Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Challenges in Obtaining Property Access: The FUSRAP Maywood Site Experience - 13433

The Formerly Utilized Sites Remedial Action Program (FUSRAP) is the US government program started in 1974 to identify, investigate and clean up or control sites that became contaminated as a result of the nation's early atomic programs. Many of these sites are not owned by the federal government and therefore require owner permission to enter. The experience in pursuing such access at the FUSRAP Maywood Superfund Site (the Maywood Site or the Site) in Bergen County, New Jersey, is extensive. Since the US Army Corps of Engineers (the Corps) assumed responsibility for the Maywood Site from the US Department of Energy in 1997, at least 186 separate property access agreements (known in FUSRAP as a Real Estate Right-of- Entry or ROE) have been executed between the Corps and approximately 55 different land owners and tenant occupants at the Maywood Site (agreement renewals with the same owners over time account for the difference). Maywood's experience during the Corps' tenure, reflected here in three case studies of representative property access efforts, offers some lessons and best practices that may apply to other remedial programs. While the Site Community Relations Manager (the author of this paper) managed the property access task, multi-disciplinary support from across the project was also critical to success in this endeavor. (authors)

54 ENVIRONMENTAL SCIENCES↗

FUSRAP Maywood Site - Remediation of a Residential Property at 61 Trudy Drive, Lodi, NJ - 17533

The Formerly Utilized Sites Remedial Action Program (FUSRAP) is the U.S. government program started in 1974 to identify, investigate and clean up or control sites that became contaminated as a result of the nation's early atomic programs. The FUSRAP Maywood (New Jersey) Superfund Site (FMSS) consists of 92 designated property parcels known as vicinity properties. 61 Trudy Drive in Lodi, New Jersey is one such vicinity property. Construction planning for a recently-completed remedial excavation at 61 Trudy Drive was predicated on a fundamental question: to remediate the property with the existing home remaining in place or to demolish the exiting home. Answering this question involved detailed engineering and cost analyses, programmatic considerations, and stakeholder input. 61 Trudy Drive was originally addressed under FUSRAP in 1985 by the U.S. Department of Energy (DOE). However, subsequent remediation on an adjacent property by the U.S. Army Corps of Engineers (USACE) in 1998 suggested that residual contamination remained at depth at 61 Trudy. The property owner at that time declined to allow FUSRAP access to the property. However, a property transfer in 2012 presented USACE with an opportunity to address this property. Characterization of the property began in 2013; remedial activities were completed in 2015. The 61 Trudy Drive remediation required an intensive stakeholder communications program tailored for several audiences, including the affected property owner, local government officials and the neighboring community This paper will present the FUSRAP history at 61 Trudy Drive, to provide context for recent FUSRAP actions there. It will then focus on the challenges and complexities of performing environmental remediation in a suburban residential setting, focusing on both construction and communications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FUSRAP Maywood Site Remediation of Redstone Park, Lodi, NJ - 17534

The Formerly Utilized Sites Remedial Action Program (FUSRAP) is the U.S. government program started in 1974 to identify, investigate and clean up or control sites that became contaminated as a result of the nation's early atomic programs. FUSRAP was administered by the U.S. Department of Energy (DOE) until 1997, when it was transferred to the U.S. Army Corps of Engineers (USACE) by congressional action. Redstone Park is a 1.5-acre municipal park located in a residential neighborhood in Lodi, Bergen County, New Jersey, USA. The park is a designated vicinity property of the FUSRAP Maywood Superfund Site. This paper will summarize the FUSRAP history of the property spanning over 20 years and then focus on the construction and community relations challenges of recent FUSRAP actions at the site. All of Redstone Park except for a portion bordering a residential property was remediated under FUSRAP in 1996. This remaining portion was remediated in 1998. The 1996 remediation included some hand-digging of surface contamination around the roots of several large mature trees in the park. As part of this action, the DOE proposed alternate cleanup standards whereby subsurface contaminated soil would remain in place around the root balls of the trees and in deeper areas (greater than 1.2 meters [m]) under a large storm drain pipe (or culvert) that runs through the park. This proposal was made to preserve the natural value of the trees and to protect the drainage pipe from damage. After careful review which included an assessment of potential health hazards, the U.S. Environmental Protection Agency (EPA) approved this proposal. The Borough of Lodi also supported the proposal as a way to preserve the trees for the enjoyment of park users. In 2009, EPA conducted a mandatory Five-Year Review of the FUSRAP Maywood Site. The review identified data gaps which prevented a full assessment of remedy effectiveness at Redstone Park. The USACE reviewed all the historic soil data from the park [1] and developed a characterization plan to address those gaps. Field surveys and sampling confirmed that the material around the tree roots and under the pipe did not comply with the current FUSRAP Maywood Site unrestricted use soil cleanup criteria (an average of 5 pico Curies per gram of radium-226 and thorium-232 combined above background) as established in the site's Soils and Buildings Record of Decision [2]. As noted earlier, USACE also considered the widespread uprooting of trees in the region during Hurricane Sandy in 2012 in its re-evaluation of the earlier decision to leave the trees in the park in place. That re-evaluation concluded it was in the best interest of all stakeholders to remove the residual contamination in Redstone Park. USACE subsequently excavated the soil under and around the drainage pipe as Phase 1 of a two-phased approach to address this residual contamination. 1,116 cubic yards of soil were removed for safe offsite disposal during this action in June-July 2016. Phase 2 (removal of contaminated soil around the tree roots) began in September 2016 with expected completion by December 2016. The work was staged in two phases so as not to impact the park during the summer school vacation months when park use is heaviest. (authors)

54 ENVIRONMENTAL SCIENCES↗

Challenges in obtaining property access: The FUSRAP Maywood site experience - 15550

The Formerly Utilized Sites Remedial Action Program (FUSRAP) is the US government program started in 1974 to identify, investigate and clean up or control sites that became contaminated as a result of the nation's early atomic programs. Many of these sites are not owned by the federal government and therefore require owner permission to enter. The experience in pursuing such access at the FUSRAP Maywood Superfund Site (the Maywood Site or the Site) in Bergen County, New Jersey, is extensive. Since the US Army Corps of Engineers (the Corps) assumed responsibility for the Maywood Site from the US Department of Energy in 1997, over 200 separate property access agreements (known in FUSRAP as a Real Estate Right-of-Entry or ROE) have been executed between the Corps and approximately 75 different land owners and tenant occupants at the Maywood Site (agreement renewals with the same owners over time account for the difference). Maywood's experience during the Corps' tenure, reflected here in three case studies of representative property access efforts, offers some lessons and best practices that may apply to other remedial programs. While the Site Community Relations Manager (the author of this paper) managed the property access task, multi-disciplinary support from across the project was also critical to success in this endeavor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced IGCC/Hydrogen Gas Turbine Development

The objective of this program was to develop the technologies required for a fuel flexible (coal derived hydrogen or syngas) gas turbine for IGCC that met DOE turbine performance goals. The overall DOE Advanced Power System goal was to conduct the research and development (R&D) necessary to produce coal-based IGCC power systems with high efficiency, near-zero emissions, and competitive capital cost. To meet this goal, the DOE Fossil Energy Turbine Program had as an interim objective of 2 to 3 percentage points improvement in combined cycle (CC) efficiency. The final goal is 3 to 5 percentage points improvement in CC efficiency above the state of the art for CC turbines in IGCC applications at the time the program started. The efficiency goals were for NOx emissions of less than 2 ppm NOx (@15 % O2). As a result of the technologies developed under this program, the DOE goals were exceeded with a projected 8 point efficiency improvement. In addition, a new combustion technology was conceived of and developed to overcome the challenges of burning hydrogen and achieving the DOE’s NOx goal. This report also covers the developments under the ARRA-funded portion of the program that include gas turbine technology advancements for improvement in the efficiency, emissions, and cost performance of gas turbines for industrial applications with carbon capture and sequestration. Example applications could be cement plants, chemical plants, refineries, steel and aluminum plants, manufacturing facilities, etc. The DOE’s goal for more than 5 percentage point improvement in efficiency was met with cycle analyses performed for representative IGCC Steel Mill and IGCC Refinery applications. Technologies were developed in this program under the following areas: combustion, larger latter stage buckets, CMC and EBC, advanced materials and coatings, advanced configurations to reduce cooling, sealing and rotor purge flows, turbine aerodynamics, advanced sensors, advancements in first stage hot gas path components, and systems analyses to determine benefits of all previously mentioned technologies to a gas turbine system in an IGCC configuration. This project built on existing gas turbine technology and product developments, and developed and validated the necessary turbine related technologies and sub-systems needed to meet the DOE turbine program goals. The scope of the program did not cover the design and validation of a full-scale prototype machine with the technology advances from this program incorporated. In summary, the DOE goals were met with this program. While the commercial landscape has not resulted in a demand for IGCC gas turbines many of the technologies that were developed over the course of the program are benefiting the US by being applied to new higher efficiency natural gas fueled gas turbines.

33 ADVANCED PROPULSION SYSTEMS↗

Effects of head-starting on multi-year space use and survival of an at-risk tortoise

A major challenge in the recovery of long-lived at-risk taxa like turtles is low juvenile recruitment. Head-starting—the raising of juveniles to larger sizes to improve survival—is one tool that can be used in circumstances where juvenile recruitment is limited. Due to declining populations and difficulty detecting juveniles, however, lack of knowledge of the ecology of juveniles can hinder efforts to develop and evaluate head-starting programs for many turtle species. We sought to inform recovery efforts of Mojave desert tortoises by quantifying multi-year space use and survival of head-started juveniles after release. We radio-tracked tortoises head-started under three different husbandry treatments that varied in rearing duration (from two to over six years) and whether head-starting included an indoor rearing component the first year. We compared postrelease space use and survival as a function of treatment, release size, and time since release. We found that space use, including home range size and site fidelity, varied by husbandry treatment, with smaller and younger tortoises having smaller home ranges and higher site fidelity. Additionally, home range size decreased and site fidelity increased with time since release across treatments. Tortoises with an indoor-rearing component experiencing increased risk of mortality as movement increased compared to tortoises reared solely outdoors. Nevertheless, survival did not differ among treatments or with tortoise age or size. Regardless of husbandry treatment, head-started tortoises exhibited similar space-use and survival overall. Our study provides insight into juvenile tortoise behavior and head-starting as a tool for tortoise conservation.

60 APPLIED LIFE SCIENCES↗

Nuclear Thermal Propulsion Ground Test History

Nuclear Thermal Propulsion (NTP) was started in ~1955 under the Atomic Energy Commission as project Rover and was assigned to Los Alamos National Laboratory. The Nevada Test Site was selected in 1956 and facility construction began in 1957. The KIWI-A was tested on July 1, 1959 for 5 minutes at 70MW. KIWI-A1 was tested on July 8, 1960 for 6 minutes at 85MW. KIWI-A3 was tested on October 10, 1960 for 5 minutes at 100MW. The National Aeronautics and Space Administration (NASA) was formed in 1958. On August 31, 1960 the AEC and NASA established the Space Nuclear Propulsion Office and named Harold Finger as Director. Immediately following the formation of SNPO, contracts were awarded for the Reactor In Flight Test (RIFT), master plan for the Nuclear Rocket Engine Development Station (NRDS), and the Nuclear Engine for Rocket Vehicle Application (NERVA). From December 7, 1961 to November 30, 1962, the KIWI-B1A, KIWI-B1B, and KIWI-B4A were tested at test cell A. The last two engines were only tested for several seconds before noticeable failure of the fuel elements. Harold Finger called a stop to any further hot fire testing until the problem was well understood. The KIWI-B4A cold flow test showed the problem to be related to fluid dynamics of hydrogen interstitial flow causing fuel element vibrations. President Kennedy visited the NTS one week after the KIWI-B4A failure and got to see the engine starting to be disassembled in the maintenance facility. The KIWI-B4D and KIWI-B4E were modified to not have the vibration problems and were tested in test cell C. The NERVA NRX program started testing in early 1964 with NRX-A1 cold flow test series (unfueled graphite core), NRX-A2 and NRX-A3 power test series up to 1122 MW for 13 minutes. In March 1966, the NRX-EST (Engine System Test) was the first breadboard using flight functional relationship and total operating time of 116 minutes. The NRX-EST demonstrated the feasibility of a hot bleed cycle. The NRX-A5 had multiple start-ups in May-June 1966 with 30.75 minutes accumulative operating time at or above 1GW. The NRX-A6 was tested in December 1969 and ran for 62 minutes at 1100 MW. Each engine had post-test examination and found various structure anomalies which were identified for correction and the fuel element corrosion rate was reduced. The Phoebus series of research reactors began testing at test cell C, in June 1965 with Phoebus 1A. Phoebus 1A operated for 10.5 minutes at 1100 MW before unexpected loss of propellant and leading to an engine breakdown. Phoebus 1B ran for 30 minutes in February of 1967. Phoebus 2A was the highest steady state reactor built at 5GW. Phoebus 2A ran for 12 minutes at 4100 MW demonstrating sufficient power is available. The Peewee test bed reactor was tested November- December 1968 in test cell C for 40 minutes at 500MW with overall performance close to pre-run predictions. The XE' engine was the only engine tested with close to a flight configuration and fired downward into a diffuser at the Engine Test Stand (ETS) in 1969. The XE' was 1100 MW and had ~28 start-ups. The nuclear furnace NF-1 was operated at 44 MW with multiple test runs at 90 minutes in the summer of 1972. The NF-1 was the last NTP reactor tested. The Rover/NERVA program was cancelled in 1973. However, before cancellation, a lot of other engineering work was conducted by Aerojet on a 75, 000 lbf prototype flight engine and by Los Alamos on a ~16,000 lbf "Small Engine" nuclear rocket design. The ground test history of NTP at the NRDS also offers many lessons learned on how best to setup, operate, emergency shutdown, and post-test examine NTP engines. The reactor and engine maintenance and disassembly facilities were used for assembly and inspection of radioactive engines after testing. Most reactor/ engines were run at test cell A or test cell C with open air exhaust. The Rover/NERVA program became aware of a new environmental regulation that would restrict the amount of radioactive particulates allowed to be release in open air and successfully demonstrated a scrubber concept with the NF-1. The ETS stand was the only one with a high altitude test chamber used for XE'. The ETS and other test cells showed the effects the engine's radiation had on the facility materials and instrumentation as well as side effects the ground test facility has back on the engine operation. The breakdown of Phoebus 1A at test cell C showed how the site was cleaned up and back to operation for five more engines before the program was cancelled.

Gerrish, Harold P.↗

DESALINATION AND WATER TREATMENT RESEARCH AT SANDIA NATIONAL LABORATORIES.

Water is the backbone of our economy - safe and adequate supplies of water are vital for agriculture, industry, recreation, and human consumption. While our supply of water today is largely safe and adequate, we as a nation face increasing water supply challenges in the form of extended droughts, demand growth due to population increase, more stringent health-based regulation, and competing demands from a variety of users. To meet these challenges in the coming decades, water treatment technologies, including desalination, will contribute substantially to ensuring a safe, sustainable, affordable, and adequate water supply for the United States. This overview documents Sandia National Laboratories' (SNL, or Sandia) Water Treatment Program which focused on the development and demonstration of advanced water purification technologies as part of the larger Sandia Water Initiative. Projects under the Water Treatment Program include: (1) the development of desalination research roadmaps (2) our efforts to accelerate the commercialization of new desalination and water treatment technologies (known as the 'Jump-Start Program),' (3) long range (high risk, early stage) desalination research (known as the 'Long Range Research Program'), (4) treatment research projects under the Joint Water Reuse & Desalination Task Force, (5) the Arsenic Water Technology Partnership Program, (6) water treatment projects funded under the New Mexico Small Business Administration, (7) water treatment projects for the National Energy Technology Laboratory (NETL) and the National Renewable Energy Laboratory (NREL), (8) Sandia- developed contaminant-selective treatment technologies, and finally (9) current Laboratory Directed Research and Development (LDRD) funded desalination projects.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Rehabilitation After International Space Station Flights

Rehabilitating U.S. crew members to preflight status following flights on the Russian Mir Space Station required longer than six months for full functional recovery of some of the seven crew members. Additional exercise hardware has been added on the International Space Station as well as a rehabilitative emphasis on functional fitness/agility and proprioception. The authors will describe and present the results of the rehabilitation program for ISS and evaluate rehabilitative needs for longer missions. Pre- and in-flight programs emphasize strength and aerobic conditioning. One year before launch, crew members are assigned an Astronaut Strength and Conditioning specialist. Crew members are scheduled for 2 hours, 3 days a week, for pre-flight training and 2.5 hours, six days a week, for in-flight training. Crewmembers are tested on functional fitness, agility, isokinetic strength, and submaximal cycle ergometer evaluation before and after flight. The information from these tests is used for exercise prescriptions, comparison, and evaluation of the astronaut and training programs. The rehabilitation program lasts for 45 days and is scheduled for 2 hours during each crew workday. Phase 1 of the rehabilitation program starts on landing day and places emphasis on ambulation, flexibility, and muscle strengthening. Phase 2 adds proprioceptive exercise and cardiovascular conditioning. Phase 3 (the longest phase) focuses on functional development. All programs are tailored specifically for each individual according to their test results, preferred recreational activities, and mission roles and duties. Most crew members reached or exceeded their preflight test values 45 days after flight. Some crew members subjectively indicated the need for a longer rehabilitation period. The current rehabilitation program for returning ISS crew members seems adequate in content but may need to be extended for longer expeditions.

Chauvin, S. J.↗

The Goddard Space Flight Center ergonomics program

Since the Kennedy Space Center (KSC) Cardiovascular Screening Program started in 1984, we have made many changes to accommodate the growing number of participants. As a result of these changes, screening of KSC employees has become more efficient and productive. Various aspects of the program are covered.

Batson, Eileen↗

NASA's Space Launch System: Systems Engineering Approach for Affordability and Mission Success

NASA is working toward the first launch of the Space Launch System, a new, unmatched capability for deep space exploration with launch readiness planned for 2019. Since program start in 2011, SLS has passed several major formal design milestones, and every major element of the vehicle has produced test and flight hardware. The SLS approach to systems engineering has been key to the program's success. Key aspects of the SLS SE&I approach include: 1) minimizing the number of requirements, 2) elimination of explicit verification requirements, 3) use of certified models of subsystem capability in lieu of requirements when appropriate and 4) certification of capability beyond minimum required capability.

Hutt, John J.↗

HEAO - Signature of a successful space science program

The HEAO (High Energy Astronomy Observatory) Program consists of three large automated scientific observatories launched between 1977 and 1979 to observe from near-earth orbit stellar X-ray and gamma-ray sources and to measure incoming cosmic ray particles. The HEAO-2 and HEAO-3 spacecraft are expected to exceed their design lifetimes by a factor of three, as did HEAO-1, which operated for 18 months. All three missions are considered successful in that target dates have essentially been met, launch and flight operations have been relatively smooth, instrumentation has performed well, and there have been no cost overruns. The paper lists ten factors contributing to the missions' success, among them a thorough definition before program start, commonality of spacecraft design, redundancy of mission critical equipment, ample design margins, and tight control of system changes. Specific mission parameters are included in the paper as well as the technological advances engendered by the HEAO Program in such areas as high-resolution X-ray optics and solid-state spectrometry.

Speer, F. A.↗

Computational Materials Program for Alloy Design

The research program sponsored by this grant, "Computational Materials Program for Alloy Design", covers a period of time of enormous change in the emerging field of computational materials science. The computational materials program started with the development of the BFS method for alloys, a quantum approximate method for atomistic analysis of alloys specifically tailored to effectively deal with the current challenges in the area of atomistic modeling and to support modern experimental programs. During the grant period, the program benefited from steady growth which, as detailed below, far exceeds its original set of goals and objectives. Not surprisingly, by the end of this grant, the methodology and the computational materials program became an established force in the materials communitiy, with substantial impact in several areas. Major achievements during the duration of the grant include the completion of a Level 1 Milestone for the HITEMP program at NASA Glenn, consisting of the planning, development and organization of an international conference held at the Ohio Aerospace Institute in August of 2002, finalizing a period of rapid insertion of the methodology in the research community worlwide. The conference, attended by citizens of 17 countries representing various fields of the research community, resulted in a special issue of the leading journal in the area of applied surface science. Another element of the Level 1 Milestone was the presentation of the first version of the Alloy Design Workbench software package, currently known as "adwTools". This software package constitutes the first PC-based piece of software for atomistic simulations for both solid alloys and surfaces in the market.Dissemination of results and insertion in the materials community worldwide was a primary focus during this period. As a result, the P.I. was responsible for presenting 37 contributed talks, 19 invited talks, and publishing 71 articles in peer-reviewed journals, as detailed later in this Report.

Bozzolo, Guillermo↗

From Elastic Scattering to Central Exclusive Production: Physics with Forward Protons at RHIC

In this work, we describe a physics program at the Relativistic Heavy Ion Collider (RHIC) with tagged forward protons. The program started with the proton-proton elastic scattering experiment (PP2PP), for which a set of Rosman Pot stations was built. The PP2PP experiment took data at RHIC as a dedicated experiment at the beginning of RHIC operations. To expand the physics program to include non-elastic channels with forward protons, like Central Exclusive Production (CEP), Central Production (CP) and Single Diffraction DIssociation (SD), the experiment with its equipment was merged with the STAR experiment at RHIC. Consequently the expanded program, which included both elastic and inelastic channels became part of the physics program and operations of the STAR experiment. In this paper we shall describe the physics results obtained by the PP2PP and STAR experiments to date.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

COMET: First mission progress

The COMmercial Experiment Transporter (COMET) is a set of hardware and related infrastructure used to support orbital experiments of the Commerical Centers for the Development of Space (CCDS's) and their industrial partners. During the three years since the program started, contracts have been signed, design reviews conducted on all components, experiments selected for the first mission, all hardware has been manufactured, the first phase of integrated testing of the satellite, the experiments, and the Launch Facility have all been completed. The program experienced several delays in 1993. A component failure in the Service Module during preparation for environmental testing in January resulted in an eight-week delay for the Service Module part of the FreeFlyer. Discovery of large overruns of the mass budget required a major revision of the mission profile for COMET 1. In the spring of 1993, Space Industries Incorporated (SII) and Westinghouse stopped work because of a lack of funds. EER continued to work toward completion of their launch systems. SII and Westinghouse resumed work in September 1993. Since resumption of work, a technical review of all systems to ascertain their state of readiness has been completed. No major problems were discovered. All systems are proceeding toward a launch date in the first quarter of 1994.

Pawlick, Joseph F., Jr.↗

Glenn Heat Transfer Simulation and Solver Graphical User Interface: Development and Testing

In the Tui ine Branch of the Turbomachinery and Propulsion Systems Division, researching and developing efficient turbine aerothermodynamics technologies is the main objective. Creating effective turbines for jet engines is a process which, if based purely on physical experimental testing, would be extremely expensive. It is for this reason, and also for the reasons of speed and ease, that the Turbine Branch spends a large amount of effort working with simulations of turbines. Specifically, they focus their work on two main fields: Computational Field Dynamics (CFD), and Experimental data analysis. The experimental field involves comparing experimental results to simulated results, whereas the CFD field involves running these simulations. The simulations are applied to aerodynamics and heat transfer cases, for both steady and unsteady flow conditions. By and large this work is applied to the domain of flow and heat transfer in axial turbines. The main application used to run these heat flow simulations is GlennHT. This program, recently rewritten in FORTRAN 90, allows the user to input a job file which specifies all the necessary parameters needed to simulate flow through a user-defined grid. There are several other executables used as well, ranging in application from converting grid files to and from particular formats, to merging blocks in a connectivity file, to converting connectivity files to a GlennHT compatible format. All of these executables are run from the command line in a terminal; some of them have interactive prompts where the user must specify the files to be manipulated after the program starts, while others take all of their parameters from the command line. With this amount of variation comes a good deal of commands and formats to memorize, which can cause slower and less efficient work, as users may forget how to execute a certain program, or not remember the pathnames of the files they wish to use. Two years ago, steps were made to expedite this process with a graphical user interface (GUI) that combines the functionality of all the executables along with adding some new functionality, such as residuals graphing and boundary conditions creation. Upon my beginning here at Glenn, many parts of the GUI, which was developed in Java, were nonfunctional. There were also issues with cross-platforming, as systems in the branch were transitioning from Silicon Graphics (SGI) machines to Linux machines. My goals this summer are to finish the parts of the GUI that are not yet completed, fix parts that did not work correctly, expand the functionality to include other useful features, such as grid surface highlighting, and make the system compatible with both Linux and SGI. I will also be heavily testing the system and providing sufficient documentation on how to use the GUI, as no such documentation existed previously.

Kardamis, Joseph R.↗

Development and Demonstration of a 25 Watt Thermophotovoltaic Power Source for a Hybrid Power System

The development of a propane-fueled, 25 W thermophotovoltaic (TPV) power source for use in a hybrid power system is described. The TPV power source uses a platinum emitting surface with an anti-reflective coating to radiate to gallium antimonide photocells, which converts the radiation to electric power. The development program started with the design and fabrication of an engineering prototype system. This was used as a component development vehicle to develop the technologies for the various components. A 25 W demonstration prototype was then designed and fabricated using the most advanced component approaches. The designs and test results from this development program are discussed.

Doyle, Edward↗

HANFORDS PUBLIC TOUR PROGRAM - AN EXCELLENT EDUCATIONAL TOOL

Prior to 2001, the Department of Energy (DOE) sponsored limited tours of the Hanford Site for the public, but discontinued the program after the 9/11 terrorist attacks on the U.S. In 2003, DOE's Richland Operations Office (DOE-RL) requested the site's prime contractor to reinstate the public tour program starting in 2004 under strict controls and security requirements. The planning involved a collaborative effort among the security, safety and communications departments of DOE-RL and the site's contracting companies. This paper describes the evolution of, and enhancements to, Hanford's public tours, including the addition of a separate tour program for the B Reactor, the first full-scale nuclear reactor in the world. Topics included in the discussion include the history and growth of the tour program, associated costs, and visitor surveys and assessments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗