Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STEAM SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

In-Service Monitoring of Steam Pipe Systems at High Temperatures

A system and method for monitoring the properties of a fluid, such as water, in a steam pipe without mechanically penetrating the wall of the pipe. The system uses a piezoelectric transducer to launch an ultrasonic probe signal into the pipe. Reflected ultrasonic signals are captured in a transducer, which can be the same transducer that launched the probe signal. The reflected signals are subjected to data processing, which can include filtering, amplification, analog-to-digital conversion and autocorrelation analysis. A result is extracted which is indicative of a property of the fluid, such as a height of the condensed fluid, a cavitation of the condensed fluid, and a surface perturbation of the condensed fluid. The result can be recorded, displayed, and/or transmitted to another location. One embodiment of the system has been constructed and tested based on a general purpose programmable computer using instructions recorded in machine-readable non-volatile memory.

Bar-Cohen, Yoseph↗

Guidelines for Estimating Unmetered Industrial Water Use

The document provides a methodology to estimate unmetered industrial water use for evaporative cooling systems, steam generating boiler systems, batch process applications, and wash systems. For each category standard mathematical relationships are summarized and provided in a single resource to assist Federal agencies in developing an initial estimate of their industrial water use. The approach incorporates industry norms, general rules of thumb, and industry survey information to provide methodologies for each section.

99 GENERAL AND MISCELLANEOUS↗

Fluidized-bed technology enabling the integration of high temperature solar receiver CSP systems with steam and advanced power cycles

Solar Particle Receivers (SPR) are under development to drive concentrating solar plants (CSP) towards higher operating temperatures to support higher efficiency power conversion cycles. The novel high temperature SPR-based CSP system uses solid particles as the heat transfer medium (HTM) in place of the more conventional fluids such as molten salt or steam used in current state-of-the-art CSP plants. The solar particle receiver (SPR) is designed to heat the HTM to temperatures of 800 °C or higher which is well above the operating temperatures of nitrate-based molten salt thermal energy storage (TES) systems. The solid particles also help overcome some of the other challenges associated with molten salt-based systems such as freezing, instability and degradation. The higher operating temperatures and use of low cost HTM and higher efficiency power cycles are geared towards reducing costs associated with CSP systems. This paper describes the SPR-based CSP system with a focus on the fluidized-bed (FB) heat exchanger and its integration with various power cycles. Furthermore, the SPR technology provides a potential pathway to achieving the levelized cost of electricity (LCOE) target of $0.06/kWh that has been set by the U.S. Department of Energy's SunShot initiative.

14 SOLAR ENERGY↗

High Temperatures Health Monitoring of the Condensed Water Height in Steam Pipe Systems

Ultrasonic probes were designed, fabricated and tested for high temperature health monitoring system. The goal of this work was to develop the health monitoring system that can determine the height level of the condensed water through the pipe wall at high temperature up to 250 deg while accounting for the effects of surface perturbation. Among different ultrasonic probe designs, 2.25 MHz probes with air backed configuration provide satisfactory results in terms of sensitivity, receiving reflections from the target through the pipe wall. A series of tests were performed using the air-backed probes under irregular conditions, such as surface perturbation and surface disturbance at elevated temperature, to qualify the developed ultrasonic system. The results demonstrate that the fabricated air-backed probes combined with advanced signal processing techniques offer the capability of health monitoring of steam pipe under various operating conditions.

High Temperatures (HT)↗

Analysis of AC-DC Converters for Grid-tied High Temperature Steam Electrolysis Systems

Grid-tied HTSE systems have the prospects to produce clean hydrogen enabling power and broad energy systems decarbonization. Most commercially available power electronic converter systems (PECS) are designed for batteries, solar PVs, wind, and other well-established renewable energy resources. Standards (such as IEEE 1547, UL 1741, CA Rule-21, HI Rule14) exist for PECS used for renewable energy systems such as battery storage and solar PVs. However, those that consider the dynamic behavior of HTSEs and that can be used for large-scale H2 systems are yet to be developed. This paper investigates the performance of these PECS for the HTSE application that are set up at the Idaho National Laboratory for hydrogen production testing, research and development. In particular, the performance analysis of two grid-tied PECS (A and B) is conducted for a 100 kW solid oxide HTSE system. System A consists of 6 units of 30kW MOSFET-switched bidirectional AC-DC rectifier while system B has a single unit of 150kW thyristor-switched AC-DC rectifier. Both systems are connected to the HTSE stacks via a DC-DC converter. Different operational conditions of the HTSE system are tested to analyze the dynamic response of the HTSE’s PECS. The experimental results show the need to develop advanced control strategies for PECS that incorporates the dynamics of HTSE systems for improved performance.

High temperature steam electrolysis↗

Integrated solar thermochemical reaction system for steam methane reforming

Solar-aided upgrade of the energy content of fossil fuels, such as natural gas, can provide a near-term transition path towards a future solar-fuel economy and reduce carbon dioxide emission from fossil fuel consumption. Both steam and dry reforming a methane-containing fuel stream have been studied with concentrated solar power as the energy input to drive the highly endothermic reactions but the concept has not been demonstrated at a commercial scale. Under a current project with the U.S. Department of Energy, PNNL is developing an integrated solar thermochemical reaction system that combines solar concentrators with micro- and meso-channel reactors and heat exchangers to accomplish more than 20% solar augment of methane higher heating value. The objective of our three-year project is to develop and prepare for commercialization such solar reforming system with a high enough efficiency to serve as the frontend of a conventional natural gas (or biogas) combined cycle power plant, producing power with a levelized cost of electricity less than 6¢/kWh, without subsidies, by the year 2020. In this paper, we present results from the first year of our project that demonstrated a solar-to-chemical energy conversion efficiency as high as 69% with a prototype reaction system.

03 NATURAL GAS↗

Analysis of AC-DC Converters for Grid-tied High Temperature Steam Electrolysis Systems

Grid-tied HTSE systems have the prospects to produce clean hydrogen enabling power and broad energy systems decarbonization. Most commercially available power electronic converter systems (PECS) are designed for batteries, solar PVs, wind, and other well-established renewable energy resources. Standards (such as IEEE 1547, UL 1741, CA Rule-21, HI Rule-14) exist for PECS used for renewable energy systems such as battery storage and solar PVs. However, those that consider the dynamic behavior of HTSEs and that can be used for large-scale H2 systems are yet to be developed. This paper investigates the performance of these PECS for the HTSE application that are set up at the Idaho National Laboratory for hydrogen production testing, research and development. In particular, the performance analysis of two grid-tied PECS (A and B) is conducted for a 100 kW solid oxide HTSE system. System A consists of 6 units of 30kW MOSFET-switched bidirectional AC-DC rectifier while system B has a single unit of 150kW thyristor-switched ACDC rectifier. Both systems are connected to the HTSE stacks via a DC-DC converter. Different operational conditions of the HTSE system are tested to analyze the dynamic response of the HTSE’s PECS. The experimental results show the need to develop advanced control strategies for PECS that incorporates the dynamics of HTSE systems for improved performance.

08 - HYDROGEN↗

Improvement design study on steam generator of MHR-50/100 aiming higher safety level after water ingress accident

Mitsubishi Heavy Industries, Ltd. (MHI) has been studying on MHI original High Temperature Gas cooled Reactor (HTGR), namely MHR-50/100, for commercialization with supported by JAEA. In the heat transfer system, steam generator (SG) is one of the most important components because it should be imposed a function of heat transfer from reactor power to steam turbine system and maintaining a nuclear grade boundary. Then we especially focused an effort of a design study on the SG having robustness against water ingress accident based on our design experience of PWR, FBR and HTGR. In this study, we carried out a sensitivity analysis from the view point of economic and plant efficiency. As a result, the SG design parameter of helium inlet/outlet temperature of 750 deg. C/300 deg. C, a side-by-side layout and one unit of SG attached to a reactor were selected. In the next, a design improvement of SG was carried out from the view point of securing the level of inherent safety without reliance on active steam dump system during water ingress accident considering the situation of the Fukushima nuclear power plant disaster on March 11, 2011. Finally, according to above basic design requirement to SG, we performed a conceptual design on adapting themes of SG structure improvement. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

Assessment of Geothermal Resource Potential at a High-Priority Area on the Utah Testing and Training Range–South (UTTR–S)

Field investigations conducted during 2011 support and expand the conclusion of the original Preliminary Report that discovery of a viable geothermal system is possible in the northwestern part of the Utah Testing and Training Range-South (UTTR-S), referred to henceforth as Focus Area 1. The investigations defined the southward extent of the Wendover graben into and near Focus Area 1, enhanced the understanding of subsurface conditions, and focused further geothermal exploration efforts towards the northwestern-most part of Focus Area 1. Specifically, the detailed gravity survey shows that the Wendover graben, first defined by Cook et al. (1964) for areas north of Interstate Highway 80, extends and deepens southwest-ward to the northwest corner of Focus Area 1. At its deepest point, the intersection with a northwest-trending graben there is favorable for enhanced permeability associated with intersecting faults. Processing and modeling of the gravity data collected during 2011 provide a good understanding of graben depth and distribution of faults bounding the graben and has focused the interest area of the study. Down-hole logging of temperatures in wells made available near the Intrepid, Inc., evaporation ponds, just north of Focus Area 1, provide a good understanding of the variability of thermal gradients in that area and corroborate the more extensive temperature data reported by Turk (1973) for the depth range of 300-500 m. Moderate temperature gradients in the northern part of the Intrepid area increase to much higher gradients and bottom-hole temperatures southeastward, towards graben-bounding faults, suggesting upwelling geothermal waters along those faults. Water sampling, analysis, and temperature measurements of Blue Lakes and Mosquito Willey's springs, on the western boundary of Focus Area 1, also show elevated temperatures along the graben-bounding fault system. In addition, water chemistry suggests origin of those waters in limestone rocks beneath the graben in areas with temperatures as high as 140 C (284 F). In conclusion, all of the field data collected during 2011 and documented in the Appendices of this report indicate that there is reasonable potential for a viable geothermal resource along faults that bound the Wendover graben. Prospects for a system capable of binary electrical generation are especially good, and the possibility of a flash steam system is also within reason. The next steps should focus on securing the necessary funding for detailed geophysical surveys and for drilling a set of temperature gradient wells to further evaluate the resource, and to focus deep exploration efforts in the most promising areas.

15 GEOTHERMAL ENERGY↗

Energy Conversion Alternatives Study (ECAS)

ECAS compared various advanced energy conversion systems that can use coal or coal-derived fuels for baseload electric power generation. It was conducted in two phases. Phase 1 consisted of parametric studies. From these results, 11 concepts were selected for further study in Phase 2. For each of the Phase 2 systems and a common set of ground rules, performance, cost, environmental intrusion, and natural resource requirements were estimated. In addition, the contractors defined the state of the associated technology, identified the advances required, prepared preliminary research and development plans, and assessed other factors that would affect the implementation of each type of powerplant. The systems studied in Phase 2 include steam systems with atmospheric- and pressurized-fluidized-bed boilers; combined cycle gas turbine/steam systems with integrated gasifiers or fired by a semiclean, coal derived fuel; a potassium/steam system with a pressurized-fluidized-bed boiler; a closed-cycle gas turbine/organic system with a high-temperature, atmospheric-fluidized-bed furnace; a direct-coal-fired, open- cycle magnetohydrodynamic/steam system; and a molten-carbonate fuel cell/steam system with an integrated gasifier. The sensitivity of the results to changes in the ground rules and the impact of uncertainties in capital cost estimates were also examined.

Source record↗

Possible Mechanism for Formation of Nonwettable “Dry Spots” on a Heated Surface during Nucleate Pool Boiling: II. Feedwater Stop Regime

The problems of simulation of heterogeneous nucleate pool boiling on a horizontal surface on the ascending branch of the boiling curve from the formation of a steam lens (SL) to the boiling crisis are considered. The proposed hypothesis provides in a number of cases a logically consistent interpretation of experiments and outlines the organizational principle of transferring the wall–liquid–steam system into the regime of nonwettable “dry spot” formation. The model includes the following types of nucleate boiling: (a) cyclic boiling with the contact line reverse to the bubble bottom center and bubble departure from the surface (at low heat flux q and the contact angle θ < 90°); (b) single steam bubble conversion into a steam lens, i.e., local film boiling with the possibility of spreading of a single “dry spot” at the variation of the contact angle θ ≥ 90°, and substantial growth of the departure diameter D{sub d} and SL lifetime τd; (c) formation of a single steam cluster of four SLs at a given pressure, the liquid underheating, and the average wall overheating.

42 ENGINEERING↗

Experimental study on the guillotine break accident of the main steam line with Atlas

A main steam line break (MSLB) accident is defined as a pipe break in the main steam system of a nuclear power plant. The MSLB accident is characterized as cool-down event due to the increased steam flow rate, which causes excessive energy removal from the steam generators and eventually reactor coolant system. This results in a decrease in reactor coolant temperature. The cool-down causes an increase in core reactivity due to the negative moderator and Doppler reactivity coefficients. The thermalhydraulic integral effect test was performed to simulate a double-ended guillotine break accident of the main steam line of a pressurized water reactor. With an aim of simulating the MSLB accident as realistically as possible, a pertinent scaling approach was taken, especially focusing on a break flow. The main objectives of this test were not only to provide physical insight into the system response of a nuclear power plant during the MSLB accident but also to produce an integral effect test data to validate the safety analysis codes. In the present test, asymmetric thermal-hydraulic behavior was clearly observed between the loops. In the cold leg-1A and -1B where the affected steam generator is connected, the flow rates were higher and the fluid temperatures were lower than those in the cold leg-2A and -2B. This could be attributed to the excessive heat removal in the cold leg-1A and -1B through the affected steam generator. This integral effect test data will be used to evaluate the prediction capability of existing safety analysis codes. Furthermore, this data can be utilized to identify any code deficiency for a MSLB simulation, especially for DVI-adapted plants. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Waste remediation

A system including a steam generation system and a chamber. The steam generation system includes a complex and the steam generation system is configured to receive water, concentrate electromagnetic (EM) radiation received from an EM radiation source, apply the EM radiation to the complex, where the complex absorbs the EM radiation to generate heat, and transform, using the heat generated by the complex, the water to steam. The chamber is configured to receive the steam and an object, wherein the object is of medical waste, medical equipment, fabric, and fecal matter.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗