Advanced Risk Reduction Tool (ARRT) Special Case Study Report: Science and Engineering Technical Assessments (SETA) Program

This special case study report presents the Science and Engineering Technical Assessments (SETA) team's findings for exploring the correlation between the underlying models of Advanced Risk Reduction Tool (ARRT) relative to how it identifies, estimates, and integrates Independent Verification & Validation (IV&V) activities. The special case study was conducted under the provisions of SETA Contract Task Order (CTO) 15 and the approved technical approach documented in the CTO-15 Modification #1 Task Project Plan.

Kirsch, Paul J.↗

Project Risk Assessment and Monitoring for CarbonSAFE Illinois - Macon County (Task 2)

A risk evaluation performed for CarbonSAFE Macon County included performing a risk assessment for the overall project and the identification of technical project risks. These tasks were accomplished through a combination of risk assessment meetings, workshops, expert solicitation, and identifying and implementing risk mitigation or prevention activities. Information from previous carbon storage projects and from the execution of the project (including drilling a test well and conducting 2D seismic survey) were assessed to identify future risks towards the development of a storage complex.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Panel to review EOSDIS plans

Formed in Jan. 1992, the Panel to Review EOSDIS Plans was charged with advising NASA on its plans for developing the Earth Observing System (EOS) Data and Information System (EOSDIS). Specifically, the panel was asked to do the following: assess the validity of the engineering and technical underpinnings of the EOSDIS; assess its potential value to scientific users; suggest how technical risk can be minimized; and assess whether current plans are sufficiently resilient to be adaptable to changing technology and requirements such as budget environments, data volumes, new users, and new databases. The panel completed an interim report (Addendum A) and transmitted it to NASA and other interested parties in the government on 9 Apr. 1992. Because of a delay in NASA's plans to select the contractor for EOSDIS, the panel was not able to complete its review of the program according to the original government request. With the issuance of a letter report (Addendum B) on 28 Sep. 1992, the panel became inactive until such time as NASA could release the details of the contractor's proposed architecture, schedule, and costs for developing EOSDIS. In early 1993, NASA awarded the contract for the EOSDIS Core System (ECS). On 20 Apr. 1993, NASA asked the panel to reconvene to do the following: ( 1) complete its review of NASA's approach to the EOSDIS architecture and implementation; (2) appraise NASA's responses to the panel's previous recommendations; and (3) review the planning for EOSDIS in the context of NASA's role in the Global Change Data and Information System (GCDIS) implementation plan. To respond to the NASA charge, the panel met three times in 1993 including sessions with NASA officials and the EOSDIS contractor. In addition, several of the panel members visited individual Distributed Active Archive Centers (DAAC's) to obtain additional views of EOSDIS. The panel has now obtained substantial information on the EOSDIS budget, contractor work program, and current baseline architecture that was not previously available, due to procurement restrictions. This report presents the panel's findings and recommendations based on this additional information.

Source record↗

How Can You Support RIDM/CRM/RM Through the Use of PRA

Probabilistic Risk Assessment (PRA) is one of key Risk Informed Decision Making (RIDM) tools. It is a scenario-based methodology aimed at identifying and assessing Safety and Technical Performance risks in complex technological systems.

DoVemto. Tpmu↗

Safety and Security Defense-in-Depth for Nuclear Power Plants

This report describes the risk-informed technical elements that will contribute to a defense-in-depth assessment for cybersecurity. Risk-informed cybersecurity must leverage the technical elements of a risk-informed approach appropriately in order to evaluate cybersecurity risk insights. HAZCADS and HAZOP+ are suitable methodologies to model the connection between digital harm and process hazards. Risk assessment modeling needs to be expanded beyond HAZCADS and HAZOP+ to consider the sequence of events that lead to plant consequences. Leveraging current practices in PRA can lead to categorization of digital assets and prioritizing digital assets commensurate with the risk. Ultimately, the culmination of cyber hazard methodologies, event sequence modeling, and digital asset categorization will facilitate a defense-in-depth assessment of cybersecurity.

97 MATHEMATICS AND COMPUTING↗

Probabilistic risk assessment of the Space Shuttle. Phase 3: A study of the potential of losing the vehicle during nominal operation, volume 1

This document is the Executive Summary of a technical report on a probabilistic risk assessment (PRA) of the Space Shuttle vehicle performed under the sponsorship of the Office of Space Flight of the US National Aeronautics and Space Administration. It briefly summarizes the methodology and results of the Shuttle PRA. The primary objective of this project was to support management and engineering decision-making with respect to the Shuttle program by producing (1) a quantitative probabilistic risk model of the Space Shuttle during flight, (2) a quantitative assessment of in-flight safety risk, (3) an identification and prioritization of the design and operations that principally contribute to in-flight safety risk, and (4) a mechanism for risk-based evaluation proposed modifications to the Shuttle System. Secondary objectives were to provide a vehicle for introducing and transferring PRA technology to the NASA community, and to demonstrate the value of PRA by applying it beneficially to a real program of great international importance.

Fragola, Joseph R.↗

Risk Analysis of Various Design Architectures for High Safety-significant Safety-related Digital Instrumentation and Control Systems of Nuclear Power Plants during Accident Scenarios

This report documents the plus-up activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing advanced risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems to support system design decisions and diversity and redundancy applications, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the LWRS-developed framework instructs nuclear vendors and utilities on how to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). Adding diversity within system or components is the main means to eliminate and mitigate CCFs, but diversity also increases plant complexity and errors and may not address all sources of systematic failures. How to optimize the diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in HSSSR DI&C systems of NPPs and supporting relevant design optimization, the framework provides: ? An integrated best-estimate, risk-informed capability to address new technical digital issues quantitatively, accurately, and efficiently in plan modernization progress, such as software CCFs in HSSSR DI&C systems of NPPs ? A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to efficiently predict and prevent risk in the early design stage of DI&C systems ? Technical bases and risk-informed insights to assist U.S. Nuclear Regulatory Commission (NRC) and industry to address and fulfill the risk-informed alternatives for evaluation of CCFs in HSSSR DI&C systems of NPPs ? An integrated risk-informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The plus-up research and development efforts of this project in FY 2022 are focused on methodology improvement of software CCF modeling and estimation, prevention analysis, importance analysis and risk analysis of various design architectures of HSSSR DI&C systems. This work greatly enhances the capability of the LWRS-developed framework for the risk assessment and design optimization of safety-critical DI&C systems. It should be noted that all the analyses are performed for the demonstration of the LWRS-developed framework, not for the evaluation of relevant systems. Results are obtained based on very limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

PRA in Design: Increasing Confidence in Pre-Operational Assessments of Risks (Results of a Joint NASA/NRC Workshop)

In late 2009, the National Aeronautics and Space Administration (NASA) and the U.S. Nuclear Regulatory Commission (NRC) jointly organized a workshop to discuss technical issues associated with application of risk assessments to early phases of system design. The workshop, which was coordinated by the Idaho National Laboratory, involved invited presentations from a number of PRA experts in the aerospace and nuclear fields and subsequent discussion to address the following questions: (a) What technical issues limit decision-makers' confidence in PRA results, especially at a pre-operational phase of the system life cycle? (b) What is being done to address these issues'? (c) What more can be done ? The workshop resulted in participant observations and suggestions on several technical issues, including the pursuit of non-traditional approaches to risk assessment and the verification and validation of risk models. The workshop participants also identified several important non-technical issues, including risk communication with decision makers, and the integration of PRA into the overall design process.

Youngblood, Robert↗

Quantitative Risk Analysis of High Safety Significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants using IRADIC Technology

This report documents the activities performed by Idaho National Laboratory (INL) during fiscal year (FY) 2021 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) Risk Assessment project. In FY-2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems (IRADIC technology) was proposed for this strategy, which aims to (1) provide a best-estimate risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the High Safety Significant Safety-related (HSSSR) DI&C systems, (2) develop an advanced risk assessment technology to support transition from analog to DI&C technologies for nuclear industry, (3) assure the long-term safety and reliability of vital HSSSR DI&C systems, (4) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the IRADIC technology is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify responding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the individual level, system level, and plant level, (4) providing insights and suggestions on designs to manage the risks; thus, to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). In this report, an approach for performing software CCF analysis, given limited data, is developed and demonstrated using a case study of a highly redundant digital reactor trip system. Consequence analysis is also performed based on different accident scenarios. Results indicate that plant modernization including the improvement of HSSSR DI&C systems will make great benefits to plant safety by providing more safety margins to accident management. In addition, a novel approach is proposed in this report for the quantification of software hazards when sufficient operational and testing data available. The method incorporates software development quality as well as strong analysis techniques to identify and link software defects to potential failure modes. The approach includes both semantic and test-based analysis to detect failures that can exist in different stages of the software development life cycle. This method is applied to an advanced human system interface relevant to reactor trip safety developed from the APR 1400 design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

INTEGRATED RISK ASSESSMENT OF DIGITAL I&C SAFETY SYSTEMS FOR NUCLEAR POWER PLANTS

Upgrading the existing analog instrumentation and control (I&C) systems to state-of-the-art digital I&C (DI&C) systems provides the foremost means to improve performance and reduce costs for existing light-water reactors (LWRs). However, qualification of digital technologies remains a challenge?especially the issue of software common cause failure (CCF), which has been difficult to address. Existing analyses of CCFs in I&C systems mainly focus on hardware failures. With the application and upgrading of new DI&C systems, software CCFs due to design flaws might become a potential threat to plant safety, considering that most redundancy designs use similar digital platforms or software in their operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of particular concern in U.S. Nuclear Regulatory Commission (NRC) licensing procedures. In 2019, the Risk-Informed Systems Analysis (RISA) Pathway of the U.S. Department of Energy?s (DOE?s) Light Water Reactor Sustainability (LWRS) Program initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, secure DI&C technologies for digital upgrades/designs. An integrated risk assessment for the DI&C (RADIC) process was proposed for this strategy to identify potential key digital-induced failures, implement reliability analyses of related digital safety I&C systems, and evaluate the unanalyzed sequences introduced by these failures (particularly software CCFs) at the plant level. This paper summarizes these RISA efforts in the risk analysis of safety-related DI& systems at Idaho National Laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Integrated Risk Assessment Process of Safety-Related Digital I&C Systems in Nuclear Power Plants

Upgrading the existing analog instrumentation and control (I&C) systems to state-of-the-art digital I&C (DI&C) systems will greatly benefit existing light water reactors. However, the issue of software common cause failure (CCF) remains an obstacle in terms of qualification for digital technologies. Existing analyses of CCFs in I&C systems mainly focus on hardware failures. With the application and upgrading of new DI&C systems, design flaws could cause software CCFs to become a potential threat to plant safety, considering that most redundancy designs use similar digital platforms or software in their operating and application systems. With complex multilayer redundancy designs to meet the single failure criterion, these I&C safety systems are of particular concern in U.S. Nuclear Regulatory Commission licensing procedures. In Fiscal Year 2019, the Risk-Informed Systems Analysis (RISA) Pathway of the U.S. Department of Energy’s Light Water Reactor Sustainability Program initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades and designs. An integrated risk assessment for the DI&C process was proposed for this strategy to identify potential key digital-induced failures, implement reliability analyses of related digital safety I&C systems, and evaluate the unanalyzed sequences introduced by these failures (particularly software CCFs) at the plant level. Here this paper summarizes these RISA efforts in the risk analysis of safety-related DI&C systems at Idaho National Laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Oak Ridge National Laboratory Technical Input for the Nuclear Regulatory Commission Review of the 2017 Edition of ASME Section III, Division 5, ‘High Temperature Reactors’

To assist the Nuclear Regulatory Commission in its decision making on endorsement of the American Society for Mechanical Engineers Boiler and Pressure Vessel Code Section III, Division 5 (2017 Edition) for development of advanced non-light water reactors, the following Division 5 portions were reviewed: Article HBB-2000 Material; Article HCB-2000 Material; Article HGB-2000 Material; Mandatory Appendix HBB-I-14 Tables and Figures; and, Nonmandatory Appendix HBB-U Guidelines for Restricted Material Specifications to Improve Performance in Certain Service Applications. In addition to the 2017 Edition, the same parts of the 2019 Edition have also been reviewed as indicated in various sections of the report. This review was conducted by a collaboration of national laboratory and private sector participants with significant industrial experience, including some heavy lifting and deep diving from Clarus Consulting, LLC., all intended to achieve an objective, independent, and practical perspective. The report provides recommendations, descriptions of the evaluation methods, and the source references for the data used. To build confidence required for endorsement of the Code, this review was conducted as a verification and validation of the above Code contents. The objective of verification is to ensure that the Code is free of error – direct or implied; contains the information needed for its use, including proper coverage of the Code-specified materials for the intended application, and completeness and adequacy of references to other portions of the Code. The objective of validation is to authenticate that the Code tabulations and graphs represent design inputs consistent with what are determined using rules and methods specified by the Code. The authentication process used data that were assembled and/or generated independent of Code development, while the methods of analysis followed Code-specified methods where appropriate. The designated portions for this review cover the five alloys codified for high temperature reactor applications in Division 5, i.e. 316 SS, 304 SS, 800H, 2¼Cr-1Mo, and 9Cr-1Mo-V, regarding their general requirements, permitted specifications and design stress intensity values for pressure-retaining applications, deterioration in service, fatigue acceptance test, permissible weld materials, tensile and yield strength, expected minimum stress-to-rupture values (including for Alloy 718), weld stress rupture factors, permissible materials for bolting use, and restricted specifications in certain service applications. Additionally, stress intensity values for bolting materials including 316 SS, 304 SS and alloy 718 were reviewed. Analysis and discussion are also provided on contents outside of these designated Code portions where it was deemed relevant and necessary to develop a technically sound understanding of issues relating to the designated portions. Due to unavailability of sufficient test data on welds during the review period, the weld stress rupture factors in Tables HBB-I-10.14A to E, which cover a total of ten tables for the five alloys welded with twenty-eight different weld metals (some with similar properties), have been deferred to a future review effort. The review identified mainly two types of issues. The first type includes instances where the Code is found factually incomplete or incorrect, such as obsolete materials specifications listings, missing tabulation of stresses for bolting. Changes to the Code are recommended in these cases. The second type of issue includes instances where the Code tabulations and graphs are found to be less conservative than the review analysis results. In these cases, recommendations are made for further review and consideration where the difference in conservatism exceeds 10%, which is our threshold for questioning technical adequacy, meriting a risk assessment by the Nuclear Regulatory Commission and/or reactor designers. It is noted that this effort has been executed using all available data and established methods of analysis, including methods and criteria specified and used by the Code. As such, the findings that are presented in quantitative detail, in a format for convenient comparison with the Code, and with identification of where further review is recommended, should provide a sound technical basis for decisions about quantifying the implications of the reduced design margins and technical adequacy/inadequacy to form a basis for conditioning specific Code tabulation values on endorsement. Recommendations for specific changes to the Code, however, entail design conservatism considerations beyond the scope of this review effort, and are not made in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cybersecurity Technical Assistance Capabilities Overview [Slides]

Electric grids around the world are undergoing rapid structural and operational change, making it more important than ever to understand evolving risks and improve grid resilience and security against natural and human disruptions. Through tailored technical assistance, NREL is working with partners to support the secure and resilient deployment of energy systems and address grid integration challenges.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA'S Use of Ground-Based Multi-Layered Pressure Vessels (MLPV)

NASA has taken the US technical lead in assessing and reducing risks associated with operations of non-code MLPVs, with the goal of developing technical standards and processes for continued use, maintenance, inspection, and repair of MLPVs

Clifton T Arnold, Jr.↗

Prospects for Interstellar Propulsion

In recognition of the increasing prospects for Earth-like exoplanet discoveries and its significance for spurring future interstellar voyages of discovery, the United States Congress recently directed NASA to undertake an interstellar mission technology assessment report. In response to this legislative charge to action, NASA has undertaken a series of extramural interstellar workshops aimed at identifying and evaluating technology concepts for enabling an interstellar scientific probe mission, associated technical challenges, technology readiness level assessments, risks, potential near-term milestones, and funding requirements. This paper summarizes these activities and discusses the scientific and technical rationale for a long-term program consisting of incremental, staged technical developments that are extensible for interstellar travel to a nearby star system over many decades.

Litchford, Ronald J.↗

Risk-Informed Applications and Science – Past, Present, & Future

This is a presentation to be made at the University of Tokyo. The Idaho National Laboratory is creating the next-generation reliability- and risk-assessment methods and tools that support risk-informed decision-making by combining physics-based models with probabilistic quantification approaches. Integrating these two worlds of physics and probability using a simulation framework leads us to predictions based upon an approach called “computational risk assessment” which will serve as the technical basis for the future of reliability and risk approaches. The driving factors for this new approach includes: temporal (timing issues), spatial (location issues), mechanistic (physics issues), and topological (complexity issues). By combining phenomenology directly with stochastic quantification, we are able to perform advanced uncertainty analysis directly on both parameters and models. In addition, new tools allow for the creation of reduced order models that mimic high-fidelity engineering models while still permitting the realization of thousands of simulation iterations in short run-times on current workstation-class computers. While these advanced methods and tools can provide increased realism in our engineering safety and risk approaches, their greater benefit is to provide a risk-informed engineering framework for design and operation. This talk will briefly review the history of risk assessment and risk-informed applications, describe some of the current research and development found at the Idaho National Laboratory, and discuss potential future applications and approaches for advanced methods and tools.

97 MATHEMATICS AND COMPUTING↗

Energy-Storing Cryogenic Carbon Capture™ for Utility and Industrial-scale Processes (Final Report)

This project leverages work completed under funding from previous U.S. Department of Energy (DOE) projects and other sources of funding around the Cryogenic Carbon Capture Process™ (CCC). The purpose of this project is to further develop a perturbation of the CCC process that stores energy called the Cryogenic Carbon Capture™ Energy Storing (CCC-ES) process. The successful completion of the tasks in this project has prepared the CCC-ES process for scaling and developed initial plans and a feasibility analysis for an engineering-scale or small-commercial scale system that can store at least 10 MWh of energy. The specific areas of work in this project are: (1) Develop a conceptual, site-specific integrated process flow diagram: Sustainable Energy Solutions (SES) developed a conceptual, site-specific plan including a process flow diagram for integrating CCC-ES at a specific location. The proposed system was based on a typical engineering-scale CCC system designed to capture 30-50 metric tonnes of CO 2 per day (TPD), with modifications and additional changes and equipment put in place to add the energy storage element to the system. The 30-50 TPD scale corresponds to the required 10 MWh of stored energy. This task includes updating simulation software for transient analysis. SES also coordinated with the Jim Bridger Power Plant in Point of Rocks, Wyoming to get site-specific data. Using these data, SES completed site-specific preliminary process flow diagrams, estimated capital and operating costs for the CCC-ES system, and used the upgraded software package to estimate the primary figures of merit. (2) Complete a technoeconomic analysis (TEA): SES completed a full-scale TEA of the CCC-ES system to meet specific success criteria. This TEA used process information from the host site selected above. (3) Technology and data gap assessment for the CCC-ES process: As part of the technology gap assessment, SES performed an assessment of the best alternative energy storage solutions including figures of merit and operational strengths and weaknesses. SES then compared the proposed system with a discussion of how it addresses the weaknesses of alternative systems, showing for example a cost of stored energy at less than $50/MWh and with a roundtrip efficiency of greater than 95%. This assessment includes technical and other risk analyses and technology gaps with research and development needs to commercialize the process by 2030. Finally, work includes a commercialization roadmap/development pathway outlining the major milestones to move to a commercially operating CCC-ES system. (4) Phase II pre-FEED project plan: SES completed a project plan for the Phase II pre-FEED analysis using the same host site as in the Phase I conceptual study.

03 NATURAL GAS↗

Towards a Methodology and Tooling for Model-Based Probabilistic Risk Assessment (PRA)

A Probabilistic Risk Assessment (PRA) aims to identify and assess potential risks to system technical performance requirements for the purpose of furnishing risk insights into project decisions. PRAs have traditionally been conducted manually using software with an isolated data model. As system complexity rises it becomes difficult to ensure consistency between a PRA, the evolving system design, and other engineering analyses; the techniques for conducting PRAs must evolve to meet this challenge. This work presents progress towards a methodology and tooling for conducting a PRA by leveraging data in the system model, embedded for other purposes and analyses, to conduct a PRA. An approach for identifying the appropriate probabilistic equation for each risk scenario from a standard library is presented, which is a significant step towards the quantification of the likelihood of a risk scenario occurrence. The final calculation of the likelihood of occurrence is left as an item of future work. We also present the development of preliminary tooling to carry out the methodology on a well-formed system model. The information needed to conduct the PRA is embedded in a consistent manner in a system model, so the model-based PRA can be regularly executed as the system model changes. The ability to modify the PRA in concert with lifecycle evolution affords a project the opportunity to track the extent to which system modification impacts compliance with requirements. These aspects of this model-based PRA methodology make it capable of managing risk in increasingly complex technical systems.

Schreiner, Samuel S.↗