Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Right Of Way”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Hepatocellular Carcinoma Supplied by the Right Lumbar Artery

This study evaluated the clinical features of hepatocellular carcinoma (HCC) supplied by the right lumbar artery. Eleven patients with HCC supplied by the right lumbar artery were treated with chemoembolization. The patients' medical records were retrospectively analyzed. All patients underwent 6.7 {+-} 3.7 (mean {+-} SD) chemoembolization sessions, and the hepatic arterial branches were noted as being attenuated. The right inferior phrenic artery (IPA) was also embolized in 10 patients. The interval between initial chemoembolization and chemoembolization of the lumbar artery supply was 53.2 {+-} 26.9 months. Mean tumor diameter was 3.1 {+-} 2.4 cm and was located at the surface of S7 and S6. The feeding-branch arose proximal to the bifurcation of the dorsal ramus and muscular branches (n = 8) or from the muscular branches (n = 3) of the right first (n = 10) or second lumbar artery (n = 1). The anterior spinal artery originated from the tumor-feeding lumbar artery in one patient. All feeders were selected, and embolization was performed after injection of iodized oil and anticancer drugs (n = 10) or gelatin sponge alone in a patient with anterior spinal artery branching (n = 1). Eight patients died from tumor progression 10.1 {+-} 4.6 months later, and two patients survived 2 and 26 months, respectively. The remaining patient died of bone metastases after 32 months despite liver transplantation 10 months after chemoembolization. The right lumbar artery supplies HCC located in the bare area of the liver, especially in patients who undergo repeated chemoembolization, including chemoembolization by way of the right IPA. Chemoembolization by way of the right lumbar artery may be safe when the feeder is well selected.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Safe Operations at Roadway Junctions: Intelligent Roadway Infrastructure as Functional Interlocking

Automated vehicle (AV) technology is quickly maturing, and the corresponding infrastructure systems that evaluate traffic and communicate to vehicles requires sophisticated sensing and perception technologies, referred to as intelligent roadway infrastructure (IRI), to complement emerging AV capabilities. IRI provides signals to vehicles, indicating right-of-way for vehicles and communicating to approaching AVs that no other vehicle is failing to yield. This capability, denoted as safety-affirmative signaling, provides a green light or a green arrow as appropriate and affirms through communication links to connected vehicles when it is safe to proceed. About 36% of collisions occur at intersections, with most occurring upon left turns (22.2%) or crossing over (12.6%), and only a small percentage (1.2%) while turning right at an intersection. Of all intersection crashes about half (52.5%) of those vehicles were traveling through a signalized intersection 2. Safety-affirmative signaling would guarantee safety of AV fleet vehicles, by providing the interlocking principle, a term from automated train control that only allows progression through a railway intersection after affirming no opportunity for a crash exists. IRI through safety-affirmative signaling would bring performance and safety to complex roadway intersections where AV transit fleet service is most needed, as well as safety benefits to traditional, non-automated vehicles and vulnerable road users. The implementation of IRI has functional, programmatic, and technical challenges. Research work performed at the National Renewable Energy Laboratory (NREL) in an integrative approach encapsulating these themes, and termed infrastructure perception and control (IPC) is motivated by improved performance (travel time), improved safety (reduced collisions), and improved energy efficiency (less fuel burned and minimized production of greenhouse gases). IPC is intended not only for roadway and intersection applications but also in extension to inform complementary buildings and grid systems to enable better co-management, as vehicles and their charging needs become increasingly integrated into the built environment. The NREL IPC project presents an open-source framework, architecture, and supporting technology to implement IRI, addressing critical issues such as fusion of data, reliability, standardization of data interfaces, and confidence of detection. The framework is informed by previous experience in U.S. Department of Defense research technology, specifically in the use of radar to detect, identify, and track aerial threats. These principles combined with multi-sensor fusion provides for a complete digital twin with known and measurable confidence and accuracy from which safety-affirmative signaling can be developed and deployed.

ADVANCED PROPULSION SYSTEMS,MATHEMATICS AND COMPUT↗

Transfer and Transition: Interagency Coordination for Managing Public Lands at UMTRCA Title II Sites in Wyoming - 16614

By the end of fiscal year 2025, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is anticipating adding 17 sites remediated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) to the current inventory of 90 sites that it manages. Among the new sites are ones where federal public lands occur within the proposed long-term care boundary, the boundary determined by the Nuclear Regulatory Commission and LM as necessary to maintain site protectiveness for the entombed uranium mill tailings and residual groundwater contamination. For these sites, public land withdrawals for land and minerals will need to be established. LM's primary mission at UMTRCA sites is to protect the public and the environment from exposure to contamination at the sites. For the sites with public lands or federally controlled minerals that will be transferring to LM, the Office will apply to the Department of the Interior (DOI) Bureau of Land Management (BLM) for new, public land and mineral withdrawals. At most current LM UMTRCA sites that involved public lands and minerals, DOI granted DOE 'full administrative jurisdiction' and permanent withdrawals. Hence, these withdrawals are, permanently, no longer subject to public land, mining, and mineral-leasing laws and regulations. LM is coordinating with DOI/BLM in Wyoming to permanently withdraw full and partial jurisdiction at future UMTRCA Title II sites in that state. This approach would allow LM to fully administer surface lands and minerals, where necessary, and DOI and LM to administer surface lands and leasable minerals where it would not jeopardize sites' radiological safety and long-term public and environmental protection. This 'shared-jurisdiction approach' will meet LM's strategic goal of protecting human health and the environment but also allow BLM to fulfill their mission to 'manage and conserve the lands under the mandate of multiple-use and sustained yield'. In addition, LM could also fulfill the fourth goal of its Strategic Plan, to optimize land use and assets. The portions of the sites where LM will ask for full jurisdiction are those that contain the disposal cell and any adjacent lands and minerals required to maintain and protect it. It is anticipated that the shared jurisdiction portion of the withdrawal would largely coincide with land where known or projected contaminated groundwater from the past ore processing exists or will migrate over time. Examples of BLM-authorized activities on the shared jurisdiction portions of the withdrawals may include livestock grazing, wildlife habitat improvement projects, recreation, and rights of ways for roads, pipelines, utilities, and communication sites. In addition, BLM could authorize subsurface uses such as oil and gas, coal, or geothermal development or groundwater pumping from deeper aquifers if the proposal would not disturb groundwater contamination. For areas of the withdrawal where the agencies will share jurisdictional authority, DOE LM and BLM will develop an interagency agreement (IA) to define acceptable uses and associated roles and responsibilities. To ensure maximum protection of human health and the environment, each site's IA will include a provision allowing DOE LM the right of first refusal against any action it believes might affect radiological safety at the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage (CCUS) technology has significant potential to reduce greenhouse gas (GHG) emissions and mitigate the impact of climate change, particularly in hard to decarbonize industrial and commercial sectors. CCUS involves capturing carbon dioxide (CO 2 ) from industrial processes or power generation and utilizing it for other purposes, such as enhanced oil recovery (EOR), or storing the captured CO 2 underground. CCUS technology can reduce the environmental impact of continued fossil fuel use while smoothing the transition to a low-carbon economy. CCUS can create new economic opportunities, such as the development of new industries and job creation, and can enhance energy security by diversifying energy sources. For these reasons, enabling CCUS has become a key objective of the Biden-Harris administration’s clean energy policy and has received bipartisan support. Despite its environmental and economic potential, CCUS faces multiple barriers to widespread deployment. One of the main challenges is the high cost and technical difficulty of implementing and operating large-scale CCUS infrastructure. CCUS remains a relatively expensive way to reduce carbon emissions (e.g., compared to solar photovoltaic technology’s displacement of coal generation). Additionally, financial incentives and supportive policies like those enacted to support solar photovoltaic development, especially at the state level, are inconsistent or nonexistent, which can discourage investment in CCUS projects. There are also technical challenges associated with safe and secure underground CO 2 storage and the development of new carbon utilization technologies. Public opposition to various aspects of CCUS technologies, ranging from concerns that CCUS will extend reliance on fossil fuels to CCUS infrastructure being sited in disadvantaged communities, is a growing challenge. This paper focuses on another significant barrier to broad CCUS deployment: the need for considerable expansion of the dedicated land-based CO 2 pipeline network in the United States to meet CCUS goals and the unique regulatory challenges to its development. To reach carbon emissions targets in the United States by 2050, CCUS technology will need to be supported by tens of thousands of miles of CO 2 pipelines. Estimates range from a minimum of roughly 29,000 pipeline miles (according to a 2020 Great Plains Institute study) to 66,000 pipeline miles (as per a 2021 Princeton University–led study). As of October 2022, however, the U.S. Department of Transportation (U.S. DOT) reports fewer than 5,400 miles of U.S. pipelines carrying CO 2 . This deficit—and what it means for the prospect of moving substantially larger quantities of CO 2 from source to use or storage—threatens to stifle the development of CCUS projects and technologies identified as an important tool to meet emissions targets. The current regulatory landscape facing CO 2 pipeline development can best be described as uncertain. At the federal level, the U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) oversees safety regulation of pipelines transporting hazardous materials, including CO 2 upon commencement of operation. However, PHMSA’s definition of CO 2 as “a fluid consisting of more than 90 percent CO 2 molecules compressed to a supercritical state” has not been updated since its 1991 addition to the Federal Register. Because CO 2 can be transported in a gaseous, liquid, or supercritical state (indeed, the physical state of CO 2 can fluctuate within a single pipeline due to environmental changes), doubts persist about the extent of PHMSA’s purview—and raise questions about what, if anything, states should do to address this apparent gap. PHMSA has begun a major revision of its existing rules, but the agency does not expect a first draft before 2024. Economic oversight of CO 2 pipelines is even less clear. The Federal Energy Regulatory Commission (FERC) and Surface Transportation Board (STB)—which regulate the rates of interstate oil/natural gas and non-energy pipelines, respectively—have both declined jurisdiction over interstate CO 2 pipelines. This presumably leaves economic regulation to state and/or local governments, but few if any states have the laws or resources in place to oversee just and reasonable rates. Further, the interstate nature of CO 2 pipeline development creates questions around how different states should align their rate-making decisions. Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation Currently, regulatory responsibilities regarding CO 2 pipeline siting and permitting fall to state and local governments. The variety of laws and regulations across the country, however, creates a maze of requirements for pipeline developers to navigate. To secure necessary permits, most states require pipeline companies to be “common carriers” that provide transport service to the public at uniform rates. However, the specific definition of that term varies. Some states require clear evidence that a pipeline services the public, while others automatically deem any pipeline company transporting energy products or hazardous materials to be a “common carrier”—with little consideration for accessibility to third parties. Other states have eschewed common-carrier terminology entirely, placing private and publicly accessible pipelines on equal footing. Much like the variation in common-carrier requirements, laws governing eminent domain authority to secure rights-of-way (ROW) to commence construction on a planned pipeline route differ by state. Several states have no laws or rules governing CO 2 pipelines. In addition to creating questions about whether long-standing rules for other pipelines (e.g., natural gas or petroleum products) apply to CO 2 , this policy vacuum leaves local governments as the sole authority over sections of pipe within their boundaries. With dozens of counties along a given route, the probability of inconsistent regulation of the same pipeline is significant. Even in states with CO 2 pipeline laws in place, local regulatory attempts to address rising concerns over pipeline routing and safety have triggered lawsuits by pipeline companies seeking to delimit areas of federal, state, and local government responsibility. Meanwhile, legislators across the country have introduced bills to restrict the application of eminent domain to CO 2 pipeline projects, which could threaten a key means of securing ROW that companies cannot secure through negotiation with landowners. Taken separately, any of these regulatory issues—the narrow federal definition of CO 2 , FERC’s and STB’s decisions that CO 2 pipelines are not within their jurisdiction, and the considerable variation in state and local governments’ laws regulating CO 2 pipeline technologies—are extremely difficult to resolve. Adding the required scale of CO 2 pipeline expansion and the currently identified narrow window of time in which to reach climate target goals, the task becomes even more difficult—and raises a host of urgent questions for regulators. How should CO 2 be defined in federal regulations to ensure consistent safety standards across the country? What is the potential impact radius of a CO 2 pipeline rupture, and how should that inform local emergency response? In the absence of centralized federal oversight, what should state legislatures do to increase alignment for interstate CO 2 pipeline projects? This paper intends to serve as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure.

42 ENGINEERING↗

Carbon dioxide pipeline network transportation cost model: evaluating economic and geographic factors for efficient carbon capture, storage, and utilization

This study presents a comprehensive pipeline network modeling framework to estimate the CO 2 delivery cost for CO 2 utilization and geologic CO 2 storage across the United States. We developed a Python-based CO 2 pipeline transportation cost model leveraging Argonne National Laboratory’s pipeline engineering expertise and detailed natural gas transmission pipeline cost data across U.S. regions. Using existing road corridors as practical routing guides, the model designs pipeline networks that aggregate CO 2 from one or multiple sources and deliver it to selected destinations. It then minimizes the total transportation cost by optimizing pipeline diameters and incorporating booster pumps. A key contribution is the incorporation of up-to-date, region-specific cost factors with itemized components for materials, labor, miscellaneous construction expenses, and right-of-way acquisition. Results emphasize that regional variation and economies of scale associated with CO 2 pipeline costs are significant and should be explicitly accounted for in screening and planning studies. By combining realistic routing constraints with regionalized cost inputs, the model provides transparent design methodology and location-specific insights into source–destination delivery costs, including the effects of routing complexity along existing road networks. We demonstrate the model with two illustrative case studies – one for CO 2 storage and one for CO 2 utilization – in which the model designs pipeline networks spanning hundreds of miles across the states, collecting CO 2 from multiple sources and delivering it to designated endpoints while minimizing levelized cost of delivery via diameter and compression optimization. The model offers a practical, scalable approach for alternative design option screening and early-stage CO 2 transportation planning.

CCS↗

Understanding the life cycle surface land requirements of natural gas-fired electricity

The surface land use of fossil fuel acquisition and utilization has not been well characterized, inhibiting consistent comparisons of different electricity generation technologies. We present a method for robust estimation of the life cycle land use of electricity generated from natural gas through a case study that includes inventories of infrastructure, satellite imagery and well-level production. Approximately 500 sites in the Barnett Shale of Texas were sampled across five life cycle stages (production, gathering, processing, transmission and power generation). Total land use (0.62 m 2 MWh -1 , 95% confidence intervals +/-0.01 m 2 MWh -1 ) was dominated by midstream infrastructure, particularly pipelines (74%). These results were sensitive to power plant heat rate (85-190% of the base case), facility lifetime (89-169%), number of wells per site (16-100%), well lifetime (92-154%) and pipeline right of way (58-142%). When replicated for other gas-producing regions and different fuels, our approach offers a route to enable empirically grounded comparisons of the land footprint of energy choices.

03 NATURAL GAS↗

Techno-Economic Analysis of Repurposing Natural Gas Transmission Pipeline Networks to Accommodate Hydrogen Blends

Blending hydrogen into natural gas infrastructure could supplement natural gas supply and increase resilience for applications such as ammonia production, peaking and load-following power plants, and heating. The United States has an extensive network of natural gas pipelines, but the feasibility of employing this infrastructure to transport hydrogen is unclear. We analyze the costs associated with repurposing three distinct natural gas transmission pipelines in different locations within the United States to carry blends of hydrogen up to 100% via three different pipeline network modification methods and compare against the cost of building a new dedicated hydrogen pipeline. We conduct a sensitivity analysis on the hoop stress limit of the existing pipe, techno-economic parameters, emissions, and relative capacity. The results show that the capital costs required to upgrade a pipeline can vary from tens of millions to billions of dollars depending on the length and capacity of the existing pipeline section, whether the existing pipeline already operates at or below its maximum allowable operating pressure, whether future demand is expected to increase or decrease, the network modification method selected, and pipe material costs. The delivered cost of energy to end users is impacted less by the levelized cost of transporting hydrogen blends than by the cost of the natural gas and hydrogen fuels being transported. The emissions impact of blending hydrogen into natural gas transmission networks scales proportionally with the amount of energy displaced with low-emission hydrogen (such as from natural gas with carbon capture and sequestration or electrolysis powered by nuclear, renewable, or geothermal electricity), therefore low blend ratios (e.g., < 20% vol. hydrogen) will result in low emissions impacts. Factors such as permitting and right-of-way costs, the proximity of the pipeline to hydrogen demand and production, and the compatibility of and/or retrofitting costs of end-use gas-fueled technologies will likely be greater drivers in determining whether converting a particular natural gas pipeline to carry hydrogen makes economic sense.

08 HYDROGEN↗

Determining the Minimum Phase‐to‐Phase Gap Distance for Unconventional Transmission Lines Using Numerical Method

With the increasing demand for power transmission, compact, high surge impedance loading (HSIL) high-voltage transmission lines have emerged as a viable solution due to their reduced land acquisition costs and higher power delivery capability. The compactness of a transmission line depends on effective insulation coordination, particularly in determining the phase-to-phase clearance, which is governed by the critical flashover voltage under switching and lightning overvoltage conditions. Traditional methods for phase-to-phase clearance rely on empirical formulas derived from experimental data, which are convenient for conventional high-voltage lines. However, unconventional HSIL lines require a faster and more adaptable evaluation method, as they involve optimized conductor positioning to reduce right-of-way requirements while enhancing natural power loadability. This study presents a simplified numerical approach to determine the minimum phase-to-phase gap, utilizing arc propagation viability curves, and offers an efficient alternative to conventional empirical methods. The proposed method was successfully applied to a 500 kV conventional line as well as 500 and 735 kV unconventional line designs, demonstrating its capability in accurately assessing insulation requirements. Results reveal that the method can support reduced gap clearances while still maintaining reliability, thereby validating its usefulness in optimizing compact transmission line configurations.

Arafat, Easir [The University of Texas at Dallas, ↗

Connected Traffic Signal Coordination Optimization Framework through Network-Wide Adaptive Linear Quadratic Regulator–Based Control Strategy

Traffic congestion in metropolitan areas causes several significant challenges, such as longer travel times, decreased productivity, increased fuel consumption and vehicle emissions, and even severe injuries during crashes. Traffic signal control is a management approach to reduce traffic congestion and allocate the appropriate right of way for safety and mobility efficiency, both in temporal and spatial domains. Here, this study proposes a network-wide adaptive signal control coordination optimization framework based on the linear quadratic regulator algorithm. The traffic flow conditions driven by signal control inputs are formulated based on their network-wide state-space representation. After modeling traffic control regulation constraints, an adaptive linear quadratic regulator algorithm is designed to maximize the network-wide total throughput under the current conditions. Optimal signal control split time durations for multiple intersections in the network are derived by solving the algebraic Riccati equation. Furthermore, the recursive least square parameter estimation method is employed to quantify dynamic traffic condition changes. To verify the effectiveness of this proposed signal control framework, both simulation and real-world experimental tests are conducted for multiple intersections in downtown Chattanooga, Tennessee, United States. In preparation for real-world experimental tests, pipelines for real-time data processing implementation and historical traffic flow data analysis are conducted. The test results demonstrate that the proposed control framework achieves a decrease in travel time by up to 19.4%, total time spent (TTS) by up to 11.9%, and relative queue balance (RQB) by up to 15.6%. The research findings indicate that the proposed signal control framework can be generalized to handle large scale signal control optimization network-wide.

97 MATHEMATICS AND COMPUTING↗

Development of Emergency Vehicle Preemption Strategies on Smart Corridors in a Digital Twin Environment

Emergency Response Vehicles (ERVs), such as firetrucks, ambulances, etc. operate with the purpose of saving lives and mitigating property damage. As such, ERV travel-time reductions may result in significant benefits to the community. A common strategy to improve travel times is Emergency Vehicle Preemption (EVP). EVP seeks to reduce ERV delays by providing the right-of-way to ERVs as they approach an intersection. This study proposes a new Dynamic Preemption strategy that determines the need for preemption prior to the ERV reaching the vicinity of the intersection, utilizing real-time data streams. This paper evaluates the effectiveness of some existing and proposed preempt control strategies using a digital twin testbed consisting of a series of signalized intersections on an urban arterial in Georgia. The best EVP strategy maximizes the improvement in ERV travel time while minimizing the adverse effect of preemption on the traffic in conflicting directions. Therefore, this study evaluates both the positive impact of EVP on the ERV as well as the adverse impact on the cross-street traffic. The study found that the potential exists for significant improvements in ERV travel time with the proposed Dynamic Preemption strategy, with minimal impact to the conflicting traffic. For the simulation corridor there was a 20% reduction in the ERV travel times with the implementation of the Dynamic Preemption strategy, compared to traditional EVP practices.

Roy, Somdut [Georgia Institute of Technology]↗

Topographic and Air-Photo Lineaments in Various Locations Related to Geothermal Exploration in Colorado

These line shapefiles trace apparent topographic and air-photo lineaments in various counties in Colorado. It was made in order to identify possible fault and fracture systems that might be conduits for geothermal fluids, as part of a DOE reconnaissance geothermal exploration program. Geothermal fluids commonly utilize fault and fractures in competent rocks as conduits for fluid flow. Geothermal exploration involves finding areas of high near-surface temperature gradients, along with a suitable "plumbing system" that can provide the necessary permeability. Geothermal power plants can sometimes be built where temperature and flow rates are high. This line shapefile is an attempt to use desktop GIS to delineate possible faults and fracture orientations and locations in highly prospective areas prior to an initial site visit. Geochemical sampling and geologic mapping could then be centered around these possible faults and fractures. To do this, georeferenced topographic maps and aerial photographs were utilized in an existing GIS, using ESRI ArcMap 10.0 software. The USA_Topo_Maps and World_Imagery map layers were chosen from the GIS Server at server.arcgisonline.com, using a UTM Zone 13 NAD27 projection. This line shapefile was then constructed over that which appeared to be through-going structural lineaments in both the aerial photographs and topographic layers, taking care to avoid manmade features such as roads, fence lines, and utility right-of-ways. Still, it is unknown what actual features these lineaments, if they exist, represent. Although the shapefiles are arranged by county, not all areas within any county have been examined for lineaments. Work was focused on either satellite thermal infrared anomalies, known hot springs or wells, or other evidence of geothermal systems. Finally, lineaments may be displaced somewhat from their actual location, due to such factors as shadow effects with low sun angles in the aerial photographs. Credits: These lineament shapefile was created by Geothermal Development Associates, as part of a geothermal geologic reconnaissance performed by Flint Geothermal, LLC, of Denver Colorado. Use Limitation: These shapefiles were constructed as an aid to geothermal exploration in preparation for a site visit for field checking. We make no claims as to the existence of the lineaments, their location, orientation, and/or nature.

15 GEOTHERMAL ENERGY↗

Archuleta County CO Lineaments

This layer traces apparent topographic and air-photo lineaments in the area around Pagosa springs in Archuleta County, Colorado. It was made in order to identify possible fault and fracture systems that might be conduits for geothermal fluids. Geothermal fluids commonly utilize fault and fractures in competent rocks as conduits for fluid flow. Geothermal exploration involves finding areas of high near-surface temperature gradients, along with a suitable plumbing system that can provide the necessary permeability. Geothermal power plants can sometimes be built where temperature and flow rates are high. To do this, georeferenced topographic maps and aerial photographs were utilized in an existing GIS, using ESRI ArcMap 10.0 software. The USA_Topo_Maps and World_Imagery map layers were chosen from the GIS Server at server.arcgisonline.com, using a UTM Zone 13 NAD27 projection. This line shapefile was then constructed over that which appeared to be through-going structural lineaments in both the aerial photographs and topographic layers, taking care to avoid manmade features such as roads, fence lines, and right-of-ways. These lineaments may be displaced somewhat from their actual location, due to such factors as shadow effects with low sun angles in the aerial photographs. Note: This shape file was constructed as an aid to geothermal exploration in preparation for a site visit for field checking. We make no claims as to the existence of the lineaments, their location, orientation, and nature.

15 GEOTHERMAL ENERGY↗

Competing Use Analysis for Offshore Renewables and Subsea Cables

Demand for abundant and diverse resources in the oceans is growing, necessitating marine spatial planning. To inform development of Marine Hydrokinetic (MHK) and Offshore Wind (OSW) resources, the Department of Energy (DOE) has asked NREL to identify the competing uses areas between promising MHK/OSW sites and submarine power and telecommunications cables. The first step in this work is to identify and quantify the overlap between the MHK/OSW resource availability and existing cable routes. The analysis is done in terms of resource area because the task of quantifying actual impacts on available resource is a non-trivial undertaking that involves subjective decisions of identifying resource opportunities. Quantifying overlap in-terms of resource area?on the other hand?is significantly more straight forward, and useful to marine spatial planners. This dataset of polygons describes recommended setback areas from submarine cables for marine renewable energy Development. Two archive files are provided: 1. NREL Cables Setback-Polygons.zip contains the following GeoJSON files: 1.a. cables_100ft.geojson: The Code of Federal Regulations (CFR 585.301) specifies that the legal right of way for submarine cables is 100 ft (~30 meters) to either side of the cable (i.e., 200 ft wide). 1.b. cables_2z.geojson: The International Cable Protection Committee (ICPC) of the North American Submarine Cable Association (NASCA) recommends setback distances for new facilities as the maximum of 500 m or twice the bottom depth (2z), per ICPC Recommendation 13 No. 2 (Communications Security, Reliability and Interoperability Council IV 2014). For depths 250 m, 2 * depth is to be used. 1.c. cables_3z.geojson: The ICPC of NASCA recommends setback distances for new cables as the maximum of 500 m or three times the bottom depth (3z), per ICPC Recommendation 2 No. 10 (Communications Security, Reliability and Interoperability Council IV 2014). So for depths 167 m, 3 * depth is to be used. 2. NREL Submarine Cable Analysis Code Data Presentations.zip contains all files (code, data, README, etc) from release 0.1 of this Github repository for possibly regenerating the product as submarine cable configurations change: https://github.com/ecoquants/nrel-cables. For more details, please see the link to the full report for which this data product is a supplemental output: Submarine Cable Analysis for U.S. Marine Renewable Energy Development by Ben Best and Levi Kilcher National Renewable Energy Laboratory

16 TIDAL AND WAVE POWER↗

Long-term groundwater monitoring plan for Ramona, Kansas

Ramona, Kansas, is a small rural town with 187 residents (2010 Census). Located in the north-central portion of Marion County, Ramona is 104 mi southwest of Topeka, Kansas, in the SE 1/4 of Section 2, Township 17 South, Range 3 East (Figure 2.1). Grain storage has occurred over the years at multiple locations in Ramona, including the former CCC/USDA facility, the facility operated by the Tampa Cooperative Association (the Co-op), and several privately owned locations along the east and south edges of the town (Figure 2.2). The Co-op operates north and west of the Union Pacific Railroad right-of-way.

LaFreniere, L. M.↗

Phase III of Construction of University Fitness Center and Human Performance Lab

This grant did not include administrative expenses/legal expenses, land or rights-of-way purchases or relocation expenses. The construction funds for the Fitness Center $\$$932,100 and the Performance Lab $\$$23,900 totaled $\$$956,000. Actual dollars expended totaled, $\$$956,509.22, $\$$932,609.22 for the Fitness Center and $\$$23,900 for the Performance Lab. The University contributed $\$$509.22. The projects are completed and in use. All inspections and occupancy permits have been obtained. All contractors have released all construction leans.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council

This report, Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council (WECC), was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). The intent of WECC’s work was to identify planning-level energy corridors that the Department of Energy (DOE) and its affiliates could study in greater detail. Argonne was tasked by DOE to analyze the WECC Proposed Energy Corridors in five topic areas for use in reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. In compliance with Section 368 of the Energy Policy Act of 2005 (EPAct), the Secretaries of Energy, Agriculture, and the Interior (Secretaries) published a Programmatic Environmental Impact Statement in 2008 to address the proposed designation of energy transport corridors on federal lands in the 11 western states. Subsequently, Records of Decision designating the corridors were issued in 2009 by the Bureau of Land Management (BLM) and the U.S. Forest Service (USFS). The 2012 settlement of a lawsuit, brought by The Wilderness Society and others against the United States, which identified environmental concerns for many of the corridors requires, among other things, periodic reviews of the corridors to assess the need for revisions, deletions, or additions. A 2013 Presidential Memorandum requires the Secretaries to undertake a continuing effort to identify and designate energy corridors. The WECC Proposed Energy Corridors and their analyses in this report provide key information for reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. Load centers and generation hubs identified in the WECC analysis, particularly as they reflect renewable energy development, would be useful in reviewing and potentially updating the designated Section 368 corridor network. Argonne used Geographic Information System (GIS) technology to analyze the proposed energy corridors in the WECC report in five topic areas: • Federal land jurisdiction, • Existing Section 368 corridors, • Existing transmission lines, • Previously studied corridor locations, and • Protected areas. Analysis methods are explained and tables and maps are provided to describe the results of the analyses in all five topic areas. WECC used a rational approach to connecting the hubs it identified, although there may be opportunities for adapting some of the proposed WECC routes to previously designated Section 368 corridors, for example: • The WECC proposed energy corridors are in fact centerlines of proposed routes connecting hubs of various descriptions related to electric energy transmission. Although the centerlines were sited to avoid sensitive areas, infrastructure proposed within actual pathways or corridors defined by the centerlines would sometimes affect lands where such development would not normally be allowed, such as National Parks and Monuments, National Wildlife Refuges, and Wilderness Areas. • Many WECC proposed energy corridors are sited along centerlines of existing roads, including Interstate Highways, where in some cases additional width to accommodate energy transmission infrastructure may not be available. Examples include the WECC Proposed Corridor along Interstate 70 through Glenwood Canyon in Colorado, and along U.S. Highway 89 across Glen Canyon Dam in Arizona. • Several WECC proposed energy corridors are parallel to designated Section 368 corridors that have already cleared the preliminary steps to right-of-way approval. In many of these cases, the WECC hub connection objectives can be met more efficiently by routing on the designated Section 368 corridors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗