Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Trajectory Correction Maneuver”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Impacts of Center of Mass Shifts on Messenger Spacecraft Operations

The MESSENGER (MErcury Surface, Space ENvironment, GEochemistry, and Ranging) has successfully completed its first three years of flight operations following launch on August 3, 2004. As part of NASA s Discovery Program, MESSENGER will observe Mercury during flybys in 2008 and 2009, as well as from orbit beginning in March 2011. This paper discusses the impact that center of mass (CM) location changes have had on many mission activities, particularly angular momentum management and maneuver execution. Momentum trends were altered significantly following the first deep-space maneuver, and these changes were related to a change in the CM. The CM location also impacts maneuver execution, and uncertainties in its location led to the significant direction errors experienced at trajectory correction maneuver 11. Because of the spacecraft sensitivity to CM location, efforts to estimate its position are important to momentum and maneuver prediction. This paper summarizes efforts to estimate the CM from flight data, as well as the operational strategy to handle CM uncertainties and their impact on momentum trends and maneuver execution accuracy.

O'Shaughnessy, D. J.↗

A Linear Analysis for the Flight Path Control of the Cassini Grand Finale Orbits

Cassini’s Grand Finale Mission begins after the last targeted Titan flyby on April 22, 2017 and ends with a series of 22 ballistic orbits each passing within a few thousand kilometers of the cloud tops of Saturn, ultimately impacting the planet on September 15, 2017. Despite the ballistic nature of the trajectory, the absence of targeted maneuvers throughout the final orbits causes position uncertainties to grow exponentially with time, posing a significant difficulty for the science sequence planning team. Thus, a strategy that incorporates trajectory correction maneuvers was developed to significantly reduce dispersions from the reference path and maintain dispersions below 250 km (1- ). In this paper, the linear method used to determine the optimal number and location of the maneuvers to control the trajectory, along with the corresponding targets, is detailed. A nonlinear Monte Carlo trajectory dispersion tool served as a testbed to validate the linear analysis results. Based on orbit determination covariance sampling with Monte Carlo simulations, the linear approach allowed the Cassini maneuver analysts to run thousands of maneuver combinations in little time, eventually finding an optimal strategy with three statistical maneuvers ( V99 < 1.5 m/s) to adequately control most of the trajectory.

Vaquero, Mar↗

Entry, Descent, and Landing Operations Analysis for the Mars Phoenix Lander

The Mars Phoenix lander was launched August 4, 2007 and remained in cruise for ten months before landing in the northern plains of Mars in May 2008. The one-month Entry, Descent, and Landing (EDL) operations phase prior to entry consisted of daily analyses, meetings, and decisions necessary to determine if trajectory correction maneuvers and environmental parameter updates to the spacecraft were required. An overview of the Phoenix EDL trajectory simulation and analysis that was performed during the EDL approach and operations phase is described in detail. The evolution of the Monte Carlo statistics and footprint ellipse during the final approach phase is also provided. The EDL operations effort accurately delivered the Phoenix lander to the desired landing region on May 25, 2008.

Prince, Jill L.↗

The International Cometary Explorer comet encounter and earth-return trajectory

ICE experienced a successful encounter with Comet Giacobini-Zinner on September 11, 1985. The comet-intercept trajectory, earth-return trajectory, and two cases of a possible 2014 capture trajectory are presented. Also, the essential propulsive trajectory correction maneuvers and the projected August 10, 2014 lunar swingby maneuver are discussed. The targeting methodology used for designing the trajectories is also discussed.

Roberts, Craig E.↗

Implementation of an Autonomous Multi-Maneuver Targeting Sequence for Lunar Trans-Earth Injection

Using a fully analytic initial guess estimate as a first iterate, a targeting procedure that constructs a flyable burn maneuver sequence to transfer a spacecraft from any closed Moon orbit to a desired Earth entry state is developed and implemented. The algorithm is built to support the need for an anytime abort capability for Orion. Based on project requirements, the Orion spacecraft must be able to autonomously calculate the translational maneuver targets for an entire Lunar mission. Translational maneuver target sequences for the Orion spacecraft include Lunar Orbit Insertion (LOI), Trans-Earth Injection (TEI), and Trajectory Correction Maneuvers (TCMs). This onboard capability is generally assumed to be supplemental to redundant ground computation in nominal mission operations and considered as a viable alternative primarily in loss of communications contingencies. Of these maneuvers, the ability to accurately and consistently establish a flyable 3-burn TEI target sequence is especially critical. The TEI is the sole means by which the crew can successfully return from the Moon to a narrowly banded Earth Entry Interface (EI) state. This is made even more critical by the desire for global access on the lunar surface. Currently, the designed propellant load is based on fully optimized TEI solutions for the worst case geometries associated with the accepted range of epochs and landing sites. This presents two challenges for an autonomous algorithm: in addition to being feasible, the targets must include burn sequences that do not exceed the anticipated propellant load.

Whitley, Ryan J.↗

Computation and analysis of satellite opportunities for the Mariner Jupiter/Saturn 1977 mission

The MJS77 mission provides the United States with the first opportunity to study the large satellites of Jupiter and Saturn at close range. Techniques are presented which allow the mission analyst to generate single and multiple satellite encounters at Jupiter and Saturn, and to incorporate satellite gravity assist into the targeting problem. These methods are applied to the MJS77 mission to generate, parametrically, the single and multiple satellite opportunities and characteristics at both flyby planets. An interesting consequence of this study is that a close encounter with a Galilean satellite increases the flexibility of a trajectory design which would otherwise require sizable post-Jupiter trajectory correction maneuvers to achieve the desired Saturn arrival date timing. In addition the Saturn studies revealed that as many as four satellites can be encountered on a single trajectory.

Beerer, J. G.↗

Preliminary Statistical Maneuver Analysis for A Low-Thrust NRHO to DRO Transfer

To understand practical implications of implementing transfers that leverage multibody dynamics, a statistical analysis is performed on an Earth-Moon Near Rectilinear Halo Orbit (NRHO) to distant retrograde orbit (DRO) transfer using solar electric propulsion. The statistical analysis includes perturbations due to maneu- ver execution and orbit determination error to understand operational character- istics of the transfer such as statistical ∆V and statistical state targeting errors at the final DRO. We explore the need for low-thrust trajectory correction maneuver (TCM) opportunities as well as the delivery accuracy to the final target. Finally, we explore options for long-term-stable target DROs.

low thrust↗

Wild 2 approach maneuver strategy for Stardust spacecraft

14th AAS/AIAA Space Flight Mechanics Meeting Maui, Hawaii, USAStardust will return samples of dust from comet Wild 2 to be collected during an encounter in January 2004. Approach to Wild 2 will be performed with a number of trajectory correction maneuvers following a period of solar conjunction ending in early October 2003.

maneuver↗

Mars Science Laboratory Propulsive Maneuver Design and Execution

The NASA Mars Science Laboratory (MSL) rover, Curiosity, was launched on November 26, 2011 and successfully landed at the Gale Crater on Mars. For the 8-month interplanetary trajectory from Earth to Mars, five nominal and two contingency trajectory correction maneuvers (TCM) were planned. The goal of these TCMs was to accurately deliver the spacecraft to the desired atmospheric entry aimpoint in Martian atmosphere so as to ensure a high probability of successful landing on the Mars surface. The primary mission requirements on maneuver performance were the total mission propellant usage and the entry flight path angle (EFPA) delivery accuracy. They were comfortably met in this mission. In this paper we will describe the spacecraft propulsion system, TCM constraints and requirements, TCM design processes, and their implementation and verification.

maneuver↗

Rosetta Navigation at its Mars Swing-By

This paper reports on the navigation activities during Rosetta s Mars swing-by. It covers the Mars approach phase starting after a deterministic deep-space maneuver in September 2006, the swing-by proper on 25 February 2007, and ends with another deterministic deep-space maneuver in April 2007 which was also foreseen to compensate any navigation error. Emphasis is put on the orbit determination and prediction set-up and the evolution of the targeting estimates in the B-plane and their adjustments by trajectory correction maneuvers.

Budnik, Frank↗

Maneuver reconstruction techniques for open-loop spin-stabilized spacecraft

The Pioneer missions were supported by spin-stabilized spacecraft designs using open-loop control and blow-down propulsion subsystems. Reliable estimates of the ever-changing performance inherent to these subsystems were needed to effectively design and reconstruct trajectory correction maneuver (TCM) strategies. These performance updates were obtained by adjusting model parameters to match independent telemetric and radiometric observations to define the simultaneous changes in attitude, velocity, and spin rate during a maneuver sequence.

Frauenholz, R. B.↗

Assessment and Verification of SLS Block 1-B Exploration Upper Stage State and Stage Disposal Performance

One of the SLS Navigation System's key performance requirements is a constraint on the payload system's delta-v allocation to correct for insertion errors due to vehicle state uncertainty at payload separation. The SLS navigation team has developed a Delta-Delta-V analysis approach to assess the effect on trajectory correction maneuver (TCM) design needed to correct for navigation errors. This approach differs from traditional covariance analysis based methods and makes no assumptions with regard to the propagation of the state dynamics. This allows for consideration of non-linearity in the propagation of state uncertainties. The Delta-Delta-V analysis approach re-optimizes perturbed SLS mission trajectories by varying key mission states in accordance with an assumed state error. The state error is developed from detailed vehicle 6-DOF Monte Carlo analysis or generated using covariance analysis. These perturbed trajectories are compared to a nominal trajectory to determine necessary TCM design. To implement this analysis approach, a tool set was developed which combines the functionality of a 3-DOF trajectory optimization tool, Copernicus, and a detailed 6-DOF vehicle simulation tool, Marshall Aerospace Vehicle Representation in C (MAVERIC). In addition to delta-v allocation constraints on SLS navigation performance, SLS mission requirement dictate successful upper stage disposal. Due to engine and propellant constraints, the SLS Exploration Upper Stage (EUS) must dispose into heliocentric space by means of a lunar fly-by maneuver. As with payload delta-v allocation, upper stage disposal maneuvers must place the EUS on a trajectory that maximizes the probability of achieving a heliocentric orbit post Lunar fly-by considering all sources of vehicle state uncertainty prior to the maneuver. To ensure disposal, the SLS navigation team has developed an analysis approach to derive optimal disposal guidance targets. This approach maximizes the state error covariance prior to the maneuver to develop and re-optimize a nominal disposal maneuver (DM) target that, if achieved, would maximize the potential for successful upper stage disposal. For EUS disposal analysis, a set of two tools was developed. The first considers only the nominal pre-disposal maneuver state, vehicle constraints, and an a priori estimate of the state error covariance. In the analysis, the optimal nominal disposal target is determined. This is performed by re-formulating the trajectory optimization to consider constraints on the eigenvectors of the error ellipse applied to the nominal trajectory. A bisection search methodology is implemented in the tool to refine these dispersions resulting in the maximum dispersion feasible for successful disposal via lunar fly-by. Success is defined based on the probability that the vehicle will not impact the lunar surface and will achieve a characteristic energy (C3) relative to the Earth such that it is no longer in the Earth-Moon system. The second tool propagates post-disposal maneuver states to determine the success of disposal for provided trajectory achieved states. This is performed using the optimized nominal target within the 6-DOF vehicle simulation. This paper will discuss the application of the Delta-Delta-V analysis approach for performance evaluation as well as trajectory re-optimization so as to demonstrate the system's capability in meeting performance constraints. Additionally, further discussion of the implementation of assessing disposal analysis will be provided.

Patrick, Sean↗

InSight Entry, Descent and Landing Post-Flight Performance Assessment

On November 26, 2018, the Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight) lander successfully touched down on the surface of Mars. NASA Langley Research Center’s (LaRC) Program to Optimize Simulated Trajectories II (POST2) was used during both project development and flight operations to assess the Entry, Descent and Landing (EDL) vehicle performance against related requirements across the expected range of possible environmental and spacecraft conditions. During flight operations, these analyses were used to evaluate the need for updating flight software EDL parameters and the effects of executing a trajectory correction maneuver (TCM). Therefore, the NASA LaRC POST2 simulation had a critical role during the cruise, approach and ultimately EDL phases of the mission. This paper presents results of the final pre- and post- EDL flight performance assessments. A summary of the reconstructed “as-flown” trajectory with a comparison of key EDL metrics to the nominal and three-sigma bound pre-EDL predictions is also provided. Emphasis on the trajectory between entry interface and parachute deploy is provided as this is the period during which deviations from the pre-EDL prediction occurred. The post-flight assessment provides important verification of the POST2 models and analysis techniques used for InSight, providing critical feed-forward information to future lander missions.

Robert W Maddock↗

Lucy Mission Design Strategy in a Dynamic Operations Environment from Launch Through First Asteroid Encounter

Lucy, a 12-yearlong NASA Discovery-class mission which launched on October 16, 2021will fly by several Jupiter-Trojan asteroids a t the L4 and L5 La grange points. Prior to theL4 Trojan encounter in 2027 and 2028, Lucy will utilize two Earth gravity-assist flybys and fly by two main-belt a steroids. After the L4 encounters a third Earth flyby will set up the L5 Troja n encounter in 2033. This pa per summarizes the baseline mission plan with focus on the spacecraft trajectory and the corresponding essential trajectory correction maneuvers as well as how the Lucy team adapted to many unforeseen changes to the spacecraft configuration and added an asteroid target of opportunity that required changes to the baseline mission plan. Refinement of asteroid flyby science requirements after launch also required updates to the baseline Lucy trajectory.

James V. Mcadams↗

Mars Exploration Rovers navigation results

The twin Mars Exploration Rovers, Spirit and Opportunity, were launched on June 10, 2003(dagger), and July 8, 2003, from Cape Canaveral, Florida. Spirit and Opportunity were targeted for landings at Gusev Crater (arrival on January 4, 2004) and Meridiani Planum (arrival on January 25, 2004). The primary navigation challenge was to deliver each spacecraft to the desired atmospheric entry interface point with sufficient accuracy such that each lander would touch down within a specified landing ellipse (about 70 km x 5 km) determined to be safe for landing and also judged to be scientifically interesting. In order to achieve landing within the target ellipse, precise control of the inertial entry flight path angle (FPA) at atmospheric entry was required. The maximum allowable errors in FPA following TCM-5 (trajectory correction maneuver #5) at Entry (E) - 2 days were +/-0.12(deg) (3(sigma)) for Spirit and +/-0.14(deg) (3(sigma)) for Opportunity. Achieving these entry delivery accuracies necessitated significant improvements to the interplanetary avigation system used for MER. These improvements included new processes and software for orbit determination, propulsive maneuver design, and entry, descent, and landing (EDL) trajectory simulation. The actual achieved atmospheric entry accuracies for Spirit and Opportunity significantly exceeded the requirements. At the navigation data cutoff for the TCM-5 final design, the orbit determination FPA knowledge error was +/-0.028(deg) (3(sigma) ) for Spirit and +/-0.035(deg) (3(sigma)) for Opportunity. Because of exceptionally accurate navigation performance, TCM-5 (E - 2 days) and TCM-6 (E - 4 hours) were canceled for both Spirit and Opportunity. The actual landing locations (determined from in-situ Doppler tracking between the MER rovers and the Mars Odyssey orbiter) differed from the target landing points by 10.1 km (downtrack) for Spirit and 24.6 km (downtrack) for Opportunity. The majority of the landing position offsets for both landers was primarily caused by variations in atmosphere and spacecraft aerodynamic modeling from what was predicted. The amount of the landing position offset caused by navigation-only errors was only 3.3 km (uptrack) for Spirit and 9.7 km (downtrack) for Opportunity.

Mars Exploration Rover (MER)↗

Mars Exploration Rovers navigation results

The twin Mars Exploration Rovers, Spirit and Opportunity, were launched on June 10, 2003, and July 8, 2003, from Cape Canaveral, Florida. Spirit and Opportunity were targeted for landings at Gusev Crater (arrival on January 4, 2004) and Meridiani Planum (arrival on January 25, 2004). The primary navigation challenge was to deliver each spacecraft to the desired atmospheric entry interface point with sufficient accuracy such that each lander would touch down within a specified landing ellipse (about 70 km x 5 km) determined to be safe for landing and also judged to be scientifically interesting. In order to achieve landing within the target ellipse, precise control of the inertial entry flight path angle (FPA) at atmospheric entry was required. The maximum allowable errors in FPA following TCM-5 (trajectory correction maneuver #5) at Entry (E) -2 days were +/-0.12 deg(3 sigma) for Spirit and +/-0.14 deg(3 sigma) for Opportunity. Achieving these entry delivery accuracies necessitated significant improvements to the interplanetary navigation system used for MER. These improvements included new processes and software for orbit determination, propulsive maneuver design, and entry, descent, and landing (EDL) trajectory simulation. The actual achieved atmospheric entry accuracies for Spirit and Opportunity significantly exceeded the requirements. At the navigation data cutoff for the TCM-5 final design, the orbit determination FPA knowledge error was 0.028 deg(3 sigma) for Spirit and 0.035 deg(3 sigma) for Opportunity. Because of exceptionally accurate navigation performance, TCM-5 (E - 2 days) and TCM-6 (E - 4 hours) were canceled for both Spirit and Opportunity. The actual landing locations (determined from in-situ Doppler tracking between the MER rovers and the Mars Odyssey orbiter) differed from the target landing points by 10.1 km (downtrack) for Spirit and 24.6 km (downtrack) for Opportunity. The majority of the landing position offsets for both landers was primarily caused by variations in atmosphere and spacecraft aerodynamic modeling from what was predicted. The amount of the landing position offset caused by navigation-only errors was only 3.3 km (uptrack) for Spirit and 9.7 km (downtrack) for Opportunity.

Mars Exploration Rover (MER)↗

Hayabusa Re-Entry: Trajectory Analysis and Observation Mission Design

On June 13th, 2010, the Hayabusa sample return capsule successfully re-entered Earth s atmosphere over the Woomera Prohibited Area in southern Australia in its quest to return fragments from the asteroid 1998 SF36 Itokawa . The sample return capsule entered at a super-orbital velocity of 12.04 km/sec (inertial), making it the second fastest human-made object to traverse the atmosphere. The NASA DC-8 airborne observatory was utilized as an instrument platform to record the luminous portion of the sample return capsule re-entry (~60 sec) with a variety of on-board spectroscopic imaging instruments. The predicted sample return capsule s entry state information at ~200 km altitude was propagated through the atmosphere to generate aerothermodynamic and trajectory data used for initial observation flight path design and planning. The DC- 8 flight path was designed by considering safety, optimal sample return capsule viewing geometry and aircraft capabilities in concert with key aerothermodynamic events along the predicted trajectory. Subsequent entry state vector updates provided by the Deep Space Network team at NASA s Jet Propulsion Laboratory were analyzed after the planned trajectory correction maneuvers to further refine the DC-8 observation flight path. Primary and alternate observation flight paths were generated during the mission planning phase which required coordination with Australian authorities for pre-mission approval. The final observation flight path was chosen based upon trade-offs between optimal viewing requirements, ground based observer locations (to facilitate post-flight trajectory reconstruction), predicted weather in the Woomera Prohibited Area and constraints imposed by flight path filing deadlines. To facilitate sample return capsule tracking by the instrument operators, a series of two racetrack flight path patterns were performed prior to the observation leg so the instruments could be pointed towards the region in the star background where the sample return capsule was expected to become visible. An overview of the design methodologies and trade-offs used in the Hayabusa re-entry observation campaign are presented.

Cassell, Alan M.↗

Mars Science Laboratory Orbit Determination

Mars Science Laboratory (MSL) Orbit Determination (OD) met all requirements with considerable margin, MSL OD team developed spin signature removal tool and successfully used the tool during cruise, A novel approach was used for the MSL solar radiation pressure model and resulted in a very accurate model during the approach phase, The change in velocity for Attitude Control System (ACS) turns was successfully calibrated and with appropriate scale factor resulted in improved change in velocity prediction for future turns, All Trajectory Correction Maneuvers were successfully reconstructed and execution errors were well below the assumed pre-fight execution errors, The official OD solutions were statistically consistent throughout cruise and for OD solutions with different arc lengths as well, Only EPU-1 was sent to MSL. All other Entry Parameter Updates were waived, EPU-1 solution was only 200 m separated from final trajectory reconstruction in the B-plane

Mars Science Laboratory (MSL)↗