Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Time Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Diaspora: Resilience-Enabling Services for Real-Time Distributed Workflows

The need for real-time processing to enable automated decision making and experimental steering has driven a shift from high-performance computing workflows on a centralized system to a distributed approach that integrates remote data sources, edge devices, and diverse compute facilities. Under this paradigm, data can be processed close to the source where it is generated, thus reducing latency and bandwidth usage. System resilience is thus a key challenge, requiring distributed workflows to survive component failures and to meet stringent quality-of-service requirements, which results in the need to mitigate anomalies such as congestion and low availability of resources. To address these challenges, we propose Diaspora, a unified resilience framework that is inspired by event-driven communication patterns used in public clouds. Specifically, we propose an event fabric that extends across sites, facilities, and computations to provide timely, reliable, and accurate information about data, application, and resource status. On top of the event fabric, we build resilience-enabling services that combine QoS-aware data streaming, resilient data views, resilient compute and data resources, and anomaly detection and prediction, all of which collectively enhance workflow resilience for these scientific cases.

Rao, Nageswara↗

Studying the tastes effecting mode choice behavior of travelers under transit service disruptions

Public transit (PT) service disruption is a phenomenon which is quite common across the world and is characterized by significant delays or cancelations of transit services. These disruptions can substantially affect commuter trips, particularly in cities with significant PT mode share, which triggers a change in both short-term and long-term traveler behavior. While service disruptions due to cancelations have been well studied in the literature, there has been limited work on studying the impacts of disruptions due to significant service delays on traveler behavior. This study analyzes data from a joint revealed preference cum stated preference (RP-SP) survey conducted in the Chicago metropolitan area in the US to understand traveler’s mode choice under the two forms of PT service disruptions. The trip specific attributes of the other competing alternatives for an individual were extracted using Google’s application programming interface (API) in the survey. The collected data is analyzed using the latent class choice model formulation. The results show that travelers find canceled PT service situations 3 times more onerous than service disruptions due to delays. While the value of travel time savings under disruptions due to delays and cancelations for rail users is found to be around US$\$$10/hr and US$\$$32/hr respectively, for bus users the values are US$\$$19/hr and US$\$$43/hr respectively. The findings from this study provide separate sets of preferences under each disruption scenario to planners. This information will be useful in planning remedial actions aimed at minimizing the impact of transit service disruptions.

99 GENERAL AND MISCELLANEOUS↗

The Effects of Denial-of-Service Attacks on Secure Time-Critical Communications in the Smart Grid

According to IEC 61850, many smart grid communications require messages to be delivered in a very short time. –Trip messages and sample values applied to the transmission level: 3 ms –Interlocking messages applied to the distribution level: 10 ms •Time-critical communications are vulnerable to denial-of-service (DoS) attacks –Flooding attack: Attacker floods many messages to the target network/machine. We conducted systematic, experimental study about how DoS attacks affect message delivery delays.

97 MATHEMATICS AND COMPUTING↗

Demand Response Optimization and Management System for Real-TIme (DROMS-RT)

To design and demonstrate DROMS-RT, a highly distributed Demand Response Optimization and Management System for Real-Time (DROMS-RT) power flow control to support large scale integration of distributed renewable generation into the grid. AutoGrid developed a novel control and communications platform to allow highly dispatchable demand response (DR) services in time frames suitable for providing ancillary services to the transmission grid. These services will be substantially less expensive and more efficient than other forms of ancillary services options currently available to manage the intermittency associated with large-scale renewable integration. DROMSRT successfully leveraged Automated Demand Response (ADR) by fundamentally re-thinking the architecture of the DR platform from the ground up and by developing innovative new technologies in a number of areas related to DR. DROMS-RT leveraged the low-cost, open, interoperable DR signaling technology, OpenADR, and low-cost, internet-protocol based telemetry solutions to reduce the cost of hardware. This allowed DROMS-RT to provide dynamic price signals to millions of OpenADR clients. Statistically rigorous signal processing techniques were developed to reliably detect even small load reductions in the presence of noisy baseline profiles. Novel forecasting engines based on modern online machine learning algorithms enabled accurate individualized forecasts for customer loads in the presence of dynamic pricing signals, and a real-time decision engines enabled continuous optimization and optimal dispatch of DR resources across a large portfolio of heterogeneous loads that respond at varying time-scales. Moreover, the real-time optimization conducted by the decision engine can utilize grid physics to maximize load reduction at the transmission system in addition to the distribution sites, for more efficient grid operation. Finally, the Software-as-a-Service (SaaS) availability of the DROMS-RT platform has reduced the cost of deployment and enable participation of small commercial and residential customers in DR who otherwise would not be able to do so.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scientific & Intelligence Exascale Visualization Analysis System

SIEVAS provides an immersive visualization framework for connecting multiple systems in real time for data science. SIEVAS provides the ability to connect multiple COTS and GOTS products in a seamless fashion for data fusion, data analysis, and viewing. It provides this capability by using a combination of micro services, real time messaging, and web service compliant back-end system.

Money, JamesH.↗

Scientific & Intelligence Exascale Visualization Analysis System

SIEVAS provides an immersive visualization framework for connecting multiple systems in real time for data science. SIEVAS provides the ability to connect multiple COTS and GOTS products in a seamless fashion for data fusion, data analysis, and viewing. It provides this capability by using a combination of micro services, real time messaging, and web service compliant back-end system.

Money, James H.↗

The Salem Smart Power Center: An Assessment of Battery Performance and Economic Potential

This paper presents an assessment of the economic potential of a 5 MW/1.25 MWh Energy Storage System (ESS) installed at the Salem Smart Power Center (SSPC), a smart grid technology demonstration facility owned and operated by Portland General Electric (PGE) in Salem, Oregon. The ESS and the grid conditions in which it operates were modeled using Pacific Northwest National Laboratory’s Battery Storage Evaluation Tool (BSET) to explore tradeoffs between services, and to develop optimal control strategies. This assessment monetized the value derived from nine services the SSPC could provide to PGE and the customers it serves. The ESS and the grid conditions in which it operates were modeled using PNNL’s in-house optimization tool BSET to explore tradeoffs between services, and to develop optimal control strategies. The analysis resulted in a number of lessons that provide crucial insights into the practical application of ESS, including; The SSPC, which was originally conceived as a research and test facility and built with the prevailing maturity technology level, was built at a cost ($20.4 million) that exceeds current day prices ($5.4 million) for a similarly designed and built 5 MW/1.25 MWh system; In terms of economic operation, the SSPC is currently underutilized, deployed only for primary frequency response. PNNL modeling indicates that optimal operation of the ESS could generate an additional value of $2.3 million over 20 years. It should also be noted that primary frequency response is the highest benefit application but requires a response from the SSPC only 17 hours each year. While optimally engaged, the ESS would provide arbitrage and ancillary services 78 percent of the time, but those services generate only 27 percent of the total value; Participation in Western EIM represents an interesting opportunity for PGE with a potential to generate $2.1 million value in PV terms over 20 years in the 5-min real-time market; With an energy to power ratio of only 0.25, the SSPC is not well suited to engage in most energy-intensive applications such as arbitrage or ancillary services. By upsizing the storage capacity to 5 MWh and 10MWh, the additional value allows the benefits ($13.3 million and 20.3 million, respectively) to exceed the system’s revenue requirements ($11.5 and $16.4 million, respectively). For the SSPC, ROI ratios exceeded 1.0 when the energy to power ratio fell between 0.5 and 3.5, and peaked at an energy to power ratio of 2.0. This report represents the output of the first of a two-phase effort. Phase II will involve the development of enhanced control strategies to assist PGE in realizing the benefits of energy storage in real-time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fast DR: Controlling Small Loads over the Internet

Current state-of-the-art demand response systems are expensive due to extreme reliability constraints in telemetry, control, and metering. The typical cost of enabling a site for regulation services is between $50k and $80k. These costs are orders of magnitude too high for small loads to participate in high-value grid services. Traditional demand response (DR) schedules events in advance and provides basic on/off control. We developed fast DR measurement and communication technologies, which are scalable cost-effective demand response systems with sufficient reliability for real-time control and monitoring of loads over the internet, and we demonstrated an example system for under $100. We installed FastDR systems for lighting, motor, and thermostat control along with power metering at a total of 10 sites, including 6 commercial buildings and 4 residential buildings. This demonstration addressed the following important methodological questions: 1) Can we reliably control loads simultaneously and with low latency across multiple sites within a specified response time; 2) How reliable is using the internet or 4G cellular network as the mode of control and metering; and 3) Can existing Smart Meters provide data for real-time telemetry services. Testing shows fast DR is capable of control to response in 4 seconds and loads complete transition in seconds to less than one minute depending on load type. We demonstrated 4s regulation services and synchronized load control, and we successfully met specifications for ancillary services across the US. Telemetry via the 4G cellular network demonstrated 94.5% success rate, and residential Internet demonstrated a 98% success rate.

Kiliccote, Sila↗

Waste Chemistry Envelope for the Determination of Pitting Corrosion Susceptibility - 19554

Liquid radioactive wastes at the Hanford and Savannah River sites are stored in large underground carbon steel tanks. The high-level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks, will be required to be in service for times exceeding the initial intended life (i.e., greater than 60 years). Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. Administrative programs are in place to mitigate potential corrosion mechanisms and thereby maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. Waste chemistry and temperature control are the means by which corrosion degradation of the waste tanks is minimized. Chemistry controls are based on in-situ coupon tests, waste tank experience, and laboratory testing. These requirements comprise the technical standards for corrosion control. The standards are utilized then as guidelines for operational procedures. The present waste chemistry controls for the Hanford DSTs were established in the 1980's in response to tank failures caused by stress corrosion cracking (SCC) at the DOE Savannah River Site (SRS). Portions of the SRS chemistry limits, which were developed at the Savannah River National Laboratory (SRNL) were coupled with corrosion testing results from Pacific Northwest National Laboratories (PNNL) and adopted for corrosion control of the double-shell tank (DST) waste at the Hanford Site. Since that time, the temperatures of the waste in the DSTs have decreased to less than 50 deg. C in most cases as the radioactive material has decayed. As a consequence, new chemistry controls were formulated for SCC in 2010. This testing however, did not address that potential for pitting in the supernatant and at the liquid-air interface. Indeed, initial tests indicated that the inhibitor requirements for SCC would be insufficient for the prevention of pitting. In addition to lower waste temperatures, future retrieval and process changes may impact the DST waste chemistry. Initial projections suggest that the waste chemistry of the DSTs may shift to a broader range of pH and higher aggressive anion concentrations (e.g., chloride, sulfate, etc.) than the wastes that are presently stored. Additionally, processes within the vitrification facility may result in streams that are returned to the tank farm for evaporation. These streams may also contain high concentrations of aggressive species. SRNL investigated the propensity for pitting of the carbon steel waste tanks at current and projected DST waste chemistries. A statistically designed series of tests provided a pitting factor that relates the ratio of the inhibitor species to the aggressive species and the probability of observing pitting. An acceptable pitting factor was determined and was utilized for the development of a new chemistry envelope. The new chemistry envelope was compared to the envelope that was established for SCC and was determined to be bounding. Validation of the new chemistry envelope was performed via model simulations and comparison with historical experimental results and approaches to establishing chemistry envelopes. The new chemistry envelope will eventually be part of an overall assessment of the condition of the tanks and any changes made to the overall structural integrity program for the Hanford DSTs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-service Inspection of Radioactive Waste Tanks at the Savannah River Site – 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-service inspection of radioactive waste tanks at the Savannah River Site - 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks, will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of erosion/corrosion data for high-level waste pipelines at Hanford - 15519

Washington River Protection Solutions (WRPS) has implemented a fitness-for-service program which will evaluate the degraded condition of the tank farm waste transfer system. The Tank Farms Waste Transfer System Fitness-for-Service Requirements and Recommendations, includes a requirement to inspect primary piping, encasements, and jumpers for corrosion/erosion. The 242-A Evaporator pump room was upgraded by adding instrumentation to the feed and return jumpers, prior to running the next campaign. As part of this upgrade, several jumpers were removed for disposal and a total of five jumpers were selected for ultrasonic thickness (UT) inspection. The jumpers selected were the following: 18-4, C-4 and 5, J-13A, 13-K, and 19-5. All of these jumpers will be removed permanently except for jumper 19-5 which will be reinstalled for further service. As part of this study, several jumpers from the AW-02E Feed Pit were also removed for disposal and two were selected for UT inspection. The jumpers selected were the 1-4 and B-2 which were packaged and sent to the 222-S Laboratory for UT assessments. This paper includes details of each jumper as well as the estimated remaining useful life (ERUL), if applicable, for its components based on the wall thinning measured in elbows and straight sections. The jumper's ultrasonic thickness measurements are plotted and trends are assessed based on the volume of fluid transferred or time of service. Variability in thickness is generally evaluated in two approaches, radially around the circumference of the pipe or component and longitudinally along the length. The paper also explains the analysis procedure for evaluating the different components. In particular, issues related to thinning from manufacturing different types of elbows (long radius, five diameter bend radius) are presented. Analysis techniques are developed for elbows that differentiate thinning from erosion/corrosion and manufacturing which is critical for this analysis. Results demonstrate that in most components, the thickness measurements are still greater than the manufactured nominal thickness. For the cases in which the thickness is below the nominal thickness, the ERUL well exceeds the life needed for servicing the Waste Treatment Plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of a Grade 91 Steel Forging and Seamless Pipe Section After 141,000-Hours of Operation in a Superheat Outlet Header

In this work, two unique heats of 9Cr creep strength enhanced ferritic (CSEF) steels extracted from a retired superheat outlet header after 141,000 hours of service were evaluated. These two CSEF steels were a forging manufactured to SA-182 F91 (F91) reducer and a seamless pipe produced to SA-335 P91 (P91) pipe. Their creep deformation and fracture behavior were assessed using a lever arm creep frame integrated with in-situ high-temperature digital image correlation (DIC) system. Critical metallurgical and microstructure factors, including composition, service damage, grain matrix degradation, precipitates, and inclusions were quantitatively characterized to link the performance of the two service aged F91 and P91 CSEF steels. The creep test results show the F91 and P91 steels exhibit a large variation in creep strength and creep ductility. The F91 steel fractured at 572 hours while P91 steel fractured at 1,901 hours when subjected to a test condition of 650 °C and 100 MPa. The nominal creep strains at fracture were 12.5% (F91) and 14.5% (P91), respectively. The high-resolution DIC strain measurements reveal the local creep strain in F91 was about 50% while the local creep strain in P91 was >80%. The characterization results show that the F91 steel possessed pre-existing creep damage from its time in service, a higher fraction of inclusions, and a faster matrix grain coarsening rate. These features contribute to the observed reduction in performance for the F91 steel. The context for these findings, and the importance of metallurgical risk in an integrated life management approach will be emphasized.

Wang, Yiyu↗

Development of Technology for Detachment of Calandria Tube Rolled Joint of Pressurised Heavy Water Reactors

Coolant channel assembly of PHWRs consisting mainly of pressure tube and calandria tube undergoes sag due to irradiation enhanced creep during its life time. Typical service life of the pressure tube is limited to about 15 full power years due to such ageing related degradation. On account of the degradation the pressure tube needs replacement more than twice during the licensed period of reactor operation. As the sag in the calandria tube is also excessive, it has to be replaced to facilitate installation of new and straight pressure tube during retubing and to avoid interference of sagged calandria tube with horizontal reactivity devices. The calandria tube and the tube sheet are joined by sandwich type rolled joints. For detaching the joint an improved technique has been developed that helps to detach the joint without affecting the groove geometry and integrity of the tube sheet. The system works on the principle of fast thermal cycle of heating and cooling of the insert and calandria tube in the rolled joint region while applying axial load to the calandria tube. Though rolled joint detachment by induction heating technique has been in use in CANDU reactors for removal of pressure tubes and calandria tubes, the present design incorporates a liquid nitrogen for faster cooling and simultaneous application of load with a gripping module for detachment and removal of calandria tube and the insert from the tube sheet of end shield in shorter time. This paper describes the methodology of rolled joint detachment, challenges involved in the design, features of the detachment system, findings of experimental trials and observations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Load Estimation of Offshore Wind Turbines

The influence of 3 MW Hywind-II wind turbine wakes from an upstream offshore floating wind turbine on a downstream turbine with a separation distance of seven rotor diameters was studied for a site in the Gulf of Maine. The turbines and the platforms were subjected to atmospheric boundary layer flows. Various sensitivity studies on fatigue loads with respect to the positions of the downstream turbine were performed and validated with a large-eddy simulation tool. In particular, the effect of various lateral positions of the downstream turbine relative to the upstream turbine were considered using time-series turbine wake data generated from the large-eddy simulation tool which served as an input to an aero-elastic wind turbine model to assess the loads. The load response from the rotor, tower, and the floating platform for the downstream turbine were sensitive to the lateral offset positions where turbines that were partially exposed to upstream turbine wakes yielded significant increases in the cyclic load range. For the given set of lateral positions for the downstream turbine, the largest damage equivalent load occurred when the turbine was one rotor diameter to the left of the centerline, when looking upstream, which is the position of the turbine fully exposed to upstream turbine wake. On the other hand, the fatigue load on the downstream turbine placed on the right side of the position fully exposed to the upstream turbine wake, yielded lower stress due to the non-symmetric shape of the turbine wake. The configuration associated with the largest damage equivalent loads was further investigated in a large-eddy simulation, modeling both the upstream and downstream turbines. It was found that the energy spectra at the blade rotational frequency were a magnitude order higher for the downstream turbine, especially for surge, heave, pitch, and yaw motion of the platform. In conclusion, the increase of the damage equivalent load for the flapwise blade root moment was 45% compared to the upstream turbine, which can potentially reduce the turbine service life time.

17 WIND ENERGY↗

Improving the performance of first- and last-mile mobility services through transit coordination, real-time demand prediction, advanced reservations, and trip prioritization

Socio-demographic trends and recent economic development patterns have resulted in travel behavior changes that call for more flexible and accessible public transit options. Because flexible transit services vary in scope, size, and service type, new data-informed methods are useful to optimize services based on the specific needs of local communities and riders. In this study, real-world demand and vehicle trajectory data were used to evaluate and optimize system performance for an existing first-mile–last-mile (FMLM) service in Robinson Township, PA. A general FMLM model for arbitrary demand and service supply was then developed to quantify system performance—both travel time costs and day-to-day reliability—for various operational polices considering spatio-temporal demand variation and transportation network dynamics. Heuristics were used for optimal real-time vehicle routing in sizable real-world networks accommodating various service types and scopes. In this case study, total user costs were reduced by 18.6% when rides were coordinated with mainline fixed-route transit. Predictive routing strategies were shown to marginally improve system performance under sparse and variable spatio-temporal demand. The case study also highlights potentially large travel time and user reliability improvements—reductions of 51% and 53.8%, respectively—when trip requests were made in advance of their desired pickup time. Finally, we show that travel time reliability can be improved for time-inflexible trips with trip prioritization without increasing total user costs. These results were stable to changes in demand density.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Technical Specification Surveillance Interval Extension Using Self-Diagnostics

As part of the Light Water Reactor Sustainability program, an ongoing research effort is being conducted on technical specifications surveillance interval extension of digital equipment in nuclear power plants. The research team is led by Idaho National Laboratory and includes Pacific Northwest National Laboratory, Technology Resources, and Oak Ridge National Laboratory. This research focuses on developing methods for applying the U.S. Nuclear Regulatory Commission (NRC)–approved guidance to implement a licensee-controlled, risk-informed surveillance frequency change program in digital instrumentation and control (I&C) systems that include self-diagnostics and online monitoring (OLM) capabilities. Although approved methods exist for extending technical specifications (TS) surveillance test intervals (STIs) for general equipment, including analog I&C equipment, gaps remain in technology and guidance on crediting newer digital equipment’s internal self-diagnostics and OLM characteristics. Previous research described a general methodology for crediting internal self-diagnostics for extending surveillance test intervals. The methodology used self-diagnostics to detect—and credited recovery from—failure. Self-diagnostics were also applied for performance monitoring during the extended surveillance interval. This report discusses the status of recent activities to evaluate the previously developed methodology using a pilot study. Although both a utility partner for a pilot study and a specific digital asset were identified in FY2020, delays in obtaining proprietary information resulted in a limited ability to fully evaluate the methodology, and further interactions were complicated by the COVID pandemic. Therefore, at that time, the use of public-domain information—along with current processes for surveillance interval extension through a surveillance frequency control program—identified the need to fully assess diagnostic coverage as part of the pilot study. Furthermore, self-diagnostics were also identified as a potential option to replace the drift analyses conducted as part of current STI extension procedures. In FY2022, the project was reconstituted with the industry partner, and information and data were made available by the industry partner to the research team for review. The shared information included failure event descriptions and data for a digital I&C system since its implementation, as well as recent STI extension interval reports developed by the utility partner on that digital I&C system. This report presents an evaluation of this information and data and describes an application of the proposed methodology cited above. The methodology seeks to take advantage of the self-diagnostics and OLM capabilities to reduce risk or reduce the level of qualitative monitoring assessment needed to perform a risk-informed STI extension using existing NRC approved guidance or both. Addressing these issues of STI extension by crediting self-diagnostics is likely to result in benefits for current and future nuclear power plant (NPP) operations, including lowering the barriers to adoption of digital I&C systems and increasing cost savings by deferring or eliminating unneeded preventive maintenance (tasks or checks or activities). Specifically, self-diagnostic and OLM capabilities of newer digital equipment being installed in non-safety and safety applications are designed to detect failures, provide early warning of potential failures, and notify plant operators to take appropriate action to reduce out of service (OOS) time thus protecting safety margins. Moreover, the equipment is expected to provide information that time-related operational degradation is identified early to ensure timely and planned corrective actions instead of a reactive and unplanned approach ahead of an extended-surveillance interval.

42 ENGINEERING↗