Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TENNESSEE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Signatures in Lightning Activity during Tennessee Valley Severe Storms of 5-6 May 2003

During the first week of May 2003, the Tennessee Valley experienced 14 tornadoes. Those that moved across the Tennessee Valley Region of northern Alabama and southern Tennessee provided an opportunity for study us- ing the North Alabama Lightning Mapping Array (LMA). On 5 May a classic supercell trekked across southern Tennessee spawning several tornadoes producing FO-F3 damage; on 6 May a high precipitation supercell moved across northern Alabama producing several FO-F1 tornadoes. The life cycle of these supercells will be discussed by presenting their electrical and radar evolution.

Gatlin, Patrick N.↗

Session 097A - Panel: Accomplishments and Update of the East Tennessee Technology Park in Oak Ridge, TN (1/4) (R1.16a)

This panel was deferred until 2021. The session was designed to highlight and celebrate the accomplishment of Vision 2020 at US DoE's East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Vision 2020 is the overarching strategy and guidance that have formed the foundation of success in closing one of the largest cleanup site in the DOE Complex. The session was supposed to feature representatives from the DOE Oak Ridge Office of Environmental Management (OREM) and its contractor, UCOR, in exploring the partnerships and performance excellence that have made the difference in achieving success. OREM's Vision 2020 is a collaboration with entities that have made a difference in its success: economic developers, workforce developers, the University of Tennessee, and community partners. The vigorous Oak Ridge small business contracting community has also been instrumental in helping achieve success. This session plans to celebrate the entire process, its numerous players, and the spirit of accomplishment as the Oak Ridge community comes to realize the promise of 30 years of continuous cleanup excellence. This session integrated with panel sessions 97B, 97C and 97D. Panelists with presentations: Beyond Cleanup: Achieving Risk Reduction through Partnerships and Performance Excellence (Kenneth Rueter); Strategic Approach to Achieve End States at the East Tennessee Technology Park (Jay Mullis)

61 RADIATION PROTECTION AND DOSIMETRY↗

Tennessee Valley and Eastern Kentucky Wind Working Group

In December 2009, the Southern Alliance for Clean Energy (SACE), through a partnership with the Appalachian Regional Commission, EKPC, Kentucky's Department for Energy Development and Independence, SACE, Tennessee's Department of Environment and Conservation, and TVA, and through a contract with the Department of Energy, established the Tennessee Valley and Eastern Kentucky Wind Working Group (TVEKWWG). TVEKWWG consists of a strong network of people and organizations. Working together, they provide information to various organizations and stakeholders regarding the responsible development of wind power in the state. Members include representatives from utility interests, state and federal agencies, economic development organizations, non-government organizations, local decision makers, educational institutions, and wind industry representatives. The working group is facilitated by the Southern Alliance for Clean Energy. TVEKWWG supports the Department of Energy by helping educate and inform key stakeholders about wind energy in the state of Tennessee.

17 WIND ENERGY↗

Spatial and temporal trends in contaminant concentrations in Hexagenia nymphs following a coal ash spill at the Tennessee Valley Authority's Kingston Fossil Plant

A dike failure at the Tennessee Valley Authority Kingston Fossil Plant in East Tennessee, United States, in December 2008, released approximately 4.1 million m(3) of coal ash into the Emory River. From 2009 through 2012, samples of mayfly nymphs (Hexagenia bilineata) were collected each spring from sites in the Emory, Clinch, and Tennessee Rivers upstream and downstream of the spill. Samples were analyzed for 17 metals. Concentrations of metals were generally highest the first 2 miles downstream of the spill, and then decreased with increasing distance from the spill. Arsenic, B, Ba, Be, Mo, Sb, Se, Sr, and V appeared to have strong ash signatures, whereas Co, Cr, Cu, Ni, and Pb appeared to be associated with ash and other sources. However, the concentrations for most of these contaminants were modest and are unlikely to cause widespread negative ecological effects. Trends in Hg, Cd, and Zn suggested little (Hg) or no (Cd, Zn) association with ash. Temporal trends suggested that concentrations of ash-related contaminants began to subside after 2010, but because of the limited time period of that analysis (4 yr), further monitoring is needed to verify this trend. The present study provides important information on the magnitude of contaminant exposure to aquatic receptors from a major coal ash spill, as well as spatial and temporal trends for transport of the associated contaminants in a large open watershed.

01 COAL, LIGNITE, AND PEAT↗

CO 2 Sequestration Assessment of the basal sandstone in Tennessee (SECARB Phase III Work Product 1.6.a)

Geologic carbon sequestration is the permanent storage of CO 2 in deep underground geologic formations, which is preceded by the separation and capture of CO 2 at the point of emissions from a stationary source such as a coal-fired electric power plant. The United States Department of Energy’s (DOE’s) Office of Fossil Energy National Energy Technological Laboratory (NETL) is engaged in research and development of Carbon Sequestration Program technology. This report assesses potential geologic carbon dioxide (CO 2 ) storage capacity of the basal sandstone in Tennessee. The Southeast Regional Carbon Sequestration Partnership evaluated the Basal Sandstone in Tennessee for potential to store commercial quantities of CO 2 . This report expands upon the findings from the 2007 assessment of potential CO 2 storage reservoirs in the southeast United States, which included an initial assessment of the basal sandstone capacity. These estimates are based on limited and generalized data sets, which are primarily from published literature. In the 2007 report, the depth range for the basal sandstone was found to be 4,000 to 8,000 feet (ft) and the average thickness was 100 ft. The capacity estimate for the basal sandstone from the 2007 report was 2.5 gigatons (Gt) (metric) of CO 2 . Recognized the need for a more accurate estimate of capacity for the geologic sinks. This report provides a site specific, detailed geologic investigation of the basal sandstone. In this report the CO 2 storage capacity of the basal sandstone in Tennessee is assessed using an average reservoir total porosity, gross formation thickness, and average storage reservoir depth and pressure. The methodology is based on the capacity assessment methodology for saline aquifers in the United States Department of Energy 2010 Carbon Sequestration Atlas of the United States and Canada. Storage capacities are summarized in Table ES-1.

54 ENVIRONMENTAL SCIENCES↗

NREPS Applications for Water Supply and Management in California and Tennessee

Management of water resources is a balancing act between temporally and spatially limited sources and competitive needs which can often exceed the supply. In order to manage water resources over a region such as the San Joaquin Valley or the Tennessee River Valley, it is pertinent to know the amount of water that has fallen in the watershed and where the water is going within it. Since rain gauge networks are typically sparsely spaced, it is typical that the majority of rainfall on the region may not be measured. To mitigate this under-sampling of rainfall, weather radar has long been employed to provide areal rainfall estimates. The Next-Generation Weather Radars (NEXRAD) make it possible to estimate rainfall over the majority of the conterminous United States. The NEXRAD Rainfall Estimation Processing System (NREPS) was developed specifically for the purpose of using weather radar to estimate rainfall for water resources management. The NREPS is tailored to meet customer needs on spatial and temporal scales relevant to the hydrologic or land-surface models of the end-user. It utilizes several techniques to mitigate artifacts in the NEXRAD data from contaminating the rainfall field. These techniques include clutter filtering, correction for occultation by topography as well as accounting for the vertical profile of reflectivity. This presentation will focus on improvements made to the NREPS system to map rainfall in the San Joaquin Valley for NASA s Water Supply and Management Project in California, but also ongoing rainfall mapping work in the Tennessee River watershed for the Tennessee Valley Authority and possible future applications in other areas of the continent.

Gatlin, P.↗

REaCH iT- Research, Education and Collaborative Healthcare in Tennessee

A self-evaluation of the strengths and weaknesses of the University of Tennessee Cancer Institute programs revealed several major weaknesses impairing progress toward advancing translational research into the detection and treatment of cancer patients in Tennessee. The stated goal of the grant was to bring together cancer researchers in the state of Tennessee in a network to develop multidisciplinary approaches to the prevention, diagnosis and treatment of cancers. This goal was met through a number of mechanisms that were funded under the auspices of this DOE grant, which included pilot project grants, seminars, symposia, scientific retreats, and the purchase of common equipment for investigators housed in the newly built Cancer Research Building at the UTHSC in Memphis. These approaches will have a major impact on the diagnosis and treatment of patients that suffer from various forms of cancer.

59 BASIC BIOLOGICAL SCIENCES↗

New Amphibian and Reptile Distribution Records from Middle and East Tennessee

Tennessee, USA is home to an exceptionally diverse collection of herpetofauna. The geographic distribution of herpetofauna in the state has been well documented (Redmond and Scott 1996; Scott and Redmond 2008), but many distribution gaps still exist, particularly in rural counties. Here, the following 28 records make strides toward filling in these distributional gaps, especially in rural counties surrounding Knoxville, Tennessee. All records were collected from 13 counties in Tennessee and vouchered with the Austin Peay State University Snyder Museum of Zoology (APSU) or the Eastern Kentucky University Photographic Voucher Collection (EKU).

59 BASIC BIOLOGICAL SCIENCES↗

Brownfields to Brightfields: A Sustainability Initiative at DOE'S East Tennessee Technology Park Cleanup - 16120

As DOE works toward completing their cleanup mission at the East Tennessee Technology Park (ETTP), the ultimate goal is to return property no longer needed for government use to the community for beneficial re-use. The vision for ETTP is to transform the former gaseous diffusion facility into a commercial industrial park, leveraging the site's infrastructure to attract businesses to the site. While hundreds of acres at ETTP have been transferred for re-use, areas within the former production footprint of the site have future use restricted due to the presence of residual contamination, underground structures and utilities and/or physical features that limit their reuse potential. Brownfield redevelopment with solar energy generation has proven to be an excellent option for beneficial reuse and sustainability thanks to the flexible nature of solar photovoltaic technology and design that can address the restrictions and limitations of the site. Developing a solar project on a cleanup site can be challenging due to a large number of stakeholders and regulatory compliance issues of the environmental legacy at DOE cleanup sites; however, the challenges can be offset by the available infrastructure and low cost property. The requirement for large amounts of land or surface area is a major constraint to the growth of photovoltaic solar systems. An average solar generating facility requires 2 or more hectares (5 acres) for each megawatt (MW) of power generated. Re-using land that is otherwise un-developable provides a cost effective site for renewable energy generation to innovative solar developers. At ETTP, DOE's Oak Ridge Office of Environmental Management and the community reuse organization (Community Reuse Organization of East Tennessee - CROET) supported a local small business (Restoration Services, Inc. - RSI) familiar with the site and environmental regulations to secure a power purchase agreement with the regional electric provider (Tennessee Valley Authority - TVA) for a 1 MW utility-scale photovoltaic solar facility. The solar facility, Powerhouse Six, was developed through a commercial partnership (RSI and Vis Solis, Inc.) that worked closely with the lead ETTP site cleanup contractor (URS-CH2M Oak Ridge LLC - UCOR) and the local government. The selected site at ETTP had limitations on subsurface disturbance to 10 feet below ground surface because of utility ducts and residual contamination. Near surface relics (facility foundation remnants) were also found to prohibit ground penetration. A photovoltaic solar design using a ballasted ground mount system was developed to conform to the restrictions. The ballasted system could follow existing land contours, eliminating the need for any extensive site preparation and avoiding the risk of ground penetration. The lead cleanup contractor's role in facilitating the completion of this project included making the necessary environmental assessment documentation available to obtain the construction notice to proceed from the regional electric provider. They accelerated the transfer of ETTP power lines and electric demand to the city electric department to accommodate connection to the electric grid and supplied the communication connection required for metering the electric power generation. DOE's support along with their cleanup contractor's re-industrialization program and power integration group provided regular communication with the project stakeholders for more than six months to facilitate the early transfer of the utility infrastructure. Powerhouse Six sustainability benefits: - Generates enough clean energy to power more than 100 homes or prevents pollution equivalent to removing 240 cars from the road annually (1,141 metric tons of carbon dioxide); - Provides Brownfield reuse/redevelopment at ETTP; - Eliminates the generation of wastes through excavation and saves money to cleanup other areas for re-use; - Supports regional electric provider's renewable energy initiative; - Offers community economic development/ jobs and property tax income to the City of Oak Ridge; - Demonstrates benefit of ETTP re-industrialization; - Provides long-term lease payments to the community reuse organization; - Supports DOE renewable energy goals; - Demonstrates collaboration between DOE and a public utility for renewable energy development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achieving the Vision: An Update on Cleanup, Closure, and Reindustrialization of the East Tennessee Technology Park - 18401

URS-CH2M Oak Ridge LLC (UCOR) is responsible for cleanup of the U.S. Department of Energy's (DOE) East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Formerly known as the K-25 site, the facility enriched uranium for major defense nd energy programs for more than 40 years. The site's industrial processes - largely the gaseous diffusion method used for enriching uranium - left behind radioactive, chemical and industrial contaminants in soils and structures. Cleanup of the environmental legacies enables DOE's goal for converting ETTP into a private sector industrial park. Return of the restored site to the community will attract new industries to the region, creating jobs and growing the economy. The central elements to achieve DOE's vision for the site are 1) Cleanup, 2) Closure, and 3) Reindustrialization. Cleanup entails completion of all demolition activities and remedial actions consistent with the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) agreements. Closure leaves facilities and infrastructure in a condition that enables transfer of the site to non-federal entities and reduces DOE's long-term stewardship costs. Closure activities include: - Infrastructure stabilization (site utilities, roads, stormwater, etc.); - Disposal or transfer of government property; - Relocation of most DOE contractors and support functions offsite; - Transfer of the majority of the site property to non-federal entities for redevelopment. Reindustrialization enables DOE's vision for the site as a multi-use private sector industrial park, reducing DOE's costs and enhancing the local economy. Transfer to the private sector will be accomplished through the Community Reuse Organization of East Tennessee (CROET), which will serve as the Park Manager. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Erosion Control Measures at Oak Ridge Reservation Landfills Oak Ridge, Tennessee - 19190

URS-CH2M Oak Ridge LLC (UCOR) manages the cleanup of the 2,200-acre East Tennessee Technology Park (ETTP) for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The ETTP was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. In disposing of low-level radioactive and other wastes from demolition activities, the UCOR approach relies on the availability of onsite facilities to streamline disposal, reduce costs and enhance cleanup schedules while confining shipments and related hazards onsite. The sanitary/industrial waste facility, known as the Oak Ridge Reservation Landfill Facility (ORRLF) is a solid waste operation that receives and disposes of sanitary/industrial, construction/demolition and classified, special waste; and spoil materials types of waste generated at the U.S. Department of Energy (DOE) Oak Ridge facilities. ETTP is the primary generator; however, the landfill accepts waste from Y-12 National Security Complex (Y-12), Oak Ridge National Laboratory and other DOE prime contractors in the Oak Ridge area. ORRLF's mission is to receive nonhazardous, non-radioactive, and non-Resource Conservation and Recovery Act of 1976 (RCRA)-regulated solid wastes. Approved operations include receiving, compacting, and covering wastes; leachate management, site drainage; erosion control and prevention, inspections, maintenance and recording keeping. The Oak Ridge Reservation has three separate State of Tennessee-permitted active landfills (Landfill IV, Landfill V, and Landfill VII) that meet different disposal needs -- classified industrial waste, industrial waste that includes office trash and cafeteria waste, and construction and demolition debris,. As with a typical landfill, strategic waste placement and covering involves moving a lot of soil, usually resulting in large areas of exposed land. After increased sediment was noted in streams following heavy rains, a concerted erosion prevention and sediment control effort began in 2017. While not uncommon for landfills, the ORRLF staff knew they could do better in controlling sediment. In response, the ORRLF staff developed an approach of aggressive revegetation, ditch improvements and other erosion controls. Staff developed a list of all the areas that needed the most attention and requested resources. UCOR management arranged funding for needed improvements. The oldest of the three landfills is Industrial Landfill IV, which opened in 1989 and has an expected remaining 60 years of life. Therefore, how the landfills are maintained/managed today directly affects the compliance posture, the capacity, and the infrastructure in the future. A systematic, aggressive and multi-pronged approach was taken to address the major concerns first, then continue with longer-term, and/or lower priority projects. Buy-in was obtained from both craft and supervision, resulting in approaches like 'Ditch of the Month'. In addition, management support at the highest levels has provided resources and recognition that further fuels progress. After working on the site for the past year, what used to be exposed brown hills looks more like a golf course now. Now that the grass is established and other erosion controls are in place, the amount of sediment leaving the site has been reduced, and the appearance of the landfills is improved. Vegetation dissipates the kinetic energy from rain droplets while the root system helps hold the soil in place, and wire-reinforced silt fences and straw wattles have greatly improved erosion control. Improved ditches reduce the runoff velocities allowing sediments to fall out of suspension in the stormwater before they reach the receiving waters, and structures are in place to let finer sediment settle in ponds rather than going downstream. In addition, the project has added more stone to roadways to minimize tracking dirt down the road as an average of 20 to 40 trucks per day enter and leave the site. Ongoing landfill erosion and sediment control must be funded and maintained continually. The lack of attention to either resource will negatively affect the condition of the landfill fairly quickly. Constant compliance commitment is necessary to ensure protection to the environment, the operator/workers and the public. Operations must include sediment control, pond maintenance and clean out, road maintenance and construction, erosion prevention, seeps repair, leachate management, landfill expansion, mowing and grounds upkeep and much more. Knowledgeable/experience staff is also crucial. Knowing how to build lifts, create leachate drainage windows, respond to high rains events, compact waste will impact operations today and future operations into the closure / post closure periods. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

What Shapes Transportation Charging Infrastructure Availability? Evidence from Tennessee

This study examines how community, travel, and freight characteristics relate to public charging infrastructure availability across Tennessee ZIP codes. We link Alternative Fuels Data Center station locations with traffic, socioeconomic, demographic, commuting, and freight employment data to build a ZIP code-level dataset. Ordinary least squares regression captures variation in chargers per 10,000 residents (R2=0.311). Quantile regressions at the 25th, 50th, and 75th percentiles, with pseudo R2 values up to 0.099, show that the determinants of infrastructure availability differ across low-, medium-, and high-availability areas. Percent female, percent car commuters, average household size, and median age are negatively associated with charging availability across much of the distribution. Truck traffic is positively associated only in lower-availability ZIP codes, while vehicle miles traveled shifts from a negative association at the lower end of the distribution to a positive association at the upper end. The results provide insight into how public charging deployment aligns with community characteristics, mobility demand, and freight activity across Tennessee. Future work can distinguish charger types and power levels, incorporate land-use and temporal rollout patterns, and examine how charging infrastructure needs differ across urban and rural contexts.

Calderón, Oriana [University of Tennessee, Knoxvil↗

Evaluation of Invertebrate Bioaccumulation of Fly Ash Contaminants in the Emory, Clinch, and Tennessee Rivers, 2009 – 2010

This report provides a summary of results from studies on invertebrate bioaccumulation of potential contaminants associated with a major fly ash spill into the Emory River following the failure of a dike at the Tennessee Valley Authority's (TVA) Kingston Fossil Plant (KIF) in Kingston, Tennessee, in late December 2008. Data included in this report cover samples collected in calendar years 2009 and 2010. Samples collected from most sites in 2009 were processed by two different laboratories using different approved U.S. Environmental Protection Agency (EPA) analytical methods: ALS Laboratory Group in Ft. Collins, CO, processed sampling using EPA method 6010 (but method 6020 for uranium and SW7470 for mercury), and PACE Analytical in Minneapolis, MN, used EPA method 6020. A preliminary evaluation of results from both laboratories indicated that some differences exited in measured concentrations of several elements, either because of specific differences of the two methods or inter-laboratory differences. While concentration differences between the laboratories were noted for many elements, spatial trends depicted from the results of both methods appeared to be similar. However, because samples collected in the future will be analyzed by Method 6020, only the results from PACE were included in this report to reduce data variation potentially associated with inter-laboratory and analytical method differences.

20 FOSSIL-FUELED POWER PLANTS↗

Time and frequency domain analyses of high-frequency hydrologic and chloride data in an east Tennessee watershed

In the realm of sustainability science, it is becoming increasingly important to understand the basal condition of a natural system as well as its long-term behavior. Research is needed to better explain the temporal scaling of water chemistry in streams and watersheds and its relationship with the hydrologic factors that influence its behavior. Persistence of dissolved chemicals in streams has been demonstrated to be linked to certain hydrologic processes, such as interaction between hydrologic units and storage in surface or sub-surface systems. In this study, spectral and wavelet analyses provided a novel theoretical basis for insights into long-term chloride behavior in an east Tennessee watershed. Temporal scaling analyses were conducted on weekly time series data of chloride collected from November 1995 to December 2005 at the West Fork of Walker Branch in Oak Ridge, Tennessee. The objectives of the study were to: evaluate chloride concentration (a conservative solute) to determine the presence of statistical persistence and the relationship of the persistence to hydrologic variables (discharge and rainfall) using time and frequency domain analyses of high-frequency hydrologic and chloride concentration data. Results demonstrated that chloride showed some level of statistical persistence that was influenced by rainfall and/or discharge. Short-term statistical persistence (less than a year) was related to the persistence of rainfall and discharge, whereas long-term statistical persistence (more than a year) was related to the persistence of discharge.

58 GEOSCIENCES↗

Wireless Roadside Inspection Phase II Tennessee Commercial Mobile Radio Services Pilot Test (Final Report)

The Federal Motor Carrier Safety Administration (FMCSA) Wireless Roadside Inspection (WRI) Program is researching the feasibility and value of electronically assessing truck and bus driver and vehicle safety at least 25 times more often than is possible using only roadside physical inspections. The WRI program is evaluating the potential benefits to both the motor carrier industry and to government. These potential benefits include reduction in accidents, fatalities and injuries on our highways and keeping safe and legal drivers and vehicles moving on the highways. WRI Pilot tests were conducted to prototype, test and demonstrate the feasibility and benefits of electronically collecting safety data message sets from in-service commercial vehicles and performing wireless roadside inspections using three different communication methods. This report summarizes the design, conduct and results of the Tennessee CMRS WRI Pilot Test. The purpose of this Pilot test was to demonstrate the implementation of commercial mobile radio services to electronically request and collect safety data message sets from a limited number of commercial vehicles operating in Tennessee. The results of this test have been used in conjunction with the results of the complimentary pilot tests to support an overall assessment of the feasibility and benefits of WRI in enhancing motor carrier safety (reduction in accidents) due to increased compliance (change in motor carrier and driver behavior) caused by conducting frequent safety inspections electronically, at highway speeds, without delay or need to divert into a weigh station

99 GENERAL AND MISCELLANEOUS↗

Tennessee Energy and Cost Savings for New Single- and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC

The 2009 and 2012 International Energy Conservation Codes (IECC) yield positive benefits for Tennessee homeowners. Moving to either the 2009 or 2012 IECC from the 2006 IECC is cost effective over a 30-year life cycle. On average, Tennessee homeowners will save $\$$1,809 over 30 years under the 2009 IECC, with savings still higher at $\$$6,102 with the 2012 IECC. After accounting for upfront costs and additional costs financed in the mortgage, homeowners should see net positive cash flows (i.e., cumulative savings exceeding cumulative cash outlays) in 1 year for both the 2009 and 2012 IECC. Average annual energy savings are $\$$123 for the 2009 IECC and $\$$415 for the 2012 IECC.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Economic Benefits, Carbon Dioxide (CO2) Emissions Reductions, and Water Conservation Benefits from 1,000 Megawatts (MW) of New Wind Power in Tennessee (Fact Sheet)

The U.S. Department of Energy?s Wind Powering America Program is committed to educating state-level policymakers and other stakeholders about the economic, CO2 emissions, and water conservation impacts of wind power. This analysis highlights the expected impacts of 1000 MW of wind power in Tennessee. Although construction and operation of 1000 MW of wind power is a significant effort, seven states have already reached the 1000-MW mark. We forecast the cumulative economic benefits from 1000 MW of development in Tennessee to be $1.2 billion, annual CO2 reductions are estimated at 2.4 million tons, and annual water savings are 1,321 million gallons.

17 WIND ENERGY↗

Transmittal of the Calculation Package that Supports the Analysis of Performance of the Environmental Management Waste Management Facility Oak Ridge, Tennessee (Based 5-Cell Design Issued 8/14/09)

This document presents the results of an assessment of the performance of a build-out of the Environmental Management Waste Management Facility (EMWMF). The EMWMF configuration that was assessed includes the as-constructed Cells 1 through 4, with a groundwater underdrain that was installed beneath Cell 3 during the winter of 2003-2004, and Cell 5, whose proposed design is an Addendum to Remedial Design Report for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee, DOE/OR/01-1873&D2/A5/R1. The total capacity of the EMWMF with 5 cells is about 1.7 million cubic yards. This assessment was conducted to determine the conditions under which the approved Waste Acceptance Criteria (WAC) for the EMWMF found in the Attainment Plan for Risk/Toxicity-Based Waste Acceptance Criteria at the Oak Ridge Reservation, Oak Ridge, Tennessee [U.S. Department of Energy (DOE) 2001a], as revised for constituents added up to October 2008, would remain protective of public health and safety for a five-cell disposal facility. For consistency, the methods of analyses and the exposure scenario used to predict the performance of a five-cell disposal facility were identical to those used in the Remedial Investigation and Feasibility Study (RI/FS) and its addendum (DOE 1998a, DOE 1998b) to develop the approved WAC. To take advantage of new information and design changes departing from the conceptual design, the modeling domain and model calibration were upaded from those used in the RI/FS and its addendum. It should be noted that this analysis is not intended to justify or propose a change in the approved WAC.

54 ENVIRONMENTAL SCIENCES↗