Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Design Report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Towards a Future Linear Collider and The Linear Collider Studies at CERN

During the week 18-22 October, more than 400 physicists will meet at CERN and in the CICG (International Conference Centre Geneva) to review the global progress towards a future linear collider. The 2010 International Workshop on Linear Colliders will study the physics, detectors and accelerator complex of a linear collider covering both the CLIC and ILC options. Among the topics presented and discussed will be the progress towards the CLIC Conceptual Design Report in 2011, the ILC Technical Design Report in 2012, physics and detector studies linked to these reports, and an increasing numbers of common working group activities. The seminar will give an overview of these topics and also CERN’s linear collider studies, focusing on current activities and initial plans for the period 2011-16. n.b: The Council Chamber is also reserved for this colloquium with a live transmission from the Main Auditorium.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

H3 Final Design and Technical Report

The goal of this Project was to develop a standards-compliant, fabrication-ready design of Columbia Power Technologies’ (C·Power) next-generation wave energy converter (WEC), the StingRAY H3p. The H3p is a design iteration of C·Power’s StingRAY WEC and is intended for electrical power generation suitable for micro-grids or remote loads. The H3p was designed for grid-connection and at least two years of continuous testing and operation at the proposed PacWave-South (PWS) test site.

16 TIDAL AND WAVE POWER↗

Semiconductor Nanostructures by Scientific Design (Final Technical Report)

We developed and used quantum simulation techniques to predict structural, electronic, optical and thermal properties affecting the scientific design of semiconductor nanostructures. We focused on the study of surfaces and interfaces at the nanoscale, in particular embedding and solvation of semiconductor nanoparticles, and provided a microscopic description of nanostructured materials in realistic environments, directly comparable with experimental conditions. We addressed three major problems: (i) the design of realistic structural models of integrated nanostructures, e.g. quantum dots embedded in solid matrices and nanostructures immersed in fluids; (ii) the development of efficient and accurate calculations to describe the excited state properties of nanostructures, beyond standard Density Functional Theory, so as to understand and predict electronic properties involved in renewable energy applications, for example solar conversion devices. In particular we developed and used methods based on a many body perturbation theory. (iii) the development of calculations of heat transport properties of nanostructured materials, for thermoelectric applications, including predictive calculations of thermal and electrical conductivity and of Seebeck coefficients. Specifically, we developed and used methods based on the Boltzmann transport equation and molecular dynamics.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Consultancy on Large-Scale Submerged Aerobic Cultivation Process Design - Final Technical Report: February 1, 2016 -- June 30, 2016

NREL is developing an advanced aerobic bubble column model using Aspen Custom Modeler (ACM). The objective of this work is to integrate the new fermentor model with existing techno-economic models in Aspen Plus and Excel to establish a new methodology for guiding process design. To assist this effort, NREL has contracted Genomatica to critique and make recommendations for improving NREL's bioreactor model and large scale aerobic bioreactor design for biologically producing lipids at commercial scale. Genomatica has highlighted a few areas for improving the functionality and effectiveness of the model. Genomatica recommends using a compartment model approach with an integrated black-box kinetic model of the production microbe. We also suggest including calculations for stirred tank reactors to extend the models functionality and adaptability for future process designs. Genomatica also suggests making several modifications to NREL's large-scale lipid production process design. The recommended process modifications are based on Genomatica's internal techno-economic assessment experience and are focused primarily on minimizing capital and operating costs. These recommendations include selecting/engineering a thermotolerant yeast strain with lipid excretion; using bubble column fermentors; increasing the size of production fermentors; reducing the number of vessels; employing semi-continuous operation; and recycling cell mass.

09 BIOMASS FUELS↗

New England Aqua Ventus I: 100% Hull Design (Final Technical Report)

This report serves as the final technical report for the US Department of Energy (DOE) award DE-EE0006713 (Award 6713). The project is titled “New England Aqua Ventus I Offshore Wind Advanced Technology Demonstration Project 100% Front-End Engineering and Design (FEED)”. The New England Aqua Ventus I (NEAV) project demonstrates a unique prestressed concrete semi-submersible floating hull technology, called VolturnUS. The technology is applicable to harness nearly 60% of the US offshore wind resource within 50 miles of the coast. The hull will be demonstrated at full-scale with a commercial scale wind turbine connected to the grid in the Northeast US off Monhegan Island, Maine for 20 years.

17 WIND ENERGY↗

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM↗

The International Linear Collider Progress Report 2015

The International Committee for Future Accelerators (ICFA) set up the Global Design Effort (GDE) for the design of the International Linear Collider (ILC) in 2005. Drawing on the resources of over 300 national laboratories, universities and institutes worldwide, the GDE produced a Reference Design Report in 2007, followed by a more detailed Technical Design Report (TDR) in 2013. Following this report, the GDE was disbanded. A compact core team, the Linear Collider Collaboration (LCC), replaced it. This is still under the auspices of ICFA and is directly overseen by the Linear Collider Board, which reports to ICFA. The LCC is charged with continuing the design effort on a much-reduced scale until the Project is approved for construction. An additional mandate of the LCC was to bring together all linear collider work, including the CERN-based Compact Linear Collider (CLIC) under one structure in order to exploit synergies between the two studies.

43 PARTICLE ACCELERATORS↗

Some Beam Dynamics and Related Studies of Possible Changes to the ILC Baseline Design

Since the completion of the ILC Reference Design Report (RDR) in 2007, global R and D has continued on all ILC systems in a coordinated program titled Technical Design Phase 1. This program, which is planned and coordinated by the Program Managers and the Technical Area Group Leaders, will transition to a Phase 2 in 2010 which has the goal of producing a more complete Technical Design Report in 2012. In this transition there will be a re-baseline process which will update and or modify the RDR baseline design taking into account progress with systems design and progress with various technologies coming from the continuing R and D programs. The RDR design was considered by some to be a conservative one and many of the topics being studied for inclusion in a new baseline are directed towards more optimum cost versus risk designs. Some of these are engineering systems design modifications, both technical and civil, while others are accelerator parameters, technical system designs and beam dynamics optimizations. A few of the latter are described here.

43 PARTICLE ACCELERATORS↗

Energy-Recovery Linacs for Commercial Radioisotope Production

Most radioisotopes are produced by nuclear reactors or positive ion accelerators, which are expensive to construct and to operate. Photonuclear reactions using bremsstrahlung photon beams from less-expensive electron linacs can generate isotopes of critical interest, but much of the beam energy in a conventional electron linac is dumped at high energy, making unwanted radioactivation. The largest part of this radioactivation may be completely eliminated by applying energy recovery linac technology to the problem with an additional benefit that the energy cost to produce a given amount of isotope is reduced. Consequently, a Superconducting Radio Frequency (SRF) Energy Recovery Linac (ERL) is a path to a more diverse and reliable domestic supply of short-lived, high-value, high-demand isotopes at a cost lower than that of isotopes produced by reactors or positive-ion accelerators. A Jefferson Lab approach to this problem involves a thin photon production radiator, which allows the electron beam to recirculate through rf cavities so the beam energy can be recovered while the spent electrons are extracted and absorbed at a low enough energy to minimize unwanted radioactivation. The thicker isotope photoproduction target is not in the beam. MuPlus, with Jefferson Lab and Niowave, proposed to extend this ERL technology to the commercial world of radioisotope production. In Phase I we demonstrated that 1) the ERL advantage for producing radioisotopes is at high energies (~100 MeV), 2) the range of acceptable radiator thickness is narrow (too thin and there is no advantage relative to other methods and too thick means energy recovery is too difficult), 3) using optics techniques developed under an earlier STTR for collider low beta designs greatly improves the fraction of beam energy that can be recovered (patent pending), 4) many potentially useful radioisotopes can be made with this ERL technique that have never before been available in significant commercial quantities. We developed a plan for the Phase II project that started with a Conceptual Design Report (CDR) based on the results of the Phase I studies and concluded with a Technical Design Report (TDR) for a facility to make isotopes that are most attractive based on market analyses.

43 PARTICLE ACCELERATORS↗

Energy-Recovery Linacs for Commercial Radioisotope Production - Phase I

Most radioisotopes are produced by nuclear reactors or positive ion accelerators, which are expensive to construct and to operate. Photonuclear reactions using bremsstrahlung photon beams from less-expensive electron linacs can generate isotopes of critical interest, but much of the beam energy in a conventional electron linac is dumped at high energy, making unwanted radioactivation. The largest part of this radioactivation may be completely eliminated by applying energy recovery linac technology to the problem with an additional benefit that the energy cost to produce a given amount of isotope is reduced. Consequently a Superconducting Radio Frequency (SRF) Energy Recovery Linac (ERL) is a path to a more diverse and reliable domestic supply of short-lived, high-value, high-demand isotopes at a cost lower than that of isotopes produced by reactors or positive-ion accelerators. A Jefferson Lab approach to this problem involves a thin photon production radiator, which allows the electron beam to recirculate through rf cavities so the beam energy can be recovered while the spent electrons are extracted and absorbed at a low enough energy to minimize unwanted radioactivation. The thicker isotope photoproduction target is not in the beam. MuPlus, with Jefferson Lab and Niowave, proposed to extend this ERL technology to the commercial world of radioisotope production. In Phase I we demonstrated that 1) the ERL advantage for producing radioisotopes is at high energies (~100 MeV), 2) the range of acceptable radiator thickness is narrow (too thin and there is no advantage relative to other methods and too thick means energy recovery is too difficult), 3) using optics techniques developed under an earlier STTR for collider low beta designs greatly improves the fraction of beam energy that can be recovered (patent pending), 4) many potentially useful radioisotopes can be made with this ERL technique that have never before been available in significant commercial quantities. We developed a plan for the Phase II project that started with a Conceptual Design Report (CDR) based on the results of the Phase I studies and concluded with a Technical Design Report (TDR) for a facility to make isotopes that are most attractive based on market analyses.

07 ISOTOPE AND RADIATION SOURCES↗

Super-B Project Overview

The SuperB project aims at the construction of an asymmetric very high luminosity B-Factory on the Frascati/Tor Vergata (Italy) area, providing a uniquely sensitive probe of New Physics in the flavour sector of the Standard Model. The luminosity goal of 10{sup 36} cm{sup -2} s{sup -1} can be reached with a new collision scheme with 'large Piwinski angle' (LPA) and the use of 'crab waist sextupoles' (CW). A LPA&CW Interaction Region (IR) has been successfully tested at the DA{Phi}NE {Phi}-Factory at LNF-Frascati in 2008. The LPA&CW scheme, together with very low {beta}*, will allow for operation with relatively low beam currents and reasonable bunch length, comparable to those of PEP-II and KEKB. In the High Energy Ring (HER), two spin rotators will bring longitudinally polarized beams into collision at the IP. The lattice has been designed with a very low intrinsic emittance and is quite compact, less than 2 km long. The tight focusing requires the final doublet quadrupoles to be very close to the IP and very compact. A Conceptual Design Report was published in March 2007, and beam dynamics and collective effects R&D studies are in progress in order to publish a Technical Design Report by the end of 2010.

43 PARTICLE ACCELERATORS↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

Halau Uma: Kahikinui Community Cultural, Educational, and Resilience Center Preliminary Design Technical Assistance Summary Report

The Kahikinui Homestead Community in Maui faces energy resilience challenges due to its remote, off-grid location. This report summarizes preliminary technical assistance to design a microgrid for six modular homes using solar PV, wind, and battery storage. Results indicate that a hybrid PV and battery system, supplemented by small wind turbines, offers a cost-effective, resilient solution supporting energy independence and disaster preparedness.

Quiroz, Jimmy Edward [Sandia National Laboratories↗

Kauhale 'O Kipapa: Kahikinui Community Cultural, Educational, and Resilience Center Preliminary Design Technical Assistance Summary Report

The Kahikinui Homestead Community in Maui faces energy resilience challenges due to its remote, off-grid location. This report summarizes preliminary technical assistance to design a microgrid for six modular homes using solar PV, wind, and battery storage. Findings show hybrid PV and battery systems, supplemented by small wind turbines, offer cost-effective, resilient solutions. This work supports enhanced energy independence and disaster preparedness for the community.

Quiroz, Jimmy Edward [Sandia National Laboratories↗

Ingot Nb based SRF technology for the International Linear Collider

The International Linear Collider (ILC) is anticipated to be built as the next energy-frontier electron-positron colliding accelerator with a global effort in particle physics. Niobium based Superconducting Radio-Frequency (SRF) technology is required to provide beam-accelerating structure with elliptical cavity strings to linearly accelerate the electron and positron beams up to 250 GeV and to realize a center-of-mass energy of 500 GeV in collisions. The accelerator design and R&D efforts progressed, and the ILC Technical Design Report (ILC-TDR) was published in 2013. Niobium will take a critical role to generate electric field gradient with a frequency of 1.3 GHz, for accelerating the beam with the best efficiency, in energy balance, using RF superconductivity. This paper discusses a technical approach to provide Nb material (ingot) and thin disks for producing the elliptical cavity structure, with direct slicing from Nb ingot having sufficiently optimized purity and residual resistance ration (RRR) necessary for the ILC SRF cavities.

43 PARTICLE ACCELERATORS↗

Turkish Accelerator Center (TAC) Project: Status and Regional Importance

The Turkish Accelerator Center (TAC) Project was started in 1997 with support of the State Planning Organization (SPO) of Turkey under Ankara University's coordination. After completing Feasibility Report (FR, 2000) and Conceptual Design Repot (CDR, 2005), third phase of the project was started in 2006 as an inter-university project with support of SPO. Third phase of the project has two main scientific goals: to write Technical Design Report (TDR) of TAC and to establish an Infrared Free Electron Laser (IR FEL) facility as a first step. The first facility and TDR studies are planned to be completed in 2012. Construction phase of TAC will cover 2013-2023. TAC collaboration include ten Turkish Universities: Ankara, Gazi, Istanbul, Bogazici, Dogus, Uludag, Dumlupmar, Nigde, Erciyes and S. Demirel Universities. It was planned that the first facility will be an IR FEL and Bremsstrahlung laboratory based on 15-40 MeV electron linac and two optical cavities with 2.5 and 9 cm undulators to scan 2-250 microns wavelength range. Main purpose of the facility is to use IR FEL for research in material science, nonlinear optics, semiconductors, biotechnology, medicine and photochemical processes. In this study; aims, regional importance, main parts and main parameters of TAC and TAC IR FEL and Bremsstrahlung facility are explained. Road map of the TAC project is given. National and international collaborations are explained.

43 PARTICLE ACCELERATORS↗