Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Program management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Cryogenic fluid management program flight concept definition

The Lewis Research Center's cryogenic fluid management program flight concept definition is presented in viewgraph form. Diagrams are given of the cryogenic fluid management subpallet and its configuration with the Delta launch vehicle. Information is given in outline form on feasibility studies, requirements definition, and flight experiments design.

Kroeger, Erich↗

Federal Energy Management Program’s Technical Resilience Navigator: Communications Plan

The Federal Energy Management Program is working to develop a standard, agency-neutral energy and water technical resilience navigator (TRN) to assist federal agencies with their resilience planning efforts, building on agency-expressed needs. The TRN Communications Plan defines how the project team and FEMP will generate awareness of the TRN, recruit validators, encourage its use across federal agencies, increase awareness among various audiences, and solicit user feedback on its usefulness including suggestions for improvement. In support of this purpose, the communications plan characterizes the key audiences, messages, communications channels, and activities needed to help ensure success. The role of communications is to define strategy and ensure leadership and consistency in messaging, writing, outreach, media relations, editing, and design related to the TRN.

99 GENERAL AND MISCELLANEOUS↗

Development of integrated programs for Aerospace-vehicle Design (IPAD): Product program management systems

The Integrated Programs for Aerospace Vehicle Design (IPAD) is a computing system to support company-wide design information processing. This document presents a brief description of the management system used to direct and control a product-oriented program. This document, together with the reference design process (CR 2981) and the manufacture interactions with the design process (CR 2982), comprises the reference information that forms the basis for specifying IPAD system requirements.

Isenberg, J. M.↗

About the Federal Energy Management Program (FEMP)

The federal government is the nation's largest energy consumer. Mandated by law, the Federal Energy Management Program (FEMP) works with its stakeholders to enable federal agencies to meet energy-related goals, identify affordable solutions, facilitate public-private partnerships, and provide energy leadership to the country by identifying government best practices.

Federal Energy Management Program↗

Nondestructive Examination for Nuclear Power Plant Cable Aging Management Programs

Degradation of the cable jacket, electrical insulation, and other cable components of installed cables within nuclear power plants (NPPs) is known to occur as a function of age, temperature, radiation, and other environmental factors. System tests verify cable function under normal loads; however, the concern is over cable performance under exceptional loads associated with design-basis events (DBEs). The cable’s ability to perform safely over the initial 40 year planned and licensed life has generally been demonstrated and there have been very few age-related cable failures. With greater than 1000 km of power, control, instrumentation, and other cables typically found in an NPP, replacing all the cables would be a severe cost burden. Justification for life extension to 60 and 80 years requires a cable aging management program (AMP) to justify cable performance under normal operation as well as accident conditions. This paper addresses various NDE technologies that constitute the essence of an acceptable aging management program.

cable aging inspection↗

Feedback of the Dutch Historical Waste Management Program - 17085

This paper provides a feedback on the Dutch historical waste management program. Over the past decades, the High Flux Reactor located in Petten in the province of North Holland has tested numerous types of materials and fuels irradiation, for both medical and nuclear energy applications. A number of waste containers was accumulated on site, where the storage facility was initially built. Following Dutch political decisions in the 1980's, the contents of the waste storage facility in Petten must be transferred to another location. The consequences of this decision included the transportation of waste containers from Petten to the new location, which is located in the South-West of the Netherlands. This project was initiated and is now running. It includes a complex structure and can be described as follows: each historical-waste container will be opened, its contents segregated in three categories depending on the dose rate emission, characterized and repacked in new containers suitable for transportation and storage at the new site. The approach chosen is based on the final dose rate emitted by the repacked containers, which are sub-divided into 3 categories.. The lowest dose-emitting containers are transported directly to the new storage facility. The 2 other categories are first transported to a third party to be super compacted and subsequently transported to the new storage facility. So far, the segregation method is based on Co-60 gamma emission and nuclide vectors associated to the different materials. A pre-sorting has been established to fit as much as possible IAEA recommendations. Historical waste has then to be classified in families sharing common history. Thus, a set of canisters containing the pieces of the old reactor vessel, which was replaced in 1984 was the first challenge, followed by a set of canisters containing residues of instruments only and pieces coming from the top of the control rods of the reactor which were not directly irradiated in the reactor. So far, the two first sets of canisters are being treated and characterized as well as possible. Reporting and official documents have been filled up to comply to Dutch transport regulations and to define waste acceptance criteria for the storage facility. The first transports of containers with Low Level Waste occurred in October 2015, and another transport took place at the end of 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technetium Management Program Plan - 17376

Technetium management is a high-priority activity for the U.S. Department of Energy (DOE) Office of Environmental Management (EM) complex. Waste management and remediation issues involving technetium represent environmental risks and challenges that are unique to DOE. This plan lays out the technology development activities that are underway as well as future technology needs to address technetium issues across DOE EM sites and across programmatic areas of tank waste, groundwater and soils, and facility decommissioning and deactivation in order to be comprehensive and to allow integration of similar activities. The program was developed in close coordination with site representatives and program offices. Activities and needs that were identified share common themes and were grouped into areas of characterization, treatment, and disposition. Characterization includes understanding the inventory at particular locations, the chemical species, and chemical and physical behavior, whether in a treatment process flowsheet or a geological setting that displays periodic contaminant releases. The tools for characterization in these different environments might use the same sensors or protocols. Treatment options include methods to capture technetium such as ion-exchange or manipulation of oxidation states, which also may be applied across program areas. Disposition includes end-points of the processes and environmental risk, including waste form behavior, mobility of technetium once it is treated or remediated, and long-term monitoring. Disposition represents integration of all cleanup actions at a site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US Department of Energy Federal Energy Management Program Energy Treasure Hunt Toolkit

The US Department of Energy’s Federal Energy Management Program (FEMP) aims to assist federal agencies and their stakeholders with their energy-focused goals, opportunities, and barriers. The program offers various technical trainings and resources to its stakeholders. One of these resources is an energy treasure hunt program. This report presents the FEMP energy treasure hunt toolkit, a technical resource designed for systematic application for federal facilities seeking to optimize their energy and carbon usage. The toolkit was designed to help facilitate energy-focused kaizen events, identify energy-saving recommendations, analyze identified opportunities, and provide the tools needed to detect actionable projects to advance federal facilities. Through a collaboration with the Oak Ridge National Laboratory team that executed the industrial-focused Better Plants energy treasure hunt program, a similar treasure hunt toolkit was designed for FEMP. The purpose of this report is to provide an overview of the treasure hunt process and FEMP toolkit capabilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Investigation and Demonstration of Reliability Target Allocation to Support Reliability and Integrity Management Program

Nuclear energy is the most reliable and environmentally sustainable energy source available today. In the United States (U.S.), nuclear-generated power accounts for approximately 20% of total electricity and over 55% of clean energy. New advanced reactors have enormous potential to help further decarbonize the energy market, enhance grid resiliency, create new jobs, and build a stronger economy. More than 50 new reactors are being developed in the U.S., and the federal government realizes an urgent need to deploy nuclear technologies to meet the country’s energy, environmental, and national security goals. As such, the U.S. Department of Energy (DOE) launched multiple programs to support advanced reactor deployment. The research described in this report explores implementation strategies for the Reliability and Integrity Management Program that directly supports the DOE goal to enable the near-term deployment of the advanced reactor technologies. The project is conducted under the Regulatory Development Program for advanced reactors sponsored by the DOE.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hybrid Power Management Program Continued

Hybrid Power Management (HPM) is the innovative integration of diverse, state-of-the-art power devices in an optimal configuration for space and terrestrial applications. The appropriate application and control of the various power devices significantly improves overall system performance and efficiency. The advanced power devices include ultracapacitors and photovoltaics. HPM has extremely wide potential with applications including power-generation, transportation, biotechnology, and space power systems. It may significantly alleviate global energy concerns, improve the environment, and stimulate the economy.

Eichenberg, Dennis J.↗

LeRC cryogenic fluid management program overview

An overview is given of the Lewis Research Center's cryogenic fluid management program in the form of viewgraphs. Objectives, approach, program elements, cost analysis, modeling, and flight experiment development are outlined.

Symons, E. P.↗

Augmenting Space Technology Program Management with Secure Cloud & Mobile Services

The National Aeronautics and Space Administration (NASA) Game Changing Development (GCD) program manages technology projects across all NASA centers and reports to NASA headquarters regularly on progress. Program stakeholders expect an up-to-date, accurate status and often have questions about the program's portfolio that requires a timely response. Historically, reporting, data collection, and analysis were done with manual processes that were inefficient and prone to error. To address these issues, GCD set out to develop a new business automation solution. In doing this, the program wanted to leverage the latest information technology platforms and decided to utilize traditional systems along with new cloud-based web services and gaming technology for a novel and interactive user environment. The team also set out to develop a mobile solution for anytime information access. This paper discusses a solution to these challenging goals and how the GCD team succeeded in developing and deploying such a system. The architecture and approach taken has proven to be effective and robust and can serve as a model for others looking to develop secure interactive mobile business solutions for government or enterprise business automation.

Hodson, Robert F.↗

Data Driven Analysis for Modernization Program Management

NNSA is responsible for managing national nuclear security missions: ensuring a safe, secure, and reliable nuclear deterrent; supplying nuclear fuel to the Navy; and supporting the nation’s nuclear nonproliferation efforts. However, over half of NNSA’s facilities are more than 40 years old, and roughly one-third date back to the Manhattan Project. To execute its critical nuclear security missions, NNSA is making large investments to modernize its nuclear production capabilities. This ramp up represents NNSA’s largest modernization effort since the Cold War. Given the scale of these efforts, NNSA’s Office of Secondary Stage Production Modernization has implemented data driven techniques to prioritize investments and inform strategic decision making. NNSA, with support from its site managing contractors, has developed and implemented an integrated schedule and risk management system to address the issues and limitations with the traditional approach. The multi-year integrated schedules are key to identifying program linkages and managing large portfolios comprised of many different projects and efforts. In conjunction with the integrated schedule, a new program risk management system has also been developed and implemented, which manages program risks and opportunities, along with specific mitigation strategies to reduce or eliminate the risks per timelines that are tracked in the integrated schedule. This paper is supplemented with a follow-on presentation on effective management of program material and throughput modeling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA Wildland Fire Management Program

This short talk (less than 10 minutes) is to introduce the NASA Applied Science Wildland Fire Management program to a general audience.

NASA↗