Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Short circuiting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Device for testing continuity and/or short circuits in a cable

A device for testing current paths is attachable to a conductor. The device automatically checks the current paths of the conductor for continuity of a center conductor, continuity of a shield and a short circuit between the shield and the center conductor. The device includes a pair of connectors and a circuit to provide for testing of the conductive paths of the cable. The pair of connectors electrically connects the conductive paths of a cable to be tested with the circuit paths of the circuit. The circuit paths in the circuit include indicators to simultaneously indicate the results of the testing.

Hayhurst, Arthur R.↗

A Nanostructured Composites Thermal Switch Controls Internal and External Short Circuit in Lithium Ion Batteries

A document discusses a thin layer of composite material, made from nano scale particles of nickel and Teflon, placed within a battery cell as a layer within the anode and/or the cathode. There it conducts electrons at room temperature, then switches to an insulator at an elevated temperature to prevent thermal runaway caused by internal short circuits. The material layer controls excess currents from metal-to-metal or metal-to-carbon shorts that might result from cell crush or a manufacturing defect

McDonald, Robert C.↗

The effect of different solar simulators on the measurement of short-circuit current temperature coefficients

Gallium arsenide solar cells are considered for several high temperature missions in space. Both near-Sun and concentrator missions could involve cell temperatures on the order of 200 C. Performance measurements of cells at elevated temperatures are usually made using simulated sunlight and a matched reference cell. Due to the change in bandgap with increasing temperature at portions of the spectrum where considerable simulated irradiance is present, there are significant differences in measured short circuit current at elevated temperatures among different simulators. To illustrate this, both experimental and theoretical data are presented for gallium arsenide cells.

Curtis, H. B.↗

Solar Cell Short Circuit Current Errors and Uncertainties During High Altitude Calibrations

High altitude balloon based facilities can make solar cell calibration measurements above 99.5% of the atmosphere to use for adjusting laboratory solar simulators. While close to on-orbit illumination, the small attenuation to the spectra may result in under measurements of solar cell parameters. Variations of stratospheric weather, may produce flight-to-flight measurement variations. To support the NSCAP effort, this work quantifies some of the effects on solar cell short circuit current (Isc) measurements on triple junction sub-cells. This work looks at several types of high altitude methods, direct high altitude meas urements near 120 kft, and lower stratospheric Langley plots from aircraft. It also looks at Langley extrapolation from altitudes above most of the ozone, for potential small balloon payloads. A convolution of the sub-cell spectral response with the standard solar spectrum modified by several absorption processes is used to determine the relative change from AMO, lscllsc(AMO). Rayleigh scattering, molecular scatterin g from uniformly mixed gases, Ozone, and water vapor, are included in this analysis. A range of atmosph eric pressures are examined, from 0. 05 to 0.25 Atm to cover the range of atmospheric altitudes where solar cell calibrations a reperformed. Generally these errors and uncertainties are less than 0.2%

Snyder, David D.↗

Short Circuiting the Controller –Missteps in Maintenance and Inspection of Process and Wiring in STS-93

During the launch of the Chandra X-Ray Observatory in 1999, an in-flight anomaly occurred a few seconds after liftoff. A power fluctuation caused two Main Engine controllers to drop offline. Fortunately, due to redundancy, the Space Shuttle Columbia was able to successfully reach orbit and avoid an abort. After the successful deployment of Chandra and the safe return of the crew, in-vestigation revealed that the controller failure was due to a wire short in the pay-load bay. It was suspected that the Kapton insulation on the wire rubbed off against a burred screw head, the result of overtightening of the screw during a maintenance event 4 to 5 years prior to the STS-93 mission. Vibrations led the abraded wire to short during flight. The Space Shuttle Program was grounded for 4 months while a program-wide inspection and wire chafing mitigation effort of all orbiter wiring ensued.

Kristy S Yun↗

Short Circuiting the Controller – Missteps in Maintenance and Inspection of Process and Wiring in STS-93

The primary objective of the Space Transportation System mission 93 (STS-93) was to deploy the Chandra X-Ray Observatory. Chandra, the world's most powerful X-Ray telescope, allowed scientists from around the world to study some of the most distant and dynamic objects in the universe. Stripped of nearly 7,000 pounds of its own gear to make room for the payload, the orbiter assigned to this mission was Space Shuttle Columbia. Prior to STS-93, Columbia had flown 25 flights and was NASA's oldest and heaviest orbiter. On July 23, 1999, after two prior launch scrubs, Eileen Collins and her crew of four launched from Kennedy Space Center. About five seconds after launch, Mission Control at Johnson Space Center detected a voltage drop on one of Columbia's electrical buses. As a result of this power fluctuation, a primary and back-up Main Engine controller dropped offline. Given design redundancy, the two remaining controllers supported all three engines. If there had been any other AC bus issues, one engine of the three on the Orbiter would have shut down. The redundant set of digital computer units in each engine controller saved Columbia and her crew from a very risky contingency abort. Post-flight inspection revealed soot on a screw head and a hole in an adjacent Kapton insulated wire. The single strand of polyimide wire was located nearly half-way down the payload bay. The Shuttle Independent Assessment Team (SIAT) reported that the wire had rubbed and chaffed against a burred screw head. The burr was later determined to be the result of overtightening of the screw by a technician during a maintenance refurbishment. Alone, the burr may not have been problematic, but later, during another ground processing event, possibly years after, someone inadvertently stepped on the wiring harness. With the pressure and motion of unintended contact, some of the Kapton insulation rubbed off against the burred screw head. The SIAT suspected the wire damage was pre-existing and was caused 4 or 5 years prior to the flight. Finally, the intense vibrations during the launch sequence allowed contact between the exposed conductor and exposed metal area on the burred screw head, resulting in the arcing and shorting of the wire. Due to the quick turnaround times of Space Shuttle Orbiters, wiring issues caused from multiple maintenance events were often overlooked. Additionally, failing to incorporate thorough and early inclusion of human systems integration (HSI) applications as a crucial part of the decision process can result in these types of misshaps. In order to reduce human error associated with integrated manufacturing, maintenance, refurbishment and flight preparations, wire inspection criteria should be refined and standardized, visual inspection processes should be quantified, and technicians should be certified by specially trained instructors. This case, among many others, unveils why human error management and development of safety metrics is a vital piece in the development of complex systems, and why it should be supported aggressively and implemented program wide.

Human Systems Integration↗

Short-Circuited Power Networks

NASA computer program automatically analyzes power-system networks under faulted conditions. Program is general enough to calculate single-line to ground faults and three-phase-to-ground faults. Several novel programing techniques automate analysis while reducing computing time and storage requirements. Program is written in FORTRAN IV for batch execution.

Oepomo, T. S.↗