Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

U.S. DOE Midwest Combined Heat and Power Technical Assistance Partnership (Midwest CHP TAP) (Final Technical Report)

The University of Illinois Chicago (UIC) was awarded the U.S. DOE Midwest Combined Heat and Power Technical Assistance Partnership (Midwest CHP TAP) program to provided technical and policy expertise to support local opportunities to promote CHP, waste heat to power, district energy, and microgrids in the Midwest and Central regions of the U.S. that included the states of Illinois, Indiana, Iowa, Kansas, Michigan, Minnesota, Missouri, Nebraska, Ohio, and Wisconsin. During this contract period, UIC, through the Midwest CHP TAP activities, provided significant regional support to the U.S. strategic goals of: 1) Stimulating America’s Energy Revolution and Promoting Energy Independence; 2) Promoting Jobs and Manufacturing Competitiveness; 3) Supporting a Positive Trade Balance; 4) Enhancing Energy System Resiliency and Energy Security; and 5) Improving the Nation’s Infrastructure. UIC met the annual go/no-go metrics each year and either met and/or exceeded the milestones each year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Independent Technical Review of the X-740 Groundwater Remedy, Portsmouth, Ohio: Technical Evaluation and Recommendations

Two major remedial campaigns have been applied to a plume of trichloroethene (TCE) contaminated groundwater near the former X-740 facility at the Portsmouth Gaseous Diffusion Plant in Piketon Ohio. The two selected technologies, phytoremediation using a stand of hybrid poplar trees from 1999-2007 and in situ chemical oxidation using modified Fenton's Reagent from 2008-2009, have proven ineffective in achieving remedial action objectives (RAOs). The 'poor' performance of these technologies is a direct result of site specific conditions and the local contaminant hydrogeology. Key among these challenges is the highly heterogeneous subsurface geology with a thin contaminated aquifer zone (the Gallia) - the behavior of the contamination in the Gallia is currently dominated by slow release of TCE from the clay of the overlying Minford formation, from the sandstone of the underlying Berea formation, and from clayey layers within the Gallia itself. In response to the remediation challenges for the X-740 plume, the Portsmouth team (including the US Department of Energy (DOE), the site contractor (CDM), and the Ohio Environmental Protection Agency (OEPA)) is evaluating the feasibility of remediation at this site and identifying specific alternatives that are well matched to site conditions and that would maximize the potential for achieving RAOs. To support this evaluation, the DOE Office of Groundwater and Soil Remediation (EM-32) assembled a team of experts to serve as a resource and provide input and recommendations to Portsmouth. Despite the challenging site conditions and the failure of the previous two remediation campaigns to adequately move the site toward RAOs, the review team was unanimous in the conclusion that an effective combination of cost effective technologies can be identified. Further, the team expressed optimism that RAOs can be achieved if realistic timeframes are accepted by all parties. The initial efforts of the review team focused on reviewing the site history and data and organizing the information into a conceptual model and findings to assist in evaluating the potential of alternative remediation technologies. Examples of the key conceptual findings of the EM-32 review team were: (1) The Gallia represents the most practical target for deployment of in situ remediation treatment reagents - injection/extraction focused in this zone would provide maximum lateral impacts with minimal potential risk of failure or adverse collateral impacts. (2) The slow release of TCE from clay and sandstone into the Gallia represent a long term source of TCE that can re-contaminate the Gallia in the future - technologies that effectively treat the permeable portions of the Gallia, but do not leave residual treatment capacity in the system are unlikely to achieve long term remedial action objectives. CDM, the site contractor, provided important and useful information documenting the status and preliminary results of the on-site technology alternative evaluation. In the CDM evaluation, potential technologies were either retained (or screened out) in two preliminary evaluation phases and a detailed evaluation was performed on the five alternatives that were retained into the final 'detailed analysis' phase. The five alternatives that were included in the detailed analysis were: (1) hydraulic fracturing with EHC (a solid bioremediation amendment), (2) enhanced anaerobic bioremediation, (3) in situ chemical oxidation, (4) electrical resistance heating, and (5) reactive barriers. In several cases, two or three variants were separately evaluated. The review team found the CDM effort to be generally credible and reasonable. Thus, the review team focused on providing additional considerations and inputs to Portsmouth and on amending and refining the alternatives in ways that might improve performance and/or reduce costs. The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-32) to provide an independent technical panel to review previous and ongoing remedial activities designed to address TCE contamination in groundwater at X-740. In 1999, a corrective action was implemented at X-740 to address contamination in the groundwater. The DOE planted poplar trees over 2.6 acres of the groundwater plume. After several years of groundwater monitoring, the results indicated that the benefits of phytoremediation were limited and insufficient to meet remedial objectives. In 2007, an alternative remedial strategy based on in situ oxidative treatment was negotiated with Ohio EPA. During FY2008, three treatment phases of chemical oxidation were completed. The general charter for the independent technical review team is to review the results of s previous and ongoing remedial actions to determine whether the current strategy will be effective in meeting the end points specified in the regulatory work plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Design Basis Document / Owner’s Technical Specification for Nitrate Salt Systems in CSP Projects: Hypothesis of Hot Tank Failure

Work has begun on a Design Basis Document / Owner’s Technical Specification for parabolic trough and central receiver power plants using nitrate salt as the heat transport fluid and the thermal storage medium. A principal topic of recent interest is the failures of the hot salt tanks in central receiver projects. The paper outlines a hypothesis for the source of the failures, and discusses a range of possible solutions.

14 SOLAR ENERGY↗

Technical Submission Form: Technical Specification of a Wave Energy Farm.

The Wave - SPARC project developed the Technology Performance Level (TPL) assessment procedure based on a rigorous Systems Engineering exercise. The TPL assessment allows a whole system evaluation of Wave Energy Conversion Technology by measuring it against the requirements determined through the Systems Engineering exercise. The TPL assessment is intended to be useful in technology evaluation; in technology innovation; in allocation of public or priva te investment, and; in making equipment purchasing decisions. This Technical Submission Form (TSF) serves the purpose of collecting relevant and complete information, in a technology agnostic way, to allow TPL assessment s to be made by third party assessor s. The intended usage of this document is that the organization or people that are performing the role of developers or promoters of a particular technology will use this form to provide the information necessary for the organization or people who are perf orming the assessor role to use the TPL assessment.

16 TIDAL AND WAVE POWER↗

Los Alamos National Laboratory Wetland Assessment for the Replacement Water Lines from Technical Area 48 to Technical Area 55 Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing to take action at Los Alamos National Laboratory (LANL) near a wetland at Technical Area (TA) 48 and under a wetland at TA-55. The project proposes to install two 12-inch water lines along an alignment from TA-48 to Pecos Road on the east side of TA-55 (Figure 1). The proposed water lines will replace aging cast iron pipes that provide water for fire suppression to buildings within TA-55, and potable water to other areas in the Pajarito Corridor. NNSA has prepared this wetland assessment in accordance with 10 Code of Federal Regulations (CFR) Part 1022 Compliance with Wetland and Wetland Environmental Review Requirements (10 CFR Part 1022) (CFR 2003) which was promulgated to implement DOE requirements under Executive Order 11988 Wetland Management (EO 1977). A wetland is defined in 10 CFR 1022 as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands,” and a base wetland as “the 100-year wetland, that is, a wetland with a 1.0 percent chance of flooding in any given year (CFR 2003).” This wetland assessment evaluates potential impacts to wetland values and functions from implementation of the proposed action, identifies alternatives to the Proposed Action, and allows for meaningful public comment.

54 ENVIRONMENTAL SCIENCES↗

Visualization of the High-Burnup Spent Fuel Rod Phase 1 Test Plan: Technical Memo - Spent Fuel and Waste Disposition (Technical Memo)

Twenty-five high-burnup fuel rods were extracted from seven different fuel assemblies used for power production at the North Anna nuclear power plant and shipped to Oak Ridge National Laboratory (ORNL) in 2016 for detailed non-destructive examination (NDE) and destructive examination (DE). The spent fuel rods were from 17×17 lattices and consist of four cladding types—Zirlo ® , M5 ® , Zircaloy-4, and low tin Zircaloy-4 (Zirc-4). These spent fuel rods are being tested to provide: (a) baseline characterization and mechanical property data that can be used as a comparison to fuel that was loaded into a modified TN-32B cask in November 2017, as part of the high-burnup confirmatory data project and (b) data applicable to high-burnup fuel rods (>45 GWd/MTU) currently stored and to be stored in the dry-cask fleet. The TN-32B cask is referred to as the “Demo” cask and is currently expected to be transported to a separate location and the internal contents inspected in approximately ten years. ORNL has completed the NDE of the twenty-five fuel rods. The purpose of this technical memorandum is to present a simplified summary of the first phase of destructive examinations and test conditions that will be used for communicating with various stakeholders. The destructive examinations will leverage the expertise and capabilities from multiple national laboratories for performing independent measurements of relevant data. Close coordination is required to ensure that all examinations follow well documented procedures and are performed so that measured data and characteristics can be readily compared. Pacific Northwest National Laboratory (PNNL) has published a detailed overview of the test program. ORNL and PNNL developed detailed draft test plans for testing to be performed at their facilities. ORNL and PNNL are in the process of refining these test plans to apply specifically to the testing described in this memorandum. Argonne National Laboratory (ANL) contributed to the ORNL test plan by describing tests to be conducted at ANL. Testing will be based on continuous learning. If a test produces results that are inconsistent with expectations or current trends, further testing will be paused until a path forward is established to understand the results and to identify follow-on testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Los Alamos National Laboratory Floodplain Assessment for the Technical Area 8 to Technical Area 22 Natural Gas Line Replacement Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing new construction that crosses through upper Pajarito Canyon and upper Starmer Canyon from Technical Area (TA) 8 to TA-22 at Los Alamos National Laboratory (LANL). The project proposes to install a new 12 inch natural gas line to replace the existing 70+ year old natural gas line. Replacement will prevent loss of service to several LANL TAs and Bandelier National Monument. The project activities within the 100- year floodplains include 1) new natural gas line installation to replace and existing aging gas line, 2) relocating a section of fence and 3) three construction equipment and materials storage areas. NNSA has prepared this floodplain assessment in accordance with 10 Code of Federal Regulations (CFR) Part 1022 Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) (CFR 2003) which was promulgated to implement DOE requirements under Executive Order 11988 Floodplain Management (EO 1977). A floodplain is defined in 10 CFR 1022 as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands,” and a base floodplain as “the 100-year floodplain, that is, a floodplain with a 1.0 percent chance of flooding in any given year (CFR 2003).” This floodplain assessment evaluates potential impacts to floodplain values and functions from implementation of the proposed action, identifies alternatives to the Proposed Action, and allows for meaningful public comment.

54 ENVIRONMENTAL SCIENCES↗

Final Technical Report (FTR) - DE-EE0009084: Prefabricated Construction: Guidance, Technical Assistance, and Virtual Inspections

This final technical report summarizes research, case studies, and resources developed from 2020–2025 on prefabricated construction and remote virtual inspections. It documents key findings on benefits, challenges, and best practices, highlights examples from multiple states, and provides guidance to support wider adoption of these innovations in the construction sector.

99 GENERAL AND MISCELLANEOUS↗

Identifying the Technical Basis for Technical Impracticability Waivers for Recalcitrant Radionuclides at Department of Energy Sites - 19055

Injection wells are currently used to hydraulically contain the leading edge of a radioactive iodine-129 ({sup 129}I) groundwater plume that underlies the Hanford Site's 200-UP-1 Operable Unit within the Central Plateau. Hydraulic containment has been implemented because to date, no viable treatment technologies have been identified that can achieve the federal drinking water standard of 1 pCi/L. The large spatial extent of the {sup 129}I plume limits the practical implementation of readily available remedy options, and the presence of large amounts of natural stable {sup 127}I as well as multiple iodine species (iodate, iodide, and organic-iodine complexes) in the groundwater present challenges for remedy performance. As evaluations of potential remediation technologies proceed, risk-informed remediation endpoints and alternatives- such as applicable or relevant and appropriate requirements technical impracticability (TI) waivers-are being evaluated as specified in the interim Record of Decision. A TI waiver may be necessary for {sup 129}I at 200-UP-1 to achieve a plume condition that is still protective of human health and the environment. Nearly 100 TI waivers have been granted at sites across the U.S.; however, a TI waiver has not yet been granted for a radionuclide nor has one been granted for a U.S. Department of Energy (DOE)-managed site. This situation underscores the importance of developing a methodology for risk-based decision-making for iodine and other contaminants of concern at DOE sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MRCI Subtask 2.3: Developing Industrial Partnerships and Regional Technical Collaboration Final Technical Summary Report

Under the objective of regional data collection and helping accelerate deployment, MRCI collaborated with industrial stakeholders in their project planning, characterization, and analysis. Some examples of these collaborations are given below. The data and information shared by the industrial collaborations added to the regional CCS framework development and were incorporated into the overall datasets, while addressing any proprietary data requirements. Three examples of collaborative partnerships with industry that have provided geologic characterization data relevant and beneficial to the MRCI program are discussed below, including: the UIC Class II Injection Facility in Eastern Ohio, the Core Energy CO2-EOR (enhanced oil recovery) operation in Otsego County Michigan, and the Marquis ethanol plant in Hennepin Illinois.

CCS,CCUS,MRCI,Midwest USA,Technical Challenges,inj↗

Upcycling of post-consumer mixed polyolefin feedstock: An economic and technical evaluation

Here, this study reports techno-economic and life cycle analyses to evaluate the economic and environmental impacts of mechanically recycled PE/PP blends in the presence of rheology modifiers. Additionally, fiber-reinforced composites derived from the compatibilized blends were prepared and evaluated for their performance compared with virgin plastics. Results suggest that compatibilized PE/PP blends exhibit a 70% lower selling price compared to virgin PE. Furthermore, these blends achieved a 74% reduction in greenhouse gas emissions or climate change impact compared to the virgin counterpart. Fiber-reinforced composites from compatibilized PE/PP blends demonstrated improved or comparable mechanical properties relative to composites made from virgin PE/PP blends. Based on their favorable cost and environmental impact, along with performance comparable to virgin composites, compatibilized PP/PE composites made from post-consumer plastics can find applications in large-scale composite manufacturing.

Fiber reinforced plastics (FRP)↗

Performance and Technical Challenges of Liquid Argon Detectors

Liquid argon time projection chambers offer the possibility of incredible resolution of particle interactions. This review outlines the ongoing research and development towards the realization of a multi-kiloton scale detector. The ICARUS and ArgoNeuT experiments which make use of liquid argon time projection chamber technology are also described.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Performance metrics for inertial confinement fusion implosions: Aspects of the technical framework for measuring progress in the National Ignition Campaign

The National Ignition Campaign (NIC) uses non-igniting 'tritium hydrogen deuterium (THD)' capsules to study and optimize the hydrodynamic assembly of the fuel without burn. These capsules are designed to simultaneously reduce DT neutron yield and to maintain hydrodynamic similarity with the DT ignition capsule. We will discuss nominal THD performance and the associated experimental observables. We will show the results of large ensembles of numerical simulations of THD and DT implosions and their simulated diagnostic outputs. These simulations cover a broad range of both nominal and off-nominal implosions. We will focus on the development of an experimental implosion performance metric called the experimental ignition threshold factor (ITFX). We will discuss the relationship between ITFX and other integrated performance metrics, including the ignition threshold factor (ITF), the generalized Lawson criterion (GLC), and the hot spot pressure (HSP). We will then consider the experimental results of the recent NIC THD campaign. We will show that we can observe the key quantities for producing a measured ITFX and for inferring the other performance metrics. We will discuss trends in the experimental data, improvement in ITFX, and briefly the upcoming tuning campaign aimed at taking the next steps in performance improvement on the path to ignition on NIF.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗