Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RPS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

U.S. State Renewables Portfolio & Clean Electricity Standards: 2024 Status Update [Slides]

This report provides an overview and status update on U.S. state renewables portfolio standards (RPS) and has been expanded from previous editions to also cover 100% clean electricity standards (CES) adopted by a growing number of states. The report, published in slide-deck form along with accompanying data files, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on clean electricity development, and compliance costs. The 2023 edition presents historical data through year-end 2023 and projections out to 2050. Key trends from this edition of the report include the following: -Evolution of state RPS and CES programs: States continue to refine and revise their RPS policies, often by adopting higher targets and/or broader CES policies. Among the 29 states plus DC with an RPS, 16 have RPS targets of at least 50% of retail sales, and 4 states have a 100% RPS. An additional 16 states have adopted a broader 100% CES. -Historical impacts on renewables development: Almost half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is nominally associated with state RPS requirements. That percentage has declined over time to 35% of all U.S. RE capacity additions in 2023, though in certain regions RPS policies continue to play a dominant role in driving RE growth. -Future RPS and CES demand and incremental needs: The combined demand for clean electricity from RPS and CES policies will grow from roughly 500 TWh today to 1700 TWh by 2050. Accounting for current supplies—including existing nuclear and hydroelectric generation eligible for CES targets—RPS and CES policies will require 900 TWh of new clean electricity by 2050, equivalent to roughly 3x the historical rate of RPS-buildout. -RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique, state-specific issues. Most CES targets are not yet in force, and so little compliance experience to-date. -REC pricing trends: Prices for NEPOOL Class I RECs remained at roughly $\$40$/MWh over the past year, just below ACP rates in the larger state markets, while PJM Tier I REC prices continued to rise, reaching $\$35$/MWh by year-end 2023 and surpassing ACP levels in some states. Prices for solar RECs remained relatively stable, and continue to exhibit wide variation across states, with the highest prices ($200-450/MWh) in NJ, MA, and DC. -RPS compliance costs: RPS compliance costs average roughly 4% of retail electricity bills across RPS states, though vary widely from state to state, with the highest costs (11-12% of retail bills) in states with solar carve-outs and high SREC prices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

U.S. State Renewables Portfolio & Clean Electricity Standards: 2023 Status Update [Slides]

This report provides an overview and status update on U.S. state renewables portfolio standards (RPS) and has been expanded from previous editions to also cover 100% clean electricity standards (CES) adopted by a growing number of states. The report, published in slide-deck form along with accompanying data files, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on clean electricity development, and compliance costs. The 2023 edition presents historical data through year-end 2022 and projections out to 2050. Key trends from this edition of the report include the following: -Evolution of state RPS and CES programs: States continue to refine and revise their RPS policies, often by adopting higher targets and/or broader CES policies. Among the 29 states plus DC with an RPS, 16 states have RPS targets of at least 50% of retail sales, and 17 states have a 100% CES or RPS target. -Historical impacts on renewables development: Roughly half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is associated with state RPS requirements, though that percentage has declined in recent years, representing 30% of all U.S. RE capacity additions in 2022. Within some regions, particularly the Northeast and Mid-Atlantic, RPS policies play a more central role in motivating RE growth. -Future RPS and CES demand and incremental needs: RPS and CES policies will require roughly 300 terawatt-hours (TWh) of additional clean electricity supply by 2030 and 800 TWh by 2050, requiring total U.S. non-hydro RE generation to reach 28% of electricity sales by 2050 (compared to 17% today). This amounts to roughly one-quarter of EIA’s projected RE growth through 2050. -RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique, state-specific issues. Most CES targets are not yet in force. -Renewable energy certificate (REC) pricing trends: Prices for NEPOOL Class I RECs remained at roughly $\$40$ /MWh over the past year, just below alternative compliance payment (ACP) rates in the larger state markets, while PJM Tier I REC prices continued to rise, reaching $\$30$ /MWh by year-end. Prices for solar RECs (or SRECs) remained relatively stable, and continue to exhibit wide variation across states, with the highest prices ($\$200-450$ /MWh) in NJ, MA, and DC. -RPS compliance costs: RPS compliance costs average roughly 3.5% of retail electricity bills across RPS states, though vary widely from state to state, with the highest costs (8-12% of retail bills) in states with solar carve-outs and high SREC prices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Science Instrument Sensitivities to Radioisotope Power System Environment

Radioisotope Power Systems (RPS) have been and will be enabling or significantly enhancing for many missions, including several concepts identified in the 2011 Planetary Science Decadal Survey. Some mission planners and science investigators might have concerns about possible impacts from RPS-induced conditions upon the scientific capabilities of their mission concepts. To alleviate these concerns, this paper looks at existing and potential future RPS designs, and examines their potential radiation, thermal, vibration, electromagnetic interference (EMI), and magnetic fields impacts on representative science instruments and science measurements. Radiation impacts from RPS on science instruments are of potential concern for instruments with optical detectors and instruments with high-voltage electronics. The two main areas of concern are noise effects on the instrument measurements, and long-term effects of instrument damage. While RPS by their nature will contribute to total radiation dose, their addition for most missions should be relatively small. For example, the gamma dose rate from one Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) would be an order of magnitude lower than the environmental dose rate at Mars, and would have a correspondingly lower contribution to instrument noise and to any permanent damage to payload sensors. Increasing the number of General Purpose Heat Source (GPHS) modules used in an RPS would be expected to increase the generated radiation proportionally; however, the effect of more GPHS modules is mitigated from a strictly linear relationship by self-shielding effects. The radiation field of an RPS is anisotropic due to the deviation of the modules from a point-source-geometry. For particularly sensitive instruments the total radiation dose could be mitigated with separation or application of spot shielding. Though a new, higher-power RPS could generate more heat per unit than current designs, thermal impact to the flight system could be mitigated with shading and pointing if required by the mission. Alternatively, excess heat could prove beneficial in providing needed heat to spacecraft components and instruments in some thermal environments. Vibration for a new higher-power Stirling Radioisotope Generator (SRG) would be expected to be similar to the recent Advanced Stirling Radioisotope Generator (ASRG) design. While vibration should be low, it must be considered and addressed during spacecraft and instrument design. EMI and magnetic fields for new RPS concepts are expected to be low as for the current RPS, but must be considered and addressed if the mission includes sensitive instruments such as magnetometers. The assessment conducted for this paper focused on orbiter instrument payloads for two representative mission concepts- a Titan Saturn System Mission (TSSM) and a Uranus Orbiter and Probe (UOP)-since both of these Decadal Survey concepts would include many diverse instruments on board. Quick-look design studies using notional new RPS concepts were carried out for these two mission concepts, and their specific instrument packages were analyzed for their interactions with new RPS designs. The original Decadal Survey TSSM and UOP concepts did not have complete instrument performance requirements so typical measurement requirements were used where needed. Then, the general RPS environments were evaluated for impacts to various types of instruments. This paper describes how the potential impacts of the RPS on science instruments and measurements were assessed, which impacts were addressed, proposed mitigation strategies against those impacts, and provides an overview of future work.

RPS↗

U.S. Renewables Portfolio Standards 2021 Status Update: Early Release

Berkeley Lab’s annual status report on U.S. renewables portfolio standards (RPS) provides an overview of key trends associated with U.S. state RPS policies. The report, published in slide-deck form, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on renewables development, and compliance costs. The 2021 Early Release, published in lieu of a 2020 edition, presents historical data through year-end 2019, with some limited results for the year 2020. Key trends from this edition of the report include the following: Evolution of state RPS programs: States continue to refine and revise their RPS policies. Among other significant changes since the start of 2019, eight states enacted higher RPS targets or created new clean-energy/zero-carbon targets (AZ, DC, MD, NM, NV, VA, WA), in most cases setting targets equal to at least 50% of retail sales. Historical impacts on renewables development: Roughly half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is associated with state RPS requirements, though that percentage has declined in recent years, representing 23% of all U.S. RE capacity additions in 2019. However, within particular regions-namely, the Northeast and Mid-Atlantic-RPS policies continue to serve a central role in motivating RE growth. Future RPS demand and incremental needs: RPS demand growth through 2030 will require roughly 90 GW of new RE capacity and will require total U.S. non-hydro RE generation to reach 17% of electricity sales (compared to 12% in 2019). Relative to EIA projections, this amounts to roughly one-third of projected RE growth over the next decade. RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique, state-specific issues. REC pricing trends: Prices for NEPOOL Class I RECs rose steeply over 2019, reaching $40/MWh and remaining at roughly that level over 2020. PJM Tier I REC prices continued to rise at a modest pace over the course of 2020, reaching $10/MWh by year-end. Prices for solar RECs remained relatively stable over 2020, and continue to exhibit wide variation across states, with the highest prices ($200-450/MWh) in NJ, MA, and DC.RPS compliance costs and cost caps: RPS compliance costs in 2019 averaged roughly 2.6% of retail electricity bills in RPS states, compared to 2.3% in 2018, with costs in most states ranging from 0.5% to 4.5% of retail electricity bills.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Radioisotope Power Systems Program Status and Expectations

The Radioisotope Power Systems (RPS) Programs goal is to make RPS available for the exploration of the solar system in environments where conventional solar or chemical power generation is impractical or impossible to use to meet mission needs. To meet this goal, the RPS Program manages investments in RPS system development and RPS technologies. The RPS Program exists to support NASA's Science Mission Directorate (SMD). The RPS Program provides strategic leadership for RPS, enables the availability of RPS for use by the planetary science community, successfully executes RPS flight projects and mission deployments, maintains a robust technology development portfolio, manages RPS related National Environmental Policy Act (NEPA) and Nuclear Launch Safety (NLS) approval processes for SMD, maintains insight into the Department of Energy (DOE) implementation of NASA funded RPS production infrastructure operations, including implementation of the NASA funded Plutonium-238 production restart efforts. This paper will provide a status of recent RPS activities.

Radioisotope↗

Radioisotope Power Systems Reference Book for Mission Designers and Planners

The RPS Program's Program Planning and Assessment (PPA) Office commissioned the Mission Analysis team to develop the Radioisotope Power Systems (RPS) Reference Book for Mission Planners and Designers to define a baseline of RPS technology capabilities with specific emphasis on performance parameters and technology readiness. The main objective of this book is to provide RPS technology information that could be utilized by future mission concept studies and concurrent engineering practices. A progress summary from the major branches of RPS technology research provides mission analysis teams with a vital tool for assessing the RPS trade space, and provides concurrent engineering centers with a consistent set of guidelines for RPS performance characteristics. This book will be iterated when substantial new information becomes available to ensure continued relevance, serving as one of the cornerstone products of the RPS PPA Office. This book updates the original 2011 internal document, using data from the relevant publicly released RPS technology references and consultations with RPS technologists. Each performance parameter and RPS product subsection has been reviewed and cleared by at least one subject matter representative. A virtual workshop was held to reach consensus on the scope and contents of the book, and the definitions and assumptions that should be used. The subject matter experts then reviewed and updated the appropriate sections of the book. The RPS Mission Analysis Team then performed further updates and crosschecked the book for consistency. Finally, a second virtual workshop was held to ensure all subject matter experts and stakeholders concurred on the contents.

Lee, Young↗

NASA's Radioisotope Power Systems Program Status

NASA's Radioisotope Power Systems (RPS) Program began formal implementation in December 2010. The RPS Program's goal is to make available RPS for the exploration of the solar system in environments where conventional solar or chemical power generation is impractical or impossible to meet mission needs. To meet this goal, the RPS Program manages investments in RPS system development and RPS technologies. The current keystone of the RPS Program is the development of the Advanced Stirling Radioisotope Generator (ASRG). This generator will be about four times more efficient than the more traditional thermoelectric generators, while providing a similar amount of power. This paper provides the status of the RPS Program and its related projects. Opportunities for RPS generator development and targeted research into RPS component performance enhancements, as well as constraints dealing with the supply of radioisotope fuel, are also discussed in the context of the next ten years of planetary science mission plans.

Stirling engines↗