Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk Mitigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Design Status Update of the Electron-Ion Collider

The design of the electron-ion collider EIC to be constructed at Brookhaven National Laboratory has been continuously evolving towards a realistic and robust design that meets all the requirements set forth by the nuclear physics community in the White Paper. Over the past year activities have been focused on maturing the design, and on developing alternatives to mitigate risk. These include improvements of the interaction region design as well as modifications of the hadron ring vacuum system to accommodate the high average and peak beam currents. Beam dynamics studies have been performed to determine and optimize the dynamic aperture in the two collider rings and the beam-beam performance. We will present the EIC design with a focus on recent developments.

43 PARTICLE ACCELERATORS↗

Quantifying the Influence of Size, Shape, and Density of Microplastics on Their Transport Modes: A Modeling Approach

Microplastics (MPs) pose significant risks to marine ecosystems and human health, necessitating accurate predictions of their distributions in aquatic environments for effective risk mitigation. However, understanding MP transport dynamics is challenging because of the inadequate representation of MP characteristics such as size, shape, and density in numerical models. Further, the accuracy of the MP vertical profiles in existing models has not been thoroughly validated. Thus, we developed an MP transport model within the Finite Volume Community Ocean Model framework (FVCOM-MP) by integrating MP characteristics. We validated FVCOM-MP against experimental and analytical data, focusing on various MP transport modes and transitions. FVCOM-MP successfully replicates MP profiles in different transport modes, including the bedload, surface-load, suspended-load, and mixed-load modes. Additionally, we introduce phase diagrams for classifying MP transport modes based on particle characteristics, enhancing our understanding of MP dynamics in aquatic systems. The transport modes for a number of real-world MP particles, including fishing line, plastic bag/bottle fragments, synthetic fibers, tire wear particles, polyvinyl chloride and expanded polystyrene pellets, were analyzed with these phase diagrams.

Microplastic transport, Settling velocity, Rising ↗

Project: Corbomite - Product: ConsoleWorks REACT

TDi Technologies presents ConsoleWorks REACT, an advanced platform designed to tackle the complexities of cyber and operational risk assessment. This comprehensive solution goes beyond asset-focused approaches by considering the impact of both assets and people have on the security and operation of critical infrastructure, specifically targeting preventing gird mis-operation by evaluating real-time human interaction or commands with critical assets. The hypothesis suggests that by integrating the assessment of user commands into the overall risk assessment process, organizations can make more informed decisions, prioritize resources effectively, and respond promptly to potential threats. This hypothesis forms the basis for the development of a proactive and holistic risk management approach that is more comprehensive and context aware than traditional models which only look at assets, patch levels, configuration and threat intel by collecting that information off the network vs directly from the asset, human, and human interaction all in real-time. ConsoleWorks' unique man-in-the-middle architecture is a key feature that sets it apart in the cybersecurity landscape. This architecture enables the real-time observation, enforcement, and commands or interaction risk transparency of user interaction with critical infrastructure to be risk mitigated and audited as they are aggregated with device and human risk factors for a more comprehensive risk threat score across a device or group of devices. This architecture allows ConsoleWorks to act as a secure intermediary between users and critical assets, monitoring all interactions and ensuring that only authorized commands are sent to the asset to be executed. This not only enhances security but also provides a comprehensive audit trail of all user activities, contributing to compliance efforts and facilitating incident investigation and risk management. By integrating this unique architecture with our comprehensive risk assessment methodology, ConsoleWorks REACT provides a powerful solution for managing cyber and operational risks, enabling organizations to maintain a robust security posture and effectively mitigate potential threats. To that end, the primary objective of this project was to research and develop a robust solution that enables the energy industry to mitigate the risks associated with human actions that can compromise the security or operations of assets critical to energy delivery, generation, transmission and operation. ConsoleWorks REACT plays a pivotal role in achieving this goal by leveraging its unique capabilities to monitor and track all user activity. Through its Zero Trust approach, which emphasizes continuous verification, the platform ensures secure access to assets and serves as the centralized human response and notification platform for addressing cyber and operational issues.

97 MATHEMATICS AND COMPUTING↗

CalWave Design for PacWave - Preliminary Design Phase - Risk Management Plan

The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register was established to identify risks and mitigation strategies. The Risk Management Plan assesses potential risks of CalWave's technology and accompanying processes and describes the risk mitigation strategies for the project.

16 TIDAL AND WAVE POWER↗

Anthropogenic effects on flood hazards in a hyper-arid watershed: The 2015 Atacama floods

An unprecedented precipitation event in the hyper-arid Atacama Desert of Northern Chile occurred in March 2015. Geomorphic alterations to the river channel and the coastal zone, coupled with the exceptional magnitude of the rainfall, caused catastrophic damage and loss of life. On the coast of the El Salado watershed, legacy mine tailings infilled the watershed-ocean connection, while the river channel was altered both by tailings and urbanization. The consequences of this event resulted from the coupling of anthropogenic geomorphic changes with an unusual climate event. Lack of field data, complex geomorphology and sediment loads influenced by human activity make analysing floods in these regions especially challenging. The objective of this work is to improve our understanding of the factors that control flood hazards by using numerical simulations to reconstruct the 2015 flood in El Salado. We carry out unsteady two-dimensional simulations fully coupled with the sediment concentration to identify the influence of tailing deposits, considering high-resolution data of the pre- and post-2015 flood topography. In conclusion, the results highlight the importance of specific event-based studies, using models that can help designing better strategies for climate change adaptation and risk mitigation, while providing information for risk reduction and channel restoration.

54 ENVIRONMENTAL SCIENCES↗

US Department of Energy, Office of Science High Performance Computing Facility Operational Assessment 2021: Oak Ridge Leadership Computing Facility

Oak Ridge National Laboratory’s (ORNL’s) Leadership Computing Facility (OLCF) continues to surpass its operational target goals of supporting users; delivering fast, reliable computational ecosystems; creating innovative solutions for high-performance computing (HPC) needs; contributing to the community to build the next generation HPC workforce, and managing risks, safety, and security associated with operating some of the most powerful computers in the world. The results can be seen in the cutting-edge science conducted by users and the praise from the research community. Calendar year (CY) 2021 saw continued excellence in research supported by the OLCF’s leadership-class computing resources, including Summit (the nation’s most powerful supercomputer), the global scratch file system Alpine, the Scalable Protected Infrastructure (SPI), the Exploratory Visualization Environment for Research in Science and Technology (EVEREST), and the archival mass-storage resource High-Performance Storage System (HPSS). While maintaining access and exceptional user support for Summit, the OLCF continued to make progress on the installation and deployment of Frontier, which will be the nation’s first exascale system when it comes online at the start of CY 2023. Users have already begun running and optimizing scientific codes on Crusher, the OLCF test and development system equipped with Frontier’s architecture. Throughout the year, the OLCF maintained a strong culture of operational excellence, including risk management, workplace safety, and cybersecurity. The OLCF’s rigorous risk management strategy anticipated and mitigated risks, and at this time there are no high-priority operational risks. Similarly, ORNL and the OLCF were committed to operating under the US Department of Energy’s (DOE’s) safety regulations that ensure a safe workplace. Technical staff tracked and monitored existing threats and vulnerabilities within the OLCF while continually developing tools and practices to enhance operations without increasing the facility’s risk. CY 2021 was filled with outstanding results and accomplishments, including a very high rating from users on overall satisfaction for the eighth consecutive year; a tremendous number of node hours delivered to 1,671 researchers on Summit; and the successful delivery of the allocation split of roughly 60%, 20%, and 20% of core-hours offered for the Innovative and Novel Computational Impact on Theory and Experiment (INCITE), Advanced Scientific Computing Research Leadership Computing Challenge (ALCC), and Director’s Discretionary (DD) programs, respectively (Section 2). COVID-19 research remained a focus in 2021, and the ALCC and DD programs allocated over 1 million Summit hours to the COVID-19 High Performance Computing Consortium. These accomplishments, coupled with the high utilization rates (i.e., overall and capability usage), represent the fulfillment of the promise of leadership class machines: efficient facilitation of leadership-class computational applications.

97 MATHEMATICS AND COMPUTING↗

Recommended Practices for Managing Induced Seismicity Risk Associated with Geologic Carbon Storage

The geologic storage of carbon dioxide (CO 2 ) is one method to help reduce or eliminate atmospheric CO 2 emissions. The sequestered CO 2 is originally captured from the atmosphere or from a stationary industrial source and subsequently injected into a deep subsurface porous rock formation. To facilitate the successful deployment of field scale carbon storage projects, the U.S. Department of Energy (DOE) is developing tools and protocols for defensible, science-based frameworks to quantify and mitigate risks associated with the long-term storage of CO 2 . This protocol specifically addresses the risk of induced seismicity due to injection in a geologic carbon storage (GCS) site. This integrated and risk-based protocol is a product of the U.S. DOE Fossil Energy’s National Risk Assessment Partnership (NRAP), a multi-year collaborative research effort of Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), National Energy Technology Laboratory (NETL), and Pacific Northwest National Laboratory (PNNL). These recommended practices describe a set of 7 steps to evaluate, manage, communicate, and mitigate the risk of induced seismicity at GCS sites. The base methodology of the recommended practices follows a framework similar to the Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems (Majer et al., 2012), developed for the Geothermal Technology Office of the U.S. DOE. These recommended practices present a framework to systematically assess the induced seismicity risk and quantify the associated uncertainties. These recommendations are based on current research and are sufficiently general to allow for modification and application to a variety of different types of sites. The substance of the recommended practices contained herein includes both technical and non-technical issues, and covers all operational stages of the GCS project lifecycle. They start at the preliminary risk assessment phase, continue through site assessment and characterization, include best practice communication and seismic monitoring plan methodologies, discuss the evaluation and mitigation of seismic hazard and risk, and closes with an exploration of operational management plans, which conclude when the induced seismicity risk abates back to background level. The focus of these recommendations is on actively managing the risks associated with induced seismicity by developing an actionable risk management plan that starts at the project proposal stage and continues through site closure through an iterative assessment and improvement process. The audience of this document is expected to include all interested stakeholders (e.g., operators, project developers, regulators, and the general public) and is expressly written to be accessible to this broad range of partners. This document is intended to disseminate knowledge gained through recent advances in the science of induced seismicity hazard and risk assessments, to provide updates based on recent experience gained by similar corollary injection-induced seismicity cases, and most importantly to establish a uniform framework to carry out a successful induced seismicity risk management plan for carbon storage projects in the future. These recommendations do not directly address any domestic or international regulations or standards. A complementary NRAP report makes recommendations for the assessment and management of environmental subsurface risks associated with unwanted fluid migration at GCS sites (Thomas et al., 2021) and should be referred to in order to address those additional GCS site risks.

54 ENVIRONMENTAL SCIENCES↗

Recommended Practices for Managing Induced Seismicity Risk Associated with Geologic Carbon Storage

The geologic storage of carbon dioxide (CO 2 ) is one method to help reduce or eliminate atmospheric CO 2 emissions. The sequestered CO 2 is originally captured from the atmosphere or from a stationary industrial source and subsequently injected into a deep subsurface porous rock formation. To facilitate the successful deployment of field scale carbon storage projects, the U.S. Department of Energy (DOE) is developing tools and protocols for defensible, science-based frameworks to quantify and mitigate risks associated with the long-term storage of CO 2 . This protocol specifically addresses the risk of induced seismicity due to injection in a geologic carbon storage (GCS) site. This integrated and risk-based protocol is a product of the U.S. DOE Fossil Energy’s National Risk Assessment Partnership (NRAP), a multi-year collaborative research effort of Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), National Energy Technology Laboratory (NETL), and Pacific Northwest National Laboratory (PNNL). These recommended practices describe a set of 7 steps to evaluate, manage, communicate, and mitigate the risk of induced seismicity at GCS sites. The base methodology of the recommended practices follows a framework similar to the $\textit{Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems}$ (Majer et al., 2012), developed for the Geothermal Technology Office of the U.S. DOE. These recommended practices present a framework to systematically assess the induced seismicity risk and quantify the associated uncertainties. These recommendations are based on current research and are sufficiently general to allow for modification and application to a variety of different types of sites. The substance of the recommended practices contained herein includes both technical and non-technical issues, and covers all operational stages of the GCS project lifecycle. They start at the preliminary risk assessment phase, continue through site assessment and characterization, include best practice communication and seismic monitoring plan methodologies, discuss the evaluation and mitigation of seismic hazard and risk, and closes with an exploration of operational management plans, which conclude when the induced seismicity risk abates back to background level. The focus of these recommendations is on actively managing the risks associated with induced seismicity by developing an actionable risk management plan that starts at the project proposal stage and continues through site closure through an iterative assessment and improvement process. The audience of this document is expected to include all interested stakeholders (e.g., operators, project developers, regulators, and the general public) and is expressly written to be accessible to this broad range of partners. This document is intended to disseminate knowledge gained through recent advances in the science of induced seismicity hazard and risk assessments, to provide updates based on recent experience gained by similar corollary injection-induced seismicity cases, and most importantly to establish a uniform framework to carry out a successful induced seismicity risk management plan for carbon storage projects in the future. These recommendations do not directly address any domestic or international regulations or standards. A complementary NRAP report makes recommendations for the assessment and management of environmental subsurface risks associated with unwanted fluid migration at GCS sites (Thomas et al., 2021) and should be referred to in order to address those additional GCS site risks

58 GEOSCIENCES↗

Natural Hazards Perspectives on Integrated, Coordinated, Open, Networked (ICON) Science

This article is about the state of ICON principles Goldman et al. (2021), https://doi.org/10.1029/2021EO153180 in natural hazards and a discussion on the opportunities and challenges of adopting them. Natural hazards pose risks to society, infrastructure, and the environment. Hazard interactions and their cascading phenomena in space and time can further intensify the impacts. Natural hazards’ risks are expected to increase in the future due to environmental, demographic, and socioeconomic changes. It is important to quantify and effectively communicate risks to inform the design and implementation of risk mitigation and adaptation strategies. Multihazard multisector risk management poses several nontrivial challenges, including: (a) integrated risk assessment, (b) Earth system data-model fusion, (c) uncertainty quantification and communication, and (d) crossing traditional disciplinary boundaries. Here, we review these challenges, highlight current research and operational endeavors, and underscore diverse research opportunities. We emphasize the need for integrated approaches, coordinated processes, open science, and networked efforts (ICON) for multihazard multisector risk management.

58 GEOSCIENCES↗

Z Facility Sustainment Status (November FY 2024) [Slides]

FY24 sustainment project list has been revised resulting in sixteen projects. Total budget for the finalized project list is $9,570,968 (includes FY23 Carryover and FY24). Key factors for project selection included: risk mitigation to address operations highest failure risk subsystems, purchase of long lead parts to address life limited parts, and completion of multi phase sustainment projects initiated in prior year. Given the backlog of projects and limited FY24 funding, there are identified projects that are not included in the final project list that could reduce future Z facility failure risk. Should additional budget become available, these identified projects can be kicked off.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Quantitative Risk Assessment for Fuel Cell Electric Bus Hydrogen Storage and Refueling Facility

It is necessary to understand the safety implications and risk mitigation options for fuel cell electric bus fleet deployment, especially for related facilities responsible for operations such as production, storage, compression, and dispensing of hydrogen for use by the buses. In this report, we present a quantitative risk assessment for a potential fuel cell electric bus fleet that was motivated by efforts to improve resilience at the Portland International Airport but can be applicable to a range of hydrogen case studies and use cases. We estimated risk for a facility that produces, stores, compresses, and dispenses hydrogen for the fleet of buses, with a focus on individual risk to people in terms of annual frequency of fatality. We considered the frequency of hydrogen leaks that could result in harmful physical outcomes like jet fires or explosions, and the consequences of those outcomes for people. We created customized fault trees to calculate the frequencies of different sizes of leaks and event sequence diagrams to calculate ignition probabilities for the various leak sizes. We also leveraged the HyRAM+ toolkit to use these inputs to calculate overall risk for the facility, which we separated into one section responsible for producing, storing, and compressing hydrogen, and one section responsible for dispensing the hydrogen to the buses. We found that the dispensing area seemed to have a higher risk than the production/storage/compression area of the facility, largely because of the inclusion of a component with a high leak frequency (the heat exchanger used to cool the hydrogen before entering the vehicle, to prevent overheating and expansion of hydrogen in the onboard tank). For the example production and refueling facility we evaluated and the data we used for the analysis, the leak frequency had a larger impact on the risk differences between the two sections on the facility, compared to the physical outcome consequence, which was slightly different due to the varying fuel conditions, but not substantially different. Actions can be taken to prevent these hazards (e.g., lowering leak frequencies in system components) or to mitigate the consequences if they do occur (e.g., installing barriers to protect people if ignition events occur). The choice of which actions to take depends not only on safety considerations but also on space, time, staffing, feasibility, and financial constraints. Therefore, the quantitative risk assessment approach can help understand relative risk contributions from different components, leak sizes, consequences, and human actions, to prioritize risk reduction strategies and balance these parameters. The outcomes of this report may be useful for a variety of stakeholders working in the hydrogen, transportation, vehicle, and aviation sector, including those responsible for aspects like facility design, operations, and regulations. There is not a single value of risk that determines whether a hypothetical system is “safe” or not. The insights about risk mitigations may be leveraged, and the quantitative risk assessment approach can be applied to other case studies to understand risk priorities and contributions specific to different FCEB and hydrogen facility uses.

08 HYDROGEN↗

Miscalculation, Misperception and Risk Reduction

In the current security environment, the most likely wars for which the US and its allies must be prepared are wars against nuclear-armed states. Such wars bring unique risks of both vertical and horizontal escalation. Some are “accepted risks;” for example, the US may choose to escalate a conflict to clarify its commitment to an issue and defend its interest. Other are “unacceptable risks;” especially, the risk of miscalculation by the U.S. or an adversary. The focus here is on this latter category. Miscalculation is an error of judgment—the failure to accurately assess a situation. Miscalculation can result from hidden, incomplete, or ambiguous information, or from inaccurate processing of available information because of bias, overconfidence, denial, delusion, etc. Miscalculation is related to misperception. For some, they are synonymous. This paper characterizes the risks of miscalculation and introduces a discussion of a risk mitigation strategy.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

An Inventory of AI-ready Benchmark Data for US Fires, Heatwaves, and Droughts

Extreme weather events, including fires, heatwaves, and droughts, have significant impacts on earth, environmental, and energy systems. Mechanistic and predictive understanding, as well as probabilistic risk assessment of these extreme weather events, are crucial for detecting, planning for, and responding to these extremes. Records of extreme weather events provide an important data source for understanding present and future extremes, but the existing data needs preprocessing before it can be used for analysis. Moreover, there are many nonstandard metrics defining the levels of severity or impacts of extremes. In this study, we compile a comprehensive benchmark data inventory of extreme weather events, including fires, heatwaves, and droughts. The dataset covers the period from 2001 to 2020 with a daily temporal resolution and a spatial resolution of 0.5°×0.5° (~55km×55km) over the continental United States (CONUS), and a spatial resolution of 1km × 1km over the Pacific Northwest (PNW) region, together with the co-located and relevant meteorological variables. By exploring and summarizing the spatial and temporal patterns of these extremes in various forms of marginal, conditional, and joint probability distributions, we gain a better understanding of the characteristics of climate extremes. The resulting AI/ML-ready data products can be readily applied to ML-based research, fostering and encouraging AI/ML research in the field of extreme weather. This study can contribute significantly to the advancement of extreme weather research, aiding researchers, policymakers, and practitioners in developing improved preparedness and response strategies to protect communities and ecosystems from the adverse impacts of extreme weather events. Usage Notes We presented a long term (2001-2020) and comprehensive data inventory of historical extreme events with daily temporal resolution covering the separate spatial extents of CONUS (0.5°×0.5°) and PNW(1km×1km) for various applications and studies. The dataset with 0.5°×0.5° resolution for CONUS can be used to help build more accurate climate models for the entire CONUS, which can help in understanding long-term climate trends, including changes in the frequency and intensity of extreme events, predicting future extreme events as well as understanding the implications of extreme events on society and the environment. The data can also be applied for risk accessment of the extremes. For example, ML/AI models can be developed to predict wildfire risk or forecast HWs by analyzing historical weather data, and past fires or heateave , allowing for early warnings and risk mitigation strategies. Using this dataset, AI-driven risk assessment models can also be built to identify vulnerable energy and utilities infrastructure, imrpove grid resilience and suggest adaptations to withstand extreme weather events. The high-resolution 1km×1km dataset ove PNW are advantageous for real-time, localized and detailed applications. It can enhance the accuracy of early warning systems for extreme weather events, helping authorities and communities prepare for and respond to disasters more effectively. For example, ML models can be developed to provide localized HW predictions for specific neighborhoods or cities, enabling residents and local emergency services to take targeted actions; the assessment of drought severity in specific communities or watersheds within the PNW can help local authorities manage water resources more effectively.

Lin, Xinming↗

Reconceptualizing Off-Ramps as a Tool of U.S.-China Escalation Management

Great power rivalry, at any point on the competition spectrum, involves assessments of risks and decisions on where to take them. Assessing risk versus reward is also integral to the decision to cooperate in the form of arrangements like arms control. As Donald Brennan wrote more than sixty years ago, the value in arms control lies in whether it “reduce[s] the hazards of the present armament policies by a factor greater than the amount of risk introduced by the control measures themselves.” 2 States can assume in peacetime the risks inherent in cooperating with an adversary, to attempt to mitigate risks likely to arise in crisis or conflict. Or they can choose to forgo cooperation and assume risks later, which will complicate their ability to manage crises, war, and war termination.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Phase II Field Demonstration at Lansing Smith Generating Plant, Southport, Florida (Final Report)

The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.

01 COAL, LIGNITE, AND PEAT↗

Fracture Network Prediction Using Physics-based Machine Learning Algorithms

In recent years, systematic CO2 injection into geological reservoirs across the U.S. has gained traction as a strategy to mitigate greenhouse gas emissions. This approach necessitates precise monitoring to ensure secure containment, minimize risks, and optimize storage management. Our study leverages machine learning (ML) techniques to advance the understanding of CO2 injection processes, focusing on the Illinois Basin. Over a three-year injection period, we analyzed microseismic data, identifying 19 temporal intervals with significant bottom-hole pressure changes. By partitioning microseismic events into these intervals and estimating b-values, we revealed over 100 clusters of events related to fracture initiation or reactivation. Advanced spatial analysis highlighted horizontally-oriented fractures along the NNW-SSE axis. This quantification of fracture networks informs dynamic injection scheduling, work-over strategies, and risk assessments, enhancing carbon capture, utilization, and storage (CCUS) operations. Additionally, our methodology offers valuable insights for oil and gas operations and geothermal development, supporting fracture-based monitoring and risk mitigation.

Kumar, Abhash↗