Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

A platform for effective requirements management and collaboration in nuclear compliance and licensing

Buoyed by its promise as a cost effective and low-carbon-footprint source of electricity, the nuclear industry is in the midst of a world-wide renaissance. However, significant challenges, including responding to increased safety and regulatory mandates, making a smooth transition to next-generation reactor technology, and dealing with the adoption of digital instrumentation and control (I and C) systems that rely heavily on software must be effectively addressed to ensure the momentum continues. New technology solutions, such as those developed by IBM's Rational business unit, coupled with well codified processes, policies and best practices leveraged across the nuclear ecosystem's participants have been shown to aid in overcoming these obstacles. This paper will highlight some of the compliance and collaboration challenges facing the extended nuclear ecosystem, describe a potential solution that can aid in addressing the challenges, and present several examples of where the solution has been implemented in the nuclear space. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Managing Requirements-Documents to Data

Managing Requirements on long term projects like International Space Station (ISS) can go thru many phases, from initial product development to almost over 20 years of operations and sustainment. Over that time many authorized changes have been made to the requirement set, that apply to any new systems that would visit the ISS today, like commercial cargo/crew vehicles or payloads. Explore the benefits of managing requirements in a database while satisfying traditional documents needs for contracts and stakeholder/user consumption that are not tied into the database.

Orr, Kevin↗

Cryogenic propellant management system requirements for Space Station Freedom

Specific propellant management system requirements have been identified for each facility category of SSF. Distributed systems have been analyzed to indentify momentum management, guidance, and traffic management requirements associated with the guidance, navigation, and control system; space-to-space communications and enhanced tracking requirements associated with the communications and tracking system; and propellant management system utility requirements associated with the electrical power system. Flight element analyses determined attach structure, utility distribution, and structural integrity requirements for the pre-integrated truss and high mass manipulation and translation requirements for the mobile base system.

Saucillo, R. J.↗

Testing, Requirements, and Metrics

The criticality of correct, complete, testable requirements is a fundamental tenet of software engineering. Also critical is complete requirements based testing of the final product. Modern tools for managing requirements allow new metrics to be used in support of both of these critical processes. Using these tools, potential problems with the quality of the requirements and the test plan can be identified early in the life cycle. Some of these quality factors include: ambiguous or incomplete requirements, poorly designed requirements databases, excessive or insufficient test cases, and incomplete linkage of tests to requirements. This paper discusses how metrics can be used to evaluate the quality of the requirements and test to avoid problems later. Requirements management and requirements based testing have always been critical in the implementation of high quality software systems. Recently, automated tools have become available to support requirements management. At NASA's Goddard Space Flight Center (GSFC), automated requirements management tools are being used on several large projects. The use of these tools opens the door to innovative uses of metrics in characterizing test plan quality and assessing overall testing risks. In support of these projects, the Software Assurance Technology Center (SATC) is working to develop and apply a metrics program that utilizes the information now available through the application of requirements management tools. Metrics based on this information provides real-time insight into the testing of requirements and these metrics assist the Project Quality Office in its testing oversight role. This paper discusses three facets of the SATC's efforts to evaluate the quality of the requirements and test plan early in the life cycle, thus preventing costly errors and time delays later.

Rosenberg, Linda↗

The Requirements Generation System: A tool for managing mission requirements

Historically, NASA's cost for developing mission requirements has been a significant part of a mission's budget. Large amounts of time have been allocated in mission schedules for the development and review of requirements by the many groups who are associated with a mission. Additionally, tracing requirements from a current document to a parent document has been time-consuming and costly. The Requirements Generation System (RGS) is a computer-supported cooperative-work tool that assists mission developers in the online creation, review, editing, tracing, and approval of mission requirements as well as in the production of requirements documents. This paper describes the RGS and discusses some lessons learned during its development.

Sheppard, Sylvia B.↗

Training and Required Reading Management Tool

This tool manages training and required reading for groups, facilities, etc – abilities beyond the site training systems. TRRMTool imports training data from controlled site data sources/systems and provides greater management and reporting. Clients have been able to greatly reduce the time and effort required to manage training, have greater accuracy, foster individual accountability, and be proactive in verifying training of support personnel, to maintain compliance.

Nelson, Jerel↗

Conversion from Tree to Graph Representation of Requirements

A procedure and software to implement the procedure have been devised to enable conversion from a tree representation to a graph representation of the requirements governing the development and design of an engineering system. The need for this procedure and software and for other requirements-management tools arises as follows: In systems-engineering circles, it is well known that requirements- management capability improves the likelihood of success in the team-based development of complex systems involving multiple technological disciplines. It is especially desirable to be able to visualize (in order to identify and manage) requirements early in the system- design process, when errors can be corrected most easily and inexpensively.

Mayank, Vimal↗

A Framework to Assess Advanced Reactor Spent Fuel Management Facility Deployment

Advanced nuclear reactors offer various operational advantages over existing light water reactors but could produce types of spent nuclear fuel (SNF) with a wide variety of forms and characteristics depending on how many different concepts are deployed. Each advanced reactor SNF type potentially poses unique management challenges. New planning efforts will be necessary to anticipate how the management requirements of advanced reactor SNF will affect the deployment of an integrated waste management system. This paper applies a framework of high-level facility deployment milestones to a generic SNF management system, reviewing them together with the advanced reactor SNF characteristics and management requirements. This allows for the investigation of factors that influence facility and system deployment, and ultimately, the identification of challenges facing the deployment of different kinds of SNF management facilities. Here, the back end of the once-through fuel cycle is examined for four advanced reactor system technology types: sodium-cooled fast reactors, high-temperature gas-cooled reactors, liquid-fuel molten salt reactors, and lead-cooled fast reactors. It is observed that milestones earlier in the facility deployment process (e.g., siting and facility design) are more impacted by the uniqueness of advanced reactor SNF characteristics than others (e.g., construction and testing). Ultimately, none of the differences are seen as fundamentally disqualifying in a technical sense; however, they should be considered early, potentially as part of reactor design, to avoid issues in the future.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CAD/CAM data management needs, requirements and options

The requirements for a data management system in support of technical or scientific applications and possible courses of action were reviewed. Specific requirements were evolved while working towards higher level integration impacting all phases of the current design process and through examination of commercially marketed systems and related data base research. Arguments are proposed for varied approaches in implementing data base systems ranging from no action necessary to immediate procurement of an existing data base management system.

Lopatka, R. S.↗

From Research to Flight: Surviving the TRL Valley of Death for Robotic and Human Space Exploration

There must be a plan or opportunities for flight validation: a) To reduce the bottleneck of new technologies at the TRL Valley of Death; b) To allow frequent infusion of new technologies into flight missions. Risk must be tolerated for new technology flight experiments. Risk must also be accepted on early-adopting missions to enable new capabilities. Fundamental research is critical to taking the next giant leap in the scientific exploration of space. Technology push is often required to meet current mission requirements. Technology management requires more than issuing NRAs and overseeing contracts.

Johnson, Les↗

From Research to Flight: Surviving the TRL Valley of Death for Robotic and Human Exploration

Fundamental research is critical to taking the next giant leap in the scientific exploration of space. NASA should be pushing the envelope and asking "what if?" .. Technology push enables new capabilities. When NASA began, everything was enabling. .. Technology pull is often required to meet current mission requirements. Technology management requires more than issuing NRAs and overseeing contracts. Continuous assessment, peer review, and system systems studies are vital to credible TRL advancement. A strategy for taking technology R&D to new heights will lead to discoveries at far-reaching destinations..

Johnson, Les↗

Hydrodynamic Test Requirements Process Improvements

Hydrodynamic testing at Los Alamos National Laboratory would benefit from a process improvement for the requirements process. Cameo was used as a digital solution for requirements management to allow Lead Engineers to track requirements more effectively. This was identified as a process improvement throughout this Capstone project. This report includes a project proposal, business case, literature review, methodology, project plan, data analysis, decision-making report, financial analysis report, discussion, and conclusion. Initially, this project focused on figuring out a solution for the hydrotest requirement process improvements. The scope narrowed to focus on the use of Cameo for requirement capture and management. During this Capstone, four tests had digital models produced for requirements management in Cameo. The initial model was the baseline, with core requirements used across the tests. Commonalities in tests were used and the core requirements allowed for process efficiencies. In the data analysis, it was seen that overall, the implementation of using Cameo for requirements resulted in a decreasing trend for both schedule and normalized cost. Tests have different complexity levels which is also a factor in how long the requirements process will take. Additional data is needed to continue analyzing process improvements. Through decisionmaking and financial analysis, the recommendation was to use Cameo for requirements process improvement. Multiple experts provided feedback for requirements that were then captured within models. Numerous tangible and intangible benefits were identified with this process improvement. For return on investment, the metric of success was schedule reduction, which was overall seen. Four tests were analyzed, so future analysis will be needed. There is also not a great financial risk because the main cost would be purchasing more licenses. Individuals must generate requirements whether using this software or not. Overall, training is needed to help improve the skillsets of Lead Engineers but is already being supported on a regular frequency. A desktop guide was started associated with explaining the process, however, it is a work in progress. The team plans on adding additional information in the digital models to help status when requirements are met using verification methods and artifacts. From working on this project an improved understanding of Cameo and requirements was the result. There are future opportunities to extend the usage for requirements management and progress will continue after this project.

99 GENERAL AND MISCELLANEOUS↗