Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Development of an Ultra High-Pressure Metals Promoted Combustion in Oxygen Test Apparatus

Materials flammability data is needed at pressures higher than ever tested before (greater than 10,000 psi). WSTF has designed and is currently building a metals flammability apparatus that can test metals up to 30,000 psi. Solid progress was achieved on the chamber in terms of system build up and fulfilling requirements to perform a NASA Test Readiness Review. Understanding metals flammability data at extreme pressure opens the doors for higher pressure and higher performance oxygen systems. Proposed systems include more reliable/higher performance propulsion systems and more reliable/lighter Environmental Control Life Support Systems (ECLSS). The test system needed for this testing required significant research and development to select a pressurization method and eliminate contact with potentially flammable materials back to the chamber. No additional promoted combustion data was collected in FY21. This International Research & Development (IRAD) proposal was critical to getting the system very close to operational status. This capability is critical to collect forward leaning material flammability data for future spacecraft and ground systems. Forward work has been identified and funding is being sought outside of the Center Innovation Fund (CIF) process for late FY23/FY24.

promoted combustion↗

A new presentation of complex voltage data for Goldstone radar astronomy

A presentation method similar to a vector field display or a data-based grid has been used to visualize complex voltage test data taken over multiple subchannels. Unlike simple plots of all data points on the complex plane, the position of the data in the time series is part of the presentation, providing additional information to aid in fault isolation during readiness testing. The 'phase-magnitude' presentation, as it has come to be called, was designed for the demands of real-time data acquisition and processing with remote monitoring over low bandwidth communication links.

Howard, S. D.↗

Design, construction, activation, and operation of a high intensity acoustic test chamber

The design philosophy, construction, integration, and activation of the high intensity acoustic test chamber for production acceptance testing of satellites are discussed. The 32,000 cubic-foot acoustic test cell consists of a steel reinforced concrete chamber with six electropneumatic noise generators. One of the innovative features of the chamber is a unique quarter horn assembly that acoustically couples the noise generators to the chamber. Design concepts, model testing, and evaluation results are presented. Considerations such as nitrogen versus compressed air source, digital closed loop spectrum control versus manual equalizers, and microprocessor based interlock systems are included. Construction difficulties, anomalies encountered, and their resolution are also discussed. Results of the readiness testing are highlighted.

Kamel, L. T.↗

Capability Gaps Assessment and Identification of Critical Technology Elements for Mars Transit Habitat

The Habitation Systems Development Office (HP40) at NASA Marshall Space Flight Center supports systems engineering, integration, and project management for next generation space habitats. For in space operations and eventual transport of humans to Mars, NASA will rely on a Mars Transit Habitat (TH). The TH will be designed for an up to 1,200-day Mars mission and will carry all food and supplies needed to support four crew for this duration. In the current concept of operations, Mars TH transfers to near rectilinear halo orbit (NRHO) following launch and docks at Gateway as a visiting vehicle. While there, the TH will complete system shakedown testing and a series of analog missions which will grow from 3 to 6+ months in duration TH also augments Gateway’s habitation capabilities beyond 60-days. Proposed Gateway-TH missions will far exceed the longest duration cislunar human missions to date. These shakedown missions will also be the first operational readiness tests of Mars TH’s long-duration deep space systems, and of the split crew (two crew on the surface, two crew in space) operations that are vital to the approach for the first human Mars mission. Once shakedown missions are complete, Mars TH departs Gateway to aggregate with the Mars propulsion system in NRHO before onboarding the crew and final supplies in Earth orbit via a co-manifested Orion-logistics module. Orion and the LM return to Earth prior to the now aggregated Deep Space Transport vehicle’s journey to Mars. Development of the Mars TH requires significant technology development and maturation. Each year the agency performs a capability gaps assessment, where gaps developed by subject matter experts (SMEs) in various engineering/science disciplines are linked to architectural elements in formulation and prioritized. A gap captures the difference between the current state-of-the-art and the maturity of the capability that is needed to enable or enhance a mission as it is currently envisioned in the government reference architecture. HP40 conducted a gap analysis for Mars TH which will be summarized in this poster. Gaps classified as enabling (which means the mission cannot achieve success without gap closure) were subsequently used to identify critical technology elements (CTEs) for Mars TH. This identification of CTEs was also informed by an examination of the product breakdown structure for Mars TH and focused conversations with SMEs in specific technology areas. CTEs identified for Mars TH to date include the following (note this is not a comprehensive list – CTEs listed represent those in MSFC’s capability areas): inflatable softgoods for habitation; enhanced CO2 recovery; life support systems with greater levels of reliability and maintainability; autonomous guidance, navigation, command and control; and radiators for the Mars TH application. The habitation systems development team is currently delving deeper into each CTE to assess technology approaches being pursued, their maturity, and the degree of difficulty in maturation to meet projected Mars TH timelines. This poster will summarize work to date on the identification of enabling capability gaps linked to Mars TH and provide insight into the associated CTEs and technology maturation efforts.

technology development↗

An Exposure Prevention Plan for an Anhydrous Ammonia Handling System

In July of 1996, the Industrial Hygiene Team of the Environmental Management Office at NASA Lewis Research Center was contacted by the Space Station Program Office to conduct ammonia awareness training for a team of engineers and technicians. The team was tasked with assembling and operating an ammonia handling system for testing of a photovoltaic radiator at the NASA Plum Brook Station Space Power Facility. The ammonia handling system supports a radiator designed to radiate excess heat from a photovoltaic array module used to provide power to the International Space Station. The system would consist of a hazardous materials trailer equipped with an anhydrous ammonia tank, heater, accumulator, chiller, and flow bench. Meetings were held with representatives from the Space Station Program Office, the engineers and Plum Brook safety personnel. Guidance was also provided by representatives from Kennedy Space Center. Determinations were made concerning the locations and types of potential exposures and a plan was developed which included training, personal protective equipment, engineering controls and emergency response. Various organizations including the Plum Brook Safety Committee, the Lewis Environmental Management Office, the Test Readiness Review Board and the Program Office all had requirements that had to be met in order to satisfy themselves that all personnel involved in the operation of the system would be safe. What resulted was a comprehensive plan that provided more than adequate safety measures and succeeded in protecting all personnel from the hazards of the ammonia system. Testing of the photovoltaic radiator was successful and although ammonia leaks were detected and maintenance of the system was ongoing, no one was injured. It was felt that the training and controls in place allowed for a comfort level that did not interfere with the operations.

Cathy L Padolewski↗

Advanced Simulation and Computing: ASC FY24 Implementation Plan

The DOE National Nuclear Security Administration (NNSA) Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, security, and reliability of the U.S. nuclear stockpile. The SSP incorporates nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. The suite of data analyzed comes from activities including previous nuclear tests, stockpile surveillance, experimental research, and development and engineering programs. This integrated national program requires the continued use of experimental facilities and the computational capabilities to support the SSP missions. These component parts, in addition to an appropriately scaled production capability, enable NNSA to support stockpile requirements. The ultimate goal of the SSP, and thus of the Advanced Simulation and Computing (ASC) program, is to ensure that the U.S. maintains a safe, secure, and effective strategic deterrent. The ASC program is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment and certification process, study advanced nuclear weapons design and manufacturing processes, analyze accident scenarios and weapons aging, and provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This work requires a balance of resources, including technical staff, hardware, simulation software, and computer science solutions. The ASC program focuses on increasing the predictive capabilities in a three-dimensional (3D) simulation environment while maintaining support to the SSP. The Program continues to improve its unique tools for understanding and solving progressively more difficult stockpile problems (sufficient resolution, dimensionality, and scientific details), and quantifying critical margins and uncertainties. Resolving each issue requires increasingly difficult analyses because the aging process has progressively moved the stockpile further from the original test base. While the focus remains on the U.S. nuclear weapons program, where possible, the Program also enables the use of high-performance computing (HPC) and simulation tools to address broader national security needs, such as foreign nuclear weapon assessments and nuclear counterterrorism. The 2022 Nuclear Posture Review (NPR) calls for NNSA to “deliver a modern, adaptive nuclear security enterprise based on an integrated strategy for risk management, production-based resilience, science and technology innovation, and workforce initiatives.” Furthermore, “NNSA will establish a Science and Technology Innovation Initiative to accelerate the integration of science and technology (S&T) throughout its activities.” Executing this strategy necessitates the continued emphasis on developing and sustaining high-quality scientific and engineering staff, as well as supporting computational and experimental capabilities. These components constitute the foundation of the nuclear weapons program. The continued success of the SSP and LEPs is predicated upon the ability to credibly certify the stockpile, without a return to underground nuclear tests (UGTs). Shortly after the nuclear test moratorium entered into force in 1992, the Accelerated Strategic Computing Initiative (ASCI) was established to provide an extensive simulation capability to underpin stockpile certification. While computing and simulation have always been essential to the success of the nuclear weapons program, the program goal of ASCI was to execute NNSA’s vision of using these tools in support of the stockpile stewardship mission. The ASCI program was essential to the successful demonstration of the SSP, providing critical nuclear weapons simulation and modeling capabilities. ASCI officially evolved into the ASC program in fiscal year (FY) 2005, but the mission remains essentially the same: provide the simulation and computational capabilities that underpin the ability to maintain a safe, secure, effective nuclear weapon stockpile, without returning to underground nuclear testing. The capabilities that the ASC program provides at the national laboratories play a vital role in the nuclear security enterprise and are necessary for fulfilling the stockpile stewardship and life extension requirements outlined for NNSA. The Program develops modern simulation tools that provide insights into stockpile aging issues, provide the computational and simulation tools that enable designers and analysts to certify the current stockpile and life-extended nuclear weapons, and inform the decision-making process when any modifications in nuclear warheads or the associated manufacturing processes are deemed necessary. Furthermore, ASC is enhancing the predictive simulation capabilities that are essential to evaluate weapons effects, design experiments, and ensure test readiness. The ASC program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Stockpile Management and Production Modernization programs (formerly Directed Stockpile Work) also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these life extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT.

97 MATHEMATICS AND COMPUTING↗

The Deep Space Network

The primary objectives during this portion of the extended mission were to assure survival of the spacecraft for a third Mercury encounter through conservation of attitude control gas and to conduct trajectory correction maneuvers (TCMs) as necessary to target the spacecraft for a solar occultation zone pass. Special support activities included TCMs 6 and 7 conducted on October 30, 1974 and on February 12-13, 1975, respectively. This period also saw the DSN interface organization involved in (1) the allocation of sufficient coverage to assure accurate orbit determination solutions, (2) monitoring of DSN implementation for Viking to assure maintenance of compatible interfaces and capabilities required for Mariner 10, and (3) the development of encounter coverage, sequences, and readiness test plans.

Source record↗

Use of load and go countdowns by the DSN deep space stations

The Level-4 Prepass Readiness Test (PRT) (the load and go countdown) provides an effective and low risk method of improving network productivity. A carefully controlled trial period preceded the full-scale application of the Level-4 PRTS to Pioneer, Helios, and Viking cruise tracking operations. Use of this load and go concept to count down a station brings about a substantial increase in the proportion of total station hours devoted to spacecraft tracking.

Hatch, J. T.↗

DSN load and go pre-track preparation for Voyager support

The use of level 4 prepass readiness tests (load and go pretrack preparation) to increase in Network productivity is described. Application of this method of operation for Voyager support, so that increased tracking could be provided to all projects during a period of continued interproject conflicts, is discussed.

Taylor, T. M.↗

Phase curve and albedo of asteroid 5534 Annefrank

Seventy-two images of the S-class asteroid 5535 Annefrank, acquired on 2 November 2002 at target ranges of 11,415??8.5 km, were transmitted to Earth as a part of an engineering readiness test of the Stardust mission. Forty-four of these were used to create a phase curve extending to 134, the largest angle yet achieved for any S-class asteroid. Flux fell by more than six magnitudes between the extrapolated 0 and 134. A maximum illuminated cross section of 16 km2 was seen at a phase angle of 47.2. Assuming a camera efficiency of 75%, a broadband (470?? nm) geometric albedo of 0.24 was derived for Annefrank.

Solar system comets small bodies↗

Revisiting Training and Verification Process Implementation for Risk Reduction on New Missions at NASA Jet Propulsion Laboratory

In 2003 we proposed an effort to develop a core program of standardized training and verification practices and standards against which the implementation of these practices could be measured. The purpose was to provide another means of risk reduction for deep space missions to preclude the likelihood of a repeat of the tragedies of the 1998 Mars missions. We identified six areas where the application of standards and standardization would benefit the overall readiness process for flight projects at JPL. These are Individual Training, Team Training, Interface and Procedure Development, Personnel Certification, Interface and procedure Verification, and Operations Readiness Testing. In this paper we will discuss the progress that has been made in the tasks of developing the proposed infrastructure in each of these areas. Specifically we will address the Position Training and Certification Standards that are now available for each operational position found on our Flight Operations Teams (FOT). We will also discuss the MGSS Baseline Flight Operations Team Training Plan which can be tailored for each new flight project at JPL. As these tasks have been progressing, the climate and emphasis for Training and for V and V at JPL has changed, and we have learned about the expansion, growth, and limitations in the roles of traditional positions at JPL such as the Project's Training Engineer, V and V Engineer, and Operations Engineer. The need to keep a tight rein on budgets has led to a merging and/or reduction in these positions which pose challenges to individual capacities and capabilities. We examine the evolution of these processes and the roles involved while taking a look at the impact or potential impact of our proposed training related infrastructure tasks. As we conclude our examination of the changes taking place for new flight projects, we see that the importance of proceeding with our proposed tasks and adapting them to the changing climate remains an important element in reducing the risk in the challenging business of space exploration.

verifications↗

Hazard Analysis for the Mark III Space Suit Assembly (SSA) Used in One-g Operations

This Hazard Analysis document encompasses the Mark III Space Suit Assembly (SSA) and associated ancillary equipment. It has been prepared using JSC17773, "Preparing Hazard Analyses for JSC Ground Operation", as a guide. The purpose of this document is to present the potential hazards involved in ground (23 % maximum O2, One-g) operations of the Mark III and associated ancillary support equipment system. The hazards listed in this document are specific to suit operations only; each supporting facility (Bldg. 9, etc.) is responsible for test specific Hazard Analyses. A "hazard" is defined as any condition that has the potential for harming personnel or equipment. This analysis was performed to document the safety aspects associated with manned use of the Mark III for pressurized and unpressurized ambient, ground-based, One-g human testing. The hazards identified herein represent generic hazards inherent to all standard JSC test venues for nominal ground test configurations. Non-standard test venues or test specific configurations may warrant consideration of additional hazards analysis prior to test. The cognizant suit engineer is responsible for the safety of the astronaut/test subject, space suit, and suit support personnel. The test requester, for the test supported by the suit test engineer and suited subject, is responsible for overall safety and any necessary Test Readiness Reviews (TRR).

Mitchell, Kate↗

System Administration Support/SWORDS G2

The Soldier-Warfighter Operationally Responsive Deployer for Space (SWORDS) rocket is a dedicated small satellite launcher that will minimize danger and complexity in order to allow soldiers in the field to put payloads of up to 25kg into orbit from the field. The SWORDSG2 project is the development of a model, simulation, and ultimately a working application that will control and monitor the cryogenic fluid delivery to the SWORDS rocket for testing purposes. To accomplish this, the project is using the programming language environment Gensym G2. The environment is an all-inclusive application that allows development, testing, modeling, and finally operation of the unique application through graphical and programmatic methods. In addition, observation of the current cryogenic fluid delivery system in the Kennedy Space Center Cry Lab has allowed me to gain valuable experience of fluid systems and propelant delivery that is valuable to our team when developing amd modeling our own system.The ultimate goal of having a test-ready application to show to the heads of the project, and demonstrating G2's capabilities, by late 2014 will require hard work and intense study and understanding of not only the programming aspect but also the physical phenomena we want to model, observe, and control.

cryogenic fluids↗

Preparing GMAT for Operational Maneuver Planning of the Advanced Composition Explorer (ACE)

The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

Trajectory analysis↗

Fundamentals for Team Based Rehearsals and the Differences Between Low Earth and Deep Space Missions

Presentation to be presented at the 2015 IEEE Aerospace Conference, Big Sky, Montana, March 7-14-2015.Rehearsals are mission level readiness tests that exercise personnel, operational process, and flight products, in a near flight like environment. The program is started 6-9 months prior to launch and is used to ensure the final as built system will meet mission goals (i.e. validation). On Deep Space missions you rehearse cruise activities post launch!Focus on critical activities to the mission, (i.e. propulsive maneuvers, instrument commissioning and any first time events or coordinating activities that involve major stakeholders).

Deep Space Missions↗

OPALS: Mission System Operations Architecture for an Optical Communications Demonstration on the ISS

In spring 2014, the Optical PAyload for Lasercomm Science (OPALS) will launch to the International Space Station (ISS) to demonstrate space-to-ground optical communications. During a 90-day baseline mission, OPALS will downlink high quality, short duration videos to the Optical Communications Telescope Laboratory (OCTL) in Wrightwood, California. To achieve mission success, interfaces to the ISS payload operations infrastructure are established. For OPALS, the interfaces facilitate activity planning, hazardous laser operations, commanding, and telemetry transmission. In addition, internal processes such as pointing prediction and data processing satisfy the technical requirements of the mission. The OPALS operations team participates in Operational Readiness Tests (ORTs) with external partners to exercise coordination processes and train for the overall mission. The tests have provided valuable insight into operational considerations on the ISS.

Abrahamson, Matthew J.↗

Opals: Mission System Operations Architecture for an Optical Communications Demonstration on the ISS

In April of 2014, the Optical PAyload for Lasercomm Science (OPALS) Flight System (FS) launched to the International Space Station (ISS) to demonstrate space-to-ground optical communications. During a planned 90-day baseline mission, the OPALS FS will downlink high quality, short duration videos to the Optical Communications Telescope Laboratory (OCTL) ground station in Wrightwood, California. Interfaces to the ISS payload operations infrastructure have been established to facilitate activity planning, hazardous laser operations, commanding, and telemetry transmission. In addition, internal processes, such as pointing prediction and data processing, satisfy the technical requirements of the mission. The OPALS operations team participates in Operational Readiness Tests (ORTs) with external partners to exercise coordination processes and train for the overall mission. The ORTs have provided valuable insight into operational considerations for the instrument on the ISS.

Technology Demonstration↗

Preparing General Mission Analysis Tool for Operational Maneuver Planning of the Advanced Composition Explorer Mission

The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

mission design↗