Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Resource Allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Assessing Effects of Climate and Technology Uncertainties in Large Natural Resource Allocation Problems

The productivity of the world's natural resources is critically dependent on a variety of highly uncertain factors, which obscure individual investors and governments that seek to make long-term, sometimes irreversible, investments in their exploration and utilization. These dynamic considerations are poorly represented in disaggregated resource models, as incorporating uncertainty into large-dimensional problems presents a challenging computational task. In this paper, we apply the SCEQ algorithm (Cai and Judd, 2023) to solve a large-scale dynamic stochastic global land resource use problem with stochastic crop yields due to adverse climate impacts and limits on further technological progress. For the same model parameters and bounded shocks, the range of land conversion is considerably smaller for the dynamic stochastic model than for deterministic scenario analysis.

numerical methods↗

System-Availability And Resource-Allocation Program

ACARA analyzes availability, life-cycle cost, and scheduling of resources. Uses statistical Monte Carlo method to simulate capacity states of system as well as failure and repair of components. Failures of components modeled mathematically by use of combination of exponential and Weibull probability distributions. Schedules replacement of components to optimize performance of system. Made to comply with any constraints on production of components, capacities of resupply vehicles, spares kept on site, crews, and/or equipment. Written in APL2.

Viterna, L. A.↗

Linear modelling of attentional resource allocation

Eight subjects time-shared performance of two compensatory tracking tasks under conditions when both were of constant difficulty, and when the control order of one task (designated primary) was varied over time within a trial. On line performance feedback was presented on half of the trials. The data are interpreted in terms of a linear model of the operator's attention allocation system, and suggest that this allocation is strongly suboptimal. Furthermore, the limitations in reallocating attentional resources between tasks, in response to difficulty fluctuations were not reduced by augmented performance feedback. Some characteristics of the allocation system are described, and reasons for its limitations suggested.

Pierce, B.↗

JPL Resource Allocation Planning Scheduling Office (RAPSO) long range forecasting

The paper introduces the concept of the long range forecasting function, which is then used to identify periods of peak oversubscription of resources years before they actually happen, so that proper corrective actions (construction of additional antennas, reduction in support committment to the impacted projects) can be implemented.

RAPSO long range forecasting↗

Improving Learning Performance Through Rational Resource Allocation

This article shows how rational analysis can be used to minimize learning cost for a general class of statistical learning problems. We discuss the factors that influence learning cost and show that the problem of efficient learning can be cast as a resource optimization problem. Solutions found in this way can be significantly more efficient than the best solutions that do not account for these factors. We introduce a heuristic learning algorithm that approximately solves this optimization problem and document its performance improvements on synthetic and real-world problems.

resource optimization↗

Resource allocation planning with international components

Dumas, Briggs, Reid and Smith (1989) describe the need for identifying mutually acceptable methodologies for developing standard agreements for the exchange of tracking time or facility use among international components. One possible starting point is the current process used at the Jet Propulsion Laboratory (JPL) in planning the use of tracking resources. While there is a significant promise of better resource utilization by international cooperative agreements, there is a serious challenge to provide convenient user participation given the separate project and network locations. Coordination among users and facility providers will require a more decentralized communication process and a wider variety of automated planning tools to help users find potential exchanges. This paper provides a framework in which international cooperation in the utilization of ground based space communication systems can be facilitated.

Burke, Gene↗

Thematic Mapper data for forest resource allocation

A technique for classifying a Landsat Thematic Mapper image was demonstrated on the Wayne National Forest of southeastern Ohio. The classified image was integrated into a geographic information system database, and prescriptive forest land use allocation models were developed using the techniques of cartographic modeling. Timber harvest sites and accompanying haul roads were allocated.

Zeff, Ilene S.↗

A sustainable genetic algorithm for satellite resource allocation

A hybrid genetic algorithm is used to schedule tasks for 8 satellites, which can be modelled as a robot whose task is to retrieve objects from a two dimensional field. The objective is to find a schedule that maximizes the value of objects retrieved. Typical of the real-world tasks to which this corresponds is the scheduling of ground contacts for a communications satellite. An important feature of our application is that the amount of time available for running the scheduler is not necessarily known in advance. This requires that the scheduler produce reasonably good results after a short period but that it also continue to improve its results if allowed to run for a longer period. We satisfy this requirement by developing what we call a sustainable genetic algorithm.

Abbott, R. J.↗

A Queue Simulation Tool for a High Performance Scientific Computing Center

The NASA Center for Computational Sciences (NCCS) at the Goddard Space Flight Center provides high performance highly parallel processors, mass storage, and supporting infrastructure to a community of computational Earth and space scientists. Long running (days) and highly parallel (hundreds of CPUs) jobs are common in the workload. NCCS management structures batch queues and allocates resources to optimize system use and prioritize workloads. NCCS technical staff use a locally developed discrete event simulation tool to model the impacts of evolving workloads, potential system upgrades, alternative queue structures and resource allocation policies.

Spear, Carrie↗

Description of the SSF PMAD DC testbed control system data acquisition function

The NASA LeRC in Cleveland, Ohio has completed the development and integration of a Power Management and Distribution (PMAD) DC Testbed. This testbed is a reduced scale representation of the end to end, sources to loads, Space Station Freedom Electrical Power System (SSF EPS). This unique facility is being used to demonstrate DC power generation and distribution, power management and control, and system operation techniques considered to be prime candidates for the Space Station Freedom. A key capability of the testbed is its ability to be configured to address system level issues in support of critical SSF program design milestones. Electrical power system control and operation issues like source control, source regulation, system fault protection, end-to-end system stability, health monitoring, resource allocation, and resource management are being evaluated in the testbed. The SSF EPS control functional allocation between on-board computers and ground based systems is evolving. Initially, ground based systems will perform the bulk of power system control and operation. The EPS control system is required to continuously monitor and determine the current state of the power system. The DC Testbed Control System consists of standard controllers arranged in a hierarchical and distributed architecture. These controllers provide all the monitoring and control functions for the DC Testbed Electrical Power System. Higher level controllers include the Power Management Controller, Load Management Controller, Operator Interface System, and a network of computer systems that perform some of the SSF Ground based Control Center Operation. The lower level controllers include Main Bus Switch Controllers and Photovoltaic Controllers. Power system status information is periodically provided to the higher level controllers to perform system control and operation. The data acquisition function of the control system is distributed among the various levels of the hierarchy. Data requirements are dictated by the control system algorithms being implemented at each level. A functional description of the various levels of the testbed control system architecture, the data acquisition function, and the status of its implementationis presented.

Baez, Anastacio N.↗

Agriculture, Forestry and Rangeland Resources

The application of ERTS-1 imagery for providing information on agriculture, forestry, and rangeland resources is described. The use of the ERTS-1 system for stratification and sampling estimates of relatively small areas is discussed. Examples of maps to improve resource definition for land use planning, resource allocation, and resource development are provided. Inventories of various crops, as determined by photointerpretation of ERTS imagery are submitted in tabular form.

Poulton, C. E.↗

Economic aspects of spectrum management

Problems associated with the allocation of the radio frequency spectrum are addressed. It is observed that the current method very likely does not allocate the resource to those most valuing its use. Ecomonic criteria by which the effectiveness of resource allocation schemes can be judged are set forth and some thoughts on traditional objections to implementation of market characteristics into frequency allocation are offered. The problem of dividing orbit and spectrum between two satellite services sharing the same band but having significantly different system characteristics is discussed. The problem is compounded by the likelihood that one service will commence operation much sooner than the other. Some alternative schemes are offered that, within proper international constraints, could achieve a desired flexibility in the division of orbit and frequency between the two services domestically over the next several years.

Stibolt, R. D.↗