Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Superfund”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Proof of Principle (POP) for Using Electron Beam to Destroy Contaminants in Samples from a Test Superfund Site (PAHs, PCBs, Dioxins and Furans)

Fermi Research Alliance, LLC (FRA) operates Fermilab under contract with the U.S. Department of Energy and has patents on technologies and applications of a novel mobile electron beam accelerator. A high-power version of this mobile accelerator based on FRA-developed SRF technology is under development at IARC and can enable several new applications that have significant commercial potential. One such application is the e-beam treatment of contaminated sediment sites. The contaminants of concern are a variety of organic chemicals, including dioxins, furans, polyaromatic hydrocarbons (PAHs) and polychlorinated biphenyls (PCBs). Anchor QEA is interested in determining if electron beam (e-beam) technology can be used to cost effectively destroy contaminants for three specific remediation projects. The goal of this study is to do proof-of-principle (POP) work to evaluate the cost-effectiveness of e-beam treatment in removal of contaminants of concern. The study will be conducted using the Acce

43 PARTICLE ACCELERATORS↗

Progress Update: Superfund Job Training

A quick look at how the Savannah River Site is reaching out in surrounding communities to help underprivileged graduates in pursuing a career under the Recovery Act.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model for Correlating Real-Time Survey Results to Contaminant Concentrations - 12183

The U.S. Environmental Protection Agency (EPA) Superfund program is developing a new Counts Per Minute (CPM) calculator to correlate real-time survey results, which are often expressed as counts per minute, to contaminant concentrations that are more typically provided in risk assessments or for cleanup levels, usually expressed in pCi/g or pCi/m{sup 2}. Currently there is no EPA guidance for Superfund sites on correlating count per minute field survey readings back to risk, dose, or other ARAR based concentrations. The CPM calculator is a web-based model that estimates a gamma detector response for a given level of contamination. The intent of the CPM calculator is to facilitate more real-time measurements within a Superfund response framework. The draft of the CPM calculator is still undergoing internal EPA review. This will be followed by external peer review. It is expected that the CPM calculator will at least be in peer review by the time of WM2012 and possibly finalized at that time. The CPM calculator should facilitate greater use of real-time measurement at Superfund sites. The CPM calculator may also standardize the process of converting lab data to real time measurements. It will thus lessen the amount of lab sampling that is needed for site characterization and confirmation surveys, but it will not remove the need for sampling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exposure to an environmental mixture of polycyclic aromatic hydrocarbons induces hepatic cytochrome P450 enzymes in mice

Cytochrome P450 enzymes (CYPs) play an important role in bioactivating or detoxifying polycyclic aromatic hydrocarbons (PAHs), common environmental contaminants. While it is widely accepted that exposure to PAHs induces CYPs, effectively increasing rates of xenobiotic metabolism, dose- and time-response patterns of CYP induction are not well known. In order to better understand dose- and time-response relationships of individual CYPs following induction, we exposed B6129SF1/J mice to single or repeated doses (2-180 µmol/kg/d) of benzo[a]pyrene (BaP) or Supermix-10, a mixture of the top 10 most abundant PAHs found at the Portland Harbor Superfund Site. In hepatic microsomes from exposed mice, we measured amounts of active CYPs using activity-based protein profiling and total CYP expression using global proteomics. We observed rapid Cyp1a1 induction after 6 hr at the lowest PAH exposures and broad induction of many CYPs after 3 daily PAH doses at 72 hr following the first dose. Using samples displaying Cyp1a1 induction, we observed significantly higher metabolic affinity for BaP metabolism (Km reduced 3-fold), 3-fold higher intrinsic clearance, but no changes to the Vmax. Mice dosed with the highest PAH exposures exhibited 1.7 to 5-fold higher intrinsic clearance rates for BaP compared to controls and higher Vmax values indicating greater amounts of enzymes capable of metabolizing BaP. This study demonstrates exposure to PAHs found at Superfund Sites induces enzymes in dose- and time-dependent patterns in mice. Accounting for specific changes in enzyme profiles, and relative rates of PAH bioactivation and detoxification, and resulting risk will help translate internal dosimetry of animal models to humans and improve risk assessments of PAHs at Superfund sites.

Stoddard, Ethan G.↗

Microbial community structure and biodegradation activity of particle-associated bacteria in a coal tar contaminated creek

The Chattanooga Creek Superfund site (Chattanooga, TN) is one of the most polluted waterways in the southeastern U.S. with high polycyclic aromatic hydrocarbon (PAH) concentrations in the sediments. PAHs associate with suspended solids in the water column, and may be redeposited onto the floodplain. These suspended particles represent an interesting but understudied environment for PAH-degrading microbial communities. This study tested the hypotheses that particle-associated bacterial (PAB) communities have genotypic potential (PAH-dioxygenase genes) and activity (naphthalene and pyrene mineralization), and can contribute to natural attenuation of PAHs in Chattanooga Creek. Upstream of the Superfund site, mineralization ranged from 0.2 to 2.0% of added {sup 14}C-naphthalene and 0 to 0.1% {sup 14}C-pyrene (after 40 h), with first order biodegradation rate constants (k{sub 1}) ranging from 1.09 to 9.18 x 10{sup -5} h{sup -1} and 0 to 1.13 x 10{sup -6} h{sup -1}, respectively. Mineralization was significantly greater in PAB communities within the contaminated zone, with 11.8 to 31.2% {sup 14}C-naphthalene (k{sup 1} 5.34 to 14.2 x 10-4 h{sup -1}) and 1.3 to 6.6% {sup 14}C-pyrene mineralized (k{sub 1} 2.89 to 15.0 x 10{sup -5} h{sup -1}). Abundances of nagAc (naphthalene dioxygenase) and nidA (pyrene dioxygenase) genes indicated that PAB communities harbored populations with genetic potential for both low- and high-molecular weight PAH degradation, and quantification of Mycobacterium 16S rDNA genes indicated that PAH-degrading mycobacteria are also prevalent in this environment. Phylogenetic comparisons (T-RFLPs) between PAB and sediments indicated these microbial communities were taxonomically distinct, but shared some functional similarities, namely PAH catabolic genotypes, mineralization capabilities, and community structuring along a contamination gradient. 38 refs., 4 figs., 2 tabs.

01 COAL, LIGNITE, AND PEAT↗

The Use of Haz-Flote to Efficiently Remove Mercury from Contaminated Materials

There are thousands of known contaminated sites in the United Stated, including Superfund sites (1500 to 2100 sites), RCRA corrective action sites (1500 to 3500 sites), underground storage tanks (295,000 sites), U.S. Department of Defense sites (7300 sites), U.S. Department of Energy sites (4,000 sites), mining refuse piles, and numerous other hazardous metals and organic contamination sites. Only a small percentage of these sites has been cleaned up. The development of innovative technologies to handle the various clean-up problems on a national and international scale is commonplace. Many innovative technologies have been developed that can be used to effectively remediate contaminated materials. Unfortunately, many of these technologies are only effective for materials coarser than approximately 200 mesh. In addition, these technologies usually require considerable investment in equipment, and the clean-up costs of soil material are relatively high - in excess of $100 to $500 per yd{sup 3}. These costs result from the elaborate nature of the processes, the costs for power, and the chemical cost. The fine materials are disposed of or treated at considerable costs. As a result, the costs often associated with amelioration of contaminated sites are high. Western Research institute is in the process of developing an innovative soil washing technology that addresses the removal of contaminants from the fine size-fraction materials located at many of the contaminated sites. This technology has numerous advantages over the other ex-situ soil washing techniques. It requires a low capital investment, low operating costs and results in high levels of re-emplacement of the cleaned material on site. The process has the capability to clean the fine fraction (<200 mesh) of the soil resulting in a replacement of 95+% of the material back on-side, reducing the costs of disposal. The Haz-Flote{trademark} technology would expand the application of soil washing technology to heavy soils (clay-type should) to which current soil washing practices are not applied. WRI is not aware of any other soil washing technologies that demonstrate this ability at the expected cost on a per ton basis. The market for this technology is considered excellent for Superfund and other inorganic contaminated sites.

54 ENVIRONMENTAL SCIENCES↗

Lessons Learned for Construction and Waste Water Management at Radioactive Waste Closure Site

Environmental remediation of three different radioactive waste closure sites each required exhaustive characterization and evaluation of sampling and analytical information in resolving regulatory and technical issues that impact cleanup activities. One of the many regulatory and technical issues shared by all three and impacting the cleanup activities is the compliant management and discharge of waste waters generated and resulting from the remediation activities. Multiple options were available for each closure site in resolving waste water management challenges depending upon the base regulatory framework defined for the cleanup or closure of the site. These options are typically regulated by the federal Clean Water Act (CWA), with exemptions available under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Superfund Amendments and Reauthorization Act of 1986 (SARA) or Memorandum of Understanding (MOU) between regulatory agencies. In general, all parties must demonstrate equivalent compliance when concerns related to the protection of the general public and the environment. As such, all options for management of waste water resulting from closure activities must demonstrate compliance to or equivalent actions under the CWA. The CWA provides for the National Pollution Discharge Elimination System (NPDES) that is typically maintained by individual states through permitting process to generators, public utilities, and more recently, construction sites. Of the three sites, different compliance strategies were employed for each. The approach for the Columbus Closure Project (CCP) was to initiate full scale compliance to the Ohio EPA General Construction Permit No. OHC000002. The CCP provided Notice of Intent (NOI) to the Ohio EPA to discharge under the general permit according to the regulator approved Storm Water Pollution Prevention Plan. For the second site, the Li Tungsten Superfund Site in Glen Cove, New York, the option was to manage and discharge waste water under a due diligence process to New York State General Permit No. GP-02-01. For the third site, the Middlesex Sampling Plant in Middlesex, New Jersey, the options was to manage and discharge waste water to the Publicly Owned Treatment Works (POTW). Each option has resulted in a safe, cost-effective, and compliant approach to managing discharging waste waters from the site closure activities. (authors)

54 ENVIRONMENTAL SCIENCES↗

DOE Climate Change Vulnerability and Adaptation Planning: Three Relevant Case Studies - 16056

Executive Order 13653, Preparing the United States for the Impacts of Climate Change, was issued in 2013. The President emphasized the importance for federal agencies to take action to enhance climate preparedness and resilience. The U.S. Department of Energy released the DOE Climate Change Adaptation Plan in 2014 to build resilience and mitigation across the Department, and to assure inclusion of climate change adaptation as part of its planning and operations. DOE's Office of Environmental Management has an important mission to manage safe cleanup of environmental legacy contamination brought about from five decades of nuclear weapons development and government sponsored nuclear energy research. Specifically, Environmental Management is responsible for remediation of soil and groundwater, deactivation and decommissioning of facilities, and disposal of hazardous and radioactive waste. Three case studies are discussed in this paper that demonstrate the cost benefit and importance for Environmental Management to assess climate change vulnerability and implement planning procedures: 1. Los Alamos National Laboratory in New Mexico has experienced $0.5 billion in unanticipated costs as a result of climate-related events including: extreme drought, wildfires, deluge rains, and historic flooding over the past 15 years. 2. The U.S. Environmental Protection Agency American Cyanamid Superfund Site, situated on the New Jersey coast was hit by Hurricane Irene in 2011. Three major contaminated, solvent impoundment berms were breached within the 100-year flood plain, causing major damage to the facility. 3. For radioactive waste disposal facilities in low-lying areas in proximity to groundwater, climate change vulnerability and assessment is prudent for operational management. One such Superfund hazardous and radioactive waste disposal facility, the Environmental Management Waste Management Facility located at the DOE Oak Ridge Reservation in Tennessee, has documented surface and ground water management challenges since construction began in 2001, driven by changing regional weather patterns. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Evolution of DOE/Stakeholder Relationships at the Fernald Preserve, Ohio, Site - 19559

The Fernald Preserve, Ohio, Site is managed by the US Department of Energy (DOE) Office of Legacy Management. It is approximately 29 km (18 miles) northwest of Cincinnati, Ohio, on the site of a former uranium-processing plant established by the US Atomic Energy Commission in 1951. The production mission officially ended in 1991 when it was replaced by a remediation mission. Extensive environmental remediation was subsequently conducted under the Superfund program by the DOE Office of Environmental Management. After most of the remediation was concluded in 2006, the site was transferred to the DOE Office of Legacy Management, which continued comprehensive ecological restoration and is responsible for an ongoing aquifer remediation operation. The site was renamed the Fernald Preserve and opened to the public in 2008 as an undeveloped park, encompassing a diversity of natural habitats native to the area. The site now serves as a community asset, offering a Visitors Center with exhibits that tell the site story, hiking trails, wildlife observation opportunities, meeting spaces for community groups, educational program opportunities, and Interpretive Services personnel to engage the public. There was a long history of community mistrust about government operations at the site, beginning in the 1950's when land for the site was acquired by eminent domain, and continuing when contamination and hazardous waste management concerns were revealed in the 1980's. Resulting media coverage on possible contamination and cover-up concerns was extensive. In 1986, sitewide studies to determine the nature and extent of contamination and to consider cleanup options were instigated. In 1989, the site was placed on the National Priorities List of the Superfund program. Because of the longstanding mistrust held by many stakeholders, DOE faced a very serious challenge in achieving consensus among stakeholder groups about the cleanup levels, waste disposition, and the future uses of the site. Starting in the late 1980's, DOE, the regulators, site contractors and the community took a number of steps over many years to increase trust and achieve consensus among the many stakeholder groups. These steps included establishing a single cleanup mission, involving the community early and often as a critically important stakeholder, creating a citizens taskforce and community envoys, and providing extensive educational outreach. As a result, DOE, regulators, contractors, and community members moved from a position of very little trust to one of increased trust and collaboration among all concerned parties. The lessons learned from the Fernald site can be invaluable in the resolution of difficult environmental issues and should be considered as DOE seeks increased collaboration and consensus with stakeholders to solve other environmental remediation challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimating the Effects of Soil Remediation on Children’s Blood Lead near a Former Lead Smelter in Omaha, Nebraska, USA

Lead exposures from legacy sources threaten children’s health. Soil in Omaha, Nebraska, was contaminated by emissions from a lead smelter and refinery. The U.S. Environmental Protection Agency excavated and replaced contaminated soil at the Omaha Lead Superfund Site between 1999 and 2016. The goal of this study was to assess the association of soil lead level (SLL) and soil remediation status with blood lead levels (BLLs) in children living near or on the site. We linked information on SLL at residential properties with children’s BLLs and assigned remediation status to children’s BLL measurements based on whether their measurements occurred during residence at remediated or unremediated properties. We examined the association of SLL and remediation status with elevated BLL (EBLL). We distinguished the roles of temporal trend and the intervention with time-by-intervention-status interaction contrasts. All analyses estimated odds ratios (ORs) with a generalized estimating equations approach to ensure robustness under the complex correlations among BLL measurements. All analyses controlled for relevant covariates including children’s characteristics. EBLL (> 5 μg/dL ) was associated with both residential SLL [e.g., OR=2.00; 95% confidence interval (CI): 1.83, 2.19; > 400–800 vs. ≤ 200 ppm] and neighborhood SLL [e.g., OR=1.85 (95% CI: 1.62, 2.11; > 400–800 vs. ≤ 200 ppm)] before remediation but only with neighborhood SLL after remediation. The odds of EBLL were higher before remediation [OR 1.52 (95% CI: 1.34, 1.72)]. Similarly, EBLL was positively associated with preremediation status in our interaction analysis [interaction OR=1.18 (95%CI: 1.02, 1.37)]. Residential and neighborhood SLLs were important predictors of EBLLs in children residing near or on this Superfund site. Neighborhood SLL remained a strong predictor following remediation. Our data analyses showed the benefit of soil remediation. Results from the interaction analyses should be interpreted cautiously due to imperfect correspondence of remediation times between remediation and comparison groups. https://doi.org/10.1289/EHP8657

54 ENVIRONMENTAL SCIENCES↗

Testing Novel CR-39 Detector Deployment System for Identification of Subsurface Fractures, Soda Springs, ID

The Environmental Protection Agency (EPA) has teamed with Battelle Energy Alliance, LLC (BEA) at Idaho National Laboratory (INL) to facilitate further testing of geologic-fracture-identification methodology at a field site near the Monsanto Superfund Site located in Soda Springs, Idaho. INL has the necessary testing and technological expertise to perform this work. Battelle Memorial Institute (BMI) has engaged INL to perform this work through a Work for Others (WFO) Agreement. This study continues a multi-year collaborative effort between INL and EPA to test the efficacy of using field deployed Cr-39 radon in soil portals. This research enables identification of active fractures capable of transporting contaminants at sites where fractures are suspected pathways into the subsurface. Current state of the art methods for mapping fracture networks are exceedingly expensive and notoriously inaccurate. The proposed WFO will evaluate the applicability of using cheap, readily available, passive radon detectors to identify conductive geologic structures (i.e. fractures, and fracture networks) in the subsurface that control the transport of contaminants at fracture-dominated sites. The proposed WFO utilizes proven off-the-shelf technology in the form of CR-39 radon detectors, which have been widely deployed to detect radon levels in homes and businesses. In an existing collaborative EPA/INL study outside of this workscope, CR-39 detectors are being utilized to determine the location of active transport fractures in a fractured granitic upland adjacent to a landfill site at the Fort Devens, MA that EPA-designated as National Priorities List (NPL) site. The innovative concept of using an easily deployed port that allows the CR-39 to measure the Rn-222 in the soil or alluvium above the fractured rock, while restricting atmospheric Rn-222 and soil sourced Ra from contaminating the detector is unique to INL and EPA approach previously developed. By deploying a series of these inexpensive detector-casing combinations statistical samples of the Rn-222 flux can be measured, elucidating the most communicative fractures (i.e. fractures that are actively transporting water and gasses). The Rn-222 measurements can then be used as an input to create a more accurate conceptual model to be used for transport modeling and related cleanup activities. If the team’s approach is demonstrated to be applicable to a wide variety of rock types and soil conditions it might potentially offer significant cost saving without a reduction in data quality at Monsanto Superfund and other sites underlain by fracture-dominated bedrock.

58 GEOSCIENCES↗

Reference Gastrointestinal Absorption Fractions for Radionuclides Ingested in Soil

Oak Ridge National Laboratory is conducting a project for the Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation involving derivation of cancer risk coefficients for ingestion of radionuclides in soil. EPA provides guidance on quantifying gastrointestinal (GI) absorption of a chemical in a given medium for use in risk evaluations including assessments for Superfund sites. Essentially, a medium-specific GI absorption fraction may be applied if and only if there is sound information to support that value. Otherwise, the applied GI absorption fraction should be the best estimate of fractional absorption of the chemical when ingested in highly soluble form. Based on our review of the literature on GI absorption of elements in soil, we have concluded that for many elements there is convincing evidence of substantially reduced absorption in ingested soil compared with ingestion in readily dissolved form. This report summarizes the reviewed information and proposes a comprehensive set of GI absorption fractions for ingestion of elements in soil. For most elements, the proposed GI absorption fractions are lower than the default absorption fractions recommended by the International Commission on Radiological Protection for radionuclides ingested in highly soluble form, even though considerable conservatism has been incorporated into the proposed soil-specific GI absorption fractions.

59 BASIC BIOLOGICAL SCIENCES↗

Community Involvement Plan

The purpose of this CIP (formerly known as a Community Relations Plan) is to provide clear guidance for engaging and informing the community during the Superfund clean-up activities being performed at the Lab. Since being listed on the CERCLA National Priorities List (NPL) in 1989, establishing opportunities for public involvement and decision making throughout the Superfund clean-up process has been a priority of the Lab.

99 GENERAL AND MISCELLANEOUS↗

ORNLERASE - EPA COUNTS PER MINUTE CALCULATOR CONVERSION FACTORS

This database is used in the EPA's Superfund Counts Per Minute (CPM) Calculator (https://epa-cpm.ornl.gov/index.html). This database contains conversion factors used in the calculator that help users estimate the expected radiation detector reading, in counts per minute (CPM), corresponding to a measured radioactivity level reported in either pCi/cm² or pCi/g. Because surface contamination and volumetric contamination behave differently, the tool uses separate conversion processes, each based on Monte Carlo N-Particle (MCNP)–derived conversion factors. The CPM Calculator supports conversions for a range of common environmental media—including soil, steel, glass, drywall, concrete, and wood—to generate detector-ready CPM values. The primary goal of this tool is to enable more efficient, real-time field measurements, reducing reliance on laboratory analyses and ultimately saving both time and money during Superfund assessments.

Dolislager, Fred [ORNL] (ORCID:0009000325477921)↗

Comparison of Activity Determination of Radium 226 in FUSRAP Soil using Various Energy Lines - 12299

Gamma spectroscopy is used at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site as the primary radioanalytical tool for quantization of activities of the radionuclides of concern in site soil. When selecting energy lines in gamma spectroscopy, a number of factors are considered including assumptions concerning secondary equilibrium, interferences, and the strength of the lines. The case of the Maywood radionuclide of concern radium-226 (Ra-226) is considered in this paper. At the FUSRAP Maywood Superfund Site, one of the daughters produced from radioactive decay of Ra-226, lead-214 (Pb- 214), is used to quantitate Ra-226. Another Ra-226 daughter, bismuth-214 (Bi-214), also may be used to quantitate Ra-226. In this paper, a comparison of Ra-226 to Pb-214 activities and Ra-226 to Bi-214 activities, obtained using gamma spectrometry for a large number of soil samples, was performed. The Pb-214, Bi-214, and Ra-226 activities were quantitated using the 352 kilo electron volt (keV), 609 keV, and 186 keV lines, respectively. The comparisons were made after correcting the Ra-226 activities by a factor of 0.571 and both ignoring and accounting for the contribution of a U-235 interfering line to the Ra-226 line. For the Pb-214 and Bi-214 activities, a mean in-growth factor was employed. The gamma spectrometer was calibrated for efficiency and energy using a mixed gamma standard and an energy range of 59 keV to 1830 keV. The authors expect other sites with Ra-226 contamination in soil may benefit from the discussions and points in this paper. Proper use of correction factors and comparison of the data from three different gamma-emitting radionuclides revealed agreement with expectations and provided confidence that using such correction factors generates quality data. The results indicate that if contamination is low level and due to NORM, the Ra-226 can be measured directly if corrected to subtract the contribution from U-235. If there is any indication that technologically enhanced uranium may be present, the preferred measurement approach for quantitation of Ra-226 activity is detection of one of the Ra-226 daughters, Pb-214 or Bi-214, using a correction factor obtained from an in-growth curve. The results also show that the adjusted Ra-226 results compare very well with both the Pb-214 and Bi-214 results obtained using an in-growth curve correction factor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feasibility Study of Economics and Performance of Solar Photovoltaics at Massachusetts Military Reservation. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

This report presents the results of an assessment of the technical and economic feasibility of deploying photovoltaics (PV) systems on a superfund site located within the Massachusetts Military Reservation (MMR). The site was assessed for possible PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics of the potential systems were analyzedusing an electric rate of $0.17/kWh and incentives offered in the State of Massachusetts, such as the solar renewable energy credits. According to calculations, MMR can place 8 MW of ballast-weighted, ground-mounted PV systems on the crowns of the three landfill caps and the borrow pit with the PV modules tilted at 30 degrees.

14 SOLAR ENERGY↗