects a critical condition during monitoring, it raises a flag. Depending on availability of resources, a networked local cluster of CEs is formed that then carries out prognostics and fault mitigation by efficient distribution of the tasks. It should be noted that the CEs are expected not to suspend their previous tasks in the prognostic mode. When the prognostics task is over, and after appropriate actions have been taken, all CEs return to their original default configuration. Wireless technology-based implementation would ensure more flexibility in terms of sensor placement. It would also allow more sensors to be deployed because the overhead related to weights of wired systems is not present. Distributed architectures are furthermore generally robust with regard to recovery from node failures.

Goebel, Kai↗

Using ASCEM Modeling and Visualization to Inform Stakeholders of Contaminant Plume Evolution and Remediation Efficacy at F-Basin Savannah River, SC – 15156

Communication with stakeholders, regulatory agencies, and the public is an essential part of implementing different remediation and monitoring activities, and developing site closure strategies at contaminated sites. Modeling of contaminant plume evolution plays a critical role in estimating the benefit, cost, and risk of particular options. At the same time, effective visualization of monitoring data and modeling results are particularly important for conveying the significance of the results and observations. In this paper, we present the results of the Advanced Simulation Capability for Environmental Management (ASCEM) project, including the discussion of the capabilities of newly developed ASCEM software package, along with its application to the F-Area Seepage Basins located in the U.S. Department of Energy Savannah River Site (SRS). ASCEM software includes state-of-the-art numerical methods for simulating complex flow and reactive transport, as well as various toolsets such as a graphical user interface (GUI), visualization, data management, uncertainty quantification, and parameter estimation. Using this software, we have developed an advanced visualization of tritium plume migration coupled with a data management system, and simulated a three-dimensional model of flow and plume evolution on a high-performance computing platform. We evaluated the effect of engineered flow barriers on a nonreactive tritium plume, through advanced plume visualization and modeling of tritium plume migration. In addition, we developed a geochemical reaction network to describe complex geochemical processes at the site, and evaluated the impact of coupled hydrological and geochemical heterogeneity. These results are expected to support SRS’s monitoring activities and operational decisions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using ASCEM modeling and visualization to inform stakeholders of contaminant plume evolution and remediation efficacy at F-Basin Savannah river, SC - 15156

Communication with stakeholders, regulatory agencies, and the public is an essential part of implementing different remediation and monitoring activities, and developing site closure strategies at contaminated sites. Modeling of contaminant plume evolution plays a critical role in estimating the benefit, cost, and risk of particular options. At the same time, effective visualization of monitoring data and modeling results are particularly important for conveying the significance of the results and observations. In this paper, we present the results of the Advanced Simulation Capability for Environmental Management (ASCEM) project, including the discussion of the capabilities of newly developed ASCEM software package, along the its application to the F-Area Seepage Basins located in the U.S. Department of Energy Savannah River Site (SRS). ASCEM software includes state-of-the-art numerical methods for simulating complex flow and reactive transport, as well as various tool-sets such as a graphical user interface (GUI), visualization, data management, uncertainty quantification, and parameter estimation. Using this software, we have developed an advanced visualization of tritium plume migration coupled with a data management system, and simulated a three-dimensional model of flow and plume evolution on a high-performance computing platform. We evaluated the effect of engineered flow barriers on a nonreactive tritium plume, through advanced plume visualization and modeling of tritium plume migration. In addition, we developed a geochemical reaction network to describe complex geochemical processes at the site, and evaluated the impact of coupled hydrological and geochemical heterogeneity. These results are expected to support SRS's monitoring activities and operational decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Systematic Evaluation of Stochastic Methods in Power System Scheduling and Dispatch with Renewable Energy

As more wind power and other renewable resources are being integrated into the electric power grid, the forecast uncertainty brings operational challenges for the power system operators. In this report, different operational strategies for uncertainty management are presented and evaluated. A comprehensive and consistent simulation framework is developed to analyze the performance of different reserve policies and scheduling techniques under uncertainty in wind power. Numerical simulations are conducted on a modified version of the IEEE 118-bus system with a 20% wind penetration level, comparing deterministic, interval, and stochastic unit commitment strategies. The results show that stochastic unit commitment provides a reliable schedule without large increases in operational costs. Moreover, decomposition techniques, such as load shift factor and Benders decomposition, can help in overcoming the computational obstacles to stochastic unit commitment and enable the use of a larger scenario set to represent forecast uncertainty. In contrast, deterministic and interval unit commitment tend to give higher system costs as more reserves are being scheduled to address forecast uncertainty. However, these approaches require a much lower computational effort Choosing a proper lower bound for the forecast uncertainty is important for balancing reliability and system operational cost in deterministic and interval unit commitment. Finally, we find that the introduction of zonal reserve requirements improves reliability, but at the expense of higher operational costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A2E2G (Atmosphere to Electrons to the Grid platform) [SWR-23-22]

A2E2G is a platform that integrates 1) forecasting tools to account for weather uncertainty, with 2) aerodynamic wind plant models to account for wake dynamics and wind plant operation, and 3) economic models to advise on operation for a wind power plant that offers grid services in addition to energy. The A2E2G platform can be used as a high-level controller for a wind plant for market participation and real-time wind plant control. The A2E2g platform is a holistic Python tool with modules that can be run to 1) advise on market participation and 2) control and operate a wind power plant in real time. The A2E2g framework assumes two stages: the first stage is in day-ahead and the second stage is in real-time. Managing uncertainty is key in the first stage and managing variability is key in the second stage. The different components have models written and developed in the Python programming language. The code is assembled into a Python package and can be easily downloaded and installed from the A2E2g repository (https://github.com/NREL/a2e2g).

Sinner, Michael↗

Model to inform the expansion of hydrogen distribution infrastructure

A growing hydrogen economy requires new hydrogen distribution infrastructure to link geographically distributed hubs of supply and demand. The Hydrogen Optimization with Deployment of Infrastructure (HOwDI) Model helps meet this requirement. The model is a spatially resolved optimization framework that determines location-specific hydrogen production and distribution infrastructure to cost-optimally meet a specified location-based demand. While these results are useful in understanding hydrogen infrastructure development, there is uncertainty in some costs that the model uses for inputs. Thus, the project team took the modeling effort a step further and developed a Monte Carlo methodology to help manage uncertainties. Seven scenarios were run using existing infrastructure and new demand in Texas exploring different policy and tax approaches. The inclusion of tax credits increased the percentage of runs that could deliver hydrogen at <$\$4$ /kg from 31% to 77% and decreased the average dispensed cost from $\$4.35$ /kg to $\$3.55$ /kg. However, even with tax credits there are still some runs where unabated SMR is deployed to meet new demand as the low-carbon production options are not competitive. Every scenario, except for the zero-carbon scenario (without tax credits), resulted in at least 20% of the runs meeting the $\$4$ /kg dispensed fuel cost target. This indicates that multiple pathways exist to deliver $\$4$ /kg hydrogen.

08 HYDROGEN↗

Exploring the Model Design Space for Battery Health Management

Battery Health Management (BHM) is a core enabling technology for the success and widespread adoption of the emerging electric vehicles of today. Although battery chemistries have been studied in detail in literature, an accurate run-time battery life prediction algorithm has eluded us. Current reliability-based techniques are insufficient to manage the use of such batteries when they are an active power source with frequently varying loads in uncertain environments. The amount of usable charge of a battery for a given discharge profile is not only dependent on the starting state-of-charge (SOC), but also other factors like battery health and the discharge or load profile imposed. This paper presents a Particle Filter (PF) based BHM framework with plug-and-play modules for battery models and uncertainty management. The batteries are modeled at three different levels of granularity with associated uncertainty distributions, encoding the basic electrochemical processes of a Lithium-polymer battery. The effects of different choices in the model design space are explored in the context of prediction performance in an electric unmanned aerial vehicle (UAV) application with emulated flight profiles.

Saha, Bhaskar↗