Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 6.0 Deliverable – CarbonSAFE Phase III Readiness

The OASIS CarbonSAFE Phase II Project OASIS (Optimizing Alabama’s CO 2 Storage in Shelby County) is a geologic and reservoir characterization study designed to evaluate deep saline formations for potential long-term carbon dioxide (CO 2 ) storage in central Alabama near the National Carbon Capture Center (NCCC) and Alabama Power’s Plant Gaston. The project centers on understanding the potential of the Cambro-Ordovician Knox Group and underlying strata such as the Conasauga and Rome Formations for geologic storage of CO 2 . These formations were investigated as part of SECARB-USA (DE-FE0031830) and Project OASIS through the drilling of two stratigraphic test wells to obtain electronic well logs, core, and sidewall core plugs. These data provide direct measurements of porosity, permeability, and lithologic variability critical for reservoir characterization. Complementing the well program, a limited 2D seismic survey was conducted to help select the site for Westover #2 as part of SECARB-USA (DE-FE0031830), and a more regional Seismic Exchange (SEI) seismic survey was licensed and interpreted to define structural and stratigraphic frameworks in a new Static Earth Model (SEM), map reservoir continuity, and to identify potential sealing intervals. Integrated with geologic and reservoir modeling, these datasets form the basis for evaluating storage capacity, injectivity, and containment. While this document endeavors to provide readers with a high-level overview of Project OASIS activities and its suitability for subsequent CarbonSAFE Phases, such as a Phase III effort. Other project deliverables and milestones will provide more details on individual subjects.

20 FOSSIL-FUELED POWER PLANTS↗

Bering Strait Energy Planning Network

Kawerak will work with partners as a clearinghouse for energy information, provide training for remote and onsite technical assistance to communities on energy projects, work with communities to update their portions of the regional energy plan and contribute results to state energy planners, and host an annual regional energy summit to share information and provide training while networking with other regions to collaborate on energy issues and projects. These projects will look to leverage current and future DOE and other funding opportunities and to capture the Norton Sound Economic Development Corporation funding for shovel ready energy projects.

99 GENERAL AND MISCELLANEOUS↗

DOE Zero Energy Ready Home Case Study: Shore Road Project - Old Greenwich, Connecticut

This case study describes a DOE Zero Energy Ready Home in Old Greenwich, CT, that scored HERS 40 without PV and HERS 27 with PV. This 4,100 ft2 custom home has 13-inch ICF basement walls and 11-inch ICF above-grade walls with a closed-cell spray foam-insulated roof deck, and a continuously running ERV. The house has a dual-fuel heat pump, an instantaneous condensing water heater, and 4.5-kW solar shingles.

builder↗

Identification and prioritization of high risk deteriorating support infrastructure - 15475

Identification and prioritization for the re-capitalization of deteriorating waste processing and storage support infrastructure and information technology (IT) is essential for a safe, cost effective, and sustainable waste management program. Funding restraints have limited programs to performing only maintenance on aging infrastructure support systems whose operational costs, technological obsolescence, and reliability risks continue to grow without a disciplined and balanced re-capitalization program. Savannah River Site (SRS) comprises both Department of Energy Environmental Management and NNSA missions, and includes a lab, Savannah River National Laboratory. SRS has developed a crosscutting identification and prioritization tool and process that provides integration of all Site mission support infrastructure re-capitalization requirements and prioritizes into a single database that can be readily accessed for infrastructure investment decisions. This database, referred to as the SRS Critical Integrated Infrastructure Priority List (CIIPL) captures risk data that includes impacts toward safety, regulatory compliance, mission, and cost for inclusion in its prioritization process. Further, the CIIPL provides a status of each entered project's readiness for execution that includes funding source, reliability of current cost estimate, and an out year budget profile. The SRS CIIPL, created in 2009, was initially comprised of re-capitalization projects for the Site's common infrastructure (i.e. shared roads and utilities) that supported all Site missions and activities. As mission program funding became constrained, the value for a Site wide integrated prioritization tool became more apparent and the CIIPL grew to include all Site mission and tenant activities which included safeguards and security requirements. The SRS CIIPL has become a highly effective tool for achieving senior management situational awareness of the Site's most pressing support infrastructure and IT needs. The mission programs have used the CIIPL to prioritize and fund high risk projects within their own program budgets. This past year, the CIIPL was used as a budgeting and decision making tool to allocate funding for two common infrastructures high risk projects for the FY16 Site budget submission and has received laudatory comments from DOE headquarters review teams. The SRS CIIPL and its process can be a benefit to other waste management organizations by demonstrating a proven approach toward the integration of support infrastructure and IT re-capitalization requirements across diverse mission and tenant boundaries. The SRS CIIPL can provide senior management with an objective decision making tool that delivers a balanced evaluation of project requirements in terms of multiple risk criteria; safety, regulatory, mission, and cost impacts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Framework for Testing the Effectiveness of Bat and Eagle Impact-Reduction Strategies at Wind Energy Projects

The objectives of this framework are to facilitate the study design and execution to test the effectiveness of bat and eagle impact-reduction strategies at wind energy sites. Through scientific field research, the wind industry and its partners can help determine if certain strategies are ready for operational deployment or require further development. This framework should be considered a living document to be improved upon as fatality-reduction technologies advance from the initial concepts to proven readiness (through project- and technology-specific testing) and as scientific field methods improve.

17 WIND ENERGY↗

Contextual role of TRLs and MRLs in technology management.

Technology Readiness Levels (TRLs) have been used extensively from the 1970s, especially in the National Aeronautics and Space Administration (NASA). Their application was recommended by the General Accounting Office in 1999 to be used for major Department of Defense acquisition projects. Manufacturing Readiness Levels (MRLs) have been proposed for improving the way manufacturing risks and readiness are identified; they were introduced to the defense community in 2005, but have not been used as broadly as TRLs. Originally TRLs were used to assess the readiness of a single technology. With the emergence of more complex systems and system of systems, it has been increasingly recognized that TRLs have limitations, especially when considering integration of complex systems. Therefore, it is important to use TRLs in the correct context. Details on TRLs and MRLs are reported in this paper. More recent indices to establish a better understanding of the integrated readiness state of systems are presented. Newer readiness indices, System Readiness Levels (SRLs) and Integration Readiness Levels, are discussed and their limitations and advantages are presented, along with an example of computing SRLs. It is proposed that a modified SRL be considered that explicitly includes the MRLs and a modification of the TRLs to include the Integrated Technology Index (ITI) and/or the Advancement Degree of Difficulty index proposed by NASA. Finally, the use of indices to perform technology assessments are placed into the overall context of technology management, recognizing that factors to transition and manage technology include cost, schedule, manufacturability, integration readiness, and technology maturity.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Nuclear Direct Air Capture with Carbon Storage (NuDACCS) (Final Technical Report)

This final report, which is for DOE Award Number DE-FE0032160 (Direct Air Capture Combined with dedicated Long-Term Carbon Storage, Coupled to Existing Low-Carbon Energy), covers the Nuclear Direct Air Capture with Carbon Storage (NuDACCS) project period of performance from 03/31/2022 to 12/27/2024. Battelle Memorial Institute (Battelle) partnered with Aircapture LLC (Aircapture), Southern Company (Southern), Carbonvert, the University of Alabama, and Sargent & Lundy (S&L) to develop a front end engineering design (FEED) study for a direct air capture (DAC) system co-located with Southern Company's Joseph M. Farley Nuclear Plant (Plant Farley) in Columbia, Alabama. The DAC system was designed to capture at least 5,000 net tonnes of carbon dioxide (CO2) per year from ambient air in a form suitable for long duration carbon storage (e.g., geologic storage). To complement and support the FEED study, additional analyses were completed, including a Technology Maturation Plan (TMP); Workforce Readiness Plan; Project Cost Estimate; Business Case Analysis (BCA); Life Cycle Analysis (LCA); Environmental Health and Safety (EH&S) Assessment; and Environmental Justice (EJ) Analysis and Economic Revitalization and Job Creation Outcomes Analysis.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Review of Remote Welding and Nondestructive Examination Technologies for the DOE Standard Canister

The U.S. Department of Energy (DOE) manages a wide variety of spent nuclear fuel (SNF) that poses a unique management challenge. To help address this challenge, the DOE Standard Canister (DOESC), designed to remain sealed during handling, storage, transportation, and disposal, was conceptualized as a standardized containment vessel to accommodate DOE-managed SNF. Since 1999, several welding and examination processes have been independently developed for the DOESC’s closure welds. However, neither the DOESC nor these processes have been realized in an operational capacity. This review paper seeks to present and compare previously developed DOESC closure weld, nondestructive examination, and repair processes and technologies. Specific processes developed for the Idaho Spent Fuel Facility, in preparation for the Yucca Mountain geological repository, and the recent Road-Ready Demonstration Project are discussed. Further, specific focus is given to how different operating constraints and the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (BPVC) have driven certain welding and nondestructive examination requirements. Historical DOESC welding and examination strategies are assessed against current regulatory and BPVC requirements. The comparison of welding processes, technologies, and DOESC designs presented in this review paper will inform further construction efforts for other commercial and DOE-managed SNF containments, including the DOESC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dataset for report: Non-Technical Barriers to Geothermal Development in California and Nevada

In California and Nevada, geothermal projects are subject to non-technical barriers, which may create development delays leading to higher project costs and risks and decreased competitiveness with other electricity generation technologies. These non-technical barriers may include federal and state permits, authorizations, environmental reviews, and other regulatory requirements that are applicable throughout different phases of geothermal project development. The 2022 National Renewable Energy Laboratory (NREL) report, "Non-Technical Barriers to Geothermal Development in California and Nevada" presents findings of a study on non-technical barriers that may influence geothermal project development. The set of data resources relied upon for the report includes: 1) interviews conducted with relevant geothermal stakeholders including regulators and project developers, 2) federal and state environmental review documents developed for specific projects, 3) a techno-economic analysis conducted using the NREL Annual Technology Baseline (ATB) framework, and 4) an analysis of the impacts of site-specific land access and permitting considerations on project development readiness conducted using the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT) Socioeconomic Assessment Tool (SEAT).

15 GEOTHERMAL ENERGY↗

LIFE: Recent Developments and Progress

Test results from the NIF show excellent progress toward achieving ignition. Experiments designed to verify coupling of the laser energy to the fusion target have shown that the efficiency meets that needed for ignition. Several tests with the cryogenic targets needed for ignition have been performed, and world-record neutron output produced. The National Ignition Campaign is on schedule to meet its 2012 ignition milestone, with the next phase in the campaign due to start later this month. It has been a busy and very productive year. The NIF is in full 24/7 operations and has progressed markedly in the path toward ignition. The long-standing goal of the National Ignition Campaign to demonstrate ignition by the end of FY 2012 is on track. The LIFE plant design has matured considerably, and a delivery plan established based on close interactions with vendors. National-level reviews of fusion are underway, and are due to present initial findings later this year. A value proposition has been drafted for review. The LIFE project is ready to move into the delivery phase.

42 ENGINEERING↗

Advanced Energy Design Guide for K-12 School Buildings (AEDG) Training: Cooperative Research and Development Final Report, CRADA Number CRD-18-00761

U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), Building Technologies Office (BTO), Commercial Buildings Integration (CBI) Program supports the adoption of zero energy ready buildings design practices through targeted Science, Technology, Engineering, and Mathematics (STEM) workforce development. The National Renewable Energy Laboratory (NREL) identified the opportunity to provided targeted training to those professionals that have the greatest potential to impact adoption and successful design outcomes of zero energy ready buildings projects. In January 2018, ASHRAE released Achieving Zero Energy: Advanced Energy Design Guide for K-12 School Buildings (AEDG). The AEDG was developed in collaboration with NREL, American Institute of Architects (AIA), American Society of Heating, Refrigeration and Air-conditioning Engineers (ASHRAE), U.S. Green Building Council (USGBC), and Illuminating Engineers Society (IES). The purpose of this CRADA was to create a partnership between NREL, AIA, ASHRAE, USGBC, and IES to create and host on-demand, web-based training based on the AEDG.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

UKy-CAER Heat Integrated Transformative CO 2 Capture Process in Pulverized Coal Power Plants

The goal of this Phase II Topical Report is to summarize the work for public domain conducted on project DE-FE0031583. Building upon the Design Basis completed during Phase I and in accordance with the Statement of Project Objectives (SOPO), the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) along with team members has completed the Front End Engineering Design (FEED) for its advanced, versatile post-combustion CO 2 capture system (CCS) at the 10 MWe large pilot scale to be installed at the Wyoming (WY) Integrated Test Center (ITC), using a heat integrated process with split-rich fed, two-stage stripping and any advanced solvent to enhance the CO 2 absorber performance and lower the cost of CO 2 capture. The proposed project (Phases I-III) involves the design, fabrication, installation, testing and evaluation of a large pilot scale facility that will demonstrate the UK CAER transformative CCS integrated with an operating power plant. The work performed in Phase I, detailed in the Phase I Topical Report that was submitted in March 2019, included formation of a project team, securing the host site, and completing pre-FEED design basis, a cost estimation, a preliminary techno-economic analysis (TEA) and an environmental information volume (EIV). The work performed in Phase II, detailed in this Phase II Topical Report, includes completion of FEEDs, completion of a process risk analysis (PRA), obtaining necessary permits, updating the EIV and TEA, updating the cost and schedule estimate for the Phase III scope of work (SOW) and securing the necessary cost share. Updated information is provided on the current status of the UK CAER CCS technology and the project is ready to begin immediately detailed design, construction and operation of the proposed pilot.

20 FOSSIL-FUELED POWER PLANTS↗

Solar Ready Wisconsin

Through the Solar Ready Wisconsin project, the MREA was able to facilitate collaboration between Wisconsin’s leading technical college training programs, increase student work experience opportunities, and facilitate workforce training on high impact/high visibility PV installations in Wisconsin communities. The workforce development partnership offered credit-bearing advanced installation trainings at WI technical colleges, allowing students to participate in hands on installation training opportunities. Students also participated in internships with a network of PV contractors developed through MREA’s regional network of members, contracted instructors, and program partners.

14 SOLAR ENERGY↗

BIL GRID-READY WIND: Reliable and Economical Grid Services Design, Implementation, and Demonstration at the Great Pathfinder Wind Power Plant

The GRID-READY WIND project aimed to demonstrate the ability of utility-scale wind power plants (WPPs) to deliver traditional and emerging grid services (GSs) in both grid-following (GFL) and grid-forming (GFM) modes through a centralized control framework, supplemented by local control adjustments at the wind turbine generator as needed. Throughout the project, the team offered recommendations on how the grid services demonstrated with WPPs could be applied to other inverter-based resources (IBRs), such as photovoltaic (PV) systems and battery energy storage systems (BESS), while considering the unique dynamics of these resources arising from their energy generation characteristics. The project sought to enhance the confidence of system operators (SOs) and planners in utilizing WPPs, alongside other IBRs such as PV plants and BESS, to provide essential grid services over extended periods under diverse operating conditions, thereby supporting their integration into the bulk power system.

17 WIND ENERGY↗

Control Room of the Future Testbed Workshop – After-Action Report

The U.S. Department of Energy’s Office of Electricity is supporting a one-year, multi-laboratory effort to define the needs and requirements for a Control Room of the Future testbed, or CROFT. The effort responds to increasing grid complexity driven by large new loads, dynamic generation resources, and the growing adoption of advanced technologies and tools, including artificial intelligence (AI) and machine learning (ML). To support safe, secure, and effective grid modernization, CROFT will focus on how emerging technologies and tools can be rigorously evaluated in realistic operational settings, with attention to human-machine interaction, cognitive load, and workforce readiness. The project team includes Argonne National Laboratory, Idaho National Laboratory, National Laboratory of the Rockies, and Pacific Northwest National Laboratory. As part of the scoping effort, the team conducted two industry-focused workshops: one at DTECH on February 5, 2026, informed by prior industry interviews, and a second on May 4, 2026, adjacent to IEEE T&D. These engagements brought together utilities, vendors, consultants, national laboratories, academia, and government stakeholders to identify and prioritize use cases, barriers, validation needs, data-sharing constraints, and near- and longer-term requirements. This feedback will directly inform CROFT’s architecture and research focus areas, ensuring the testbed is grounded in real-world operational needs and designed to evaluate emerging technologies and tools in realistic control-room environments.

artificial intelligence↗

Building America Top Innovations 2013 Profile – Zero Energy-Ready Single-Family Homes

Building homes that are zero energy-ready is a goal of the U.S. Department of Energy’s Building America program and one embodied in Building America’s premier home certification program, the Challenge Home program. This case study describes several examples of successful zero energy-ready home projects completed by Building America teams and partner builders.

Building America↗

Versatile Link+ Transceiver Production Readiness

The Versatile Link + project is about to enter its production phase, ready for the Phase 2 HL-LHC detector upgrades. We present the status of the front-end part of the Versatile Link$^+$ project: the Versatile Link$^+$ Transceiver, which provides a low-mass, radiation tolerant, optical transmit- and receive module for tight integration in the upgrading HL-LHC detectors. We describe the development and thorough testing carried out with the transceiver prototypes and their sub-components and the design decisions that have led to the final production-ready prototype. The planned production schedule is also presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗