Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Statement of Feasibility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

38 records · Page 3

Integrating Design and Manufacturing for a High Speed Civil Transport Wing

The aerospace industry is currently addressing the problem of integrating design and manufacturing. Because of the difficulties associated with using conventional, procedural techniques and algorithms, it is the authors' belief that the only feasible way to integrate the two concepts is with the development of an appropriate Knowledge-Based System (KBS). The authors propose a methodology for an aircraft producibility assessment, including a KBS, that addresses both procedural and heuristic aspects of integrating design and manufacturing of a High Speed Civil Transport (HSCT) wing. The HSCT was chosen as the focus of this investigation since it is a current NASA/aerospace industry initiative full of technological challenges involving many disciplines. The paper gives a brief background of selected previous supersonic transport studies followed by descriptions of key relevant design and manufacturing methodologies. Georgia Tech's Concurrent Engineering/Integrated Product and Process Development methodology is discussed with reference to this proposed conceptual producibility assessment. Evaluation criteria are presented that relate pertinent product and process parameters to overall product producibility. In addition, the authors' integration methodology and reasons for selecting a KBS to integrate design and manufacturing are presented in this paper. Finally, a proposed KBS is given, as well as statements of future work and overall investigation objectives.

Marx, William J.↗

Final Environmental Impact Statement for the Galileo Mission (Tier 2)

This Final Environmental Impact Statement (FEIS) addresses the proposed action of completing the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle in October 1989, and the alternative of canceling further work on the mission. The Tier 1 (program level) EIS (NASA 1988a) considered the Titan IV launch vehicle as an alternative booster stage for launch in May 1991 or later. The May 1991 Venus launch opportunity is considered a planetary back-up for the Magellan (Venus Radar Mapper) mission, the Galileo mission, and the Ulysses mission. Plans were underway to enable the use of a Titan IV launch vehicle for the planetary back-up. However, in November 1988, the U.S. Air Force, which procures the Titan IV for NASA, notified NASA that it could not provide a Titan IV vehicle for the May 1991 launch opportunity due to high priority Department of Defense requirements. Consequently, NASA terminated all mission planning for the Titan IV planetary back-up. A minimum of 3 years is required to implement mission-specific modifications to the basic Titan IV launch configuration; therefore, insufficient time is available to use a Titan IV vehicle in May 1991. Thus, the Titan IV launch vehicle is no longer a feasible alternative to the STS/Inertial Upper Stage (IUS) for the May 1991 launch opportunity.

Source record↗