Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STORAGE FACILITIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Nonexhaustive Taxonomy of Hydropower and Pumped Storage Hydro Facilities [Slides]

The National Renewable Energy Laboratory (NREL) has published benchmark technical reports and presentations that disaggregate major product components for a variety of technologies, including land-based and offshore wind, photovoltaic, and battery energy storage systems. NREL has partnered with staff from the Pacific Northwest National Laboratory (PNNL) and members of the U.S. Department of Energy's Water Power Technology Office (WPTO) to create a non-exhaustive taxonomy of the major products and components of hydropower and pumped storage systems.

13 HYDRO ENERGY↗

Optical Fiber Sensor with a Hydrophobic Filter Layer for Monitoring Hydrogen under Humid Conditions

Real-time and remote monitoring of hydrogen concentration in underground hydrogen storage reservoirs is crucial to maintaining the integrity and safety of the storage facilities. High humidity in the underground deposits interferes with hydrogen sensors, introducing inaccuracy into the hydrogen sensing measurements. A hydrophobic filter layer over a hydrogen sensing layer on an optical fiber hydrogen sensor was devised to minimize the impact of the humidity on the sensor. The hydrogen sensor coated with a hydrophobic filter layer demonstrated a significant improvement in reliable hydrogen sensing under high humidity conditions (99% RH) without severe baseline drift and reduction of transmission intensity. Finally, the optical fiber hydrogen sensor revamped with the filter layer would enable the reliable measurement of hydrogen concentration under the humid conditions expected in subsurface hydrogen storage facilities.

08 HYDROGEN↗

Monitoring natural gas storage using Synthetic Aperture Radar: are the residuals informative?

Estimates of line-of-sight (LOS) displacements from Interferometric Synthetic Aperture Radar (InSAR) observations serve as the basis of the long-term monitoring of an operating natural gas storage site at Honor Rancho in California. Here, an inversion algorithm is used to estimate the portion of the signal that is attributable to deformation within the gas storage reservoir, located at a depth of around 3 km. Removing this contribution produces residuals that are used to characterize the background variation is surface deformation at the gas storage facility and to determine a threshold that can signify unusually large residuals. An application to almost 7 yr of InSAR data, from 2011 until 2018, indicates that there are intervals of heightened residuals as well as brief episodes of anomalously large misfits. An examination of the spatial distributions of the individual residual LOS displacements indicates larger displacements in an alluvial valley just south of the reservoir, with rapid spatial variations in sign, indicating a rather shallow origin. Furthermore, the two anomalous events also involve rapid spatial variations in the LOS displacement residuals directly above the storage facility. The results demonstrate that the technique of extracting residuals after removing the reservoir signal is a useful approach, even in the case of this deep reservoir, and is a promising method for long-term monitoring.

03 NATURAL GAS↗

INDUSTRY ENGAGEMENT TO ESTABLISH A ROBUST SECURITY APPROACH TO MOBILE RADIOACTIVE SOURCES

The mobile radiological sources used in the well-logging and radiography industries are of sufficient curie quantities to be categorized as desirable material for malicious actors. Beyond the security risk posed by these sources, there is also an understanding of the potential damage, both reputational and monetary, that a lost source would have on the licensee and the industry overall. Identifying and communicating the risk these sources pose with impacted stakeholders is a critical first step in developing a security approach. Common day-to-day operations within both industries drive the unique security challenge of mobile sources. From storage facilities, transportation vehicles, temporary storage locations, and use in the field, each phase creates challenges regarding source control and accountability. All aspects of the operational use of these sources needs to be fully understood in order to address security equipment enhancements, policies, procedures, and training. This paper will leverage more than ten years of experience that ORS has gained working closely with industry partners and mobile radiological source users across the well-logging and radiography industries. It will identify the risk posed by mobile radiological sources, clearly define the operational phases of each industry, identify security best practices of mobile sources, and discuss what long-term, sustainable security looks like within these industries. In addition, it will explore areas of a robust security approach that are not commonly given priority in these industries, such as alarm adjudication and response.

Office of Radiological Security↗

Next Generation System Analysis Model: Recently Added Features and Future Plans

To better enable informed decision-making regarding the back-end of the nuclear fuel cycle, the Integrated Waste Management System (IWMS) program within the U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) has been sponsoring the development and application of system analysis tools capable of analyzing various system options for the management of spent nuclear fuel (SNF) and high-level radioactive waste (HLW).With these tools, IWMS architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). The Next Generation System Analysis Model (NGSAM) is an agent-based simulation software tool expressly designed to be capable of modeling features within various IWMS architectures. NGSAM imports data from Oak Ridge National Laboratory (ORNL)’s unified database (e.g., historic assembly information, thermal profiles for assembly heat, and at-reactor dry storage loadings) to ensure that each simulation initializes with a realistic representation of the state of commercial SNF in the U.S. Recent major enhancements implemented into NGSAM in the period since NGSAM was last presented at the WM2019 conference include: • Tracking of railroad escort car acquisition and buffer car acquisition • The addition of heavy haul truck (HHT) and barge routes for some sites, as well as support for user-defined inter-modal routes • Updates to the logic that checks the transportation cask thermal limit maps prior to package transport • An allocation method that predicts when reactor sites would pack assemblies from their spent fuel pools for dry storage, and prioritizes shipments directly from the pools of those reactor sites in the preceding periods (before the predicted loadings to dry storage), thus reducing the number of casks loaded into dry storage at reactor sites • The addition of “reactor site family” operational limits to restrict the number of loads of SNF taken from the pool and from dry storage at a given reactor site each year • Added support for multiple canister loading map options and packages with multiple compatible transportation overpacks • Updates to the handling of non-commercial SNF, including a new database that contains data to support the updates • Updates to allow analysis of hypothetical scenarios which include repackaging at reactor sites, e.g., for possible comparative analysis with other scenarios • Implementation of additional output reports, or modification of existing ones • The ability to generate and implement user edits via the NGSAM website • The ability to model loading SNF from pool storage at an interim storage facility (ISF) into dry storage at the ISF • The ability to model consolidating SNF from different existing storage containers at a DOE site into the same DOE standard canister • The ability to model transferring SNF casks from one transportation mode to another, e.g., from HHT to rail, referred to as transloading. These new features have improved NGSAM capabilities and users’ experience with the model. Preliminary NGSAM requirements for modeling advanced reactor fuels, reprocessing, treatment, and conditioning were considered, and this paper describes them at a high level. Other nuclear fuel cycle system analysis tools developed under sponsorship of DOE-NE, like the VISION code developed at Idaho National Laboratory, might be better suited for initial high-level analysis of those technologies and advanced fuel cycles. As technologies are developed and system concepts evolve, NGSAM could provide value by providing more detailed modeling of transport, storage, and disposal of spent fuel and wastes from advanced reactors and advanced fuel cycles at the fuel element and waste container level.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Package Performance Study: A Historical Perspective and Planning for a Path Forward

The topic of spent nuclear fuel (SNF) transportation often draws public attention and concerns regarding safety, and with large-scale shipping campaigns expected in the future, public interest is anticipated to substantially increase. In 1999, the U.S. Nuclear Regulatory Commission (NRC) began an initiative called the Package Performance Study (PPS) that initially focused on SNF transportation cask responses to severe transportation accidents. A public participation approach was to be used to help guide the scope and parameters of the study, which was also to consider using full-scale physical testing of a SNF transportation cask, where appropriate. In 2010, the NRC decided not to go forward with physical testing as proposed. In 2006, the National Academy of Sciences (NAS) conducted a study on SNF and high-level radioactive waste transportation in the United States. The NAS study recommended that full-scale cask testing, as well as other accepted methodologies, continue to be used as part of the package performance evaluation. In 2012, the Blue Ribbon Commission on America’s Nuclear Future (BRC) recommended conducting the PPS with a full-scale rail transportation cask for the purpose of building public trust and confidence in the safety of SNF transport. In 2021, the U.S. Department of Energy (DOE) restarted a consent-based siting process, focusing on how to site federal facilities for the interim consolidated storage of SNF using a consent-based approach. Large-scale SNF transportation would be necessary for any such interim storage facility. As the planning activities begin for future large-scale shipping campaigns, the DOE is considering options for conducting a DOE-led PPS to help build public trust and confidence in the transportation of SNF. Therefore, the DOE is gathering information related to the previous NRC-led PPS efforts, as well as applicable international experience with the testing of SNF packages. This paper discusses previous NRC efforts, as well as the current status of a DOE-led PPS, which is in the early planning stages.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consolidated Interim Storage Advantages and Disadvantages from Prior Reports and Studies

The question of whether centralized storage of civilian spent nuclear fuel (SNF) should be part of the federal waste management system as an intermediate step before permanent disposal has been debated for more than four decades. Since the Nuclear Waste Policy Act (NWPA) (U.S. House of Representatives 1982) was enacted, the need for interim storage facilities (ISFs) as part of the federal waste management system has been analyzed and documented in numerous reports and studies. This paper summarizes the advantages and disadvantages as described in those reports of incorporating an ISF into the waste management system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Database for Radwaste Management in Germany-30 Years of Experience by TUV NORD - 20461

From the very beginning in the late 1980's TUV NORD EnSys is involved as an independent expert in quality assurance processes concerning interim storage facilities and the disposal for radioactive waste with negligible heat generation in Germany. A database has been developed since these times by TUV NORD EnSys. The development of this database over a long time will be discussed as well as the lessons learned within this process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Planning for Nuclear Power Plant Site Visits - 20481

The U.5. Department of Energy Office of Integrated Waste Management (DOE-IWM) is planning for future large-scale transport of commercial spent nuclear fuel (SNF) and high-level radioactive waste (HLW) to eventual disposal and/or storage facilities. As part of its planning efforts, DOE conducts evaluations of removing SNF from nuclear power plant sites. Site visits are a pivotal piece in the site evaluations that are conducted by DOE, and significant planning efforts are undertaken to design and implement site visits. Site visits typically include three days of surveys and meetings, including one day each for the nuclear power plant site visit, evaluating near-site transportation infrastructure, and meeting with community engagement panels or advisory boards. This paper outlines DOE-IWM's planning process for conducting nuclear power plant site visits and summarizes the key activities carried out to prepare for a site visit, including a discussion of the background research conducted prior to a site visit. Additionally, the paper describes the development of reference databases for site visits, the identification of unique site characteristics, and the use of geographic information system (GIS) applications to enhance the quality of the information collected during a site visit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low Level Radon Concentration and Radon Daughter Dose Monitoring in an Arid-zone Waste Store - 20081

Radioactive waste containing predominantly soil and rubble from the clean-up of a former uranium and thorium minerals processing research facility is currently stored at the Woomera Test Range in South Australia awaiting final disposal. Prior to commencing any manipulation of the nearly 10,000 waste drums (205 L or 55 gallon each), radon concentration monitoring and radon daughter dosimetry has been undertaken to (i) gain understanding of the temporal and spatial variation of radon and its daughters within the storage facility, which could provide insights into the radiological source term and (ii) confirm that radiological risks to workers are below the guideline values. A time series of nearly 12 months of detailed observations shows low level radon concentrations with annual average values that are slightly above the average radon concentrations in Australian homes. Peak values in summer are about three times higher than the annual average based on the CRM measurements. Both radon concentrations and annual effective dose are well below the regulatory limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Economic dispatch for electricity merchant with energy storage and wind plant: State of charge based decision making considering market impact and uncertainties

Here this paper investigates how the market impact of electricity merchants and uncertainty of wind generation affect their co-optimized scheduling policy, specifically for merchants who have both energy storage and wind plants. In the existing literature, merchants' trading actions are usually assumed not to affect market prices; however, a large-scale energy storage merchant's actions can affect market prices. To this end, we approximate the electricity price by a linear function of the quantity of power traded by the merchant in the reward function to achieve decision-making incorporating the market impact. This paper utilizes the dynamic programming approach to analyze merchants' optimal multi-period decision-making incorporating market impact, uncertain wind generation, and energy storage constraints. First, our results demonstrate that for a merchant with co-located energy storage facilities and wind power plants, the energy storage's feasible state of charge (SOC) range can be segmented into four possible sub-ranges by three analytically developed SOC reference points. The unique optimal trading decision can be achieved by comparing the current energy inventory and the SOC references of the next period. Second, our results show that market impact and uncertainties substantially change the optimal storage scheduling policy by impacting the values of the reference points. To mitigate the negative effect of the merchant's market impact on buying and selling actions, the merchant may reduce the amount of generating or pumping electricity each period to maximize profit. Moreover, we identify and investigate the trade-off between market price and transaction quantity. Our findings provide co-optimized scheduling guidance for electricity merchants with co-located energy storage and renewable power plants systems.

17 WIND ENERGY↗

Consolidated Interim Storage Advantages and Disadvantages from Prior Reports and Studies

The question of whether centralized storage of civilian spent nuclear fuel (SNF) should be part of the federal waste management system as an intermediate step before permanent disposal has been debated for more than four decades. Since the Nuclear Waste Policy Act (NWPA) [1] was enacted, the need for interim storage facilities (ISFs) as part of the federal waste management system has been analyzed and documented in numerous reports and studies. This presentation summarizes the advantages and disadvantages, as described in those reports, of incorporating an ISF into the waste management system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Ground Motion Inputs for the Seismic Shake Table Test

Currently, spent nuclear fuel (SNF) is stored in on-site independent spent-fuel storage installations (ISFSIs) at seventythree (73) nuclear power plants (NPPs) in the US. Because a site for geologic repository for permanent disposal of SNF has not been constructed, the SNF will remain in dry storage significantly longer than planned. During this time, the ISFSIs, and potentially consolidated storage facilities, will experience earthquakes of different magnitudes. The dry storage systems are designed and licensed to withstand large seismic loads. When dry storage systems experience seismic loads, there are little data on the response of SNF assemblies contained within them. The Spent Fuel Waste Disposition (SFWD) program is planning to conduct a full-scale seismic shake table test to close the gap related to the seismic loads on the fuel assemblies in dry storage systems. This test will allow for quantifying the strains and accelerations on surrogate fuel assembly hardware and cladding during earthquakes of different magnitudes and frequency content. The main component of the test unit will be the full-scale NUHOMS 32 PTH2 dry storage canister. The canister will be loaded with three surrogate fuel assemblies and twenty-nine dummy assemblies. Two dry storage configurations will be tested – horizontal and vertical above-ground concrete overpacks. These configurations cover 91% of the current dry storage configurations. The major input into the shake table test are the seismic excitations or the earthquake ground motions – acceleration time histories in two horizontal and one vertical direction that will be applied to the shake table surface during the tests. The shake table surface represents the top of the concrete pad on which a dry storage system is placed. The goal of the ground motion task is to develop the ground motions that would be representative of the range of seismotectonic and other conditions that any site in the Western US (WUS) or Central Eastern US (CEUS) might entail. This task is challenging because of the large number of the ISFSI sites, variety of seismotectonic and site conditions, and effects that soil amplification, soil-structure interaction, and pad flexibility may have on the ground motions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF↗

How To Maintain Effective IAEA Safeguards While Reducing Facility Impact

For almost twenty years, inspectors from the International Atomic Energy Agency have been visiting the K-Area Material Storage facility at the Savannah River Site where excess plutonium has been placed under IAEA safeguards as part of the United States Volunatary Offer Agreement. During that time, the mission of K-Area Complex has expanded from storage of nuclear matieral to glovebox operations in support of the National Nuclear Security Administration’s Plutonium Disposition program. With this change in mission, it is becoming increasingly challenging to manage facility staff radiation exposure and operating activities during the IAEA’s annual Physcial Inventory Verifications (PIV). This study has identified both near-term and long-term recommendations for IAEA monitoring protocols that would allow the IAEA to maintain effective safeguards of the material while decreasing the impact to the facility. A statisitical analysis has shown that reducing the number of containers measured during an annual PIV from 12 to 4 still ensures a high level of confidence in the confidence while reducing the inspector time in the facility amd with a corresponding significant reduction in personnel radiation exposure. A modified installation pattern of Remotely Monitored Sealing Arrays (RMSAs) is also proposed utilizing only the outer rows of arrays of stored material containers in the Stack Area (SA). The modified RMSA placement will provide equivalent protection, while significantly reducing personnel radiological exposure, manpower requirements and associated costs. With advances in technology, there are additional potential options in containment/surveillance and continuity of knowledge that would allow the agency to be outside of the facility during PIV measurements and have confidence in the accuracy and authencitity of the results.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Risk Assessment Considerations for Underground Hydrogen Storage in Depleted Gas Reservoirs

Underground hydrogen storage (UHS) in depleted reservoirs presents a promising solution for large-scale energy storage as hydrogen demand grows. As the UHS industry emerges, robust risk assessments are critical to ensuring safe operation of the storage facilities and minimizing the risk of accidents. This work explores risk assessment protocols for underground natural gas storage (UGS) in depleted reservoirs and identifies key considerations for repurposing these facilities for UHS. By examining the differences in physical and chemical properties between hydrogen and natural gas, this work highlights new and modified hazards that merits a reevaluation of traditional natural gas risk assessment practices. This investigation synthesizes insights from previous literature reviews and interviews with UGS industry experts and operators to identify key areas for adapting risk assessment methodologies for hydrogen. The insights gleaned from expert interviews indicate that existing risk assessment standards are non-prescriptive, leading to diverse company-specific risk assessment methodologies requiring substantial additions to become practical. Due to a lack of concrete risk assessment requirements, experience, and relevant data, this uncertainty is expected to be magnified considerably when considering hydrogen. This study identifies several areas for potential modification of existing risk assessment practices that could be considered by those developing standards or performing risk assessments for UHS. Specifically, risk assessments may be improved by including risks unique to hydrogen in existing standards, changing the magnitude of different risk factors in existing risk assessment protocols, and improving methods of data collection and communication across the industry to address large areas of uncertainty.

08 HYDROGEN↗

Spent nuclear fuel receipt rate analysis within an integrated waste management system (IWMS) architecture that includes consolidated storage

A key parameter in analyzing the performance of an integrated waste management system (IWMS) architecture for the disposition of spent nuclear fuel (SNF) is the SNF receipt rate from reactor and other custodian sites. Receipt rate in this paper means how much SNF is accepted per year for transport in the IWMS from such sites. Introducing one or more federal consolidated interim storage facilities (CISFs) into the IWMS architecture can potentially accelerate the receipt rate profile over time relative to system architectures without a CISF. This raises the question of what an optimal SNF receipt rate profile for an IWMS architecture might be in view of practical constraints and desired system performance attributes and associated metrics. This paper describes a sensitivity study on SNF receipt rates and the associated results for a selected set of IWMS scenarios aimed at informing near-term planning for interim storage capabilities and transportation assets. Two different strategies for CISF operation while awaiting availability of a disposal system to receive SNF are compared: one that relatively quickly fills an initial CISF and then idles the transportation system; and another that aims for more continuous use of transportation assets and receipt capabilities at the CISF. This study examines cost considerations and other factors, such as the timing of clearing reactor sites of SNF, efficient use of capital assets, and some other metrics that might be important to a CISF host community. Based on the analysis, an initial approach is presented that targets a continuous receipt strategy while maintaining the flexibility to step up receipt capabilities to a reasonable degree when needed and beneficial, within overall system constraints.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗