Impact of feed variability on cesium removal with multiple actual waste samples from the Hanford site

Here, the Tank Side Cesium Removal (TSCR) system, under development by Washington River Protection Solutions (WRPS), will send initial low-activity Hanford waste tank supernate feeds to the Hanford Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility. In addition to entrained solids removal from the supernate, the primary goal of TSCR is to remove cesium-137 ( 137 Cs) by ion exchange, allowing contact handling of the liquid effluent product at WTP. Crystalline silicotitanate (CST) ion exchange media, manufactured by Honeywell UOP (product IONSIV™ R9140-B), was selected as the ion exchange media at TSCR. This lot of material was found to have superior performance in comparison to historic batches of CST. Ion exchange column and batch contact testing with supernate from Hanford tanks AP-105, AP-107 and AW-102 was performed to assess the impact of feed variability on system performance. These tests demonstrated that batch contact measurements provide a reasonable prediction of column capacities with some deviation in performance attributed to column dynamics. In addition, the variability in CST capacity for cesium in the various actual waste samples does not track with historical understanding of the competing cations, suggesting that tank waste samples contain other components that may significantly impact cesium loading.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

THREE-DIMENSIONAL THERMAL MODELING ANALYSIS OF CST MEDIA FOR THE SMALL ION EXCHANGE PROJECT

The Small Column Ion Exchange (SCIX) project is designed to accelerate closure of High Level Waste (HLW) tanks at the Savannah River Site (SRS). The SRS tanks store HLW in three forms: sludge, saltcake, and supernate. An in-tank ion exchange process is being designed to treat supernate and dissolved saltcake waste. Through this process, radioactive cesium from the salt solution is adsorbed into Crystalline Silicotitanate (CST) ion exchange media packed within a flow-through column. A packed column loaded with radioactive cesium generates significant heat from radiolytic decay. The waste supernate solution within the ion exchange bed will boil around 120 C. Solution superheating above the boiling point within the column could lead to violent hazardous energy releases. System heating from loaded CST is also of concern in other process modules, such as the waste tank. Due to tank structural integrity concerns, the wall temperature limit for the SRS waste tanks is 100 C. The transfer of cesium-loaded CST to the tank could result in localized hot spots on the tank floor and walls which may exceed this limit. As a result, thermal modeling calculations have been conducted to predict the maximum temperatures achievable both in the column and in the waste tank. As specified in the associated Technical Task Plan, one objective of the present work was to compute temperature distributions within the ion exchange column module under accident scenarios including loss of salt solution flow through the bed and loss of coolant system flow. The column modeling domain and the scope of the calculations in this case were broadened relative to previous two-dimensional calculations to include vertical temperature distributions within the packed bed of ion exchange media as well as the upper column plenum region containing only fluid. The baseline design conditions and in-column modeling domain for the ion-exchange column module are shown in Figure 1. These evaluations assumed the maximum bounding cesium loading considered possible based on current knowledge regarding CST media and the anticipated feed compositions. Since this cesium loading was considerably higher than the nominal loading conditions in SRS waste, cases with lower loading were also evaluated. Modeling parameters were the same as those used previously unless otherwise indicated. The current model does not capture multi-phase cooling mechanisms operative when solution boiling occurs. This feature is conservative in the sense that it does not account for the large cooling effects associated with phase transfer. However, the potential transfer of heat to the plenum region associated with vertical bubble ascension through the column during boiling is also neglected. Thermal modeling calculations were also performed for the entire waste storage tank for the case where loaded and ground CST was transferred to the tank. The modeling domain used for the in-tank calculations is provided in Figure 2. The in-tank domain is based on SRS Tank 41, which is a Type-IIIA tank. Temperature distributions were evaluated for cylindrical, ground CST mounds located on the tank floor. Media grinding is required prior to vitrification processing of the CST in the SRS Defense Waste Processing Facility (DWPF). The location of the heat source region on the tank floor due to the accumulation of CST material was assumed to be just under the grinder. The shape of the CST mound was assumed to be cylindrical. This shape is believed to be most representative of the actual mound shape formed in the tank, given that submersible mixing pumps will be available for media dispersion. Alternative configurations involving other geometrical shapes for the CST mound were evaluated in the previous work. Sensitivity analysis for the in-tank region was performed for different amounts of CST media. As was the case for the in-column model, the in-tank model does not include multi-phase cooling mechanisms operative when solution boiling occurs. The in-column and the in-tank evaluations incorporated recently updated maximum cesium loading levels calculated using the current SCIX feed compositions, which resulted in significantly higher cesium loading than previously calculated. The calculations were conducted to ensure conservative predictions for the maximum temperatures achievable using the current baseline design. The degree of conservatism was reduced for in-column calculations relative to the previous work by using a three-dimensional modeling approach and selecting parameters which were nearer to expected conditions. The degree of conservatism for the in-tank calculations was also reduced by lowering the soil penetration depth below the tank from 150 to 20 feet. The primary goals of the extended thermal modeling effort were to determine whether fluid boiling or superheating are possible within the column module and to determine the maximum floor temperatures within the tank loaded with spent CST.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Crystalline Silicotitanate Particle Size on Cesium Removal Efficiency

Washington River Protection Solutions is working on a Tank-Side Cesium Removal (TSCR) system to remove Cs from Hanford tank waste supernate. Removal of 137 Cs from tank waste supernate by TSCR results in a low-activity waste (LAW) form that can be fed directly to the Hanford Waste Treatment and Immobilization Plant (WTP) LAW vitrification facility, where the supernate can be vitrified into a glass form. Crystalline silicotitanate (CST) ion exchange media, manufactured by Honeywell UOP, LLC (product IONSIV TM R9140-B), was selected for use as the ion exchange media to remove Cs at TSCR. The particle size used in testing is expected to impact the kinetic performance of the ion exchange media. Therefore, two single-column systems were tested with CST Lot 2002009604. One column contained <25 mesh sieve cut fraction and the other column contained <35 mesh sieve cut fraction. Flowrate through both test systems was adjusted to match the CST contact time expected for the full-scale operation, i.e., matched bed volumes per hour (BV/h) at 1.83 BV/h. The feed was processed downflow through the columns until ~1000 BVs of feed were processed. The waste acceptance criteria (WAC) limit for the WTP LAW vitrification facility is <3.18E-5 Ci 137 Cs per mole Na. For a tank waste containing 156 µCi/mL 137 Cs and 5.6 M Na, up to 0.114% of the influent 137 Cs concentration may be delivered to the WTP (based on 137 Cs content in AP-107 tank waste); this required a Cs decontamination factor of 876. The WAC limit was used as one of the relevant process parameters, along with the 50% breakthrough point, Cs loading per gram of CST, and the mass transfer zone.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Expedited Results from Samples Supporting Tank Closure Cesium Removal (TCCR) Batch 3

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 3 for processing through the TCCR unit. SRNL received and characterized a set of dip samples collected from Tank 10H (one surface and one variable depth sample). No solids were observed in either sample and therefore the samples were combined, and a suite of analyses were performed on the composite sample. The density of the combined sample was 1.174 g/mL (0.18 %RSD), which was consistent with the measured sodium concentration of 3.54 M (0.08 %RSD). The 137Cs activity in the sample was 4.75E+07 dpm/mL (4.28 %RSD) and the total Cs concentration was calculated to be 1.54 mg/L (1.16E-05 M). The in-tank batch contact samples consist of 0.1 g of crystalline silicotitanate (CST) contained within a teabag device. Duplicate samples were submerged in Tank 10H supernate for a period of about 13 days, after which time they were retrieved and transferred to SRNL for analysis. At SRNL the CST was rinsed to remove excess salt solution and the CST was then air dried before being digested for analysis. Results of the analysis indicated a 137 Cs loading of 3.66E+10 ± 1.40E+09 dpm/g or 16.5 ± 0.63 Ci/kg CST . This value represents a bounding upper limit as it includes the addition of two sigma uncertainty from replicate analysis of the individual teabag samples as well as the addition of the small amount of 137 Cs activity measured in the rinse solutions. The above values are based on the air-dried mass of CST. Correcting to the true dry mass using a F-factor of 0.8191 results in a maximum loading of 20.2 ± 0.77 Ci/kg CST .

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Tank 11H samples from tank closure cesium removal (TCCR) Batch 3 - intermediate and final samples

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. The TCCR unit processes dissolved salt from Tank 10H through a series of ion exchange columns containing crystalline silicotitanate (CST) and the effluent is then discharged to Tank 11H. Four interim samples pulled from Tank 11H during and just after the completion of processing of Batch 3 through the TCCR process have been analyzed for 137 Cs activity and density. The 137 Cs activity was found to decrease with each subsequent sample, which is consistent with the addition of decontaminated solution to Tank 11H. When compared to the expected composition from mixing the Tank 10H Batch 3 feed with the material already present in Tank 11H, the bulk chemical composition was as expected. A corrosion control sample collected from Tank 11H in June 2020 showed changes in the chemical composition and 137 Cs activity when compared to the composition measured at the end of Batch 2 processing. As there were no additions made to the tank during this period, these changes were attributed to leaching of the solids present in Tank 11H. Revision 1 of this report contains additional analyses of the fourth interim sample including inductively coupled plasma – mass spectrometry (ICP-MS) results and activities of other radionuclides. These results are consistent with the previously reported results, showing leaching from the Tank 11H heel. Notably, the 90 Sr activity was about 2.7x higher than calculated from a mixture of the original Tank 11H supernate and the Tank 10H supernate as treated by TCCR, suggesting additional leaching of Sr from the Tank 11H heel solids. In addition, Revision 1 includes analysis results for the Batch 3 Post-Production surface and variable depth samples collected in October of 2020. The Post-Production surface sample was similar in composition to the fourth interim surface sample, except for the increased Cs-137 and oxalate concentrations that were presumably associated with leaching of the Tank 11H heel solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Crystalline Silicotitanate Batch Contact Testing with Ba, Ca, Pb, and Sr

Washington River Protection Solutions is working to support initial production of immobilized low-activity waste (LAW) by feeding Hanford tank supernate from tank farms to the Hanford Waste Treatment and Immobilization Plant (WTP) LAW Facility. This goal incorporates the design of a Tank Side Cesium Removal system, which filters tank waste supernate to remove suspended solids and then removes Cs by processing it through crystalline silicotitanate (CST) ion exchange media manufactured by Honeywell UOP, LLC. The 137 Cs-depleted product is intended to be sent to the WTP for vitrification. Processing of actual tank waste supernate showed effectively complete uptake of Sr and Ba by CST and significant uptake of Ca. Further, Campbell et al. (2019) analyzed CST post-column testing and found significant (>1E-2 mmoles/g) uptake of Ca and Pb along with some Ba, Cd, Fe, Sr, and U. This led to concern that selected metals, particularly the +2 cations, Ca, Sr, Ba, and Pb may be consuming Cs exchange sites and possibly reducing CST capacity for Cs. Exchange of +2 cations was assumed to be associated with the M(OH) + species for the metal (M) ion in the caustic solution. A series of batch contact testing was conducted to evaluate the exchange behavior of Ba, Ca, Pb, and Sr onto CST. The Cs exchange behavior was also tested as a benchmark for direct comparisons. The CST was provided in the sodium form by Honeywell UOP, as IONSIV TM R9140-B, Lot 2002009604, 18 x 50 mesh. A <30-mesh aliquot was collected to match the sieve fraction expected for use in upcoming small column test configurations. Kinetic exchange rate and isotherms were measured at metal concentrations benchmarked from the AP-107 tank waste feed composition and as limited by the metal solubility in the alkaline solution. Two simplified matrices were tested: 1) 1.0 M NaOH/4.6 M NaNO 3 and 2) 0.1 M NaOH/5.5 M NaNO 3 ; these matrices represented the expected 5.6 M Na concentration of process feed and served to address the hydroxide concentration effect on exchange behavior.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cesium Ion Exchange Testing Using Crystalline Silicotitanate with Hanford Tank Waste 241-AP-107

At the time of this testing, the Low-Activity Waste Pretreatment System (LAWPS) was to provide for the initial production of immobilized low-activity waste by feeding Hanford tank supernate from tank farms to the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility for immobilization. Washington River Protection Solutions requested that Hanford tank waste collected from tank 241-AP-107 (hereafter called AP-107) be processed using conceived pretreatment steps (suspended solids removal by filtration, Cs removal by ion exchange) then vitrified. A small-scale test platform to demonstrate the solids filtration, Cs removal, and LAW vitrification was constructed and installed at Pacific Northwest National Laboratory. Bench-scale ion exchange testing with approximately 9 L of AP-107 supernate was conducted using crystalline silicotitanate (CST) ion exchange media. The IONSIV R9140-B CST was provided by Honeywell UOP, LLC in 2018 (Batch 2081000057). The ion exchange media was first tested with simulant and was previously described. This report describes the Cs ion exchange batch contact and column test results with the AP-107 tank waste. Batch contact testing helps to evaluate CST performance on tank waste supernate prior to processing it in the ion exchange columns. Batch contacts were performed with the waste at four Cs concentrations at a phase ratio of 200 (liquid volume to exchanger mass) with AP-107. The distribution coefficient (K d ) at the equilibrium condition of 8.57 µg Cs/mL (AP-107 feed condition) was determined to be 669 mL AP-107/g CST. With a CST bed density of 1.00 g/mL, this K d corresponded to a predicted 50% Cs breakthrough of 669 bed volumes (BVs). The Cs load capacity at the equilibrium feed condition was determined to be 7.5 mg Cs/g dry CST. The column testing was prototypic to the intended LAWPS operations in a lead-lag column format, although on a small-scale basis with 10-mL CST beds. The feed was processed downflow through the lead column and then through the lag column at ~2.2 BV/h. Loading continued until the lag column reached the WTP waste acceptance criteria (WAC) for receiving supernatant waste for vitrification (a function of the Na and 137 Cs concentrations). For AP-107, the WAC is 0.114% of the influent 137 Cs concentration; this required a Cs decontamination factor of 876. The Cs effluent from the lag column reached the WAC after processing ~410 BVs. To keep the subsequent product effluent below the WAC, a replacement lag column was prepared, the lead column was removed from service (after processing a total of 471 BVs), the lag column was put into the lead column position, and the replacement lag column was installed. Feed processing continued and after another ~290 BVs the Cs effluent from the lag column again exceeded the WAC. In both cases, the lead columns only reached 25% Cs breakthrough before removal. Although 50% Cs breakthrough was not reached, this value was estimated and averaged based on extrapolation of the loading curves (640 BVs) and agreed within 4% of the predicted 50% Cs breakthrough from batch contact test results (669 BVs). Table ES.1 summarizes the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Results from Batch 1 Qualification Samples for Tank Closure Cesium Removal 1A (TCCR 1A)

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal 1A (TCCR 1A) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each waste supernate batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 1 for processing through the TCCR 1A unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reduced Temperature Cesium Removal from AP-101 Using Crystalline Silicotitanate

The Tank Side Cesium Removal (TSCR) system, currently operational under Washington River Protection Solutions LLC (WRPS), sends initial low-activity Hanford waste tank supernate feed to the Hanford Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility. In addition to entrained solids removal from the supernate, the primary goal of TSCR is to remove cesium-137 ( 137 Cs) by ion exchange, allowing contact handling of the liquid effluent product at the WTP. Crystalline silicotitanate (CST) ion exchange media, manufactured by Honeywell UOP, LLC (product IONSIV™ R9140-B), was selected as the ion exchange media at TSCR. Laboratory-scale ion exchange processing using TSCR prototypic unit operations continues to contribute toward WRPS establishing accurate process flowsheets for the individual feed campaigns planned for TSCR. This report describes the small-scale ion exchange testing with 14.0 L of diluted and filtered supernate from tank 241-AP-101 (AP-101DF) at 16 °C (62 °F) to demonstrate processing at temperature conditions that are more prototypic of what the TSCR system could experience during colder seasons of the year. Since CST Cs capacity increases with decreasing contact temperature, testing at the lower operating temperature will help to predict the maximum 137 Cs loading onto the CST in the TSCR system. One of the waste acceptance criteria (WAC) for the WTP Low-Activity Waste Facility is that the waste must contain less than 3.18×10 -5 Ci 137 Cs per mole of Na. For the AP-101DF tank waste to meet this criterion, only 0.144% of the influent 137 Cs concentration may be delivered to the WTP; this requires a Cs decontamination factor of 694. Testing with AP-101DF matched TSCR prototypic operations where a lead-lag configuration was used until the lag column reached the WAC limit, then a polish column was brought online for continued processing in a lead-lag-polish column configuration. Feed was processed at 1.9 bed volumes (BVs) per hour; the flowrate, in terms of contact time with the CST bed, matched the expected flowrate at TSCR. The Cs-decontaminated product was retained for vitrification testing (to be reported separately). The lead column reached 62% Cs breakthrough after processing ~1400 BVs of feed; the 50% Cs breakthrough occurred at 1250 BVs. Testing compared to previous AP-107 testing at 16 °C showed ~80 BV increases in volume processed to reach the WAC limit for both lead and lag columns. A similar slope in breakthrough curves for both tests indicates similar kinetic behavior, with variations in feed matrices (Na and Cs concentrations) likely responsible for the deviations in reaching the WAC limit. The Cs effluent from the lag column reached the WAC limit after processing 875 BVs. Anticipating this breakthrough point, the polish column was preemptively installed at 770 BVs. Cs breakthrough from the lag column began at 300 BVs, reaching 5.32×10 0 µCi/mL, or 5.6 % Cs breakthrough, after processing all 1400 BVs of feed. Table S.1 and Figure S.1 summarize the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cesium Removal from SY-101 Tank Waste Using Crystalline Silicotitanate

The newly operational Tank Side Cesium Removal (TSCR) system removes radioactive cesium-137 ( 137 Cs) and solids from tank waste supernate in the 200 east area of the Hanford site. Efforts to expand the removal capabilities to the 200 west area are underway by a system anticipated to be called the West Area Risk Management (WARM) system. Laboratory-scale ion exchange processing using expected WARM unit operations were conducted to contribute toward Washington River Protection Solutions (WRPS) establishing accurate process flowsheets for the individual feed campaigns planned for the west area supernate pretreatment. This report describes the small-scale ion exchange testing with 8.0 L of filtered supernate from tank 241-SY-101 (referred to as SY-101) at 16 °C (62 °F) to demonstrate processing conditions that would be prototypic of what the WARM system may experience. One of the waste acceptance criteria (WAC) for the Waste Treatment Plant (WTP) Low-Activity Waste Facility is that the waste must contain less than 3.18×10 -5 Ci 137 Cs per mole of Na. For the SY-101 tank waste to meet this criterion, only 0.44% of the influent 137 Cs concentration may be delivered to the WTP; this requires a Cs decontamination factor of 227. Testing with SY-101 matched current TSCR prototypic operations where a lead-lag configuration is used until the lag column reached the WAC limit. Neither the lead nor lag columns reached the WAC, so a polish column was never utilized during this test. Feed was processed at 1.9 bed volumes (BVs) per hour; the flowrate, in terms of contact time with the crystalline silicotitate (CST) bed, matched the current flowrate at TSCR (an expected flowrate to be used at WARM). The lead column only reached 0.09% Cs breakthrough after processing ~1363 BVs of feed. Cesium breakthrough from the lag column was not observed during the entire processing. Table S.1 and Figure S.1 summarize the observed column performance and relevant Cs loading characteristics. Table S.1 and Figure S.1 also summarize the measured SY-101 Cs load performance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ion Exchange Processing of AW-105 Hanford Tank Waste through Crystalline Silicotitanate in a Staged 2- then 3-Column System

The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. In support of the Direct Feed Low-Activity Waste (DFLAW) Program for expediting Hanford tank waste supernate treatment, laboratory-scale ion exchange processing using prototypic unit operations was conducted on AW-105 tank waste at the Pacific Northwest National Laboratory Radiochemical Processing Laboratory. This report describes the small-scale ion exchange testing with 9.2 L of diluted and filtered supernate from Tank 241-AW-105 (hereafter referred to as AW-105) at 16 °C (62 °F). One of the waste acceptance criteria (WAC) for the Waste Treatment Plant (WTP) Low-Activity Waste Facility is that the waste must contain less than 3.18×10 -5 Ci 137 Cs per mole of Na. For the AW-105 tank waste to meet this criterion, only 0.225% of the influent 137 Cs concentration may be delivered to the WTP; this requires a Cs decontamination factor of 445. Testing with AW-105 matched current Tank Side Cesium Removal (TSCR) facility prototypic operations where a lead-lag configuration was used until the lag column reached the WAC limit, then a polish column was brought online for continued processing in a lead-lag-polish column configuration. Feed was processed at 1.9 bed volumes (BVs) per hour; the flowrate, in terms of contact time with the crystalline silicotitanate (CST) bed, matched the expected flowrate at TSCR. The Cs-decontaminated product was retained for vitrification testing (to be reported separately). The lead column reached 83% Cs breakthrough after processing ~1500 BVs of feed; the 50% Cs breakthrough was interpolated from the breakthrough data and occurred at 1041 BVs. Despite the AW-105 having a significantly higher K concentration (0.55 M compared to 0.10 M), testing compared to previous AP-107 ion exchange column testing at 16 °C showed no difference in BVs processed to reach the WAC on the lead column and only an approximate ~20 BV decrease in volume processed to reach the WAC limit on the lag column. The negligible differences in capacity despite the 5x concentration differences in K was determined to be due to the significantly lower NO3 concentration in the AW-105 supernate compared to the AP-107 tank waste matrix. A comparison in breakthrough curves for the two tests also indicated slightly faster kinetic behavior in the AW-105, with the variations in feed matrices (lower NO3 concentration) likely responsible for the deviation. The Cs effluent from the lag column reached the WAC limit after processing 772 BVs. Anticipating this breakthrough point, the polish column was preemptively installed around 675 BVs. Cs breakthrough from the lag column began at 300 BVs, reaching 1.10×10 1 µCi/mL, or 14.13 % Cs breakthrough, after processing all 1500 BVs of feed. The polish column processed nominally 830 BVs and reached 2.10×10 -1 µCi/mL, or 0.27 % Cs breakthrough at the conclusion of the test. Table S.1 and Figure S.1 summarize the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TANK 40 FINAL SB4 CHEMICAL CHARACTERIZATION RESULTS

A sample of Sludge Batch 4 (SB4) was pulled from Tank 40 in order to obtain radionuclide inventory analyses necessary for compliance with the Waste Acceptance Product Specifications (WAPS). This sample was also analyzed for elemental and chemical composition including noble metals. These analyses along with the WAPS analyses will help define the composition of the sludge currently in Tank 40 which is currently being fed to DWPF and will become part of Sludge Batch 5 (SB5). At SRNL the 3-L Tank 40 SB4 sample was transferred from the shipping container into a 4-L vessel and solids allowed to settle overnight. Supernate was then siphoned off and circulated through the shipping container to complete the transfer of the sample. Following thorough mixing of the 3-L sample, a 280 g sub-sample was removed. This sub-sample was then utilized for all subsequent analytical samples. Eight separate aliquots of the slurry were digested, four with HNO{sub 3}/HCl in sealed Teflon{reg_sign} vessels and four in Na{sub 2}O{sub 2} using Zr crucibles. Due to the use of Zr crucibles and Na in the peroxide fusions, Na and Zr cannot be determined from this preparation. Three glass standards were digested along with a blank for each preparation. Each aqua regia digestion and blank was diluted and submitted to Analytical Development (AD) for inductively coupled plasma-atomic emission spectroscopy (ICP-AES) analysis, inductively coupled plasma-mass spectrometry (ICP-MS) analysis, and cold vapor atomic absorption (CV-AA) analysis. Equivalent dilutions of the peroxide fusion digestions and blank were submitted to AD for ICP-AES analysis. Tank 40 SB4 supernate was collected from a mixed slurry sample in the SRNL Shielded Cells and submitted to AD for ICP-AES and ICP-MS. Weighted dilutions of slurry were submitted for ion chromatography (IC), total inorganic carbon/total organic carbon (TIC/TOC), and total base analyses. A sample of Tank 40 SB4 decant was collected by carefully removing the supernate phase from a settled sample. This decant was not filtered prior to performing a warm nitric acid digestion of the material in order to measure the Si content by ICP-AES. Three Si standards, a blank, and a matrix standard were prepared and submitted along with the Tank 40 samples. The following conclusions were drawn from the analytical results reported here: (1) The elemental composition of this sample and the analyses conducted here are reasonable and consistent with DWPF batch data measurements; (2) There was no measurable Si in samples of Tank 40 decant; and (3) Ag and the Ru, Rh, and Pd noble metal concentrations agree well with the estimate used for the SB4 70/30 blend of SB3 and Tank 51 performed in the SRNL Shielded Cells.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LITERATURE REVIEWS TO SUPPORT ION EXCHANGE TECHNOLOGY SELECTION FOR MODULAR SALT PROCESSING

This report summarizes the results of literature reviews conducted to support the selection of a cesium removal technology for application in a small column ion exchange (SCIX) unit supported within a high level waste tank. SCIX is being considered as a technology for the treatment of radioactive salt solutions in order to accelerate closure of waste tanks at the Savannah River Site (SRS) as part of the Modular Salt Processing (MSP) technology development program. Two ion exchange materials, spherical Resorcinol-Formaldehyde (RF) and engineered Crystalline Silicotitanate (CST), are being considered for use within the SCIX unit. Both ion exchange materials have been studied extensively and are known to have high affinities for cesium ions in caustic tank waste supernates. RF is an elutable organic resin and CST is a non-elutable inorganic material. Waste treatment processes developed for the two technologies will differ with regard to solutions processed, secondary waste streams generated, optimum column size, and waste throughput. Pertinent references, anticipated processing sequences for utilization in waste treatment, gaps in the available data, and technical comparisons will be provided for the two ion exchange materials to assist in technology selection for SCIX. The engineered, granular form of CST (UOP IE-911) was the baseline ion exchange material used for the initial development and design of the SRS SCIX process (McCabe, 2005). To date, in-tank SCIX has not been implemented for treatment of radioactive waste solutions at SRS. Since initial development and consideration of SCIX for SRS waste treatment an alternative technology has been developed as part of the River Protection Project Waste Treatment Plant (RPP-WTP) Research and Technology program (Thorson, 2006). Spherical RF resin is the baseline media for cesium removal in the RPP-WTP, which was designed for the treatment of radioactive waste supernates and is currently under construction in Hanford, WA. Application of RF for cesium removal in the Hanford WTP does not involve in-riser columns but does utilize the resin in large scale column configurations in a waste treatment facility. The basic conceptual design for SCIX involves the dissolution of saltcake in SRS Tanks 1-3 to give approximately 6 M sodium solutions and the treatment of these solutions for cesium removal using one or two columns supported within a high level waste tank. Prior to ion exchange treatment, the solutions will be filtered for removal of entrained solids. In addition to Tanks 1-3, solutions in two other tanks (37 and 41) will require treatment for cesium removal in the SCIX unit. The previous SCIX design (McCabe, 2005) utilized CST for cesium removal with downflow supernate processing and included a CST grinder following cesium loading. Grinding of CST was necessary to make the cesium-loaded material suitable for vitrification in the SRS Defense Waste Processing Facility (DWPF). Because RF resin is elutable (and reusable) and processing requires conversion between sodium and hydrogen forms using caustic and acidic solutions more liquid processing steps are involved. The WTP baseline process involves a series of caustic and acidic solutions (downflow processing) with water washes between pH transitions across neutral. In addition, due to resin swelling during conversion from hydrogen to sodium form an upflow caustic regeneration step is required. Presumably, one of these basic processes (or some variation) will be utilized for MSP for the appropriate ion exchange technology selected. CST processing involves two primary waste products: loaded CST and decontaminated salt solution (DSS). RF processing involves three primary waste products: spent RF resin, DSS, and acidic cesium eluate, although the resin is reusable and typically does not require replacement until completion of multiple treatment cycles. CST processing requires grinding of the ion exchange media, handling of solids with high cesium loading, and handling of liquid wash and conditioning solutions. RF processing requires handling and evaporation of cesium eluates, disposal of spent organic resin, and handling of the various liquid wash and regenerate solutions used. In both cases, the DSS will be immobilized in a low activity waste form. It appears that both technologies are mature, well studied, and generally suitable for this application. Technology selection will likely be based on downstream impacts or preferences between the various processing options for the two materials rather than on some unacceptable performance property identified for one material. As a result, the following detailed technical review and summary of the two technologies should be useful to assist in technology selection for SCIX.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

F-AREA PUMP TANK 1 MIXING ANALYSIS

The F-area pump tanks are used to transfer supernate, sludge, and other materials. In any transfer, the solution must stay well mixed without allowing particulate matter to settle out of the liquid and, thus, accumulate in the bottom of the pump tank. Recently, the pulse jet mixing in F-area Pump Tank 1 (FPT1) has been decommissioned. An analysis of the liquid transfer through FPT1 has been performed using computational fluid dynamics (CFD) methods to assess whether or not the velocities throughout the tank will remain high enough to keep all particulate suspended using only transfer and recirculation pumps. The following paragraph is an abbreviated synopsis of the transfer procedure for FPT1 [1, 2]. Prior to a transfer, FPT1 begins to be filled with inhibited water through the inlet transfer line (TI). When the tank liquid level reaches 52.5 inches above the absolute tank bottom, the recirculation pump (RI and RO) is activated. At a tank liquid level of 72.5 inches above the absolute tank bottom, the outlet transfer line (TO) is activated to reduce the liquid level in FPT1 and transfer inhibited water to H-area Pump Tank 7 (HPT7). The liquid level is reduced down to 39.5 inches, with an allowable range from 37.5 to 41.5 inches above the absolute tank bottom. HPT7 goes through a similar procedure as FPT1 until both have tank liquid levels of approximately 39.5 inches above the absolute tank bottom. The transfer of inhibited water continues until a steady-state has been reached in both pump tanks. At this point, the supernate/sludge transfer begins with a minimum flow rate of 70 gpm and an average flow rate of 150 gpm. After the transfer is complete, the pump tanks (both FPT1 and HPT7) are pumped down to between 20.5 and 22.5 inches (above absolute bottom) and then flushed with 25,000 gallons of inhibited water to remove any possible sludge heal. After the flushing, the pump tanks are emptied. Note that the tank liquid level is measured using diptubes. Figure 2.1 provides a simplified sketch (not to scale) of FPT1 during the steady-state transfer condition, which consists of two inlet flows that impact the liquid surface as plunging jets and two outlet flows drawn from near the bottom of the tank. During the transfer, the supernate level is held at 39.5 inches above the absolute bottom of the tank [1, 2]. In addition, the FPT1 can contain up to 16.7 wt.% sludge particles within the supernate for a given transfer [2]. Test results from Tank 40 sludge Batch 3 [3] provide a typical range of particulate diameters between 0.1 and 25 {micro}m, with approximately 20 vol.% of the sludge distribution consisting of particles less than 1 {micro}m in diameter. The purpose of this analysis is to estimate FPT1 flow field during the steady-state transfer conditions to ensure that the tank remains mixed and that the velocities throughout the tank are sufficient to keep all sludge particulate suspended.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RHEOLOGICAL AND ELEMENTAL ANALYSES OF SIMULANT SB5 SLURRY MIX EVAPORATOR-MELTER FEED TANK SLURRIES

The Defense Waste Processing Facility (DWPF) will complete Sludge Batch 5 (SB5) processing in fiscal year 2010. DWPF has experienced multiple feed stoppages for the SB5 Melter Feed Tank (MFT) due to clogs. Melter throughput is decreased not only due to the feed stoppage, but also because dilution of the feed by addition of prime water (about 60 gallons), which is required to restart the MFT pump. SB5 conditions are different from previous batches in one respect: pH of the Slurry Mix Evaporator (SME) product (9 for SB5 vs. 7 for SB4). Since a higher pH could cause gel formation, due in part to greater leaching from the glass frit into the supernate, SRNL studies were undertaken to check this hypothesis. The clogging issue is addressed by this simulant work, requested via a technical task request from DWPF. The experiments were conducted at Aiken County Technology Laboratory (ACTL) wherein a non-radioactive simulant consisting of SB5 Sludge Receipt and Adjustment Tank (SRAT) product simulant and frit was subjected to a 30 hour SME cycle at two different pH levels, 7.5 and 10; the boiling was completed over a period of six days. Rheology and supernate elemental composition measurements were conducted. The caustic run exhibited foaming once, after 30 minutes of boiling. It was expected that caustic boiling would exhibit a greater leaching rate, which could cause formation of sodium aluminosilicate and would allow gel formation to increase the thickness of the simulant. Xray Diffraction (XRD) measurements of the simulant did not detect crystalline sodium aluminosilicate, a possible gel formation species. Instead, it was observed that caustic conditions, but not necessarily boiling time, induced greater thickness, but lowered the leach rate. Leaching consists of the formation of metal hydroxides from the oxides, formation of boric acid from the boron oxide, and dissolution of SiO{sub 2}, the major frit component. It is likely that the observed precipitation of Mg(OH){sub 2} and Mn(OH){sub 2} caused the increase in yield stress. The low pH run exhibited as much as an order of magnitude greater B and Li (frit components) leachate concentrations in the supernate. At high pH a decrease of B leaching was found and this was attributed to adsorption onto Mg(OH){sub 2}. A second leaching experiment was performed without any sludge to deconvolute the leach rate behavior of Frit 418 from those of the SB5 sludge-Frit 418 system. At high pH, the sludgeless system demonstrated very fast leaching of all the frit components, primarily due to fast dissolution of the main component, silica, by hydroxide anion; various semiconductor studies have established this reactivity. Overall, the frit-water system exhibited greater leaching from a factor two to almost three orders of magnitude (varying by conditions and species). The slower leaching of the sludge system is possibly due to a greater ionic strength or smaller driving force. Another possible reason is a physical effect, coating of the frit particles with sludge; this would increase the mass transfer resistance to leaching. Based on this study, the cause of clogs in the melter feed loop is still unknown. A possible explanation is that the SME product, like the simulant, is too thin and could contribute to a loss of two-phase flow which could cause plugging of a restricted and poorly mixed zone like the melter feed loop. This is feasible since a previous study of a slurry showed an increase in resistance to flow at lower flow rates. Testing with a radioactive SME sample is underway and should help understand this potential mechanism.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DWPF DECON FRIT: SUMP AND SLURRY SOLIDS ANALYSIS

The Savannah River National Laboratory (SRNL) has been requested to perform analyses on samples of the Defense Waste Processing Facility (DWPF) decon frit slurry (i.e., supernate samples and sump solid samples). Four 1-L liquid slurry samples were provided to SRNL by Savannah River Remediation (SRR) from the 'front-end' decon activities. Additionally, two 1-L sump solids samples were provided to SRNL for compositional and physical analysis. In this report, the physical and chemical characterization results of the slurry solids and sump solids are reported. Crawford et al. (2010) provide the results of the supernate analysis. The results of the sump solids are reported on a mass basis given the samples were essentially dry upon receipt. The results of the slurry solids were converted to a volume basis given approximately 2.4 grams of slurry solids were obtained from the {approx}4 liters of liquid slurry sample. Although there were slight differences in the analytical results between the sump solids and slurry solids the following general summary statements can be made. Slight differences in the results are also captured for specific analysis. (1) Physical characterization - (a) SEM/EDS analysis suggested that the samples were enriched in Li and Si (B and Na not detectable using the current EDS system) which is consistent with two of the four principle oxides of Frit 418 (B{sub 2}O{sub 3}, Na{sub 2}O, Li{sub 2}O and SiO{sub 2}). (b) SEM/EDS analysis also identified impurities which were elementally consistent with stainless steel (i.e., Fe, Ni, Cr contamination). (c) XRD results indicated that the sump solids samples were amorphous which is consistent with XRD results expected for a Frit 418 based sample. (d) For the sump solids, SEM/EDS analysis indicated that the particle size of the sump solids were consistent with that of an as received Frit 418 sample from a current DWPF vendor. (e) For the slurry solids, SEM/EDS analysis indicated that the particle size range of the slurry solids was much broader than compared to the sump solids. More specifically, there were significantly more fines in the slurry solids as compared to the sump solids. (f) PSD results indicated that > 99% of both the sump and slurry solids were less than 350 microns. The PSD results also supported SEM/EDS analysis that there were significantly more fines in the slurry solids as compared to the sump solids. (2) Weight Percent Solids - Based on the measured supernate density and mass of insoluble solids (2.388 grams) filtered from the four liters of liquid slurry samples, the weight percent insoluble solids was estimated to be 0.060 wt%. This level of insoluble solids is higher than the ETP WAC limit of 100 mg/L, or 0.01 wt% which suggests a separation technology of some type would be required. (3) Chemical Analysis - (a) Elemental results from ICP-ES analysis indicated that the sump solids and slurry were very consistent with the nominal composition of Frit 418. There were other elements identified by ICP analysis which were either consistent with the presence of stainless steel (as identified by SEM/EDS analysis) or impurities that have been observed in 'as received' Frit 418 from the vendor. (b) IC anion analysis of the sump solids and slurry solids indicated all of the species were less than detection limits. (c) Radionuclide analysis of the sump solids also indicated that most of the analytes were either at or below the detection limits. (d) Organic analysis of the sump solids and slurry solids indicated all of the species were less than detection limits. It should be noted that the results of this study may not be representative of future decon frit solutions or sump/slurry solids samples. Therefore, future DWPF decisions regarding the possible disposal pathways for either the aqueous or solid portions of the Decon Frit system need to factor in the potential differences. More specifically, introduction of a different frit or changes to other DWPF flowsheet unit operations (e.g., different sludge batch or coupling with other process streams) may impact not only the results but also the conclusions regarding acceptability with respect to the ETF WAC limits or other alternative disposal options.

36 MATERIALS SCIENCE↗

Test Bed: Treatability of Hanford Tank Waste - 18501

In an effort to advance the Low Activity Waste Pretreatment System technology readiness level at the Hanford Site, the effectiveness of a critical technology element, sRF ion-exchange resin, was demonstrated in the selective removal of Cs-137 from 11.5 L of composited Hanford supernate tank waste. Prior to ion-exchange, solids filtration was performed on the tank waste composite. Between the time of filtrate collection and filtrate processing on the ion-exchange columns, additional solids had formed. These secondary solids resulted from the combination of supernates high in fluoride content with supernates high in phosphate content and the relatively short blend time. Samples were collected before, during and after the ion-exchange process for characterization of a full suite of constituents (inorganic, organic, and radionuclides) to aid in the classification of the cesium-removed waste for shipping, receiving, treatment, and disposal determinations. Following chemical analysis, the remaining 10.8 L (2.9 gal) of cesium-depleted waste was shipped to an off-site vendor for grout-encapsulation and eventual disposal at the Waste Control Specialists Federal Waste Disposal Facility in Andrews, Texas as low-level waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Filtration Options for Hanford Tank Waste - Actual Waste Demonstrations - 19105

The U.S. Department of Energy and its contractors are evaluating options for treatment of supernate streams to provide feed for the Low-Activity Waste vitrification facility at the Hanford Tank Waste Treatment and Immobilization Plant. Several options are currently under evaluation. These options include various processes for filtering the supernate in preparation for ion exchange testing. Pacific Northwest National Laboratory (PNNL) has performed filtration testing with samples from Hanford tanks AP-105 and AP-107 to provide some basis data regarding the filtration performance of these tank waste materials. Samples were received directly from the AP-105 and AP-107 tanks into the Radiochemical Processing Laboratory at PNNL. These samples were then filtrated through a variety of filtration media to provide data on both cross-flow and dead-end filtration rates. Because the samples were taken from clarified supernate well above the solids layer in the tanks, they contained relatively small quantities of solids. However, there were sufficient solids to significantly impact filtration behavior. The results filtration behavior and solids characterization will be reported. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗