Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TERMINAL FACILITIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Sensor Data Processing for Tracking Underwater Threats Using Terascale Optical Core Devices

A critical aspect of littoral surveillance (including port protection) involves the localization and tracking of underwater threats such as manned or unmanned autonomous underwater vehicles. In this article, we present a methodology for locating underwater threat sources from uncertain sensor network data, and illustrate the threat tracking aspects using active sonars in a matched filter framework. The novelty of the latter paradigm lies in its implementation on a tera-scale optical core processor, EnLight , recently introduced by Lenslet Laboratories. This processor is optimized for array operations, which it performs in a fixed point arithmetic architecture at tera-scale throughput. Using the EnLight 64 prototype processor, our results (i) illustrate the ability to reach a robust tracking accuracy, and (ii) demonstrate that a considerable speed-up (a factor of over 13,000) can be achieved when compared to an Intel XeonTM processor in the computation of sets of 80K-sample complex Fourier transforms that are associated with our matched filter techniques.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Heavy Water Components Test Reactor Decommissioning - Major Component Removal

The Heavy Water Components Test Reactor (HWCTR) facility (Figure 1) was built in 1961, operated from 1962 to 1964, and is located in the northwest quadrant of the Savannah River Site (SRS) approximately three miles from the site boundary. The HWCTR facility is on high, well-drained ground, about 30 meters above the water table. The HWCTR was a pressurized heavy water test reactor used to develop candidate fuel designs for heavy water power reactors. It was not a defense-related facility like the materials production reactors at SRS. The reactor was moderated with heavy water and was rated at 50 megawatts thermal power. In December of 1964, operations were terminated and the facility was placed in a standby condition as a result of the decision by the U.S. Atomic Energy Commission to redirect research and development work on heavy water power reactors to reactors cooled with organic materials. For about one year, site personnel maintained the facility in a standby status, and then retired the reactor in place. In 1965, fuel assemblies were removed, systems that contained heavy water were drained, fluid piping systems were drained, deenergized and disconnected and the spent fuel basin was drained and dried. The doors of the reactor facility were shut and it wasn't until 10 years later that decommissioning plans were considered and ultimately postponed due to budget constraints. In the early 1990s, DOE began planning to decommission HWCTR again. Yet, in the face of new budget constraints, DOE deferred dismantlement and placed HWCTR in an extended surveillance and maintenance mode. The doors of the reactor facility were welded shut to protect workers and discourage intruders. The $1.6 billion allocation from the American Recovery and Reinvestment Act to SRS for site clean up at SRS has opened the doors to the HWCTR again - this time for final decommissioning. During the lifetime of HWCTR, 36 different fuel assemblies were tested in the facility. Ten of these experienced cladding failures as operational capabilities of the different designs were being established. In addition, numerous spills of heavy water occurred within the facility. Currently, radiation and radioactive contamination levels are low within HWCTR with most of the radioactivity contained within the reactor vessel. There are no known insults to the environment, however with the increasing deterioration of the facility, the possibility exists that contamination could spread outside the facility if it is not decommissioned. An interior panoramic view of the ground floor elevation taken in August 2009 is shown in Figure 2. The foreground shows the transfer coffin followed by the reactor vessel and control rod drive platform in the center. Behind the reactor vessel is the fuel pool. Above the ground level are the polar crane and the emergency deluge tank at the top of the dome. Note the considerable rust and degradation of the components and the interior of the containment building. Alternative studies have concluded that the most environmentally safe, cost effective option for final decommissioning is to remove the reactor vessel, steam generators, and all equipment above grade including the dome. Characterization studies along with transport models have concluded that the remaining below grade equipment that is left in place including the transfer coffin will not contribute any significant contamination to the environment in the future. The below grade space will be grouted in place. A concrete cover will be placed over the remaining footprint and the groundwater will be monitored for an indefinite period to ensure compliance with environmental regulations. The schedule for completion of decommissioning is late FY2011. This paper describes the concepts planned in order to remove the major components including the dome, the reactor vessel (RV), the two steam generators (SG), and relocating the transfer coffin (TC).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dynamics Explorer Science Data Processing System

The Dynamics Explorer project has acquired the ground data processing system from the Atmosphere Explorer project to provide a central computer facility for the data processing, data management and data analysis activities of the investigators. Access to this system is via remote terminals at the investigators' facilities, which provide ready access to the data sets derived from groups of instruments on both spacecraft. The original system has been upgraded with both new hardware and enhanced software systems. These new systems include color and grey scale graphics terminals, an augmentation computer, micrographics facility, a versatile data base with a directory and data management system, and graphics display software packages.

Smith, P. H.↗

HEAVY WATER COMPONENTS TEST REACTOR DECOMMISSIONING

The Heavy Water Components Test Reactor (HWCTR) Decommissioning Project was initiated in 2009 as a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Removal Action with funding from the American Recovery and Reinvestment Act (ARRA). This paper summarizes the history prior to 2009, the major D&D activities, and final end state of the facility at completion of decommissioning in June 2011. The HWCTR facility was built in 1961, operated from 1962 to 1964, and is located in the northwest quadrant of the Savannah River Site (SRS) approximately three miles from the site boundary. The HWCTR was a pressurized heavy water test reactor used to develop candidate fuel designs for heavy water power reactors. In December of 1964, operations were terminated and the facility was placed in a standby condition as a result of the decision by the U.S. Atomic Energy Commission to redirect research and development work on heavy water power reactors to reactors cooled with organic materials. For about one year, site personnel maintained the facility in a standby status, and then retired the reactor in place. In the early 1990s, DOE began planning to decommission HWCTR. Yet, in the face of new budget constraints, DOE deferred dismantlement and placed HWCTR in an extended surveillance and maintenance mode. The doors of the reactor facility were welded shut to protect workers and discourage intruders. In 2009 the $1.6 billion allocation from the ARRA to SRS for site footprint reduction at SRS reopened the doors to HWCTR - this time for final decommissioning. Alternative studies concluded that the most environmentally safe, cost effective option for final decommissioning was to remove the reactor vessel, both steam generators, and all equipment above grade including the dome. The transfer coffin, originally above grade, was to be placed in the cavity vacated by the reactor vessel and the remaining below grade spaces would be grouted. Once all above equipment including the dome was removed, a concrete cover was to be placed over the remaining footprint and the groundwater monitored for an indefinite period to ensure compliance with environmental regulations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Inspection Report "Personal Property Management at Lawrence Livermore National Laboratory"

The Department of Energy's (DOE's) Lawrence Livermore National Laboratory (Livermore) is a premier research and development institution for science and technology supporting the core mission of national security. According to Livermore, as of November 2008 the Laboratory managed 64,933 items of Government personal property valued at about $1 billion. At the beginning of Fiscal Year 2008, Livermore reported 249 DOE property items valued at about $1.3 million that were missing, unaccounted for, or stolen during Fiscal Year 2007. Livermore centrally tracks property utilizing the Sunflower Assets system (Sunflower), which reflects the cradle to grave history of each property item. Changes in the custodianship and/or location of a property item must be timely reported by the custodian to the respective property center representative for updating in Sunflower. In Fiscal Year 2008, over 2,000 individuals were terminated as a result of workforce reduction at Livermore, of which about 750 received a final notification of termination on the same day that they were required to depart the facility. All of these terminations potentially necessitated updates to the property database, but the involuntary terminations had the potential to pose particular challenges because of the immediacy of individuals departures. The objective of our inspection was to evaluate the adequacy of Livermore's internal controls over Government property. Based upon the results of our preliminary field work, we particularly focused on personal property assigned to terminated individuals and stolen laptop computers. We concluded that Livermore's internal controls over property could be improved, which could help to reduce the number of missing, unaccounted for, or stolen property items. Specifically, we found that: (1) The location and/or custodian of approximately 18 percent of the property items in our sample, which was drawn from the property assigned to individuals terminated on short notice in 2008, was inaccurately reflected in Sunflower. The data in this system is relied upon for tracking purposes, so inaccurate entries could increase the probability of property not being located during inventories and, thus, being reported as 'lost' or 'missing'. We believe that providing formal training to property custodians, which was not being done at the time of our inspection, could help improve this situation. (2) Some property custodians were not adequately protecting their Government laptop computers when taking them offsite, and they were not held accountable for the subsequent theft of the laptops. We made several recommendations to management intended to improve property controls at Livermore.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

STS-99 Crew departs SLF after TCDT

The primary objective of the STS-99 mission was to complete high resolution mapping of large sections of the Earth's surface using the Shuttle Radar Topography Mission (SRTM), a specially modified radar system. This radar system produced unrivaled 3-D images of the Earth's Surface. The mission was launched at 12:31 on February 11, 2000 onboard the space shuttle Endeavour. and led by Commander Kevin Kregel. The crew was Pilot Dominic L. Pudwill Gorie and Mission Specialists Janet L. Kavandi, Janice E. Voss, Mamoru Mohri from the National Space Development Agency (Japanese Space Agency), and Gerhard P. J. Thiele from DARA (German Space Agency). This tape shows the astronauts boarding jet planes at the Shuttle Landing Facility after the Terminal Countdown Demonstration Test.

Source record↗

The Mission Oriented Terminal Area Simulation (MOTAS)

A new simulation facility is described in which flight management and flight operations research studies can be conducted in a highly realistic terminal area environment. The historical evolution and justification of the facility is discussed, along with the design configuration of the system hardware and software. Details are provided on the traffic management features of the terminal area model as well as the human controller and multicockpit interface capabilities. The facility is currently operational with two cockpit simulators, two air traffic control (ATC) stations, four pseudo pilot stations (PPS), a metering and spacing system of traffic flow control management, and terminal area models providing two route structure environments: area navigation (RNAV) for advanced-equipped aircraft and vectoring for conventionally-equipped aircraft. Plans for future experiments utilizing the facility are discussed.

Naftel, P. B.↗

Submission of Notice of Termination of Coverage Under the National Pollutant Discharge Elimination System General Permit No. CAS000002 for WDID No. 201C349114, Lawrence Livermore National Laboratory Ignition Facility Construction Project

This is the completed Notice of Termination of Coverage under the General Permit for Storm Water Discharges Associated with Construction Activity. Construction activities at the National Ignition Facility Construction Project at Lawrence Livermore National Laboratory are now complete. The Notice of Termination includes photographs of the completed construction project and a vicinity map.

54 ENVIRONMENTAL SCIENCES↗

Drones for Decommissioning

The U.S. Nuclear Regulatory Commission has responsibility for regulating the safe decommissioning of facilities and sites to meet the License Termination Rule in 10 Code of Federal Regulations (CFR) Part 20, Standards for Protection Against Radiation, Subpart E “Radiological Criteria for License Termination.” Decommissioning is performed in accordance with 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities, as part of license termination (§50.82) and release of the facility or site for unrestricted use (§50.83). The guidance currently demonstrates the minimum requirements and necessary conditions for conducting radiological surveys by a person carrying a radiation detector(s). The Pacific Northwest National Laboratory (PNNL) evaluated the use of an unoccupied aerial vehicle (UAV) to conduct radiological surveys that could be used in decommissioning to potentially reduce time, cost, and worker safety compared to current survey methods. The objective of this project was to evaluate the performance and limitations of a UAV to support a decommissioning radiological survey and compare it to a radiological survey conducted by a human. The primary research questions of interest evaluated were: 1. Did observed UAV paths differ from human paths and, if so, how much? 2. Did survey path deviation affect survey results and, if so, how? 3. Were radiological measurements from human and UAV surveys significantly different? To answer these research questions, an experimental field was set up at PNNL’s 3440 test track, and it included radiological sources commonly surveyed during decommissioning: cobalt-60 (Co-60), cesium-137 (Cs-137), and americium-241 (Am-241). Nine check sources (three each of Am-241, Cs-137, and Co-60) with activities ranging from 3.54 µCi to 39.34 µCi were set over a path that also included an area for measuring background radiation. An Aurelia X6 UAV coupled with a GPS and lidar unit was used to conduct the radiological surveys. UAV and human surveys were conducted using two different NaI(Tl) scintillation radiation detectors (2 in. × 2 in. Ludlum, Inc. and 2 in. × 0.04 in. Alpha Spectra, Inc.) at a travel velocity of approximately 0.2 m/s at a low (15–40 cm median altitude) or high (87–105 cm median altitude) survey altitude. Since the survey velocity and altitude parameters were atypical for normal UAV operations, testing was done prior to conducting the radiological surveys to establish airworthiness, evaluate the navigation system, and establish flight control. Human and UAV surveys were paired according to the detector type and altitude regime to compare the survey data. The results of this proof-of-concept research determined that the UAV and human surveys followed similar survey paths and detected the radiological sources with no significant statistical difference (in 33 out of 36 surveys). However, further research is needed prior to deploying UAVs for decommissioning surveys.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Photographic Mitigation Documentation Related to the Engine Assembly and Disassembly Facility, Area 25, Nevada National Security Site, Nye County, Nevada

This letter report provides documentation in partial fulfillment of the mitigation of adverse effects to the Engine Maintenance Assembly and Disassembly (E-MAD) facility, a major component of the Nuclear Rocket Development Station (NRDS) Historic District located in Area 25 of the Nevada National Security Site (NNSS). Construction of the E-MAD facility began in 1962 for the purpose of disassembling and maintaining nuclear-powered rocket engines. Once the building was complete in 1967, the E-MAD facility remained in continuous operation until the nuclear rocket program was terminated in 1973. The mothballed facility was repurposed in 1977 for spent nuclear fuel handling and packaging activities. By the mid-1980s, all activities at the E-MAD facility had ceased (Reno et al. 2019). This submission is intended to comply with Stipulation III.D.1 of the Memorandum of Agreement DE-GM58-20NA25534 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Corrective Action Activities and Demolition of the Engine Maintenance Assembly and Disassembly Facility and the Test Cell C Historic District, Major Components of the Nuclear Rocket Development Station Historic District Located in Area 25 at the Nevada National Security Site Nye County (hereafter referred to as the MOA). Stipulation III.D.1 states the U.S. Department of Energy (DOE) will submit the existing supplementary collection of the large-format, black-and-white photographic prints taken during the 1996 Historic American Engineering Record (HAER) documentation of the E-MAD facility to the Nuclear Testing Archive (NTA), located on the second floor of the Rogers Building at Desert Research Institute (DRI) in Las Vegas, Nevada.

54 ENVIRONMENTAL SCIENCES↗

Programmatic Value Determination and Termination of Safeguards Process for Accountable Nuclear Materials at the Nevada National Security Site

The Nuclear Material Management & Storage (MNN&S) and the Material Control and Accountability (MC&A) programs at the Nevada National Security Site (NNSS) have the responsibility to ensure accountable nuclear material (NM) no longer need by programs/projects is managed, coordinated, and dispositioned in accordance with DOE Orders 410.2, “Management of Nuclear Materials, and 474.2, “Nuclear Material Control and Accountability”. CD-NMM.007, “Programmatic Value Determination of Nuclear Material and Termination of Safeguards” is the document which lays out the process to fulfill these requirements. This paper defines the roles and responsibilities for all the organizations involved, the programmatic value determination (PVD), disposition planning, and termination of safeguards (ToS)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating repositories with fuel cycles: The airport authority model

The organization of the fuel cycle is a legacy of World War II and the cold war. Fuel cycle facilities were developed and deployed without consideration of the waste management implications. This led to the fuel cycle model of a geological repository site with a single owner, a single function (disposal), and no other facilities on site. Recent studies indicate large economic, safety, repository performance, nonproliferation, and institutional incentives to collocate and integrate all back-end facilities. Site functions could include geological disposal of spent nuclear fuel (SNF) with the option for future retrievability, disposal of other wastes, reprocessing with fuel fabrication, radioisotope production, other facilities that generate significant radioactive wastes, SNF inspection (navy and commercial), and related services such as SNF safeguards equipment testing and training. This implies a site with multiple facilities with different owners sharing some facilities and using common facilities - the repository and SNF receiving. This requires a different repository site institutional structure. We propose development of repository site authorities modeled after airport authorities. Airport authorities manage airports with government-owned runways, collocated or shared public and private airline terminals, commercial and federal military facilities, aircraft maintenance bases, and related operations - all enabled and benefiting the high-value runway asset and access to it via taxi ways. With a repository site authority the high value asset is the repository. The SNF and HLW receiving and storage facilities (equivalent to the airport terminal) serve the repository, any future reprocessing plants, and others with needs for access to SNF and other wastes. Non-public special-built roadways and on-site rail lines (equivalent to taxi ways) connect facilities. Airport authorities are typically chartered by state governments and managed by commissions with members appointed by the state governor, county governments, and city governments. This structure (1) enables state and local governments to work together to maximize job and tax benefits to local communities and the state, (2) provides a mechanism to address local concerns such as airport noise, and (3) creates an institutional structure with large incentives to maximize the value of the common asset, the runway. A repository site authority would have a similar structure and be the local interface to any national waste management authority. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Monitoring Airspace Complexity and Determining Contributing Factors

The national airspace has evolved over many years to accommodate increased traffic demand [1] while simultaneously maintaining one of the safest forms of transportation [2], [3]. One of the reasons for this success is the ability of the system and the operators to adapt and accommodate to situations that routinely disrupt optimal operations. These situations may include: adverse weather, delays, early arrivals, equipment outages, and other factors that are outside the operators ability to control. These factors can lead to states where automation is unable to properly handle these issues and therefore air traffic controllers and pilots have to intervene, ultimately increasing communication between operators resulting in higher workload. As controller workload increases to handle sub-optimal operating conditions this can be viewed as an increase in complexity. The reasoning for this is because humans are now required to make tactical decisions in response to external factors, resulting in a departure from the strategic plan where operations would be more efficiently managed. Human operators control airspace complexity under rigid regulations that are constantly changing. The airspace is divided into sectors and the number of aircraft assigned to each controller is limited for safe handling. There has been past work that devised airspace complexity metrics in commercial aviation and related these metrics to controller workload (e.g., [4],[5]). The upper bounds on the system load are pre-determined. Such bounds on complexity make for a safe system, but the system cannot scale and adapt to autonomous, dense, and heterogeneous traffic, including the many types of Unmanned Aerial Vehicles (UAVs) envisioned to be added to the operations. We hypothesize that, as traffic density and heterogeneity grow, and other key metrics change, there will be phase transitions at which the way traffic should be managed changes significantly [6]. We offer a method for in-time detection of contributing factors that lead to phase transitions, characterized by increased complexity. To the best of our knowledge, there is no tool similar to our proposed effort that identifies such contributing factors or precursor patterns. To define the scope we are proposing to measure complexity from the viewpoint of the Terminal Radar Approach Control Facilities (TRACON) controller’s perspective. In particular we are analyzing arrivals into KSFO. With safety as the top concern for airspace operators, it is important to recognize that as density and heterogeneity grow, the focus of the system will change. Times of the day when the airspace has low density and heterogeneity, the flights will follow more efficient paths where the aircraft move on established routes that are more or less directly to the destination. However, when density and heterogeneity increases, the system will begin changing focus to avoiding conflicts and collisions and route the flights in a more flexible way. Higher flexibility requires more communication and coordination between controllers and pilots which the current automation is unable to handle. This paper proposes a novel approach that monitors airspace complexity at multiple scales, uses a Machine Learning-based tool that predicts when operations will transition to a regime of greater complexity, and identifies actions that can reduce the complexity while still maintaining efficient and safe operations. We demonstrate our proposed approach using data from multiple complementary sources. This includes, but is not limited to: historical aircraft surveillance data from NASA’s Sherlock Data Warehouse [7], METAR weather data, and airport configuration data from Aviation System Performance Metrics (ASPM). The surveillance data flight paths are sampled at a variable sample rate — increasing as the aircraft approaches the airport. This is due to how Sherlock manages flight track stitching between different radar facilities which have different sampling rates. The weather and performance data are logged at defined intervals throughout the day at a courser refresh rate. In addition to the logged data and metrics, we leverage pre-defined Standard Terminal Arrival Routes (STARs) procedures to characterize the path of each flight. Each flight files for one of these routes in the flight plan well before entering the terminal airspace, and approximately follows the route until it leaves the STAR, typically on the final fix of a runway transition. However, most flights do not always fly the full STAR procedure to completion [8], but the majority do adhere to the fixes within the common route of the procedure. Our approach leverages fixes in the common route of each of the STARs to build a reference path to the airport. This allows us to characterize the flight paths in what we are defining as the “maneuvering area” (the airspace between the STAR and before the flight is lined up on the runway’s final approach) to determine how off nominal the flights are to calculate its complexity score. Determining airspace complexity is a concept that does not have a concrete answer. In designing this metric, we consider what increases the workload for the air traffic controllers. Consequently more specialized vectoring maneuvers results in higher workload. Accordingly, we start with a theory: each flight has a direct path it takes from the STAR’s common route to the final approach’s outer marker fix for the flight’s landing runway. It is important to note that the direct path is only used as a reference. If the majority of the flights have a large consistent offset as compared to other routes it does not necessarily mean that those flights have higher complexity. We are merely building a distribution based on this direct path for that particular STAR and runway pair to determine the normal mode of operations for that route. Flights that are in the upper tail of these distributions will result in higher complexity scores and flights that fly in the median will represent the normal mode of operations and therefore will have lower complexity scores. Since flights following each STAR route take different paths to the airport, we have a different distribution for each STAR route and therefore can model these distributions to compute a complexity score from their respective normalized distributions. To evaluate the effectiveness of our proposed airspace complexity metric we will compare against an established approach based on trajectory clustering [9]. This unsupervised learning technique consists of the following steps: (1) identify the general maneuvering areas (waypoints) by performing $\kappa$-means or DBSCAN clustering on locations where aircraft frequently turn based on the surveillance radar track data, (2) map flight trajectories onto sequences of waypoints, and (3) cluster the sequences based on their common subsequences. From a high-level perspective, this baseline model learns nominal operations in the airspace through the sequence of waypoints that are representative of where aircraft change direction and defines deviations from the nominal operations as “complex.” Therefore, more deviations from the nominal operations correspond to higher complexity values. For our validation, we re-implemented this technique and tune model hyper-parameters to correctly detect waypoints for the arrival traffic into the San Francisco bay area. We will compute the complexity measure over a one-year period using our proposed technique as well as the baseline. Our validation will be based on each technique’s ability to detect a set of undesirable outcomes (e.g., go-arounds, holding patterns, average time in the airspace, etc.). Since our current complexity metric is derived from the offset from the direct reference path, it’s important to understand what causes these offsets. In many of the flights with high offset distance, flights performing holding patterns and S turns can be observed. These maneuvering tactics are utilized to add distance between the aircraft and the destination runway to prevent multiple flights from having conflicting arrival times. In order to predict a rise in complexity (or the precursor to complexity), it’s necessary to be able to identify these potential conflicts (which in turn, result in higher offsets). To do this, we define a “representative flight” for each STAR route and runway pair. This flight is approximately the path the flight would take if there was a clear path with no other flights in the airspace — including the time remaining to the airport. We first identify the flights for a given STAR runway pair using the offset to the reference path distributions that fall between the 44-55 percentiles. This yields the flights that conform to the most normal mode of operation. Each of these flights is partitioned based on the percent complete from the entry point into the maneuvering areas from 0\% – 100\% complete. Then for each percent “bin”, we take the median value of the flight’s latitude/longitude coordinates, airspeed, and (non causal) time remaining to the airport to construct a lookup table for each percent complete bin on a given route. As a flight enters the maneuvering area, we can find the estimated arrival time of a flight to the airport by finding the closest point to the representative path’s percent complete bin (relative to the flight’s current position at any snapshot in the airspace) and therefore retrieve the corresponding remaining time left on the “representative path”. We assume that the flight will follow the representative path to completion when deriving these estimates. We can then compare these estimated arrival times against other flights for the same snapshot in time to identify potential conflicts. If more flights are estimated to arrive within a tolerance window than there are runways available, then we have a potential conflict. We can use this derived measure along with other factors expected to add disruption to the operation such as weather and runway configuration changes as an input to machine learning tools to detect precursors that increases in our complexity measure. This novel method will assist in uncovering insights into the contributing factors that lead to increased complexity that may allow for in-time responses to avoid reaching a high complexity state in the airspace.

complexity↗

Use of flight simulation to develop terminal instrument procedures for transport category aircraft

In a collaborative effort between the FAA and NASA, a simulation was conducted to look at the issues involved with flying a large, widebody aircraft in the terminal area using MLS-RNAV procedures. A variety of approach paths, departure paths, and holding patterns were investigated during the course of the study, which included the participation of subject pilots. The simulation made use of paths designed by the FAA Office of Aviation Standards and employed Langley's Visual Motion Simulator (VMS) for their execution. Data obtained from this simulation will be used to support the joint FAA/USAF MLS flight test and demonstration project. This paper describes the flight simulation facility adapted to model terminal area maneuvers for jet transport aircraft using the Microwave Landing System (MLS). A description of the overall project will be presented first, along with a discussion of the guidance schemes used, followed by a description of the simulation hardware and software. A sample of the resulting data will also be presented.

Branstetter, J. R.↗

Tactical Separation and Safety Alerting System for Terminal Airspace

Provision of tactical alerts to aid air traffic controllers in providing separation assurance in terminal airspace is hindered by the complexity of the airspace, its operations, and flight procedures. A prototype automation system is studied that provides controllers with both separation and safety alerts based on or derived from the separation standard for terminal airspace. The system models flight trajectories heuristically, with use of merged intent information from readily available sources: area navigation departure procedures, flight-plan routes, and arrival nominal interior routes used in terminal automation systems. Flight vertical intent is modeled according to standard procedural restrictions except when superseded by controller-issued altitude clearances. Importantly, flight trajectories are modeled for all aircraft, including those conducting visual approaches. New safety-alert thresholds for aircraft conducting visual approaches are studied. Performance of the system is evaluated through fast-time playback of recorded air traffic data from high-fidelity Human-In-The-Loop simulations and real-world operations in two Terminal Radar Approach Control facilities. The prototype system is found to produce a false-alert rate of 8% for separation alerts. The number and validity of safety alerts are studied by comparing with the current Conflict Alert system, showing that the false alerts of Conflict Alert are at 85% and they are avoided in the prototype system.

Air Traffic Management↗

Y-12 Groundwater Protection Program CY 2018 Triennial Report of the Monitoring Well Inspection and Maintenance Program Y-12 National Security Complex Oak Ridge, Tennessee

This document is the Triennial Report for the Well Inspection and Maintenance Program of the Y-12 National Security Complex (Y-12) Groundwater Protection Program (GWPP) at U.S. Department of Energy (DOE) Y-12 and includes monitoring well inspections and well maintenance activities performed at Y-12 during calendar years (CYs) 2016 through 2018. This report formally documents well inspections completed by GWPP on active and inactive groundwater monitoring wells that are part of the Y-12 monitoring network and includes well inspections performed by URS|CH2M Oak Ridge, L.L.C. (UCOR), which administers the DOE Office of Environmental Management Y-12 Water Resources Restoration Program (WRRP). The WRRP includes wells that are utilized for the regulatory monitoring of Resource Conservation and Recovery Act (RCRA) post-closure permits and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Remedial Effectiveness and Records of Decision and Solid Waste Disposal Facility (Landfill) permits and includes monitoring wells located at the CERCLA Environmental Management Waste Management Facility. Beginning in 2018, UCOR terminated three of their RCRA post-closure permits and is monitoring the former RCRA-permitted facilities under CERCLA. Consequently, the number of monitoring wells in the Y-12 network that receive UCOR-performed inspections has decreased significantly.

54 ENVIRONMENTAL SCIENCES↗

Calibration of the NASA Glenn 8- by 6-Foot Supersonic Wind Tunnel (1996 and 1997 Tests)

There were several physical and operational changes made to the NASA Glenn Research Center 8- by 6-Foot Supersonic Wind Tunnel during the period of 1992 through 1996. Following each of these changes, a facility calibration was conducted to provide the required information to support the research test programs. Due to several factors (facility research test schedule, facility downtime and continued facility upgrades), a full test section calibration was not conducted until 1996. This calibration test incorporated all test section configurations and covered the existing operating range of the facility. However, near the end of that test entry, two of the vortex generators mounted on the compressor exit tailcone failed causing minor damage to the honeycomb flow straightener. The vortex generators were removed from the facility and calibration testing was terminated. A follow-up test entry was conducted in 1997 in order to fully calibrate the facility without the effects of the vortex generators and to provide a complete calibration of the newly expanded low speed operating range. During the 1997 tunnel entry, all planned test points required for a complete test section calibration were obtained. This data set included detailed in-plane and axial flow field distributions for use in quantifying the test section flow quality.

Arrington, E. Allen↗