Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Sample Return and Preliminary Examination Timeline for the OSIRIS-REx Mission

NASA’s OSIRIS-REx spacecraft collected a sample of asteroid (101955) Bennu on October 20, 2020, using the Touch-and-Go Sample Acquisition Mechanism (TAGSAM) [1,2,3]. After sample acquisition, the TAGSAM collection head was stowed in the Sample Return Capsule (SRC; Fig. 1) for transport back to Earth. On September 24, 2023, the OSIRIS-Rex spacecraft will fly by Earth and release the SRC, which will land at the Utah Test and Training Range (UTTR). The sample will be transported to the OSIRIS-REx curation facility, located within NASA’s Johnson Space Center (JSC), where it will be examined, cataloged, and allocated for scientific analyses. Here we describe the timeline of operations for the return, recovery, and initial characterization of the Bennu sample.

Asteroid↗

Payload Topology Forum: IVA Payload Placement Process and Timeline

The IVA Payloads team provides two types of assessments for payloads with different timelines depending on the complexity and flight of the payload. This presentation provides insight into the products and services provided by the Topology team and the proper channels for requesting Topology Assessments or Placement Studies.

Placement Study↗

Timeline Assisted Commanding

The Timeline Assisted Commanding (TAC) application automates the execution of Ground Commanding Scripts based (GCS) on a pre-defined schedule of activities. It leverages the generic Data Planning and Control (DPAC) application for displaying planning events and scheduling their execution. TAC utilizes a database called Rosetta Stone to link scheduled activities with the required input parameters for commanding.

automation↗

Summary Timeline

A brief outline of what each STS-107 crewmember will be doing on any given Flight Day during their mission is presented. Details on the various experiments are listed by acronym.

Source record↗

Space Shuttle Program Primary Avionics Software System (PASS) Success Legacy - Major Accomplishments and Lessons Learned Detail Historical Timeline Analysis

This presentation focuses on the Space Shuttle Primary Avionics Software System (PASS) and the people who developed and maintained this system. One theme is to provide quantitative data on software quality and reliability over a 30 year period. Consistent data relates to code break discrepancies. Requirements were supplied from external sources. Requirement inspections and measurements not implemented until later, beginning in 1985. Second theme is to focus on the people and organization of PASS. Many individuals have supported the PASS project over the entire period while transitioning from company to company and contract to contract. Major events and transitions have impacted morale (both positively and negatively) across the life of the project.

Orr, James K.↗

Validation of Community Models: Identifying Events in Space Weather Model Timelines

I develop and document a set of procedures which test the quality of predictions of solar wind speed and polarity of the interplanetary magnetic field (IMF) made by coupled models of the ambient solar corona and heliosphere. The Wang-Sheeley-Arge (WSA) model is used to illustrate the application of these validation procedures. I present an algorithm which detects transitions of the solar wind from slow to high speed. I also present an algorithm which processes the measured polarity of the outward directed component of the IMF. This removes high-frequency variations to expose the longer-scale changes that reflect IMF sector changes. I apply these algorithms to WSA model predictions made using a small set of photospheric synoptic magnetograms obtained by the Global Oscillation Network Group as input to the model. The results of this preliminary validation of the WSA model (version 1.6) are summarized.

MacNeice, Peter↗

Global Precipitation Measurement (GPM) Safety Inhibit Timeline Tool

The Global Precipitation Measurement (GPM) Observatory is a joint mission under the partnership by National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA), Japan. The NASA Goddard Space Flight Center (GSFC) has the lead management responsibility for NASA on GPM. The GPM program will measure precipitation on a global basis with sufficient quality, Earth coverage, and sampling to improve prediction of the Earth's climate, weather, and specific components of the global water cycle. As part of the development process, NASA built the spacecraft (built in-house at GSFC) and provided one instrument (GPM Microwave Imager (GMI) developed by Ball Aerospace) JAXA provided the launch vehicle (H2-A by MHI) and provided one instrument (Dual-Frequency Precipitation Radar (DPR) developed by NTSpace). Each instrument developer provided a safety assessment which was incorporated into the NASA GPM Safety Hazard Assessment. Inhibit design was reviewed for hazardous subsystems which included the High Gain Antenna System (HGAS) deployment, solar array deployment, transmitter turn on, propulsion system release, GMI deployment, and DPR radar turn on. The safety inhibits for these listed hazards are controlled by software. GPM developed a "pathfinder" approach for reviewing software that controls the electrical inhibits. This is one of the first GSFC in-house programs that extensively used software controls. The GPM safety team developed a methodology to document software safety as part of the standard hazard report. As part of this process a new tool "safety inhibit time line" was created for management of inhibits and their controls during spacecraft buildup and testing during 1& Tat GSFC and at the Range in Japan. In addition to understanding inhibits and controls during 1& T the tool allows the safety analyst to better communicate with others the changes in inhibit states with each phase of hardware and software testing. The tool was very useful for communicating compliance with safety requirements especially when working with a foreign partner.

Dion, Shirley↗

The Ice, Cloud, and land Elevation Satellite (ICESat) Summary Mission Timeline and Performance Relative to Pre-Launch Mission Success Criteria

The Ice, Cloud and land Elevation Satellite (ICESat) mission was conceived, primarily, to quantify the spatial and temporal variations in the topography of the Greenland and Antarctic ice sheets. It carried on board the Geoscience Laser Altimeter System (GLAS), which measured the round-trip travel time of a laser pulse emitted from the satellite to the surface of the Earth and back. Each range derived from these measurements was combined with precise, concurrent orbit and pointing information to determine the location of the laser spot centroid on the Earth. By developing a time series of precise topographic maps for each ice sheet, changes in their surface elevations can be used to infer their mass balances.

Webb, Charles E.↗

Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

scheduling↗

Radar Surveillance Volume for Phase 1 UAS's Alerting Timeline

This presentation briefs simulation results for the Phase 1 UAS encounters. Results are broken into four UAS speed ranges and metrics computed include the cumulative distribution curves for range, bearing, and elevation at the first corrective alerts.

unmanned↗

Adventures in Lunar Core Processing: Timeline of and Preparation for Opening of Core Sample 73002 for the ANGSA Program

The Apollo mission returned 382 kg of rocks, soil and core samples, which have helped to advance our knowledge of lunar science. Studies of these lunar samples are crucial for our understanding of the Moon’s geological evolution. Here, we present the meticulous process that involves preparing for, and ultimately opening, the unopened Apollo 17 drive tube: 73002,0, so that the next generation of lunar scientists can further our insight into the Moon’s history.

Krysher, C. H.↗