A cost–benefit framework to evaluate capacity upgrade options in overhead line transmission planning

This paper presents the methodology behind the new Reconductoring Economic and Financial Analysis (REFA) tool, an open-access software, used by transmission utilities to evaluate transmission capacity enhancement options. The proposed methodology is intended to be used in a new planning stage, after the capacity expansion and prior to the individual transmission project engineering, allowing capacity upgrade options (reconductoring, rebuild or voltage upgrade), and respective conductor selection, to be compared under the same economic basis. Furthermore, the REFA tool implements a methodology to rank project options and conductor types based on economic criteria, considering an approximation of the ampacity and sag constraints. Results, using 5 real transmission lines in the US, show that least-cost combinations of project and conductor types can be very diverse, which emphasizes the need for the proposed methodology and tool.

Advanced conductors

The Transactive Energy Network Template Metamodel

While transactive energy, which is defined as an allocation of electricity based on dynamically discovered values or prices, has been extensively studied, its uptake and use has been slow. This report describes a tool, the transactive network template, which should hasten the creation and uptake of transactive energy networks. Some basic principles of transactive energy are familiar from existing wholesale electricity markets. Locational prices are calculated today for zones within bulk electric transmission systems. Locational prices differ while accounting for the locational costs of electricity generation and the losses and constraints incurred when electricity is transmitted from generators and distributed to consumers. A transactive energy network might include these transmission zones. However, current research strives to apply transactive energy also in electricity distribution circuits, buildings, and even for individual generating and consuming devices. At the same time, researchers explore how to apply transactive energy in real time during increasingly shorter time intervals. Automated computational agents become necessary as transactive energy becomes applied to smaller circuit zones and at faster dynamic timescales. A transactive energy network is an example of a multi-agent system. Each zone in the network is represented by its transactive agent, which makes decisions for and acts on behalf of a business entity that is responsible for and manages one of the circuit regions. A transactive energy network is also an example of a decentralized, distributed control system. Control decisions and responsibilities are distributed among the network’s transactive agents. The transactive agents are independent; that is, there typically is no centralized authority or oversight function. Instead, transactive agents exchange transactive signals and thereby negotiate the prices and quantities of electricity that they will exchange. Initially, the circuit regions and responsibilities of transactive agents appear to be very dissimilar. Each circuit region may comprise transmission, distribution, or building-level circuits. Each has a unique position and electrical connectivity within the transactive energy network. Each possesses unique assets that either generate or consume electricity, and these (e.g., renewable energy generator, diesel generator, aggregate utility load, building load, space conditioning, refrigerator, etc.) may further differ in their price flexibility and in their strategies for responding to dynamic electricity prices. Given such diversity, an implementer’s first inclination might be to start from scratch to define all these devices and to engineer their seemingly unique interactions. Given that each implementer’s perspective may be narrow within a transactive energy network, it is unlikely that uniquely engineered systems would interact well. This is where the transactive network template is applicable. The transactive network template is a metamodel that has been developed to guide implementers as they configure their own transactive agent within a network of such agents. The object-oriented design of the transactive network template provides basic code object types that may be used and extended by implementers to represent each of the assets in their circuit region. These objects further facilitate the transactive agent’s necessary computations, which are divided among responsibilities to schedule power usage, balance electric supply and demand, and coordinate the exchange of electricity with the other transactive agents. This report addresses the conceptual transactive network template design. Implementers are directed to more formal design documents and reference implementations. A Python™-based1 reference implementation of the transactive network template has been coded, and three implementations have been configured to represent a national laboratory and two university campuses. Version 2 of the transactive node template generalizes the market class and its methods to facilitate multiple, and more diverse market coordination mechanisms than were facilitated by and demonstrated using Version 1. Version 3 includes new Appendix B, which addresses the designs of methods that would make dynamic prices track approved electricity rates. In the future, the author wishes to make the transactive network template more generally applicable to networks that require more accurate power flow. Development of the transactive network template is jointly funded by the U.S. Department of Energy (DOE) Energy Efficiency and Renewable Energy and the DOE Office of Electricity. In late 2015, one of the first projects to be funded by the DOE Grid Laboratory Modernization Laboratory Consortium was the Clean Energy and Transactive Campus project, led by Pacific Northwest National Laboratory. DOE funds were matched by an investment by the Washington Department of Commerce through its Clean Energy Fund. The transactive network template was developed to guide the implementation of transactive energy networks within this project’s scope.

24 POWER TRANSMISSION AND DISTRIBUTION

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION

Techno-Economic Analysis of Photovoltaics and Battery Storage for Maine [Slides]

Maine GEO was interested in a small-scale pilot using REopt to expand on previous resilience efforts and better understand the most useful information to gather from facilities to maximize the efficacy of the analysis. The pilot began with identification of three pilot facilities from the existing Maine Community Resilience Partnership (MCRP) cohort, selection of the facilities prioritizing: social vulnerability, community led planning work and commitment to ongoing work. The technical assistance focused on working with identified facilities to help scope the project and identify their goals and then provide technical specifications on optimal energy generation and storage strategies for each community. At the conclusion of the project, participating facilities received a REopt analysis report, including optimal generation and storage strategies to address identified goals and next steps and considerations for implementation.

24 POWER TRANSMISSION AND DISTRIBUTION

Resilience Project Implementation Memo for the Town of Stowe, Vermont

This Resilience Project Implementation Process Memo was developed with and for the Town of Stowe Electric Department (SED) under the DOE C2C Expert Match Program. It is intended to outline the steps of a process, albeit nonlinear and iterative, to plan, design, and implement community resilience hubs.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Revitalizing Canton City Schools: A Sustainable and Cost-Effective Energy Efficiency Plan

The primary objective of this project was to focus on conducting the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) Level 2 Energy Audits of all the schools/school facilities in the portfolio, and on developing a comprehensive Strategic Plan for implementing energy improvements. The overall aim of budget period 1 (BP1) was to implement Energy Audits and the Strategic Plan to provide a clear pathway to prioritize energy improvements as well as allow the district to access private sector funding (if needed) and/or tax credits and realize high-impact health and safety benefits for Budget Period 2.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

A Recipe for ABC Multifamily Retrofits: Technologies, Financing, and Project Delivery

This report documents the final technical accomplishments and outcomes of Rocky Mountain Institute’s project under the U.S. Department of Energy (DOE) Award DE-EE0009064. The project aimed to develop, validate, and scale whole building retrofit solutions for multifamily buildings, including two configurations of Integrated Mechanical System Pods (IMSP-C and IMSP-U), in alignment with DOE Advanced Building Construction (ABC) initiative's decarbonization and energy efficiency goals. While the project made significant progress in Budget Period 1 (Phase 1) and throughout Budget Period 2 (Phase 2), activities were discontinued as of March 26, 2025, following a Stop Work Order issued by DOE. As such, this report reflects all completed work through that date. The project did not enter Budget Periods 3 and 4 (Phase 2), and demonstration site implementation, field M&V, and final commercialization execution were not conducted.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Advanced-Research-on-Integrated-Energy-Systems-Based Analysis to Support Resilient System Upgrades: Energy to Communities Energyshed In-Depth Partnership with Molokai, Hawaii

The Molokai, Hawaii, Energy to Communities (E2C) Energyshed project represents a collaborative effort between the National Laboratory of the Rockies, Shake Energy Collaborative, the Molokai Clean Energy Hui, Sustainable Molokai, and Ho'ahu Energy Cooperative Molokai to advance Molokai's Community Energy Resilience Action Plan (CERAP). Supported by Hawaiian Electric Company and the Hawaii State Energy Office, the initiative aims to develop a community-defined portfolio of renewable energy solutions that enhance energy resilience while aligning with the Hawaiian Electric Integrated Grid Plan (IGP) and Molokai's energy goals. Phase 1 focused on technical analyses and community engagement to co-design feasible energy scenarios. Challenges such as grid upgrades, storage sizing, and inverter ride-through standards were addressed to align technical and operational requirements with community preferences. The project equips Molokai with actionable data and insights to implement energy initiatives while ensuring resilient and culturally informed solutions. Future efforts aim to finalize project designs, secure interconnection agreements, and deploy energy projects that reflect community priorities and technical feasibility.

24 POWER TRANSMISSION AND DISTRIBUTION

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Discrete versus continuous: Enhancing battery optimization in capacity expansion models

This study compares two battery modeling approaches for capacity expansion models: discrete-duration and continuous-duration formulations. In the discrete approach, battery duration is fixed, and power capacity is optimized. In the continuous approach, both power and energy capacities are decision variables, allowing storage duration to be optimized endogenously. Although both discrete-duration and continuous-duration battery formulations are used in long-term power system planning models, the literature has provided limited direct, systematic comparisons of their implications within a common modeling framework. To address this gap, this study implements both approaches in the Regional Energy Deployment System (ReEDS TM ) capacity expansion model using two resource adequacy methods, across a range of future system conditions, and with varying battery cost projections. Results show continuous-duration and high-resolution discrete approaches produce similar capacity expansion outcomes. The continuous formulation achieves faster runtimes compared to discrete-duration runs with many discrete-duration options. However, the discrete-duration approach allows users to choose to have limited fidelity for storage duration options, which in some cases can outperform the continuous formulation. The continuous formulation has the lowest overall system costs, indicating its ability to fine-tune storage duration to better meet specific system needs. This study's findings provide a side-by-side evaluation of discrete and continuous battery modeling approaches and offer guidance for improving the representation of real-world systems, flexibility, and computational efficiency for representing energy storage in long-term power system planning models.

25 ENERGY STORAGE

Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during 2025

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases.

Ploussard, Quentin [Argonne National Laboratory (A

CO2 Storage Economic Analysis: CarbonSAFE Use Case

Poster on “CO2 Storage Economic Analysis: CarbonSAFE Use Case” for the CCUS 2025 conference held in Houston, Texas March 3-5, 2025. The cost of designing, permitting, constructing, operating, and closing a CO2 storage project is of vital importance to project developers. The National Energy Technology Laboratory has developed the NRAP/SMART Technoeconomic and Liability Evaluation for Storage (TALES) Model to provide quantitative cost-based insights to support developers planning CO2 injection and storage projects. This study presents a collaborative economic analysis applying TALES with data from the San Juan Basin CarbonSAFE Phase III project led by the New Mexico Institute of Mining and Technology to estimate potential costs incurred during the implementation of a real-world commercial-scale carbon storage project. Scenario analysis was implemented in which different operational and cost attributes were varied and the associated cost implications observed. Key results data and project cost summary metrics, first-year breakeven price of CO2 ($/tonne) and net present value (NPV), are presented for base and alternative cases. Output provides a unique perspective for project stakeholders towards evaluating the influence of different operational strategies and financing approaches on overall project cost and financial viability.

carbon storage

WRPS Hanford Update [Slides]

The purpose of this report is to coordinate with the staff from WRPS, the current contract holder for operations at the Hanford site to better inform design decisions for the Autonomous systems for Hanford waste tank handling project. The project goals are to support risk reduction associated with monitoring, inspection and mapping of Hanford tank underground pits and includes: 1. A pit mock-up demonstration of Idaho National Laboratory’s (INL) Autonomous Pit Exploration System (APES) technology, which has two configurations: A. The Autonomous Robotic Arm, which is a proposed collaboration with Florida International University (FIU) and has capabilities to visually inspect, monitor, map and conduct simple tool manipulation tasks in the tank pits, and B. The robotic crawler configuration, which has capabilities to deploy to the bottom of the pits and conduct closer and bottom-up visual inspections. 2. An Implementation Plan that identifies Hanford site-wide application of the INL remote robotics technologies to enhance the performance of the tank farm systems and the characterization of the waste they contain to mitigate risk and optimize the overall waste mission. 3. A first-of-a-kind environmental digital twin will be produced. Digital twins to date require permanently installed sensors in order to produce asset specific predictions. This project will use the intermittent signals during inspections from deployed sensors on robotic systems to produce the data sets used by AI/ML to enable predictions of issues on tanks.

42 - ENGINEERING

Analysis of US Industrial Assessment Centers (IACs) implementation

Industrial energy assessments are a fundamental action toward developing a decarbonization strategy at any level. They provide an understanding of where energy efficiency opportunities exist and help to make informed business decisions about the costs and benefits of implementing sustainable policies and practices. This paper examines the effectiveness of the Department of Energy's Industrial Assessment Centers Program at providing useful energy-efficiency audits as well as the barriers faced by the program and plans for future growth and improvement. This paper presents an analysis of the program between 1981 and 2022, covering 20,290 industrial assessments and 151,198 recommendations, with $2.6 billion of recommended savings. The analysis includes a breakdown of the IAC recommendations and implemented projects based on both the industrial subsectors according to the Standard Industrial Classification code, energy type, and systems evaluated. The results include a 47 % implementation rate, a gap analysis to understand the missed opportunities, and a discussion about reasons for recommendation rejection. A comparison of the IAC Program with other country-level energy auditing or assessment programs was conducted, and suggestions for improving implementation rates were mentioned.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Hydrogen Sustainable Infrastructure Guidelines (H2SIG)

Infrastructure interacts with major global challenges inclusive of climate change, resilience, equity and social justice, environmental protection and biodiversity, public health, and economic recovery. This effort directly addresses how to apply sustainability assessments to the unique aspects of hydrogen (H2) infrastructure projects using the Envision® sustainability framework developed by the Institute for Sustainable Infrastructure (ISI). Envision is a flexible system of criteria and performance objectives to aid decision makers and help project teams identify sustainable approaches during planning, design and construction of infrastructure projects that will continue throughout the project’s operations, maintenance, and end-of-life phases. The goal of this work is to support those interested in conducting sustainability assessments for hydrogen infrastructure projects. Through this work the team has developed hydrogen-specific guidelines and best practices to assist project developers, investors and regulators in straightforward application of the Envision framework to systematically enhance clarity and increase objectivity across hydrogen projects. Subject matter experts from 20 different organizations (industry, non-profits, municipalities, emissions regulators, national labs) were engaged through 7 focus groups to discuss the H2-prioritized Envision requirements and elements to be included in the guidelines. In addition to these guidelines, the team conducted case studies as a way of demonstrating and informing the guidelines and providing examples or ideas for implementing sustainability in future projects. Through this study, the authors found that hydrogen infrastructure projects can incorporate many sustainable practices including reducing GHG emissions affecting climate change, reducing air pollutant emissions affecting the health of communities, synergistically handling waste byproducts, integrating into existing infrastructure, incorporating renewable energy, and addressing equity and environmental justice. Additionally, hydrogen infrastructure projects could benefit from 2-way communication engagement and collaborative planning with stakeholders, educational awareness of hydrogen technology, tracking and reporting on water use and water quality, and including monetized environmental and social benefits in life-cycle cost estimates. This document is the final technical report for the Hydrogen Sustainability Assessment Methods for Project Development project. While the main focus of the report is to provide guidelines for applying sustainability to hydrogen infrastructure, there are sections within the appendix providing completed project tasks and methodology.

08 HYDROGEN

Physics-Based Limiter Redesign and Bit Performance Analysis at The Geysers

As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC (GPC), an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration, with increased footage on bottom for each bit coupled with increased bit life and time drilling. The project leverages advances in oil and gas drilling technologies including PDC bits, along with the physics-based limiter redesign techniques championed in drilling demonstrations conducted at the Utah FORGE geothermal site. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. The wells are typically drilled to the top of the reservoir with mud and then air-drilled to total depth (TD) through fractured zones at temperatures ≥ 450°F. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate rock reduction technologies. The first demonstration well has been completed, with 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However, in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges. This paper provides updates on drilling activities conducted since the Phase 1 demonstration well at GDC-36 which was drilled from November 2023-January 2024. Additional analysis of the bit performance has been conducted. Furthermore, in subsequent wells drilled by GPC, PDC bits have been used extensively, building on the gains realized at GDC-36. GPC has continued to work with bit vendors to identify designs that last longer in the harsh, air-drilled 8.5” portions of the wells. Planning for the Phase 2 demonstration at Prati-44 is ongoing.

15 GEOTHERMAL ENERGY