Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE APPROVALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Site Selection Restart in Germany Results of the Site Selection Commission - 17017

Since 2011 Germany is pursuing a phase-out strategy concerning the use of nuclear power for electricity production. This decision was strongly influenced by the Fukushima event. In 2013 the federal government announced that they also had achieved an agreement with the Federal States in Germany on a law to restart the site selection for a repository for spent fuel and high-level heat-generating waste from scratch. The new law was passed in July 2013. At first a 34-member commission had been installed in April 2014 to evaluate the Site Selection Law [1] and to develop basic principles for site selection, including safety requirements and selection criteria for rock formations. The commission included representatives from the parliament, civil society organizations, industry, environmental organizations, trade unions and scientists. The commission forwarded its recommendations in summer 2016. The evaluated law should come into force in 2017. The stepwise approach for finding a suitable site for a repository for Germany's heat-generating waste might then start in 2017. As shown in publication [2], the site selection process will take several decades. The preferred solution based on the present state of the art is the final disposal in deep geological formations in a mine with the option 'Reversibility and Retrievability (R and R)'. The scientific challenges and the upcoming R and D program are complex. Therefore a 'step-back option' (learning process) is foreseen in the program. The R and D program has to react flexibly to new findings, demands or modifications of criteria or requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

One Earth Energy Seismic Interpretation

The objectives of the Illinois Storage Corridor (ISC) project are to accelerate commercial deployment of carbon capture utilization and storage at two individual sites and receive approvals for Underground Injection Control (UIC) Class VI permits for construction at each site (ISC Project Narrative, 2020). As part of this project, and as part of the subsurface geologic characterization, 2D seismic data was acquired at both sites. This report summarizes the findings from the 2D and 3D seismic interpretation at the One Earth Energy site near Gibson City, Illinois. The seismic data confirms the stratigraphic continuity of the Mt. Simon Arkose Zone storage interval and the Eau Claire confining unit across the project area. The seismic data also indicates that there are faults that transect the Mt. Simon Arkose Zone Sandstone storage reservoir within the modeled CO 2 plume (for more detailed information, see Faults and Fractures section of One Earth Energy Class VI Permit applications). However, the seismic data also shows that there are no faults within the modeled CO 2 plume that transect the confining unit Eau Claire Formation. The faults that transect the Mt. Simon Arkose Zone Sandstone storage reservoir all tip out in the Lower Mt. Simon Formation and do not reach the overlying Eau Claire confining unit. A small 3D survey acquired around the One Earth Energy #1 characterization well confirms these findings.

20 FOSSIL-FUELED POWER PLANTS↗

Prairie State Generating Company 2D Seismic Interpretation

The objectives of the Illinois Storage Corridor (ISC) project are to accelerate commercial deployment of carbon capture utilization and storage at two individual sites and receive approvals for Underground Injection Control (UIC) Class VI permits for construction at each site (ISC Project Narrative, 2020). As part of this project, and as part of the subsurface geologic characterization, two-dimensional (2D) seismic data was acquired at both sites. This report summarizes the findings from two phases of 2D acquisition and seismic interpretation at the Prairie State Generating Company site near Marissa, Illinois. The seismic data indicates the presence of three faults that completely transect the storage and confining units. The initial 2021 2D seismic acquisition revealed the presence of a feature two miles east of the Lively Grove #1 characterization well. The feature is a polyphase fault with a component of strike-slip motion, forming a small positive flower structure. The second phase of 2D seismic acquisition in 2022 constrained the maximum extent of the fault, indicating it has a relatively limited length. Other 2022 seismic lines revealed the presence of two other faults that transect the storage and confining units in the southwest and northeast portions of the 2D seismic acquisition area. The 2021 and 2022 2D seismic surveys have identified three specific locations within the project area that may have an elevated risk of out of zone CO 2 migration due to faulting. Further technical work will be needed to quantify this risk and determine how and if this risk will impact the placement of CO 2 injection wells across the project area.

01 COAL, LIGNITE, AND PEAT↗

Geology of the One Earth Energy Site

The One Earth Energy site is one of two sites in the Illinois Storage Corridor (ISC) project. The objectives of the ISC project is to accelerate commercial deployment of carbon capture utilization and storage at two individual sites and receive approvals for Underground Injection Control (UIC) Class VI permits for construction at each site. At the One Earth Energy site, an extensive data collection program was undertaken, which included the drilling of a test well (One Earth Energy #1 [OEE #1]), four 2D seismic lines, and a small 3D seismic survey. The OEE #1 well was drilled in 2022 and acquired extensive core, log, and testing data to characterize the subsurface geology of the site. Coring was focused on the storage interval, the Mt. Simon Sandstone, and the confining interval, the Eau Claire Formation. The core and log data were used to evaluate the sedimentology and sequence stratigraphy, as well as to develop the conceptual geologic model. This report includes the geological summaries of the Mt. Simon Sandstone and the Eau Claire Formation. The extensive analysis of the log data is included in the petrophysical section, showing ranges of porosity, estimated pore size, and the mineral content of selected zones in the well. The separate petrographic technical report entitled “Petrographic and Advanced Geologic Characterization Report on One Earth Energy #1 (API# 1211325373)”, report number DOE-UIUC-0031892-04, details thin section point-counting analysis that includes mineralogical and pore space analysis, including grain size analysis, annotated thin section photomicrographs, scanning electron microscopy (SEM) with energy dispersive X-ray spectroscopy (EDS), and statistics of grain size analysis on Mt. Simon thin sections from OEE #1. The final OEE #1 well data to be included in this geology report is the routine core analysis of both whole core plugs and rotary sidewall core plugs. In addition to the OEE #1 well, four 2D seismic lines and a small 3D survey were acquired as part of the overall subsurface geological characterization. This geology report references the seismic interpretation report, entitled “One Earth Energy Site Seismic Interpretation Task 5.0”, report number DOE-UIUC-0031892-07. This report details the stratigraphic and structural interpretation of the 2D and 3D seismic data acquired at the One Earth Energy site. The 2D seismic data was acquired in 2019 and 2021, and the 3D survey was acquired in 2022. The objectives of the seismic programs were to contribute to the subsurface characterization of the Mt. Simon-Eau Claire Storage Complex by evaluating the continuity of potential storage reservoirs and containment intervals across the project area, and to determine if any geologic features are present that would increase containment risk to the proposed carbon storage project.

09 BIOMASS FUELS↗

Null Space Monte Carlo Evaluation of the Plateau to River Model

The Plateau to River Groundwater Model (P2R Model) is a groundwater flow and contaminant fate and transport (F&T) simulation model used to support remedial activities conducted by CH2M HILL Plateau Remediation Company at the Hanford Site in Washington State. Figure 1-1 illustrates the P2R Model extents, discretization, and boundary conditions. The P2R Model provides a computational framework to simulate the F&T of contaminants in groundwater associated with the 200-PO-1, 200-UP-1, 200-BP-5, and 200-ZP-1 Groundwater Operable Units (OUs) in the Hanford Site Central Plateau. In addition, the model includes adjacent areas and facilities (e.g., the State Approved Land Disposal Site). Intended and anticipated uses of the model include calculating water levels, hydraulic gradients, and groundwater flows throughout the model domain (encompassing the 200 West and 200 East Areas) for use in subsequent F&T calculations for contaminants of concern and developing scale-appropriate, telescopic-mesh refinement models for detailed evaluation of areas within the model domain where required. The overall objective of the modeling effort is to provide a basis for making informed remedial action decisions based on descriptions of current and expected future contaminant concentrations in groundwater at decision points within the OU boundaries. The objective for the model development phase is to create a common modeling platform that can be used for investigations of the Central Plateau groundwater OUs and areas downgradient toward the Columbia River. The P2R Model calibration to historical data observed at the Hanford Site is documented in CP-57037, Model Package Report for the Plateau to River Model Version 8.3. The purpose of this environmental calculation is to describe a null space Monte Carlo (NSMC) evaluation was conducted with the historic calibration of the P2R model. Use of numerical groundwater models is always accompanied with uncertainty in the results produced by a model because models are approximations of reality. Thus, by definition, lack the detail to fully represent observed behavior. Use of numerical techniques, such as a NSMC analysis, can help in identifying and quantifying the potential uncertainties associated with a numerical model such as the P2R Model. Use of the NSMC approach results in 100 groundwater flow models that are variants of the calibrated P2R Model. These variant models can be used to evaluate uncertainty in model predictions made by the calibrated P2R Model for other analyses. A secondary purpose of the environmental calculation is to establish these variant models for use with other applications.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Validation Package, July 2016 Groundwater Sampling at the Shirley Basin South, Wyoming, Disposal Site November 2016

Sampling Period: July 14-15, 2016 The 2004 Long-Term Surveillance Plan for the Shirley Basin South (UMTRCA Title II) Disposal Site, Carbon County, Wyoming, requires annual monitoring to verify continued compliance with the pertinent alternate concentration limits (ACLs) and Wyoming Class III (livestock use) groundwater protection standards. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Point-of-compliance (POC) wells 19-DC, 5-DC, and 5-SC, and monitoring wells 10-DC, 110-DC, 112-DC, 113-DC, 40-SC, 54-SC, 100-SC, 102-SC, and K.G.S.#3 were sampled. POC well 51-SC and downgradient well 101-SC were dry at the time of sampling. The water level was measured at each sampled well. See Attachment 2, Trip Report for additional details. Sampling and analyses were conducted in accordance with the Sampling and Analysis Plan for the U S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and­ analysis-plan-us-department-energy-office-legacy-management-sites). ACLs are approved for cadmium, chromium, lead, nickel, radium-226, radium-228, selenium, thorium-230, and uranium in site groundwater. Time-concentration graphs of the contaminants of concern in POC wells are included in Attachment 3, Data Presentation. The only ACL exceedance in a POC well was radium-228 in well 5-DC where the concentration was 30.7 picocuries per liter (pCi/L), exceeding the ACL of 25.7 pCi/L. Concentrations of sulfate and total dissolved solids continue to exceed their respective Wyoming Class III groundwater protection standards for livestock use in wells 5-DC, 5-SC, and 54-SC as they have done throughout the sampling history; however, there is no livestock use of the water from these aquifers at the site, and no constituent concentrations exceed groundwater protection standards at the wells near the site boundary.

Carbon County, Wyoming↗

Development of a Waste Management Organization for the Whiteshell Laboratories Closure Project - 18317

Whiteshell Laboratories (WL) has been generating and managing radioactive waste for over fifty years in support of a wide variety of research and operational applications. The current mission of the WL site, located in Manitoba, Canada, is to fully decommission the site to an approved end-state criterion and to disposition the waste in compliance with national and provincial regulations. To expedite the decommissioning schedule from over thirty years to nine years, which was a contractual commitment for the site operating company, Canadian Nuclear Laboratories (CNL), it became apparent that a centralized and optimized organization be established to coordinate all waste management activities and to fulfill the mission to process, condition, transport and disposition all radioactive wastes, which include Low-Level Waste (LLW), Intermediate-Level Waste (ILW) and High-Level Waste (HLW). The WL Waste Management Division was effectively established as a two-person operation in 2016 and has rapidly expanded to fulfill the mandate of managing nearly 30,000 cubic meters of LLW, ILW and HLW. This paper outlines the early lessons learned from managing important organizational changes without disrupting ongoing work practices; developing executive-level waste management strategies based on options studies and cost-benefit analysis comparisons; selection of storage vs. disposal disposition strategies; evaluation and selection of transportation methods and packages for LLW, ILW and HLW; and the need to develop an entire suite of programmatic documentation and procedures to support and instill a strong conduct of operations culture. The waste management strategy, which now focuses on transporting the waste to another province (Ontario) in a disposal ready form, represents the first large-scale radioactive waste transportation campaign in Canada that includes all three classes of waste. This paper provides additional insight on the overall waste management strategies for the WL Closure Project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brentwood Lessons Learned Project Report

The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for all parties involved in the project are key to an efficient approval process; and site investigation is necessary when integrating a new station design onto an existing site, particularly an older existing site that may have limited documentation on the site history and operations. The lessons learned for permitting and subcontracting construction work can be applied to other similar sites and to commercial sites.

30 DIRECT ENERGY CONVERSION↗

MOVING BEYOND PUMP AND TREAT TOWARD ENHANCED ATTENUATION AND COMBINED REMEDIES T-AREA, SAVANNAH RIVER SITE

Groundwater beneath T-Area, a former laboratory and semiworks operation at the Department of Energy (DOE) Savannah River Site, is contaminated by chlorinated solvents (cVOCs). Since the contamination was detected in the 1980s, the cVOCs at T-Area have been treated by a combination of soil vapor extraction and groundwater pump and treat. The site has received approval to discontinue the active treatments and implement a full scale test of enhanced attenuation--an engineering and regulatory strategy that has recently been developed by DOE and the Interstate Technology and Regulatory Council. Enhanced attenuation uses active engineering solutions to alter the target site in such a way that the contaminant plume will passively stabilize and shrink and to document that the action will be effective, timely, and sustainable. The paradigm recognizes that attenuation remedies are fundamentally based on a mass balance. Thus, long-term plume dynamics can be altered either by reducing the contaminant loading from the source or by increasing the rate of natural attenuation processes within all, or part of, the plume volume. The combination of technologies that emerged for T-Area included: (1) neat (pure) vegetable oil deployment in the deep vadose zone in the former source area, (2) emulsified vegetable oil deployment within the footprint of the groundwater plume, and (3) identification of attenuation mechanisms and rates for the distal portion of the plume. In the first part, neat oil spreads laterally forming a thin layer on the water table to intercept and reduce future cVOC loading (via partitioning) and reduce oxygen inputs (via biostimulation). In the second and third parts, emulsified oil forms active bioremediation reactor zones within the plume footprint to degrade existing groundwater contamination (via reductive dechlorination) and stimulates long-term attenuation capacity in the distal plume (via cometabolism). For T-Area, the enhanced attenuation development process proved to be a powerful tool in developing a defensible strategy that provides a high degree of performance while minimizing adverse collateral impacts of remediation (e.g., energy use and wetland damage) and minimizing life-cycle costs.

54 ENVIRONMENTAL SCIENCES↗

2011 Mound Site Groundwater Plume Rebound Exercise and Follow-Up - 13440

The Mound Site facility near Miamisburg, Ohio, opened in 1948 to support early atomic weapons programs. It grew into a research, development, and production facility performing work in support of the U.S. Department of Energy (DOE) weapons and energy programs. The plant was in operation until 1995. During the course of operation, an onsite landfill was created. The landfill was located over a finger of a buried valley aquifer, which is a sole drinking water source for much of the Miami Valley. In the 1980's, volatile organic compounds (VOCs) were discovered in groundwater at the Mound site. The site was placed on the National Priorities List on November 21, 1989. DOE signed a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Federal Facility Agreement with the U.S. Environmental Protection Agency (EPA) and the Ohio Environmental Protection Agency. The agreement became effective in October 1990. The area that included the landfill was designated Operational Unit 1 (OU-1). In 1995, a Record of Decision was signed that called for the installation and operation of a pump and treatment (P and T) system in order to prevent the VOCs in OU-1 groundwater from being captured by the onsite water production wells. In addition to the P and T system, a soil vapor extraction (SVE) system was installed in 1997 to accelerate removal of VOCs from groundwater in the OU-1 area. The SVE system was successful in removing large amounts of VOCs and continued to operate until 2007, when the amount of VOCs removed became minimal. A rebound study was started in February 2003 to determine how the groundwater system and contaminants would respond to shutting down the P and T system. The rebound test was stopped in February 2004 because predetermined VOC threshold concentrations were exceeded down-gradient of the landfill. The P and T and SVE systems were restarted after the termination of the rebound test. In 2006, the remediation of the Mound site was completed and the site was declared to be protective of human health and the environment, as long as the institutional controls are observed. The institutional controls that apply to the OU-1 area include provisions that no soil be allowed to leave the site, no wells be installed for drinking water, and the site may be approved only for industrial use. The onsite landfill with the operating CERCLA remedy remained. However, the Mound Development Corporation lobbied Congress for funds to remediate the remaining onsite landfill to allow for property reuse. In 2007 DOE received funding from Congress to perform non-CERCLA removal actions at OU-1 to excavate the site sanitary landfill. In 2009, DOE received American Recovery and Reinvestment Act funding to complete the project. Excavation of the landfill occurred intermittently from 2006 through 2010 and the majority of the VOC source was removed; however, VOC levels near the P and T system remained greater than the EPA maximum contaminant levels (MCLs). Presently, groundwater is contained using two extraction wells to create a hydraulic barrier to prevent down-gradient migration of VOC-impacted groundwater. Since the primary contamination source has been removed, the feasibility of moving away from containment to a more passive remedy, namely monitored natural attenuation (MNA), is being considered. A second rebound study was started in June 2011. If contaminant and groundwater behavior met specific conditions during the study, MNA would be evaluated and considered as a viable alternative for the groundwater in the OU-1 area. From June through December 2011, the second rebound study evaluated the changes in VOC concentrations in groundwater when the P and T system was not in operation. As the study progressed, elevated concentrations of VOCs that exceeded predetermined trigger values were measured along the down-gradient boundary of the study area, and so the P and T system was restarted. It was determined that a discrete area with VOC concentrations greater than the MCLs was present in groundwater down-gradient of the extraction wells. The source was not identified, but the contamination was thought not to be caused by residually contaminated soil beneath the former landfill. The data collected so far supports the consideration of MNA as a viable alternative to hydraulic containment. Additional investigations are being performed to identify possible sources or pathways of VOCs in groundwater that may be contributing to the elevated VOC levels measured down-gradient of the extraction well system. Data from this additional investigation will be used to determine whether the VOCs detected down-gradient of the hydraulic boundary are the result of residual soil contamination, a previously unknown contribution of VOC-contaminated water entering the groundwater outside the capture zone of the extraction wells, or a pulse of VOC-contaminated groundwater from the OU-1 landfill that occurred during the rebound study. (authors)

54 ENVIRONMENTAL SCIENCES↗

FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate alternatives for remediation of the groundwater in the 200-ZP-1 OU. The alternatives considered provide a range of potential response actions (i.e., no action; institutional controls and monitored natural attenuation [MNA]; and pump-and-treat with MNA, flow-path control, and institutional controls) that are appropriate to address site-specific conditions. The alternatives are evaluated against seven of the nine CERCLA evaluation criteria defined in Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (EPA/540/G-891004). The remaining two CERCLA criteria will be formally assessed during the public comment period. The FS evaluation serves as the basis for identifying a remedy to mitigate potential risks to human health and the environment. A preferred alternative (or alternatives) will be presented to the public for review and comment in the proposed plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Vadose Zone Model for SALDS for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP) is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain. The Hanford Site Central Plateau was subdivided into 26 individual vadose zone models, with 13 in the 200 East Area and 13 in the 200 West Area. Waste sites that have a completed performance assessment (PA) or past-leak analysis were not included as sources of radionuclides. Instead the vadose zone to groundwater transfer rates of the Environmental Restoration Disposal Facility, Integrated Disposal Facility, US Ecology, and Waste Management Area C (WMA C) PAs and the past-leak analysis for WMA C were used as direct input to the P2R model. Each of the vadose zone models is documented in separate environmental calculation files (ECFs). This ECF describes the State-Approved Land Disposal Site (SALDS) model. The scope of this ECF is to document the development and results of the SALDS vadose zone model. CP-63515, Model Package Report: Central Plateau Vadose Zone Models, describes the approach, assumptions, process of determining the number of models required and domain of each model, input data, and processing common to all the models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Small Waste in a Large Package - Meeting Requirements for Packaging, Transport and Disposal - 18092

A small amount of Class C Mixed Low Level Waste (MLLW) required packaging and disposition to an off-site facility. The AREVA TN RAM cask, designed and licensed for shipping Type B waste packages, was chosen as the most appropriate shipping solution. Due to packaging, shipping and disposal requirements, the standard TN RAM cask could not be utilized without making some modifications. Unique solutions and approaches had to be developed by the AREVA design team to complete the project within the anticipated budget and schedule. The general work scope was to characterize, remove from a pool, profile, package, certify and transport four irradiated components to an approved off-site facility. The material makeup of the components (three stainless steel plates and a lead counterweight) resulted in a MLLW classification which required special packaging and disposal methods. The AREVA design team worked with the disposal facility to identify all requirements associated with disposal of Class B/C MLLW. After defining the packaging and disposal requirements, it was determined that unique spacers and void fillers would be required. The design solution consisted of a liner insert as well as axial and radial spacers filled with inert material. Remaining voids in the liner insert were filled with recycled glass beads to fulfill the requirement for maximum 10% void space in the waste package. The axial spacers also served to center the waste load in the shipping cask to comply with the AREVA TN RAM Cask NRC license. Concentration averaging and waste consolidation were used to reach the Class C MLLW determination for shipping and disposal. This disposal method for Class C waste met the requirements of macro-encapsulation. Therefore, no additional treatment action was required when disposing of Class C MLLW. AREVA's solution provides a model for meeting macro-encapsulation requirements while also meeting void space requirements. This solution provides a model for how to adapt large shipping casks and liners to smaller waste packages that would not normally be a good fit for traditional casks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Supplemental Radiological Survey Plan for the Lease of the Rooms Associated with C107 of Building K-1006 at the East Tennessee Technology Park, Oak Ridge, Tennessee

In 1998, a portion of Bldg. K-1006 was leased to the Community Reuse Organization of East Tennessee (CROET) as part of the reindustrialization efforts at the East Tennessee Technology Park (ETTP). The facility was subleased and is being used as an analytical laboratory. The 1998 lease did not include rooms C107, C107-A, C107-B, C107-C, and C107-D. The lease of these rooms is now desired. These rooms comprise the area to be surveyed. The building was constructed as a laboratory facility to support the gaseous diffusion uranium enrichment process. It also contains offices and administrative spaces for laboratory personnel. After the gaseous diffusion process was shut down in the mid-1980s, the building was used to provide research and development support to ETTP environmental, safety, and health programs; the Toxic Substances Control Act Incinerator; the Central Neutralization Facility; and other multi-site waste treatment activities. It also served as the chemistry laboratory for the Environmental Technology Technical Services Organization. The activities currently conducted in Bldg. K-1006 utilize a variety of analytical techniques. Some of the major techniques being employed are X-ray analysis, electron microanalysis, and spectrochemical analysis. In 1998, a portion of Bldg. K-1006 was leased to CROET as part of the reindustrialization efforts at ETTP. The facility was subleased and is being used as an analytical laboratory. The 1998 lease did not include Rooms C107, C107-A, C107-B, C107-C, and C107-D. Some demolition of furniture and decontamination activities has taken place for Rooms C 107 and C 107-B since the last radiological survey of those rooms. In March 2009, a final remedial action (RA) was performed for the Bldg. K-1006 north basement sump. The Bldg. K-1006 north basement sump is a nominal 30-in.-diameter, 36-in.-deep concrete structure in the north corner of room C107B. The building receives groundwater in-leakage that is periodically pumped to the sewer system via this float-controlled pump. Solids in the bottom of the sump consisted of an estimated 1-ft{sup 3} coarse-grained material that varied in thickness from 0 to 4 in. with no suspended fraction. The RA consisted of removing the water in the sump and then removing and sampling the solids. The solids were mixed with grout after removal and allowed to set. The solids were then disposed off-site at an approved disposal facility. The building sump will remain until the K-1006 building is demolished. The actions for the K- 1006 sump are described in the revised Phased Construction Completion Report for Exposure Unit (EU) Z2-33, which received regulatory approval in December 2009.

54 ENVIRONMENTAL SCIENCES↗

Central Plateau Vadose Zone Geoframework

The objective of this environmental calculation file (ECF) is to document the revision of the three dimensional (3D) geoframework model (GFM) of the Central Plateau Vadose Zone (CPVZ) on the Hanford Site. CP-60925, Model Package Report: Central Plateau Vadose Zone Geoframework, documents the original version of the CPVZGFM (herein after called the CPVZ-Rev.0) and is the underlying basis for the CPVZ conceptual model. The CPVZ GFM provides a more detailed interpretation of the vadose zone hydrostratigraphic units (HSUs) in the Central Plateau area of the greater Hanford South geoframework model (HSGFM) (ECF-HANFORD-13-0029, Development of the Hanford South Geologic Framework Model, Hanford Site, Washington). The development of the CPVZ GFM provides a consistent vadose zone geologic framework that is needed to support the 3D, multiple-waste-site modeling approach proposed in CP-60405, Hanford Site Composite Analysis Technical Approach Description: Vadose Zone, while incorporating an appropriate level of geologic data and interpretations for the size of the model using current site-standard HSUs. Future more detailed site-specific investigations within the Central Plateau can then use the CPVZ GFM as a starting point instead of the larger scale HSGFM. This GFM was developed using the site standard and approved for use IHS Kingdom software. This ECF is a revision to the original model described in CP-60925, but the underlying assumptions and conceptual model are unchanged. Therefore, this revision is a new calculation of version 1.0 of the CPVZ GFM and not a new version of the GFM. Throughout this report, the original model documented in CP-60925 is called CPVZ-Rev.0and the calculation for this revision of the model is called CPVZ-Rev.1.

58 GEOSCIENCES↗

2009 EVALUATION OF TRITIUM REMOVAL AND MITIGATION TECHNOLOGIES FOR WASTEWATER TREATMENT

Since 1995, a state-approved land disposal site (SALDS) has received tritium contaminated effluents from the Hanford Site Effluent Treatment Facility (ETF). Tritium in this effluent is mitigated by storage in slow moving groundwater to allow extended time for decay before the water reaches the site boundary. By this method, tritium in the SALDS is isolated from the general environment and human contact until it has decayed to acceptable levels. This report contains the 2009 update evaluation of alternative tritium mitigation techniques to control tritium in liquid effluents and groundwater at the Hanford site. A thorough literature review was completed and updated information is provided on state-of-the-art technologies for control of tritium in wastewaters. This report was prepared to satisfy the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-026-07B (Ecology, EPA, and DOE 2007). Tritium separation and isolation technologies are evaluated periodically to determine their feasibility for implementation to control Hanford site liquid effluents and groundwaters to meet the Us. Code of Federal Regulations (CFR), Title 40 CFR 141.16, drinking water maximum contaminant level (MCL) for tritium of 20,000 pOll and/or DOE Order 5400.5 as low as reasonably achievable (ALARA) policy. Since the 2004 evaluation, there have been a number of developments related to tritium separation and control with potential application in mitigating tritium contaminated wastewater. These are primarily focused in the areas of: (1) tritium recycling at a commercial facility in Cardiff, UK using integrated tritium separation technologies (water distillation, palladium membrane reactor, liquid phase catalytic exchange, thermal diffusion), (2) development and demonstration of Combined Electrolysis Catalytic Exchange (CECE) using hydrogen/water exchange to separate tritium from water, (3) evaporation of tritium contaminated water for dispersion in the atmosphere, and (4) use of barriers to minimize the transport of tritium in groundwater. Continuing development efforts for tritium separations processes are primarily to support the International Thermonuclear Experimental Reactor (ITER) program, the nuclear power industry, and the production of radiochemicals. While these applications are significantly different than the Hanford application, the technology could potentially be adapted for Hanford wastewater treatment. Separations based processes to reduce tritium levels below the drinking water MCL have not been demonstrated for the scale and conditions required for treating Hanford wastewater. In addition, available cost information indicates treatment costs for such processes will be substantially higher than for discharge to SALDS or other typical pump and treat projects at Hanford. Actual mitigation projects for groundwater with very low tritium contamination similar to that found at Hanford have focused mainly on controlling migration and on evaporation for dispersion in the atmosphere.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Large Unmanned Aircraft System Operations in the National Airspace System - the NASA 2007 Western States Fire Missions

The National Aeronautics and Space Administration (NASA) Dryden Flight Research Center (DFRC) Ikhana (ee-kah-nah) project executed the 2007 Western States Fire Missions over several of the western United States using an MQ-9 unmanned aircraft system (UAS) in partnership with the NASA Ames Research Center, the United States Forest Service, and the National Interagency Fire Center. The missions were intended to supply infrared imagery of wildfires to firefighters on the ground within 10 minutes of data acquisition. For each of the eight missions, the NASA DFRC notified the Federal Aviation Administration (FAA) of specific flight plans within three or fewer days of the flight. The FAA Certificate of Waiver or Authorization (commonly referred to as a COA ) process was used to obtain access to the United States National Airspace System. Significant time and resources were necessary to develop the COA application, perform mission planning, and define and approve emergency landing sites. Unique aspects of flying unmanned aircraft created challenges to mission operations. Close coordination with FAA headquarters and air traffic control resulted in safe and successful missions that assisted firefighters by providing near-real-time imagery of selected wildfires.

Buoni, Gregory P.↗

Role of EIS in Materials and Coatings Selection for NASA's Launch Facilities

Corrosion studies began at NASA's John F. Kennedy Space Center (KSC) in 1966, during the Gemini/Apollo Programs, with the evaluation of long-term anti-corrosion coatings for carbon steel structures. NASAIKSC's Atmospheric Exposure Test Site was established at that time on the beach near the launch pad. In the years that followed, numerous studies at the site have identified materials, coatings, and maintenance procedures for launch hardware and equipment exposed to the highly corrosive environment at the launch pad. The atmosphere at the launch pad is highly corrosive due to the proximity of the Atlantic Ocean, high heat from rocket exhaust, and since the introduction of the Space Shuttle, the acidic combustion products of the Solid Rocket Boosters (SRBs). Currently, NASAIKSC maintains about $2 billion worth of unique equipment and facilities, not including the orbiters, each valued at about $1.8 billion. Among the items: two launch complexes, two crawler transporters, three mobile launch platforms, and specialized testing equipment. Atmospheric exposure provides very valuable data but it takes a long time and relies on human visual inspection. NASA Technical Standard for Protective Coatings requires 18 months of good performance at the Atmospheric Exposure Test Site for preliminary approval and continued good performance for 5 years for final approval of a coating system. The use of electrochemical impedance spectroscopy (EIS) was introduced at KSC in 1989 as a supplement to the traditional dc electrochemical techniques and atmospheric exposure studies. This paper presents and overview of several projects in which EIS was used in order to select materials and coatings to be used at NASA's launch facilities [1-2].

Calle, Luz Marina↗