Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “QUALIFICATION PLUS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

53 records · Page 3

Amateur Radio on the International Space Station - Phase 2 Hardware System

The International Space Station (ISS) ham radio system has been on-orbit for over 3 years. Since its first use in November 2000, the first seven expedition crews and three Soyuz taxi crews have utilized the amateur radio station in the Functional Cargo Block (also referred to as the FGB or Zarya module) to talk to thousands of students in schools, to their families on Earth, and to amateur radio operators around the world. Early on, the Amateur Radio on the International Space Station (ARISS) international team devised a multi-phased hardware development approach for the ISS ham radio station. Three internal development Phases. Initial Phase 1, Mobile Radio Phase 2 and Permanently Mounted Phase 3 plus an externally mounted system, were proposed and agreed to by the ARISS team. The Phase 1 system hardware development which was started in 1996 has since been delivered to ISS. It is currently operational on 2 meters. The 70 cm system is expected to be installed and operated later this year. Since 2001, the ARISS international team have worked to bring the second generation ham system, called Phase 2, to flight qualification status. At this time, major portions of the Phase 2 hardware system have been delivered to ISS and will soon be installed and checked out. This paper intends to provide an overview of the Phase 1 system for background and then describe the capabilities of the Phase 2 radio system. It will also describe the current plans to finalize the Phase 1 and Phase 2 testing in Russia and outlines the plans to bring the Phase 2 hardware system to full operation.

Bauer, F.↗

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Plasma Interaction Experiment /PIX/ - Description and flight qualification test program

The Plasma Interaction Experiment (PIX) is a battery powered preprogrammed auxiliary payload on the Landsat-C launch. This experiment is part of a larger program to investigate space plasma interactions with spacecraft surfaces and components. The varying plasma densities encountered during available telemetry coverage periods are deemed sufficient to determine first order interactions between the space plasma environment and the biased experimental surfaces. The specific objectives of the PIX flight experiment are to measure the plasma coupling current and the negative voltage breakdown characteristics of a solar array segment and a gold plated steel disk. Measurements will be made over a range of surface voltages up to plus or minus 1 kilovolt. The orbital environment will provide a range of plasma densities. The experimental surfaces will be voltage-biased in a preprogrammed step sequence to optimize the data returned for each plasma region and for the available telemetry coverage.

Ignaczak, L. R.↗

Fabrication Status of ITER Central Solenoid Modules

The fabrication of the modules for the ITER Central Solenoid (CS) is in progress at General Atomics (GA) in Poway, California, USA. This purpose built facility has been established with the requisite tools and machines to fabricate the seven 110 tonne CS modules (six required plus one spare). GA’s project responsibility is completing the fabrication design, developing and qualifying the fabrication processes and tools, fabricating the seven modules, and testing the modules at 4.5 K with full current. The current schedule has the first module’s completing fabrication in 2018 followed by electrical and full current testing. Upon completion of testing, the modules will be shipped to the ITER site for assembly into the CS stack. GA has co mpleted the fabrication of a qualification coil, simulating all of the processes and exercising all of the tooling required to fabricate a production module. After completion, the qualification coil underwent a cool down cycle to 4.5K which served as the final commissioning step of the helium cooling system on the parallel flow paths of a module. In addition, other final test station systems and procedures were simulated to verify their functionality including simulated critical current sharing temperature (Tcs) measurements, DC switch operation to dump the energy from the coil, and a helium leak test on the coil at <10K. After warming the coil, Paschen tests were repeated prior to the coil being dissected to evaluate the quality of the vacuum pressure impregnation (VPI). Dissection is scheduled for early spring 2018 and the results showed full resin impregnation of all areas. In the production and testing of the qualification coil, many lessons were learned and the improvements incorporated into the module fabrication processes. GA currently has five production modules in fabrication, at different stages in the process. The first module is nearly ready for vacuum pressure impregnation. The second and third modules are currently in the insulation process and the 7 pancakes of the forth module are being joined together into a 110 tonne module. Module 5 is currently being wound. The qualification coil has been completed and dissected to evaluate the VPI. A description of the VPI process is provided. To verify the turn insulation of a module, unique impulse testing methods were developed to test the insulation between the 560 turns of a module. These methods are reported in this paper.

Smith, J.↗

Voyager spacecraft attitude control propulsion system post-launch performance requirements changes

A test program aimed at the re-qualification of the 0.2-lbf attitude control thruster of the Voyager 2 spacecraft was carried out while the spacecraft was in flight on an interplanetary trajectory to Uranus. The objective of the program was to determine if the 0.2-lbf thruster could be successfully and repeatedly fired at pulse widths of less than the standard minimum pulse width of 10 milliseconds with no degradation. It was demonstrated that the thruster was qualified for short pulse operation at pulse widths of 4 ms or greater. Pulse widths of 4.0 ms provide an impulse bit of approximately 45 percent of the impulse provided by a 10-ms pulse, and the pulse-to-pulse and unit-to-unit variation is approximately plus or minus 10 percent.

Groudle, T. A.↗

SRAT CHEMISTRY AND ACID CONSUMPTION DURING SIMULATED DWPF MELTER FEED PREPARATION

Due to higher than expected hydrogen generation during the Tank 51-Sludge Batch 4 (SB4) qualification run, DWPF engineering requested the Savannah River National Laboratory (SRNL) to expand the ongoing catalytic hydrogen generation program. The work presented in this Technical Report was identified as part of SRNL/Liquid Waste Organization (LWO) meetings to define potential causes of catalytic hydrogen generation as well as from an external technical review panel commissioned to evaluate SRNL hydrogen related data and programs. New scope included improving the understanding of SRAT/SME process chemistry, particularly as it related to acid consumption and hydrogen generation. The expanded hydrogen program scope was covered under the technical task request (TTR): HLW-DWPF-TTR-2007-0016. A task technical and quality assurance plan (TT&QAP) was issued to cover focus areas raised in meetings with LWO plus a portion of the recommendations made by the review panel. A supporting analytical study plan was issued. It was also noted in the review of catalytic hydrogen generation that control of the DWPF acid stoichiometry was an important element in controlling hydrogen generation. A separate TTR was issued to investigate ways of improving the determination of the acid requirement during processing: HLWDWPF-TTR-0015. A separate TT&QAP was prepared for this task request. This report discusses some progress on this task related to developing alternative acid equations and to performing experimental work to supplement the existing database. Simulant preparation and preliminary flowsheet studies were already documented. The prior work produced a sufficient quantity of simulant for the hydrogen program and melter feed rheology testing. It also defined a suitable acid addition stoichiometry. The results presented in this report come from samples and process data obtained during sixteen 22-L SRAT/SME simulations that were performed in the second half of 2007 to produce eight SME products with frit 418 and a matching set of eight SME products with spherically beaded frit 418. The requirement to produce two 25 gallon batches of melter feed for the melter feed rheology modifier program fell under a separate task plan. One supporting 4-L SRAT simulation was performed with mercury, since the 22-L melter feed preparation runs had no mercury due to melter off-gas constraints. As a result of this work, a timeline of reactions has been developed showing the sequence of major reactions occurring during and shortly after acid addition. The traditional-style simulant used in this testing had fairly well defined speciation which enabled the reactions being observed to be related to acid consumption. The new coprecipitated simulants have somewhat different speciation, and it will be necessary to validate some of the conclusions from this testing using sample data from SRAT simulations with coprecipitated simulant. Noble metal dissolution data on timing and concentration were presented in a separate report discussing hydrogen generation. A few of those results will be brought into this report as part of the description of the SRAT chemistry timeline. The noble metal and mercury concentrations used in the preliminary flowsheet studies are summarized in Table 1 along with the ranges covered in this study.

08 HYDROGEN↗

R&D Roadmap for Enhanced Resilient Plant Systems, Metrics, Scenarios, Risk Analysis, and Modeling and Simulation

The nuclear industry and the U.S. Department of Energy are jointly developing accident tolerant fuel (ATF) which has the potential to greatly improve the safety and economic performance of the current fleet of NPPs. The combination of ATF with the optimal use of FLEX equipment (deployed as an industry response to the Fukushima Daiichi Nuclear Power Plant (NPP) accident in 2012), enhancements on plant components and systems, incorporation of augmented cooling systems or new passive cooling systems, and improvements in fuel cycle efficiency, have the potential to render the NPPs more efficient and resilient to events (both internally and externally initiated) that have the potential to challenge the integrity of the fuel or plant containment. In this report, combinations of these plant improvements are called Enhanced Resilient Plant Systems. In order to accelerate the development and deployment of the components that comprise Enhanced Resilient Plant Systems, a well-integrated toolkit that is fuel/clad-, fuel cycle-, systems-, and scenario-centric is required to provide a ready platform for the analysis of the advanced ATF fuel and cladding materials that are being developed, as well as plant systems modifications to achieve enhanced resiliency. Since the deployment of these enhancements will comprise a risk/benefit tradeoff of their impacts on plant safety and economics, the envisioned toolkit will need to be capable to characterizing the multidimensional aspects associated with these evaluations and provide decision-makers with information that can optimize the technological, economic, and safety benefits that are to be obtained. The Risk-Informed Systems Analysis (RISA) Pathway of the DOE Light Water Reactor Sustainability (LWRS) Program initiated several research tasks to develop analytical capabilities to support the industry in the transition to the ATF and Enhanced Resilient Plant Systems. The general idea behind the initiative is the development of an integrated evaluation approach which combines the plant probabilistic risk assessment (PRA) models with Multi-Physics Best Estimate Plus Uncertainty (MP-BEPU) analyses in a seamless fashion. The integrated evaluation framework aims at enabling plant system configuration variations to be studied with speed and precision, including detailed risk and benefit assessments of introducing ATF and Enhanced Resilient Plant Systems into current LWR plants to achieve both safety and operational performance enhancements. The focus of this report is to present an integrated research and development (R&D) roadmap to identify and perform high value evaluations of proposed ATF and Enhanced Resilient Plant Systems concepts to identify both the technical (e.g. benefits to risk, safety, and operational margins) and the economic (i.e. business and cost) elements associated with industry adoption of the technology. The integrated evaluation approach will be developed to support the development, testing, qualification, licensing, and deployment of ATF and Enhanced Resilient Plant Systems technology that is capable of achieving substantial safety and economic improvements as well as timely widespread adoption by the US nuclear industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Use of Forward Sensitivity Analysis Method to Improve Code Scaling, Applicability, and Uncertainty (CSAU) Methodology

Code Scaling, Applicability, and Uncertainty (CSAU) methodology was developed in late 1980s by US NRC to systematically quantify reactor simulation uncertainty. Basing on CSAU methodology, Best Estimate Plus Uncertainty (BEPU) methods have been developed and widely used for new reactor designs and existing LWRs power uprate. In spite of these successes, several aspects of CSAU have been criticized for further improvement: i.e., (1) subjective judgement in PIRT process; (2) high cost due to heavily relying large experimental database, needing many experts man-years work, and very high computational overhead; (3) mixing numerical errors with other uncertainties; (4) grid dependence and same numerical grids for both scaled experiments and real plants applications; (5) user effects; Although large amount of efforts have been used to improve CSAU methodology, the above issues still exist. With the effort to develop next generation safety analysis codes, new opportunities appear to take advantage of new numerical methods, better physical models, and modern uncertainty qualification methods. Forward sensitivity analysis (FSA) directly solves the PDEs for parameter sensitivities (defined as the differential of physical solution with respective to any constant parameter). When the parameter sensitivities are available in a new advanced system analysis code, CSAU could be significantly improved: (1) Quantifying numerical errors: New codes which are totally implicit and with higher order accuracy can run much faster with numerical errors quantified by FSA. (2) Quantitative PIRT (Q-PIRT) to reduce subjective judgement and improving efficiency: treat numerical errors as special sensitivities against other physical uncertainties; only parameters having large uncertainty effects on design criterions are considered. (3) Greatly reducing computational costs for uncertainty qualification by (a) choosing optimized time steps and spatial sizes; (b) using gradient information (sensitivity result) to reduce sampling number. (4) Allowing grid independence for scaled integral effect test (IET) simulation and real plant applications: (a) eliminate numerical uncertainty on scaling; (b) reduce experimental cost by allowing smaller scaled IET; (c) eliminate user effects. This paper will review the issues related to the current CSAU, introduce FSA, discuss a potential Q-PIRT process, and show simple examples to perform FSA. Finally, the general research direction and requirements to use FSA in a system analysis code will be discussed.

99 GENERAL AND MISCELLANEOUS↗

SLUDGE BATCH 7 ACCEPTANCE EVALUATION: RADIONUCLIDE CONCENTRATIONS IN TANK 51 SB7 QUALIFICATION SAMPLE PREPARED AT SRNL

Presented in this report are radionuclide concentrations required as part of the program of qualifying Sludge Batch Seven (SB7) for processing in the Defense Waste Processing Facility (DWPF). The SB7 material is currently in Tank 51 being washed and prepared for transfer to Tank 40. The acceptance evaluation needs to be completed prior to the transfer of the material in Tank 51 to Tank 40. The sludge slurry in Tank 40 has already been qualified for DWPF and is currently being processed as SB6. The radionuclide concentrations were measured or estimated in the Tank 51 SB7 Qualification Sample prepared at Savannah River National Laboratory (SRNL). This sample was prepared from the three liter qualification sample of Tank 51 sludge slurry (HTF-51-10-125) received on September 18, 2010. The sample was delivered to SRNL where it was initially characterized in the Shielded Cells. With consultation from the Liquid Waste Organization, the qualification sample was then modified by several washes and decants, which included addition of Pu from H Canyon and sodium nitrite per the Tank Farm corrosion control program. This final slurry now has a composition expected to be similar to that of the slurry in Tank 51 after final preparations have been made for transfer of that slurry to Tank 40. Determining the radionuclide concentrations in this Tank 51 SB7 Qualification Sample is part of the work requested in Technical Task Request (TTR) No. HLW-DWPF-TTR-2010-0031. The radionuclides included in this report are needed for the DWPF Radiological Program Evaluation, the DWPF Waste Acceptance Criteria (TSR/WAC) Evaluation, and the DWPF Solid Waste Characterization Program (TTR Task I.2). Radionuclides required to meet the Waste Acceptance Product Specifications (TTR Task III.2.) will be measured at a later date after the slurry from Tank 51 has been transferred to Tank 40. Then a sample of the as-processed SB7 will be taken and transferred to SRNL for measurement of these radionuclides. The results presented in this report are those necessary for DWPF to assess if the Tank 51 SB7 sample prepared at SRNL meets the requirements for the DWPF Radiological Program Evaluation, the DWPF Waste Acceptance Criteria evaluation, and the DWPF Solid Waste Characterization Program. Concentrations are given for thirty-four radionuclides along with total alpha and beta activity. Values for total gamma and total gamma plus beta activities are also calculated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE BATCH 6 ACCEPTANCE EVALUATION: RADIONUCLIDE CONCENTRATIONS IN TANK 51 SB6 QUALIFICATION SAMPLE PREPARED AT SRNL

Presented in this report are radionuclide concentrations required as part of the program of qualifying Sludge Batch Six (SB6) for processing in the Defense Waste Processing Facility (DWPF). The SB6 material is currently in Tank 51 being washed and prepared for transfer to Tank 40. The acceptance evaluation needs to be completed prior to the transfer of the material in Tank 51 to Tank 40. The sludge slurry in Tank 40 has already been qualified for DWPF and is currently being processed as SB5. The radionuclide concentrations were measured or estimated in the Tank 51 SB6 Qualification Sample prepared at Savannah River National Laboratory (SRNL). This sample was prepared from the three liter sample of Tank 51 sludge slurry (HTF-51-09-110) taken on October 8, 2009. The sample was delivered to SRNL where it was initially characterized in the Shielded Cells. Under the direction of the Liquid Waste Organization it was then modified by eight washes, nine decants, an addition of Pu from Canyon Tank 16.3, and an addition of NaNO{sub 2}. This final slurry now has a composition expected to be similar to that of the slurry in Tank 51 after final preparations have been made for transfer of that slurry to Tank 40. Determining the radionuclide concentrations in this Tank 51 SB6 Qualification Sample is part of the work requested in Technical Task Request (TTR) No. HLW-DWPF-TTR-2009-0014. The work with this qualification sample is covered by a Task Technical and Quality Assurance Plan and an Analytical Study Plan. The radionuclides included in this report are needed for the DWPF Radiological Program Evaluation, the DWPF Waste Acceptance Criteria (TSR/WAC) Evaluation, and the DWPF Solid Waste Characterization Program (TTR Task I.2). Radionuclides required to meet the Waste Acceptance Product Specifications (TTR Task II.2.) will be measured at a later date after the slurry from Tank 51 has been transferred to Tank 40. Then a sample of the as-processed SB6 will be taken and transferred to SRNL for measurement of these radionuclides. The results presented in this report are those necessary for DWPF to assess if the Tank 51 SB6 sample prepared at SRNL meets the requirements for the DWPF Radiological Program Evaluation, the DWPF Waste Acceptance Criteria evaluation, and the DWPF Solid Waste Characterization Program. The sample is the same as that on which the chemical composition was reported. Concentrations are given for thirty-four radionuclides along with total alpha and beta activity. Values for total gamma and total gamma plus beta activities are also calculated. Results also indicate that 99% of the Tc-99 and at least 90% of the I-129 that could have been in this sludge batch have been removed by chemical processing steps in the SRS Canyons or Tank Farm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The 2014 Sandia Verification and Validation Challenge: Problem statement

This paper presents a case study in utilizing information from experiments, models, and verification and validation (V&V) to support a decision. It consists of a simple system with data and models provided, plus a safety requirement to assess. The goal is to pose a problem that is flexible enough to allow challengers to demonstrate a variety of approaches, but constrained enough to focus attention on a theme. This was accomplished by providing a good deal of background information in addition to the data, models, and code, but directing the participants' activities with specific deliverables. In this challenge, the theme is how to gather and present evidence about the quality of model predictions, in order to support a decision. This case study formed the basis of the 2014 Sandia V&V Challenge Workshop and this resulting special edition of the ASME Journal of Verification, Validation, and Uncertainty Quantification.

42 ENGINEERING↗

FIB-ToF-SIMS characterization of irradiated U-10Zr

Post-irradiation examination (PIE) is critical for the performance assessment and qualification of nuclear fuels. Secondary ion mass spectrometry (SIMS) is a powerful materials characterization technique that allows for elemental and isotopic mapping with a depth resolution greater than EDS and EPMA. However, it has not yet been applied to PIE of metallic nuclear fuel. Here, in this work, we characterize an fast neutron spectrum irradiated U-10Zr fuel sample using a time-of-flight SIMS (ToF-SIMS) system connected to a FIB/SEM system, which allows for flexible sample analysis compared to a dedicated ToF-SIMS instrument. Analysis of the resulting hyperspectral micrograph data was aided by the development of an unsupervised machine learning (ML) algorithm that iterates on existing methods to segment the 3D micrographic datasets based on the similarity of mass spectra. The results showed that the FIB-ToF-SIMS instrument was potentially capable of spatially resolving closed fission gas bubbles in 3D by continued ion sputtering of the analyzed volume. Additionally, the ML algorithm proved useful in revealing the chemical segregation of light fission products (those with an atomic mass between approximately 85–105 amu, such as ruthenium and rhodium) plus matrix zirconium, heavy fission products (those with an atomic mass between approximately 135–150 amu, such as the lanthanides) and uranium. Future studies are planned to conduct FIB-ToF-SIMS analysis on more irradiated U-Zr samples to study the constituent redistribution.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transition to Online Cable Insulation Condition Monitoring

Nuclear power plant cables were originally qualified for 40 year life and generally have not required specific test verification to assure service availability through the initial plant qualification period. However, license renewals to 60 and 80 years of operation require a cable aging management program that depends on some form of test and verification to assure fitness for service. Environmental stress (temperature, radiation, chemicals, water, and mechanical) varies dramatically within a nuclear power plant and, in some cases, cables have degraded and required repair or replacement before their qualified end-of-life period. In other cases, cable conditions have been mild and dependable cable performance confirmed to extend well beyond the initial qualified life. Most offline performance-based testing requires cables to be de-coupled and de-energized for specially trained technicians to perform testing. These offline tests constitute an expensive operational burden that limits the economic viability of nuclear power plants. Although initial investment may be higher, new online test practices are emerging as options or complements to offline testing that avoid or minimize the regularly scheduled offline test burden. These online methods include electrical and fiber-optic partial discharge measurement, spread spectrum time or frequency domain reflectometry, distributed temperature profile measurements, and local interdigital capacitance measurement of insulation characteristics. Introduction of these methods must be supported by research to confirm efficacy plus either publicly financed or market driven investment to support the start-up expense of cost-effective instrumentation to monitor cable condition and assure reliable operation. This work summarizes various online cable assessment technologies plus introduces a new cable motor test bed to assess some of these technologies in a controlled test environment.

Glass, Samuel W.↗

Laser Powder Directed Energy Deposition of Steels for Nuclear Applications

This comprehensive investigation examines the structure–property relationships in two nuclear alloy systems—Alloy 709 (A709) austenitic stainless steel and Grade 92 (G-92) ferritic/martensitic (F/M) steel—manufactured via directed energy deposition (DED) for sodium-cooled fast reactor applications. This study establishes the fundamental mechanisms for controlling microstructures for optimizing the mechanical performance of additively manufactured nuclear materials through systematic heat treatment optimization and multiscale characterization. As-deposited A709 steel develops a complex multiscale strengthening architecture consisting of a fine cellular solidification structure with diameter of 2-3 µm within10–50 µm grains, elevated dislocation densities from rapid thermal cycling, and grain boundary precipitates that activate concurrent Hall–Petch, dislocation, and precipitation hardening mechanisms to achieve exceptional properties [yield strength (YS): 603 MPa, ultimate tensile strength (UTS): 844 MPa, Vickers hardness: 220 HV] that achieve a 44% superior strength compared to that of the wrought material. Heat treatments produce different results. Solution annealing (SA) dissolves the cellular structure and reduces the hardness to 190 HV. Precipitation treatment (PT) keeps the cellular structure but adds carbides, allowing the hardness to reach 205 HV. The best approach combines both treatments (SA+PT) and creates uniform precipitate distributions with M 23 C 6 carbides at the grain boundaries and MX carbonitrides in the matrix, achieving a hardness of 195 HV. However, directional differences persist, with a 12%–15% strength variation between orientations due to the inherited layered microstructural architecture that survives aggressive heat treatment. While tensile testing at 550°C demonstrates 40%–50% thermal softening with dynamic strain aging, DED A709 steel still maintains a 71% higher YS than that of the wrought material. Ion irradiation studies (100–400 dpa) of DED A709 steel reveal progressive radiation damage with increasing void density and radiation-induced segregation causing nickel enrichment and chromium depletion, which will ultimately compromise mechanical properties. As-deposited G-92 exhibits exceptional strength (UTS: 1650–1700 MPa, 430 HV) through a complex microstructure containing both ferrite and martensite phases, a high geometrically necessary dislocation (GND) density (17.04×10 14 /m 2 ), and fine carbides. Heat treatments create distinct changes. Normalizing produces fresh martensite with the highest hardness (460 HV) and an increased GND density (20.23×10 14 /m 2 ). Tempering develops dual precipitation systems and reduces the hardness to 290 HV. The optimal approach uses sequential normalizing plus tempering, achieving balanced properties with the lowest hardness (250 HV) and a reduced GND density (11.01×10 14 /m 2 ). A processing-dependent anisotropy is observed: horizontal specimens achieve superior ductile behavior, while vertical specimens exhibit brittle failure. A tempering heat treatment successfully mitigates this anisotropic behavior by transforming the hard martensitic as-deposited structure into tempered martensite enabling both horizontal and vertical specimens to exhibit similar stress–strain characteristics with visible necking behavior. Remarkably, testing at 550°C reveals a reversal in the anisotropy, where as-deposited specimens achieve near isotropy with superior thermal stability (a 15%–20% strength reduction), while tempered specimens develop an orientation dependence with a 25%–30% strength reduction. Both alloy systems demonstrate that DED processing creates specimens with a superior strength through refined microstructural features, though with distinct strengthening mechanisms—austenitic through cellular structures and precipitates versus F/M through phase transformations and precipitates. Heat treatment optimization requires alloy-specific approaches, with A709 benefiting from controlled precipitation while G-92 requires careful phase transformation control. The results show that DED manufacturing can produce nuclear materials with exceptional performance, but directional effects and temperature-dependent behavior must be carefully considered for reactor component design and qualification.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Testing, Calibration, and UxS Integration of the Kromek GR1 Plus CZT Gamma Spectrometer

Collecting radiation measurements can be a hazardous task, especially in the presence of highly active sources. Various scenarios necessitate source search, classification, and quantification, often with limited or no a priori information. Activities such as disaster mitigation, emergency response, environmental monitoring, and site remediation may involve dangerous radioactive sources. In these situations, there is a pressing need for remote monitoring capabilities that protect human operators from potential harm and enhance adherence to the principle of “As Low as Reasonably Achievable” (ALARA) for radiation doses. The first step toward achieving remote radiation measurement capabilities is the remote operation of a radiation sensor. Once this milestone is reached, the next challenge is to integrate this remote sensing capability into suitable actuation agents, collectively referred to as uncrewed systems (UxS). These systems include familiar platforms such as robotic quadrupeds, aerial multirotor vehicles, and ground vehicles, any of which may be teleoperated, act autonomously, or utilize a combination of both. A critical factor in achieving remote radiation sensing is the availability of data from the appropriate sensor. Many commercially available radiation sensors have closed-source documentation for their communication protocols. Typical end-user products are often self-contained, handheld devices designed for manual measurement scenarios. While there are commercial off-the-shelf (COTS) integrations of radiation sensors with UxS available for purchase, these solutions are typically tailored for specific use cases and may not meet the requirements of different applications. This paper discusses efforts to remotely acquire radiation measurements from a small form-factor CZT gamma spectrometer. Sandia National Laboratories has successfully demonstrated the initial capability to integrate low size, weight, and power (SWaP) gamma spectroscopy into various UxS, alongside co-located GPS data logging and sensor calibration and qualification. With remote gamma spectroscopy achieved, the stage is set for UxS integration of this capability.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Up-skilling and Re-skilling for the Nuclear Industry - 17276

In the UK, nuclear skills and qualifications have been the subject of several studies in higher levels of Government, including one by UK Cabinet Office. The newly formed UK Nuclear Skills Strategy Group (NSSG) has been tasked with addressing the current skills and people gaps for the UK nuclear industry. The NSSG is working with several key organisations in the UK: The National Skills Academy for Nuclear, (NSAN), which covers skills interventions, training and workforce development and experience, and the newly forming National College for Nuclear (NCfN) which will become a nuclear qualifications awarding body, regulating educational qualifications and curriculum in the nuclear sector. The NSSG has published its own UK Nuclear Skills Strategy in December 2016, aligned to the UK Cabinet Office study. It is the intent that, in the near future, nuclear qualifications and experience will be directly transferable across different organisations and nuclear sites in the UK, enabling the maintenance of high standards of behaviours and improved mobility throughout the sector. The UK needs to maintain and grow a diverse workforce and nuclear Suitably Qualified and Experienced Personnel (SQEP) people. The 2015 UK Nuclear Labour Market Intelligence (LMI) report, produced by Cogent for the Nuclear Energy Skills Alliance (NESA), concluded that the total nuclear workforce demand for the UK Nuclear Civil and Defence sector needed to grow by 33,000 people in the next five years, which includes replacement and expansion demand. This involved all disciplines and grades, with for example, higher level skilled workers needing to increase by 2200 FTEs every year. The main discipline pinch points were in, for example, Mechanical; Electrical; Project Management; Safety Case Specialists; Commissioning Engineers. Of the overall workforce, around 10% is over 60 years old and around 38% is over 50 years old. Jacobs in the UK is widely involved in many aspects of skills and competence development, with active involvement in local and national training programmes, and driving new methodologies to accelerate our staff's journey to nuclear competence. As well as looking at the immediate future, there is a risk in the UK that, over the 120-year plus clean-up mission, there won't be enough people with the right skills. Jacobs is developing sustainable solutions to this in our skills and development strategy for the nuclear sector. Jacobs has developed a variety of approaches to help us maintain and grow our diverse workforce and nuclear 'SQEP' people. This includes: - Identifying and developing our employees' technical and personal skills and capabilities, particularly the requirements of our millennials in both technical and social aspects of their working lives. - Identifying and planning for our future skills needs to meet our projected business requirements. - Our programme to transfer skilled employees from other sectors into the nuclear industry. - Our extensive school student placement scheme, aligned to the UK's 'Industrial Cadet' scheme, which has helped to bring school-aged students into Jacobs on workplace experience. - Our collaboration with our customers to develop UK national level Trailblazer Apprentice programmes. - Our involvement at a UK national level in the work of the National Skills Academy for Nuclear (NSAN), the Nuclear Energy Skills Alliance (NESA) High Level Skills Committee and the newly forming UK National College for Nuclear (NCfN). - Our work to ensure diversity is valued in our workplace, for example in our involvement in 'Women in Nuclear'. (authors)

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Supporting qualified database for uncertainty evaluation

Uncertainty evaluation constitutes a key feature of BEPU (Best Estimate Plus Uncertainty) process. The uncertainty can be the result of a Monte Carlo type analysis involving input uncertainty parameters or the outcome of a process involving the use of experimental data and connected code calculations. Those uncertainty methods are discussed in several papers and guidelines (IAEA-SRS-52, OECD/NEA BEMUSE reports). The present paper aims at discussing the role and the depth of the analysis required for merging from one side suitable experimental data and on the other side qualified code calculation results. This aspect is mostly connected with the second approach for uncertainty mentioned above, but it can be used also in the framework of the first approach. Namely, the paper discusses the features and structure of the database that includes the following kinds of documents: 1. The' RDS-facility' (Reference Data Set for the selected facility): this includes the description of the facility, the geometrical characterization of any component of the facility, the instrumentations, the data acquisition system, the evaluation of pressure losses, the physical properties of the material and the characterization of pumps, valves and heat losses; 2. The 'RDS-test' (Reference Data Set for the selected test of the facility): this includes the description of the main phenomena investigated during the test, the configuration of the facility for the selected test (possible new evaluation of pressure and heat losses if needed) and the specific boundary and initial conditions; 3. The 'QR' (Qualification Report) of the code calculation results: this includes the description of the nodalization developed following a set of homogeneous techniques, the achievement of the steady state conditions and the qualitative and quantitative analysis of the transient with the characterization of the Relevant Thermal-Hydraulics Aspects (RTA); 4. The EH (Engineering Handbook) of the input nodalization: this includes the rationale adopted for each part of the nodalization, the user choices, and the systematic derivation and justification of any value present in the code input respect to the values as indicated in the RDS-facility and in the RDS-test. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗