Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Scope”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Space Systems - Safety and Compatibility of Materials - Method to Determine the Ignition Susceptibility of Materials or Components to Particle Impact

The scope of this International Technical Specification is to provide a method to determine the ignition susceptibility of materials and components to particle impact. The method can be used to determine the conditions at which ignition and consumption of a specimen material occurs when impacted by single or multiple particles entrained in a flow of gaseous oxygen (GOX). Alternatively, the method can be used to determine if a specific material or component is subject to ignition and sustained combustion in a given flow environment when impacted by single or multiple particles entrained in a flow of GOX.

Hirsch, David B.↗

Underestimation of Project Costs

Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

Cost estimation↗

Unmanned Aircraft System Traffic Management (UTM) Research Transition Team (RTT) Concept Working Group - Concept & Use Cases Package #2 Addendum: Technical Capability Level 3

This document is a product of the joint NASA and FAA Research Transition Team's (RTT) Concept Working Group (CWG) as part of the UAS Traffic Management (UTM) project. The scope of the document covers Technical Capability Level (TCL) 3 of the UTM research path and presents the 1) Terms and Definitions, 2) Foundational Principles, 3) Concept Narratives, 4) Use Cases, 5) Operational Views (OVs), and 6) Roles and Responsibilities of actors interacting within a TCL3 environment. The document includes additional use cases to accompany the RTT CWG Package #2 document.

UTM↗

X-57 Systems Engineering Lessons Learned

The X-57 Maxwell is an electric aircraft based on a 4-passenger, twin engine Tecnam P2006T General Aviation aircraft. The X-57 project originally envisioned a straightforward integration of commercial-off-the-shelf hardware components and software into a novel configuration to demonstrate the aerodynamic and performance benefits of Distributed Electric Propulsion (DEP). The project was initially started with a high-risk venture capitalist approach under NASA’s Convergent Aeronautics Solutions (CAS) project, which led to an initial philosophy of Project Management “light” (which was then interpreted as Systems Engineering (SE) “light”). As the project matured, it was forced to transition to one with increasing SE-rigor as the project scope changed, hardware and software deficiencies were found, and the team realized the magnitude of the technical and integration challenges. In hindsight, these technical challenges came in part from an overly optimistic technology readiness assessment (TRA) at the beginning of the project, which resulted in the project assuming that little to no subsystem development would be required. The project’s approach to systems engineering evolved throughout three separate informal phases of the project as it underwent two key transitions as a result of the team wrestling with the technical challenges and resultant changing project scope. This paper discusses the assumptions, approaches, and challenges encountered from a Systems Engineering standpoint in each of the three informal phases of the X-57 project. This paper also provides recommendations on how future projects can apply Systems Engineering best practices upfront along with a realistic TRA to aid projects that find themselves with similar challenges.

Systems Engineering↗

Modification of the ECAS reference steam power generating plant to comply with the EPA 1979 new source performance standards

Detailed capital cost estimates for the ECAS and modified reference plants in mid-1978 dollars for both 250 and 175 F (394 and 353 K) stack gas reheat temperatures based on the cost estimates developed for the ECAS study are presented. The scope of the work included technical assessment of sulfur dioxide scrubber system design, on site calcination versus purchased lime, reheat of stack gas, effect of sulfur dioxide scrubber on particulate emission, and control of nitrogen oxides.

Fogelson, S. A.↗

NASA Thesaurus Data File

The NASA Thesaurus contains the authorized NASA subject terms used to index and retrieve materials in the NASA Aeronautics and Space Database (NA&SD) and NASA Technical Reports Server (NTRS). The scope of this controlled vocabulary includes not only aerospace engineering, but all supporting areas of engineering and physics, the natural space sciences (astronomy, astrophysics, planetary science), Earth sciences, and the biological sciences. The NASA Thesaurus Data File contains all valid terms and hierarchical relationships, USE references, and related terms in machine-readable form. The Data File is available in the following formats: RDF/SKOS, RDF/OWL, ZThes-1.0, and CSV/TXT.

Source record↗

EOS image data processing system definition study

The Image Processing System (IPS) requirements and configuration are defined for NASA-sponsored advanced technology Earth Observatory System (EOS). The scope included investigation and definition of IPS operational, functional, and product requirements considering overall system constraints and interfaces (sensor, etc.) The scope also included investigation of the technical feasibility and definition of a point design reflecting system requirements. The design phase required a survey of present and projected technology related to general and special-purpose processors, high-density digital tape recorders, and image recorders.

Gilbert, J.↗

Scoping Calculations of Power Sources for Nuclear Electric Propulsion

This technical memorandum describes models and calculational procedures to fully characterize the nuclear island of power sources for nuclear electric propulsion. Two computer codes were written: one for the gas-cooled NERVA derivative reactor and the other for liquid metal-cooled fuel pin reactors. These codes are going to be interfaced by NASA with the balance of plant in order to make scoping calculations for mission analysis.

Difilippo, F. C.↗

Cockpit Display of Traffic Information /CDTI/

As part of a joint NASA/FAA effort, CDTI flight tests were recently conducted with a research aircraft equipped with advanced cockpit displays. This paper briefly describes the scope of the joint program, summarizes the technical issues related to the application of CDTI, and presents flight test results.

Garren, J. F., Jr.↗

Advanced Integration Matrix (AIM)

This viewgraph presentation describes an Advanced Integration Matrix (AIM) to develop, test, and validate the integration of mission systems for long-duration manned space flight. The contents include: 1) Mission Needs Statement; 2) Scope; 3) General Objectives and Expectations; 4) Technical Approach; 5) AIM is an AHST Element; 6) Phase A and B Formulation Products; 7) Test Flow Plan; and 8) Benchmark Test.

Paul, Heather↗

Configuration Management Process Assessment Strategy

Purpose: To propose a strategy for assessing the development and effectiveness of configuration management systems within Programs, Projects, and Design Activities performed by technical organizations and their supporting development contractors. Scope: Various entities CM Systems will be assessed dependent on Project Scope (DDT&E), Support Services and Acquisition Agreements. Approach: Model based structured against assessing organizations CM requirements including best practices maturity criteria. The model is tailored to the entity being assessed dependent on their CM system. The assessment approach provides objective feedback to Engineering and Project Management of the observed CM system maturity state versus the ideal state of the configuration management processes and outcomes(system). center dot Identifies strengths and risks versus audit gotcha's (findings/observations). center dot Used "recursively and iteratively" throughout program lifecycle at select points of need. (Typical assessments timing is Post PDR/Post CDR) center dot Ideal state criteria and maturity targets are reviewed with the assessed entity prior to an assessment (Tailoring) and is dependent on the assessed phase of the CM system. center dot Supports exit success criteria for Preliminary and Critical Design Reviews. center dot Gives a comprehensive CM system assessment which ultimately supports configuration verification activities.*

Henry, Thad↗

System-Level Experimental Validations for Supersonic Commercial Transport Aircraft Entering Service in the 2018-2020 Time Period

This report describes the work conducted under NASA funding for the Boeing N+2 Supersonic Experimental Validation project to experimentally validate the conceptual design of a supersonic airliner feasible for entry into service in the 2018 -to 2020 timeframe (NASA N+2 generation). The primary goal of the project was to develop a low-boom configuration optimized for minimum sonic boom signature (65 to 70 PLdB). This was a very aggressive goal that could be achieved only through integrated multidisciplinary optimization tools validated in relevant ground and, later, flight environments. The project was split into two phases. Phase I of the project covered the detailed aerodynamic design of a low boom airliner as well as the wind tunnel tests to validate that design (ref. 1). This report covers Phase II of the project, which continued the design methodology development of Phase I with a focus on the propulsion integration aspects as well as the testing involved to validate those designs. One of the major airplane configuration features of the Boeing N+2 low boom design was the overwing nacelle. The location of the nacelle allowed for a minimal effect on the boom signature, however, it added a level of difficulty to designing an inlet with acceptable performance in the overwing flow field. Using the Phase I work as the starting point, the goals of the Phase 2 project were to design and verify inlet performance while maintaining a low-boom signature. The Phase II project was successful in meeting all contract objectives. New modular nacelles were built for the larger Performance Model along with a propulsion rig with an electrically-actuated mass flow plug. Two new mounting struts were built for the smaller Boom Model, along with new nacelles. Propulsion integration testing was performed using an instrumented fan face and a mass flow plug, while boom signatures were measured using a wall-mounted pressure rail. A side study of testing in different wind tunnels was completed as a precursor to the selection of the facilities used for validation testing. As facility schedules allowed, the propulsion testing was done at the NASA Glenn Research Center (GRC) 8 x 6-Foot wind tunnel, while boom and force testing was done at the NASA Ames Research Center (ARC) 9 x 7-Foot wind tunnel. During boom testing, a live balance was used for gathering force data. This report is broken down into nine sections. The first technical section (Section 2) covers the general scope of the Phase II activities, goals, a description of the design and testing efforts, and the project plan and schedule. Section 3 covers the details of the propulsion system concepts and design evolution. A series of short tests to evaluate the suitability of different wind tunnels for boom, propulsion, and force testing was also performed under the Phase 2 effort, with the results covered in Section 4. The propulsion integration testing is covered in Section 5 and the boom and force testing in Section 6. CFD comparisons and analyses are included in Section 7. Section 8 includes the conclusions and lessons learned.

Magee, Todd E.↗

Space transfer concepts and analysis for exploration missions

The current technical effort is part of the third phase of a broad-scoped and systematic study of space transfer concepts for human lunar and Mars missions. The study addressed the technical issues relating to the First Lunar Outpost (FLO) habitation vehicle with emphasis on the structure, power, life support system, and radiation environment for a baseline habitat with specific alternatives for the baseline.

Woodcock, Gordon R.↗

Space transfer concepts and analyses for exploration missions

The current technical effort is part of the third phase of a broad-scoped and systematic study of space transfer concepts for human lunar and Mars missions. The study addressed the technical issues relating to the First Lunar Outpost (FLO) habitation vehicle with emphasis in the structure, power, life support system, and radiation environment.

Gordon R Woodcock↗

Composites for Exploration Upper Stage

The Composites for Exploration Upper Stage (CEUS) was a 3-year, level III project within the Technology Demonstration Missions program of the NASA Space Technology Mission Directorate. Studies have shown that composites provide important programmatic enhancements, including reduced weight to increase capability and accelerated expansion of exploration and science mission objectives. The CEUS project was focused on technologies that best advanced innovation, infusion, and broad applications for the inclusion of composites on future large human-rated launch vehicles and spacecraft. The benefits included near- and far-term opportunities for infusion (NASA, industry/commercial, Department of Defense), demonstrated critical technologies and technically implementable evolvable innovations, and sustained Agency experience. The initial scope of the project was to advance technologies for large composite structures applicable to the Space Launch System (SLS) Exploration Upper Stage (EUS) by focusing on the affordability and technical performance of the EUS forward and aft skirts. The project was tasked to develop and demonstrate critical composite technologies with a focus on full-scale materials, design, manufacturing, and test using NASA in-house capabilities. This would have demonstrated a major advancement in confidence and matured the large-scale composite technology to a Technology Readiness Level 6. This project would, therefore, have bridged the gap for providing composite application to SLS upgrades, enabling future exploration missions.

composites↗

Some technical writing skills industry needs

It is suggested that engineers and other technical students be taught three classes of skills in technical writing. First, "Big Picture Things", which includes: the importance of clear writing, the wide scope of writing, the wide scope of writing tasks that will be faced in industry, and the principles of organization of technical materials such as; how to analyze, classify, partition, and interpret. Second, "Writing Procedures", which encompasses: how to get words on paper efficiently and team-write. Third, "Writing Details", in which two considerations are important: how to achieve precision in the use of language and the aspects of style. Three problems in style are cited: the problem of sentence transition, overuse of attributive adjectives, and verbosity in paragraph structure. The most important thing in technical writing is considered to be functionality, economy and clarity.

Smith, F. R.↗

Beyond the Space Station

The significance of the Space Station is examined with regard to the possibilities it will open. The Space Station, as a unique R&D facility, operation base, and transportation node, will not only enhance deeper-space ventures but also enable entirely new initiatives for man's advancement in space not possible before. One large goal enabled by the Space Station could be a manned Mars landing mission as a major national objective some time beyond the year 2000. Since its principal themes would be joint exploration and advancement of mankind in space, its scientific, technical and sociological benefits would be of unprecedented scope and magnitude. The Space Station should be regarded as having a 'beachhead' role in supporting multiple goals and multiple users. Commonalities and possible synergisms between program and mission systems, elements, and technologies of large new initiatives beyond the Space Station should be assessed.

Von Puttkamer, J.↗