Brief Overview of the ASD Integrated Test Stand, Activities and Hazards
The ITS venue provides the first opportunity to fully assemble and test the performance of the injector; integrate, assemble and test four modules; measure the severity of the Beam Break-Up instability and perform the first set of beam measurements. Figure 1 shows a high level configuration of the ITS without the system of overhead cable management trays. The final configuration will integrate the injector, 4 modules (12 accelerator cells), 264 SSPP Line Replaceable Units (LRUs), global controls, data acquisition, and a subset of the downstream transport, Table 1. This was chosen because it provides the minimum accelerator cells required to measure the Beam Break-Up (BBU) instability and perform measurements required to validate the ASD beam transport computer models, which are priority measurements for commissioning.