Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Midwest Regional Carbon Conversion/Utilization Procurement Grant Workshop

https://events.usea.org/events/midwest-regional-carbon-conversionutilization-procurement-grant-workshop As the U.S. economy moves toward clean energy and a lower carbon future, the U.S. Department of Energy (DOE) is seeking to partner with states, communities, and industries to support the procurement and development of carbon conversion products. These efforts have been enabled by provisions included in the Bipartisan Infrastructure Law (BIL). As part of the BIL, supporting the Administration’s goal to achieve a carbon-free power sector by 2035 and putting the United States on a path to a net-zero economy by 2050, a new initiative was established within DOE’s Office of Fossil Energy and Carbon Management through its Carbon Conversion/Utilization Program. The new initiative will establish a demonstration grant program to issue grants to eligible entities to procure commercial and industrial products derived from the conversion of anthropogenic carbon oxides and demonstrate a significant net reduction in life cycle greenhouse gas emissions compared to incumbent technologies, processes, and products. DOE-FECM will establish a demonstration grant program within the Carbon Conversion/Utilization Program to support eligible applicants that procure those commercial and industrial products derived from anthropogenic carbon oxides. Therefore, the Carbon Conversion/Utilization Program, with the assistance of the United States Energy Association (USEA), will conduct a series of workshops (both virtual and in-person) with relevant stakeholders, e.g., product manufacturers, eligible entities, or their representative national organizations (e.g., United States Conference of Mayors, etc.) to solicit input and ideas on challenges and opportunities for a potential grant program.

Larimore, Ryan↗

The private sector economic and employment benefits to the nation and to each state of proposed FY 1990 NASA procurement expenditures

The private sector economic and employment benefits (disaggregated among 80 industries and 475 occupations) of the proposed FY 1990 NASA procurement expenditures to the nation and to each state are estimated. Nationwide, it is found that FY 1990 NASA procurement expenditures of $11.3 billion will have an economic multiplier of 2.1 and will create, directly and indirectly, 237,000 jobs, $23.2 billion in total industry sales, $2.4 billion in corporate profits, and $7.4 billion in Federal, state, and local government tax revenues. These benefits are widely dispersed throughout the United States and are significant in many states not normally considered to be major beneficiaries of NASA spending. The indirect economic benefits are identified for each state resulting from the second-, third-, and fourth rounds of industry purchases generated by NASA procurement expenditures. Each state is ranked on the basis of several criteria, including the total benefits, indirect benefits, and per capita benefits received from NASA spending. The estimates developed are important for maintaining a viable U.S. Space Program through the remainder of this century.

Source record↗

Summary data on all NASA procurement actions

Summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during the first six months on fiscal year 1990 are presented. Areas addressed include competition in NASA awards, awards to business firms, awards to educational and other nonprofit institutions, contract for operation of Jet Propulsion Laboratory, and awards through other government agencies. Other topics covered are the U.S. geographical distribution of awards, awards placed outside the U.S., and procurement activity by installation.

Source record↗

NASA Procurement Career Development Program

The NASA Procurement Career Development Program establishes an agency-wide framework for the management of career development activity in the procurement field. Within this framework, installations are encouraged to modify the various components to meet installation-specific mission and organization requirements. This program provides a systematic process for the assessment of and planning for the development, training, and education required to increase the employees' competence in the procurement work functions. It includes the agency-wide basic knowledge and skills by career field and level upon which individual and organizational development plans are developed. Also, it provides a system that is compatible with other human resource management and development systems, processes, and activities. The compatibility and linkage are important in fostering the dual responsibility of the individual and the organization in the career development process.

Source record↗

State-Level Trends in Renewable Energy Procurement via Solar Installation versus Green Electricity

In recent years, options for procuring renewable energy have increased, ranging from rooftop solar installation to utility green pricing to Community Choice Aggregation. These options vary in terms of costs and benefits to the consumer as well as grid integration implications. However, little is known regarding how the presence of a wide range of voluntary utility-scale renewable procurement options as well as their growth could affect adoption of distributed residential solar. To examine this relationship, we fit a two-stage least squares random effects regression model on panel data from 2016 to 2019 for all fifty US states plus the District of Columbia, controlling for variables that measure state-level policies, economic factors, and resource availability. Although there was no evidence of a strong relationship between demand for utility-scale and distributed options across all states, the state-level correlations suggest a wide variation between states including a positive, zero or negative relationship between utility-scale and distributed generation.

consumer demand↗

Voluntary Renewable Energy Procurement Programs in Regulated Utility Markets

Multinational corporations are increasingly purchasing renewable energy (RE) to fulfill international commitments, reduce supply chain emissions, limit environmental impact, and secure stable and affordable electricity. The potential scale of global corporate RE purchasing has been estimated to be nearly 100 GW and growing; however, many markets still lack supportive enabling environments for corporations to access RE through on-site project development or private sector transactions. Even where allowed by law, on-site generation may be insufficient due to space and technical constraints, introducing additional challenges. Utility green pricing and utility green tariff programs backed by renewable energy certificates (RECs), referred to as utility green procurement programs (GPPs) in this report, offer powerful market-based solutions to utilities, regulators, and policymakers to provide corporate and other consumers with RE product options while generating revenue to support RE development. As RE markets expand around the globe, GPPs have proven to be effective mechanisms in market regimes, ranging from fully integrated state-owned utilities to broadly liberalized power markets. GPPs utilize RECs, which are a type of energy attribute certificate and closely resemble guarantees of origin, to track and ultimately monetize RE attributes that corporations and other buyers must procure to demonstrate progress against their RE commitments and make public claims of RE use. Time-tested and transparent REC accounting mechanisms provide market confidence, while at the same time offering flexibility to utilities, regulators, and customers for a range of applications. RECs are used in all types of electricity market structures, as indicated in Figure 1, but REC-based program designs and supporting components differ depending on the type of market. Liberalized markets allow for customers to contract directly with generators for electricity and RECs, while traditionally regulated markets with vertically integrated utility structures may have greater restrictions on generation asset ownership and electricity sales. RE markets can be further defined as being either mandatory or voluntary. Mandatory markets require suppliers to deliver specified amounts of RE to grid customers, such as under a renewable portfolio standard (RPS), while voluntary markets involve no legal mandates, but demand is driven by self-imposed customer goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Securing Digital Energy Infrastructure: Procurement, Contracting, and Supply Chain Risk Management Guidance

Recognizing the scale of this industry challenge, the United States (U.S.) Department of Energy (DOE) Grid Deployment Office (GDO) and Cybersecurity Energy Security & Emergency Response office have launched a multi-year BESS supply chain security initiative to identify consequence-driven approaches to addressing BESS supply chain security and provide resources to support prioritization of supply chain security efforts associated with the procurement of BESS equipment and services. This guide is one element of the supporting resources to be provided and sets forth a framework and guidance for procurement bidding, selection, risk analysis, and agreements stakeholders can implement to mitigate cybersecurity risks across the entirety of battery system component ecosystem, including the interconnected software and hardware required for control and monitoring BESSs.

25 ENERGY STORAGE↗

Renewable Electricity Procurement Options Data (RE-POD)

The Renewable Electricity Procurement Options Data (RE-POD) is an aggregated dataset meant to help local jurisdictions and utility customers within those jurisdictions understand the options that may be available to them to procure renewable electricity or renewable energy credits to meet energy goals. This data is part of a suite of state and local energy profile data available at the "State and Local Energy Profile Data Suite" link below and builds on Cities-LEAP energy modeling, available at the "EERE Cities-LEAP Page" link below. Examples of how to use the data to inform energy planning can be found at the "Example Uses" link below.

Array↗

Commercial and Industrial Energy Procurement in Nigeria: A Consumer's Guidebook

Across Africa, countries have incorporated a variety of new energy sources into their energy mix to account for increasing demand. In Nigeria, electricity consumption per capita has grown nearly 50% in the past 20 years. To address rising demand for energy in Nigeria, the country has passed several recent policies and regulations aimed at increasing energy generation across the country, improving the country's transmission infrastructure, and ensuring that electricity reliably reaches end users, including commercial and industrial (C&I) customers. This guidebook is designed for C&I customers in Nigeria to use in the consideration of procuring such onsite, captive energy systems to supplement their energy needs. Each section of this guidebook touches on a step of the procurement process and details the relevant stakeholders, processes, and data needed to make decisions during that step.

14 SOLAR ENERGY↗

Establishing Building-Level Energy Goals in Procurement Documents: Lessons Learned from Pilot Utility and Portfolio Projects: Preprint

Encouraging commercial building owners to set measurable energy goals before design begins can drive design and contractor teams to develop innovative energy efficiency solutions within conventional building budgets. A federal building owner piloted this technique and created a large-scale zero energy office building on a budget comparable to local market construction rates. The successes and lessons learned from this performance-based procurement project formed the basis of an expanded program using utilities as the outreach channel to replicate the approach. The utilities delivered incentive-based offerings to focus building owners on the whole building rather than on individual building components and systems. In addition, a ripple effect was evident, with individual building owners as well as owners of multiple-building portfolios adopting the techniques, sometimes with variations, but always maintaining the same core principles. The original performance-based procurement process and its successful implementation in a federal building project informed all these efforts. Those successes and lessons learned demonstrate that the approach can be adapted to utility programs with some variation and is a powerful tool for engaging building owners as they make critical design decisions that impact energy performance over the life of the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Establishing Building-Level Energy Goals in Procurement Documents: Lessons Learned from Pilot Utility and Portfolio Projects

Encouraging commercial building owners to set measurable energy goals before design begins can drive design and contractor teams to develop innovative energy efficiency solutions within conventional building budgets. A federal building owner piloted this technique and created a large-scale zero energy office building on a budget comparable to local market construction rates. The successes and lessons learned from this performance-based procurement project formed the basis of an expanded program using utilities as the outreach channel to replicate the approach. The utilities delivered incentive-based offerings to focus building owners on the whole building rather than on individual building components and systems. In addition, a ripple effect was evident, with individual building owners as well as owners of multiple-building portfolios adopting the techniques, sometimes with variations, but always maintaining the same core principles. The original performance-based procurement process and its successful implementation in a federal building project informed all these efforts. Those successes and lessons learned demonstrate that the approach can be adapted to utility programs with some variation and is a powerful tool for engaging building owners as they make critical design decisions that impact energy performance over the life of the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A709 Procurement and ASTM Specification Status

This is a presentation regarding A709 Procurement and ASTM Specification Status for the Joint ART Materials/AMMT Program Review meeting. The A709 team consists of Argonne National Laboratory, Idaho National Laboratory, Oak Ridge National Laboratory, and Subject matter expert John Grubb and Richard Wright. Discussion topics will discuss incorporation of 709 into ASTM Standard A 240 for plate material in the solution annealed condition with a precipitation treatment as a supplemental requirement is underway, Incorporation of Alloy 709 into ASME, Section II, Specification SA 240 will be made upon the completion of the ASTM task, The required commercial scale heats of Alloy 709 for property characterization to provide the technical basis for Code qualification have been procured, and Laboratory testing of properties from these three heats is underway as will be discussed separately at this review meeting.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SPC-70525 Rev 2 Beryllium Metal Procurement Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. Key to this design are neutron reflector components constructed of Beryllium Metal (S-65) which is a structural grade of hot-pressed beryllium block. MARVEL will be located at the Transient Reactor Test (TREAT) facility. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Flexible Ramping Product Procurement in Day-Ahead Markets

Flexible ramping products (FRPs) emerge as a promising instrument for addressing steep and uncertain ramping needs through market mechanisms. Initial implementations of FRPs in North American electricity markets, however, revealed several shortcomings in existing FRP designs. Here, in many instances, FRP prices failed to signal the true value of ramping capacity, most notably evident in zero FRP prices observed in a myriad of periods during which the system was in acute need for rampable capacity. These periods were marked by scheduled but undeliverable FRPs, often calling for operator out-of-market actions. On top of that, the methods used for procuring FRPs have been primarily rule-based, lacking explicit economic underpinnings. In this paper, we put forth an alternative framework for FRP procurement, which seeks to set FRP requirements and schedule FRP awards such that the expected system operation cost is minimized. Using real-world data from U.S. ISOs, we showcase the relative merits of the framework in (i) reducing the total system operation cost, (ii) improving price formation, (iii) enhancing the the deliverability of FRP awards, and (iv) reducing the need for out-of-market actions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Managing Procurements in the Time of Covid-19: SNS-PPU as a Case Study

In early 2020, COVID-19 swept across the world. The accelerator industry, like many others, was impacted by disease, delays, shortages, and new working conditions. All Thomas Jefferson National Accelerator Facility (JLab) employees were sent home in mid-March 2020, with many still working remotely now. At the time, JLab was working on the Proton Power Upgrade (PPU) to the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL). Procurements had been placed and were being managed, parts were being received and inspected. This paper details the JLab procurement plan for the SNS PPU project, and the mitigations that were developed to continue to support this project smoothly under the limitations imposed by COVID-19.

Wilson, K. M.↗

From Policy to Compliance: Federal Energy Efficient Product Procurement

Federal buyers are required to purchase energy-efficient products in an effort to minimize energy use in the federal sector, save the federal government money, and spur market development of efficient products. The Federal Energy Management Program (FEMP)’s Energy Efficient Product Procurement (EEPP) Program helps federal agencies comply with the requirement to purchase energy-efficient products by providing technical assistance and guidance and setting efficiency requirements for certain product categories. Past studies have estimated the savings potential of purchasing energy-efficient products at over $500 million per year in energy costs across federal agencies.1 Despite the strong policy support for EEPP and resources available, energy-efficient product purchasing operates within complex decision-making processes and operational structures; implementation challenges exist that may hinder agencies’ ability to comply with purchasing requirements. The shift to purchasing green products, including energy-efficient products, relies on “buy in” from a variety of potential actors throughout different purchasing pathways. Challenges may be especially high for EEPP relative to other sustainable acquisition programs given that efficient products frequently have a higher first cost than non-efficient ones, which may be perceived as a conflict with fiscal responsibility, or more simply problematic for agency personnel trying to stretch limited budgets. Federal buyers may also face challenges in determining whether a given product is subject to EEPP requirements. Previous analysis on agency compliance with EEPP, conducted by the Alliance to Save Energy (ASE), shows that federal agencies are getting better at purchasing energy-efficient products. ASE conducted two reviews of relevant solicitations for product and service contracts listed on Federal Business Opportunities (FBO), the centralized website where federal agencies are required to post procurements greater than $25,000. In 2010, ASE estimated a compliance rate of 46% in 2010, up from an estimate of 12% in 2008. Our work updates and expands on ASE’s 2010 analysis to gauge agency compliance with EEPP requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Report on the completion of long-lead components procurement of new sodium materials test loop

This report provides an update on the completion of long-lead components procurement of new sodium materials test loop. The loop, designated as SMT-3, is a forced-convection sodium loop to be used for the evaluation of sodium compatibility of advanced Alloy 709 with emphasis on long term exposures of tensile, creep, fatigue, creep fatigue, and fracture toughness ASTM-size specimens in support of ASME Code qualification and NRC licensing. The report is a deliverable (Level 4) in FY18 (M4NT-18AN050503013), under the Work Package NT-18AN05050301, “A709 Sodium Compatibility” performed by Argonne National Laboratory (ANL), as part of the Advanced Materials Program for the Advanced Reactor Technology. This work package enables the development of advanced structural materials by providing corrosion, microstructure, and mechanical property data from the standpoint of sodium compatibility of advanced structural alloys. The first sodium loop (SMT-1) with a single tank was constructed in 2011 at ANL and has been in operation for exposure of subsize sheet specimens of advanced alloys at a single temperature. The second sodium loop with dual tanks (SMT-2) was constructed in 2013 and has been in operation for the exposure of subsize sheet specimens of advanced alloys at two different temperatures. The current loop (SMT-3) has been designed to incorporate sufficient chamber capacity to expose a large number of ASTM-size specimens to evaluate the sodium effects on tensile, creep, fatigue, creep-fatigue, and fracture toughness properties, in support of ASME Code Qualification and USNRC Licensing. Three major long lead items were identified: 1) Selection and approval of location for the new loop and installation of the necessary infrastructure, such as transformer, power supply panels, and wiring, that is adequate for the long term operation of the loop, 2) Perform a detailed piping analysis that meets the ANL QA and Safety guidelines as well as complying with ASME Code requirements, and 3) Design and fabrication of the specimen exposure vessels that are capable of at least 42 tensile, creep, and fatigue specimens in each vessel and is compliant and compatible with ASME Code and the piping design analysis. The SMT-3 loop will be located in Building 206 adjacent to the currently operating SMT-2 loop. In addition, we have removed the aged power supply system in Building 206 and installed a new transformer, wiring, and power panels for the new loop. The preliminary loop design was sent to an outside vendor for a detailed piping analysis, to ensure compliance with the ASME Code guidelines. The piping design was completed in FY2017. The construction of components such as cold trap, economizers, piping arrangement etc. will be performed in the central shops at ANL. About 150 liters of sodium for the loop will be procured in early FY2018. The loop system is designed to circulate sodium through the sample tanks and he associated loop without an operator for an extended period of time. With the three sodium loops (i.e., single-tank, dual-tank and four–tank), materials can be tested at different sodium temperatures, and large tensile, creep, fatigue, creep-fatigue, and fracture toughness specimens can be exposed to sodium for extended periods of time and generate data on mechanical properties in support of ASME Code Qualification and USNRC Licensing of advanced Alloy 709 for use as a structural material in SFRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Reference Interoperability Procurement Language

Achieving interoperability involves reaching agreement on common interfaces and promoting interoperability through performance specifications. Effective integration practices are a simple, effective, and direct way of addressing the challenge. By deciding on an integration approach with well-defined interfaces and selecting systems and devices that conform to that approach and choosing integrators that have experience implementing the chosen approach, many problems can be avoided. No integration effort is seamless but by specifying interoperability requirements during the procurement process typical problems from ad hoc approaches can be avoided or reduced. By continuing this approach to its conclusion at the end of the procurement process, these same interoperability requirements may lead themselves to specified performance criteria that can be used to measure interoperability during implementation. The contractual language may contain performance incentives and penalties tied to these requirements as appropriate.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗